2nd Change Order 03/12/2012 e MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 2 Renovation of the Monroe County Courthouse(Marathon) INITIATION DATE: February 28, 2012 TO CONTRACTOR: CONTRACT DATE:November 17,2010 The Contract is changed as follows: The original(Contract Sum)(Guaranteed Maximum Price)...........................................$835,775.00 Net change by previously authorized Change Orders...................................................$165,176.55 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$1,000,951.55 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order.......$ 11,074.61 The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order is.......$1,012,026.16 The Contract Time will be(increased)(decreased)(unchanged)by.................................. NIA The date of Substantial Completion as of the date of this Change Order is.........................July 26,2012 Detailed description of change order and justification: Provide a 10'W X 161L X 8'H building for the Sheriffs maanetometer for the life of the Ry ect. SuMdina is To have elechfcal hook ug, electrical outlets alvwood interior walls Itahts,,and doors rnaulation and an 8 000 btu air conditioning unit The Building Wil be handicap accessible This change Order is 1 325%of the original contract price Not valid until signed by Owner,Ajeanli and Contractor ARCHITECT: ,Inc. ate CONTRACTOR: alcon Electrical Co&4= .___...__ Date DIRECTOR PROJECT MANAGEMENT: r�� J ett Date 2�12— DIRECTOR PUBLIC WORKS/E Kevi �� Date COUNTY/DEPUTY ADMINIS TOR: 40(C` C n Gastese/Debbie Frederick bate Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes 0 No❑ If Yes, explanation: Because of the asbestos remedfiWon, the Sheriffs magnetometer must be moved from its current location. • Change Order was included in the original specifications. Yes❑No If Yes,explanation of increase in price: • Change Order exceeds$25,000 or 5%of contract price(whichever is greater). Yes❑No If Yes,explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes® No❑ If no,explanation of why: • Change Order is correcting an error or omission in design document. Yes[]No Should a claim under the applicable professional liability policy be made?- Yes[I No Explain: n 1 (71FPedro Falcon Electrical Contractors, Inc. 31160 Avenue C,Big Pine Key,FL 33043.4516 .(305)872-2200•Fax(305)872-2219•falconel@bellsouth.net CGC1507617/EC0001491 /EC13003416 Request for Change Order 28 February 2012 Project:Renovation of the Monroe County Courthouse(Marathon) Change Order Request No: ?????? Description: Provide Temporary Building for Sherrifrs Equipment Pedro Falcon Provide 10'W x 16'L x 8'H(Building Size Determined by Size of b&uometer,clearances required for Occupants)Temporary Building for Duration of Project to House Sherriff's Equipment for the life of the project:Building to have electrical hook-up from existing building,electrical outlets,plywood interior walls,lights,(2)doors,insulated,A/C Unit 8,000 btu,handicap accessible Building Cost................................................................................$8,720.00 Building Set-up&Removal...............................................................$800.00 Electrical Set-up&Removal..............................................................$525.00 Subtotal....................................................................................$10,045.00 Industrial •Commercial •Institutional • Utility Established 1985 OH&P Overheadat 5%................................................................................................$502.25 Subtotal...............................................................................$10,547.25 Profitat 5%.......................................................................................................$527.36 Exclusions:Permit Fees of any sort Net Amount of Request for Change Order:.................................................$11,074.61 Additional Time Requested for Change:To Be Determined Based upon Processing of this Modification.PFEC currently demobilized and off site per Monroe County direction. Respectfully Submitted, Ken Bygler Project Manager MEMORANDUM TO: Board of County Commissioners From: Debbie Frederick Deputy County Administrator Date: March 8, 2012 RE: Change Orders Attached is a proposed change order for Pedro Falcon Electrical Contractors, Inc. for the renovation of the Monroe County Courthouse in Marathon. Change Order#2 is for an increase of$11,074.61 to provide a building for the Sheriff's magnetometer for the life of the project. The building is to have electrical hook-up, electrical outlets, plywood interior walls, lights and doors, insulation and an 8,000btu air conditioning unit. The building will be handicap accessible. According to Ordinance 026-1998 adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Administrator/Deputy Administrator intends to approve this change order on FfiY, March IS2012. bie Frederick Deputy County Administrator DLF: adc Campo-Abra From: Campo-Abra Sent: Friday, March 09, 2012 8:50 AM To: County Commissioners and Aides Subject: Change Orders Attachments: FS#17.pdf, MK Courthouse.pdf Please review the attached Change Orders submitted by Pedro Falcon Electrical Contractors: o Change Order#1 for the Renovation and Addition of Fire Station#17 o Change Order#2 for the Marathon Courthouse Abra Campo Sr.Administrative Assistant Office of County Administrator The Historic Gato Cigar Factory 1100 Simonton Street, Suite 2-205 Key West, Fl-33040 Office: 305.292.4441 Fax: 305.292.4544 campo-abra@monroecounty-ll.gov WA Please consider the environment before printing this email. PLEASE NOTE: Florida has a very broad public records law. Most written communications to or from the County regarding County business are public record,available to the public and media upon request.Your e-mail communication may be subject to public disclosure. 1