1st Change Order 08/03/2020 MONROE COUNTYANGINEERING/ ]PROJECT MANAGEMENT
CONTRACT CHANGE
PROJECT TITLE: CHANGE ORDER NO, #1
Long Key Transfer Station New Canopy INITIATION DATE: 7/17/2020
CONTRACT DATE: January 22, 2020
TO CONTRACTOR:
Sea Tech of the Florida Keys Inc.
PO. Box 420529
Summerland Key, FL, 33042
The Contract is changed as follows::
The original (Contract Sum) (Guaranteed Maximum Price) ...................... ....................$27,735.00
Net change by previously authorized Change Orders... ..........................................__$ 0.00
The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was . ...,,,.,., 7,735.00
The (Contract Sum) (Guaranteed Maximum Price)will be(increased) (decreased) (unchanged) by this
Change Order 400,00
The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is 28,135.00
The Contract Time will be (increased) (decreased) (unchan-ged) by_.._..._....... ........... 0
The date of Substantial Completion as of the date of this Change Order is.............. July 30, 2020
Detailed description of change order and justification:
Original Scope of Work only included installation of gutters on the canopy. Monroe County now desires to
have gutte►s placed along the entire office building in lieu of the gutter at the canopy.
Chance order is 1.4 % of original contract,price
Not valid until signed by Owner Architect if applicable), and Contractor
ARCHITECT: N/A
N/A Gate
20
CONTRACTOR: f
Sea T h 6f the Florida Keys I Date
DIRECTOR PROJECT MANAGEMENT CaA.1_1 X_"u� 7/31/2020
Cary Kni t, Direc r Date
Project Management
Digitally signed by Kevin G.W ikon,P.E.
DN cn Kev n G.W'Ison P E o Monroe County FL(the Florida Keys,ou,
COUNTY/ASSISTANT ADMINISTRATOR, emal wlsonkevn@7:58 04'00' flgov c US
I Date 2020 08 03 16 0]58 0400
Roman Gastesi Date
Kevin Wilson
Christine Hurley
Change Order Attachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes F] No F1
If Yes, explanation: Original Scope of Work only included installation of 20'6" of gutters on the
canopy. Change Order is for installation of a total of 43'of gutters on the office building.
• Change Order was included in the original specifications. Yes El No Z
If Yes, explanation of increase in price:
• Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes 0 No FA
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes EJ No M
If no, explanation of why: No architect on file,
• Change Order is correcting an error or omission in design document. Yes [-]No N
Should a claim under the applicable professional liability policy be made? Yes EJ No E]
Explain:
� till
OF THE FLORIDA KFYS
DESIGN BUILD CONTRACTORS
July 15, 2020
Monroe County Public Works & Engineering
11'roject Management Department
Office: (305)295-4338
Fell: (305)395-8 83
Attn: Steven Sanders, Contract Manager
Re: l.,ong Key "Transfer Station Canopy
S1.11ject: Change:Carder 401 —Add glitters
We hereby propose to furnish aaaaterials, equipnaent and perform the labor necessary to install a gutter and
downspout for the full length (43'0")of the office building in lieu of installing;the 20'6"at the canopy.
All ni aterial is guaranteed to be as specified and the above work to be perlornied in accordance with the
manufacturer's specifications and completed in a substantial workmanlike manner for the seam of:
Four Hundred and 00/100 Dollars...............
Payment in full upon completion.
Any alteration or deviation frown above specifications involving extra costs will be executed only upon written
orders and will become an extra charge over and.above the estimate. All agreements contingent upon strikes,
accidents,or delays beyond our control, Owner to carry lire,tornado and other necessary insurance capon above
work. Workers Compensation and General Liability insurance on above wart:will be taken out by SEA TECH,
INC'. Note - This proposal may be withdrawn by us if not accepted within 30 days.
A,CCE11"LANCE OF PIZOPOSA.I.
The above prices,specifications and conditions are satisfactory and are hereby accepted. You are authorized to do
the work specified. Payment will be made as outlined above.
Signature Date