Item C38 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: July16, 2014 Division: Engineering&Public Works Bulk Item: Yes X NO Department: Wastewater Staff Contact Person/Phone#:Wilson(453-8797) AGENDA ITEM WORDING: Approval for expansion of the Ramrod Central Sewer collection system to include an additional three(3)parcels at a cost of$53,848.80($17,949.60/EDU)less the assessment revenue of$13,500($4,500/EDU). ITEM BACKGROUND: FKAA requested price quotations for expanding the central collection system on Ramrod Key after inspection of the proximity of these three parcels to the existing collection system. The quoted price for the six parcels meets the criterion established by the BOCC in January& July 2013. Including the properties, each of which is a single family residence for which permits are ready to be issued, will enable a higher level of treatment than the on-site BAT systems that would otherwise be installed at a similar cost. The properties will be assessed $4,500/EDU and they will be added to the assessment rolls upon approval. These properties were not initially included in the collection system because permits were not in process at the time of the initial design. Capacity in the system is available since the design included anticipated future buildout. PREVIOUS RELEVANT BOCC ACTION: In January and July of 2013, the BOCC approved expansion of the Inner & Outer Islands collection systems to include an additional 131 and 6 EDUs, respectively. In 2009 the Commission established a breakpoint of$22,000/EDU for adding properties to the central sewer system CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: Recommend Approval TOTAL COST: $40,348.80 INDIRECT COST: Staff Time BUDGETED: Yes No-X DIFFERENTIAL OF LOCAL PREFERENCE:N/A COST TO COUNTY: N/A SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes No AMOUNT PER MONTH Year P)L- APPROVED BY: County Atty OMB/Purchap'-Ij sing_ Risk Management DOCUMENTATION: Included X Not Required,__ DISPOSITION: AGENDA ITEM# Revised 7/09 Wilson-Kevin From: Tom Walker <twalker@fkaa.com> Sent: Thursday,July 10, 2014 8:48 AM To: Wilson-Kevin Subject: Ramrod Properties Attachments: RFQ%20012%20-%20Krause%20addition%20RESPONSE%20070814.pdf Kevin—the 3 Krause properties will cost$53k or$17.7/property to connect to central system. Can you approve or need BoCC to include in service area?It's surrounded by service area....will on 3 sides..0 t REQUEST FOR QUOTATION j' QUOTATION NO: 012 TO: Layne Heavy Civil DATE: July 3,2014 FROM: Florida Keys Aqueduct Authority PROJECT: Cudjoe Regional Wastewater Program-Outer Islands KEYWORD DESCRIPTION: LPS Service Extension-Ramrod Key DATE QUOTATION REQUIRED: July 11, 2014 The following modification to the contract has been identified, Pursuant to the General Conditions,please provide a quotation far the alteration as described in Item 1.The quotation should include an itemized breakdown of contractor and subcontractor costs,including labor,materials,rentals,approved services,overhead,and profit.This request shall not be considered authorization to proceed with the work Therein described. To be completed by Initiator of Re 1.Scope of Work: Provide a cost to extend LPS service to the Ramrod Key properties shown on the attached sketch. Estimated quantities for the work are as follows: ITEM UNIT PRICE QUANTITY COST 2" HPDE R, 1 FM w/fittings „ $ 20.00 1150 23,000.00 2" HPDE Ball'Valve W/Box $ 5.00 $ 535.00 Siimplex Station (complete) $ 6,400.0 � " 3 $ 19,200.00 Flushing Connection Assembly ��„� 1,450.00 1 „ , $ 1,450.00 Silt Fencing As required , Mark4t)- 8% $ 3,'w53 ,g0 TOUL $ 47,719.8 ,.," *Cost subject to 0DP 2.Reason(s)for Modification: ® Owner❑ Unforeseen Conditions(site,weather,etc. [:]Other Extend service to additional properties. 