Item Q1 MEMORANDUM Office of the County Administrator TO: Board of County Commissioners FROM: Roman Gastesi County Administrator DATE: November 4, 2014 SUBJECT: County Divisions' Monthly Activity Report for October, 2014 MONTHLY ACTIVITY REPORT—OCTOBER,2014 AIRPORTS Continued coordinated with City of Key West on "drone" ordinance and issues. • Meet with new owners of the Conch Flyer Restaurant to discuss future improvements to the EYW facility. • Met with Baker Consultants to discuss future projects. • Met with Consultants to discuss Joint Use possibilities • Conducted monthly airline and car rental meetings at EYW. • EYW - Zombie bike ride event at the airport, on Sunday October 19, 2014 very successful. • Met with Commissioners Rice, Kolhage and Carruthers to discuss general airport issues. • Met with FAA on pre-coordination planning for the temporary ATC tower at EYW during existing ATC tower upgrade work. • Met with C & S Consultants to discuss future land development strategies for EYW. • Met with Ocean Tropic to discuss FAR part 135 charter ops at EYW and MTH. • Met with stakeholders to prepare for any EBOLA related emergency responses. • Performed ground breaking ceremony for the Marathon Customs project on October 21, the event was well attended with Peter Horton, Commissioner Rice, Mayor Ramsay, Daniel Samess (CoQ and CBP representatives speaking to a crowd of 35, with the media in attendance. EMPLOYEE SERVICES T. WEBSITE UPDATES (other than normal position vacancy updates, etc.): Smoking policy added TT. TURNOVER NUMBERS: Monthly Turnover: 1.77% Turnover for the year: 13.98% Resignations: 7 Terminations: 0 Retired: 2 Deceased: 0 Layoffs: 0 1 III. HUMAN RESOURCES • IAFF Negotiation Meeting—2 • Pre-determination hearing - 2 • Conference Call with ADP • Employee Grievance Council meetings —2 • Meeting with ADAAG to discuss Evaluation and Transition Plan for Communications/Programs/Services • Personnel Policies Board meeting - 2 • HR Florida Conference attendee BENEFITS Health Fairs — All three locations completed. Online PHA now available for those who wish to go to their own personal physician. Coordinating all aspects of upcoming open enrollment in November. New Providers, benefits, etc. Will be livestreamed and recorded for those not able to attend. Meeting with GBS regarding Plan Document revision WORKERS COMPENSATION Settlement mediation Meeting with OMB regarding WC billing procedures SAFETY/RISK • Inspections: Pigeon Key fire suppression system. • Respirator Fit testing/training: Public Works —PK, Solid Waste—Long Key • Follow up Inspection SI Fire Station regarding mold remediation work. CPR/First Aid Training: 15 employees in Marathon BUDGET & FINANCE OMB • Worked on Rollover Resolutions. Submitted Agenda Items and Resolutions for the BOCC meeting; 49 Resolutions. • Processed various billings and invoices, including: Monroe County Sheriff, postage, DJJ, rent, travel reimbursements, other Commissioner invoices and generated various PO's. • Distributed Approved Resolutions. Created FY 15 Budget Summary. • Posted Resolutions from the 10/17/14 meeting and sent them to the County Attorney. • Reviewed negative Budgets for remainder of FYI and made budget transfers as needed Staff attended the Govmax Conference 10/20/14-10/21/14 • Addressed Payroll account Fatals. 2 • Trued up Library, Social Services, and Fund 158 revenue for resolutions for November. • Worked on Airport CIP spreadsheet. • Assisted Grants Administration with Contracts/Agenda Items for November BOCC meeting. • Posted 260 Budget Transfer Requests; Prepared 146 transfers for FYI end of year issues and FYI beginning budget set-ups; Prepared 3 Resolutions; Reviewed 20 contracts; Approved 37 PAF's; • Assisted HR in processing merit raise PAF's. • Updated revenue, expense and fund balance schedules. • Processed 23 HSO Request to Purchase documents Grants Administration • Updated applications from non-profits for Byrne JAG funding, at FDLE's request, in SIMON. • Attended the Govmax Budgeting Conference in Sarasota Florida. • Processed invoices from Byrne JAG recipients, the Lower