Loading...
1st Change Order 08/03/2020 MONROE COUNTYANGINEERING/ ]PROJECT MANAGEMENT CONTRACT CHANGE PROJECT TITLE: CHANGE ORDER NO, #1 Long Key Transfer Station New Canopy INITIATION DATE: 7/17/2020 CONTRACT DATE: January 22, 2020 TO CONTRACTOR: Sea Tech of the Florida Keys Inc. PO. Box 420529 Summerland Key, FL, 33042 The Contract is changed as follows:: The original (Contract Sum) (Guaranteed Maximum Price) ...................... ....................$27,735.00 Net change by previously authorized Change Orders... ..........................................__$ 0.00 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was . ...,,,.,., 7,735.00 The (Contract Sum) (Guaranteed Maximum Price)will be(increased) (decreased) (unchanged) by this Change Order 400,00 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is 28,135.00 The Contract Time will be (increased) (decreased) (unchan-ged) by_.._..._....... ........... 0 The date of Substantial Completion as of the date of this Change Order is.............. July 30, 2020 Detailed description of change order and justification: Original Scope of Work only included installation of gutters on the canopy. Monroe County now desires to have gutte►s placed along the entire office building in lieu of the gutter at the canopy. Chance order is 1.4 % of original contract,price Not valid until signed by Owner Architect if applicable), and Contractor ARCHITECT: N/A N/A Gate 20 CONTRACTOR: f Sea T h 6f the Florida Keys I Date DIRECTOR PROJECT MANAGEMENT CaA.1_1 X_"u� 7/31/2020 Cary Kni t, Direc r Date Project Management Digitally signed by Kevin G.W ikon,P.E. DN cn Kev n G.W'Ison P E o Monroe County FL(the Florida Keys,ou, COUNTY/ASSISTANT ADMINISTRATOR, emal wlsonkevn@7:58 04'00' flgov c US I Date 2020 08 03 16 0]58 0400 Roman Gastesi Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes F] No F1 If Yes, explanation: Original Scope of Work only included installation of 20'6" of gutters on the canopy. Change Order is for installation of a total of 43'of gutters on the office building. • Change Order was included in the original specifications. Yes El No Z If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes 0 No FA If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes EJ No M If no, explanation of why: No architect on file, • Change Order is correcting an error or omission in design document. Yes [-]No N Should a claim under the applicable professional liability policy be made? Yes EJ No E] Explain: � till OF THE FLORIDA KFYS DESIGN BUILD CONTRACTORS July 15, 2020 Monroe County Public Works & Engineering 11'roject Management Department Office: (305)295-4338 Fell: (305)395-8 83 Attn: Steven Sanders, Contract Manager Re: l.,ong Key "Transfer Station Canopy S1.11ject: Change:Carder 401 —Add glitters We hereby propose to furnish aaaaterials, equipnaent and perform the labor necessary to install a gutter and downspout for the full length (43'0")of the office building in lieu of installing;the 20'6"at the canopy. All ni aterial is guaranteed to be as specified and the above work to be perlornied in accordance with the manufacturer's specifications and completed in a substantial workmanlike manner for the seam of: Four Hundred and 00/100 Dollars............... Payment in full upon completion. Any alteration or deviation frown above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and.above the estimate. All agreements contingent upon strikes, accidents,or delays beyond our control, Owner to carry lire,tornado and other necessary insurance capon above work. Workers Compensation and General Liability insurance on above wart:will be taken out by SEA TECH, INC'. Note - This proposal may be withdrawn by us if not accepted within 30 days. A,CCE11"LANCE OF PIZOPOSA.I. The above prices,specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment will be made as outlined above. Signature Date Pace 1 of 1