3.Approval of Request: Owner: Donald Hubbs Date: July 3,2014 Engineer: Walt Schwarz Date: July 3,2014 PAGE 1 OF 2 RFQ No,012 To be completed by Contractor: 4. Total cost of modification (attach detailed breakdown) $ 53,848.80 5. Will a modification to the contract time be required? ❑ Yes ®No 6. Attachment identification: (list) Cost Breakdown Attached. 7. Quotation is in effect until: (date) 8/30/14 Digitally signed by patrick.stalker@layne.com patrick.stalker@layne.com D�I:cn patrickstalker(alayne.eom 8. Approval of Quotation Date;2014,07,0811:07:51-04'00' Contractor Layne Heavy Civil Date 7/8/14 As stated on the attached cost breakdown, Clearing of the ROW to be done by others, PAGE 2 OF 2 RFQ No.012 RFQ No. 012 -Cost Breakdown Item Unit Price Quantity Total Cost 2" HDPE DR11 FM w/ Fittings $ 21.00 1150 $ 24,150.00 2" HDPE Ball Valve w/Box $ 535.00 1 $ 535.00 Simplex Station (Install Only) $ 2,900.00 3 $ 8,700.00 Flushing Connection $ 1,450.00 1 $ 1,450.00 Service Connection $ 1,000.00 3 $ 3,000.00 Tie-in to Existing LPS $ 2,650.00 1 $ 2,650.00 Silt Fence $ 2.50 1150 $ 2,875.00 Clearing ROW By Others Engineering/Permiting $ 6,500.00 1 $ 6,500.00 Mark-up -8% $ 3,988.80 TOTAL $ 53,848.80 1, a �/H y 1 � IY YI di /i /v J s✓ J ,G H w � f / 9/% � �y„ �al✓" + � a�,�Jlil� , ,.(1M I �y l �/ D✓ k �I u, r j i 9� ran .1�Fmr: r � r a„k r r Wilson-Kevin From: Tmirn Walker /twa|kmr@8ma.com> Sent: Tuesday,July OO. 20l43:56PM To: Hudey-Chhstine;VVUson'Kevim;Julie[heorc Kirk Zue|ch Cc: RudyKamse(rksconst@beUsouthoet); Tuicke,-a4ary; ^Eadie' Bob'; Bill Brmokman; Trwers'Johm;Joshua Pee|e\ Donald Hubbs Subject: KE3 lots on Ramrod -pemmitx /eadv not in service area Christine—we have recommended that these 3 properties be included in the central system as their connection costs are less than the cost of providing on-site systems. if the County concurs with adding these to the Cudjoe Regional service area,we will execute a Change Order with the Contractor for this work. Thanks' Tom(}. Walker, PE, 0CEE Manager ofEngineering Florida Keys Aqueduct Authority 305.295.2140 From: Hurley-Christine [ ] Sent:Tuesday,July 0G, 20149:32AM To: Wilson-Kevin; Tom Walker; ]u\ieCheon; 0rkZue|ch Cc: RudyKmuoe ; TucharMary; 'Eadie, Bob'; Bill Broohman; Travars-John Subject: 3 lots on Ramrod ' permits ready- not in service area Kevin: VVe have three permits ready for pickup. But, didn't realize they are NOT in current[udUoe Service area. They are between Johnson 5t and Mako Avenue. Rudy Krause will email us the RE#s. He has requested FKAA add the three lots to service area. if they don't he needs to design, permit and build on site aerobic systems. Can someone from FKAA tell meif they think these sites will get added?We could issue permit with condition perhaps— that aerobic will be installed if�KAA doesn't add. Let me know, Christinet x . . w } \\}¥. �/���. �. � \�y .\�/ �\� � �\«/���< ! / \ � ~� ^ . . � � � ��/ \ :� / � . d ��� \ � � ��7 \ ./�: < .:/ �> \�z � < }��j < » ° ^ � ; ��} . , > � f , > ?. ^ : t ?2 � ` i } ;\, ��� > . \ � ,� � . � r , , . . . S \ . y� : 2 � . :w ° °� � \: % �x§ �\ ��. . .v - y� § . : , ; .� s ` .,..�\ ° \��g . \ « , e , . \ � \\ < : d�» � « »° � \ : ^ ° < \ � ° �\ \��� . � ?« . " � � z< / /� °� . . « � I � Z