Keys Medical Center as well as the Department of Health on their Adult Immunization Program agreement with the County. • Performed required quarterly performance reporting on FDLE Byrne JAG grants. • Submitted required performance and financial reports to DOJ regarding the Drug Court grants. • Prepared and submitted the required monthly activity report to FDOT on the Airport grants. • Submitted the FDLE Residential Substance Abuse Treatment grant application in SIMON. • Attended the BOCC meeting where all, except two, of the HSAB recommended funding agreements as well as two of the direct funded agreements and the Clerk's Drug Abuse funded agreements were on the agenda. • Reviewed FDOT reimbursement request and had staff submit. • Reviewed FAA reimbursement request and had staff submit the request to the Clerk's Finance department for processing. • Reviewed the Airports Cash Management Policy. • Reviewed and approved Airport operations Requests to Purchase documents. • Reviewed and approved Airport operations invoices. • Met with Airport staff regarding year end processes. • Submitted the required PFC quarterly report to the FAA. • Reviewed and submitted to DCF the closeout documents on the CJMHSA grant along with the refund check for unspent funds. • Reviewed the Airport FYI grant rollovers. • Attended a meeting with the FAA representative for Monroe County. • Attended the KWIA weekly senior staff meetings. • Attended the EMAS pre-construction meeting. • Attended the monthly Rental Car Market Share Meeting and the monthly Airline meeting. 3 • Compiled and submitted requested Airport data to the PFC consultants,Newton & Associates. • Provided requested information to Jacobs &Associates and met with our representative regarding Airport projects. • Updated internal schedules with the September Airport activity data. • Created a grant funded Airport Project Schedule. Purchasing • Number of PO's Reviewed, Signed and Processed—908 • Number of PO's Voided- 10 • Office Depot Orders reviewed and released- 144 • Staples Orders- get info fm Lisa A. • Business Cards Orders- 4 • Amazon Orders —5 • Newspaper(competitive solicitation ad) invoices Processed- 3 • PO Requests Entered for Dept- 3 • Pieces of US Mail Processed- 1135 • Contracts Reviewed—30 • Processed September 2014 Pcard billing statement& submitted to Finance 10/3/14. • Bid public records requests/processed- 3 • Conduct(11)bid openings and tabulate results for: 1. Janitorial Svcs Islamorada Library due 10/1/14 - 5 respondents 2. Janitorial Svcs Four Facilities Marathon due 10/2/14 - 6 respondents 3. Janitorial Svcs BPK Library due 10/7/14 - 4 respondents 4. Janitorial Svcs. Key Largo Library due 10/8/14- 4 respondents 5. Freeman Justice Ctr. Acoustic Renov. due 10/14/14- 2 respondents 6. Invasive Exotic Plant Rmvl/Contractor due 10/15/14- 4 respondents 7. Invasive Exotic Plant Rmvl/Tech Crew due 10/16/14- 5 respondents 8. Marathon Courthouse Sewer Imp. Due 10/21/14- 3 respondents 9. Eng. Design & Permitting Sl 1 Rdwy& Drug Imp. Due 10/22/14- 4 respondents 10. SI 9`h Ave. Drainage Imp. Proj due 10/28/14- 3 respondents 11. Geiger Key Culvert Installation due 10/29/14- 4 respondents • Bid Specifications uploaded on Demandstar- 3 • Bid Addendums uploaded on Demandstar - 9 • Processed Buccaneer Courier Sep-Oct 2014 billing. • Worked and submitted Purchasing's portion of the FYI cost allocation data. • Review and proofread the revised Purchasing Policies and Procedures for distribution and publication. COMMUNITY SUPPORT SERVICES IN-HOME AND NUTRITION SERVICES (IHNS) OAA, Older Americans Act Programs: Nutrition (Information in this section is for the period 08/21/2014-09/20/2014: • C-1 Congregate Meals totaled 1035 units during this period. Monthly goals for this program continue to fluctuate based upon the availability of funds. 4 • C-2 Home Delivered Meals Hots totaled 159 units, and Home Delivered Meals Frozen totaled 2870 units. We continue to receive a large number of referrals for Home Delivered Meals. In-Home Services (Information in this section is for the period 08/21/2014-9/20/2014): • III-B Chore: 0 units this period, 91.5 units year-to-date, 10.45% achieved. • III-B Screening and Assessment: 0 units this period, 5.25 units year-to-date, 0% achieved. • III-B Homemaking/Personal Care: 60 units this period, 696.00 units year-to-date, 30% achieved. • III-E Screening and Assessment: 4 units this period, 4 units year to date, 0% achieved. • III-E Chore: 0 units this period,10 units year-to-date, 18% achieved. III-E In-Home Respite: 180.25 units this period, 1017.75 units year-to-date, 13.12% year-to-date-achieved. • III-E Facility Respite: 228.25 units this period,2459.25 units year to date, 10.3%year- to-date achieved. Non-OAA Programs: CCDA(Community Care for Disabled Adults)for SEPTEMBER 2014: • Case Management: 6 units for the month were produced; 23 units year-to-date. • Homemaking: 120.25 units for the month were produced; 407 units year-to date. • Home-Delivered Meals: 125 meals for the month were provided; 315 meals year- to-date. • Personal Care: 49 units for the monthly were produced; 152 units year-to-date. Overall Program Achievement was 38.32% achieved, -11.38%underachieved. CCE (Community Care for the Elderly) for the period 08/21/2014-9/30/2014: • Case Management: 54.50 units for the period and 78.0 units year-to-date. 7.57% achieved year-to-date. We are currently 100% achieved • Case Aide: 0 unit achieved and 0 unit year-to-date, 0 % achieved year-to-date. • Companionship: 0 units achieved and 16.75 units year-to-date, 2.19% achieved year-to-date. • Home Modification: 0 units achieved and 0 units year-to-date, 0% achieved year- to-date. • Enhanced Chore: 0 units achieved and 13 units year-to-date, 0% achieved year-to- date. • Chore: 12 units achieved and 24 units year-to-date, 100% achieved year-to-date. • Homemaking: 647.25 units for the period and 1414.0 units year-to-date 34.34% achieved year-to-date. There are 156 clients on the waiting list. • Specialized Medical Equipment: 0 unit for the period and 0 unit year-to-date, 0% achieved year-to-date. • Transportation: 0 units for the period and 0 units year-to-date, 0% achieved year- to-date. • Personal Care: 401.75 units for the period and 887.75 units year-to-date. 24.56% achieved year-to-date. There are 49 clients on the waiting list. 5 • Respite: 42.75 units for the period and 120.75 units year-to-date. 18.58% achieved year to date. There are 20 clients on the waiting list. CCE overall is at 22.57% achievement. We are -2.43%underachieved ADI (Alzheimer's Disease Initiative) for the period 8/21/14-9/20/14: 217.75 units were produced in the period and 598.75 units year to date. 7.25% achieved. HCE (Home Care for the Elderly Program) for the period 09/16/14-10/15/2014: 5.5 billable units this period, 7.75 billable units year-to-date at the beginning of the contract year, .89% achieved. Monroe County Transit • One-way trips provided: 1,854 • Unduplicated clients served: 228 • Special Needs Clients registered:642 Deposited Revenue: $2,311.00 Expenditures: 46,485.98 Percentage Spent Fiscal YTD: 9.5% Community Support Services Incoming calls, provision of information and referrals 687 Staff responded to incoming calls providing information and referrals to callers based on specific inquiries and/or needs. These inquiries range from how and where to apply for Food Stamp benefits, where the closest food bank is located, how to report suspected abuse, or to find out what available services there are at the time. Other callers are scheduled for intake by Social Services case management staff to cover Possible programs such as LIHEAP, ESG rent assistance, prescription drug assistance, and welfare assistance. Unduplicated Welfare client households that received service 218 New Welfare cases receiving service 60 Info &Written Referrals 107 Low Income Crisis Assistance cases— 63 $15,518.49 Low Income Home Energy Assistance cases- 23 $ 7,550.00 Home and field visits 59 Home and field visits cover visits to In-Home,Nutrition, WAP, and ESG rent clients. Case Managers make these visits to perform annual or semi-annual updates for In-Home and Nutrition clients. WAP clients are visited for testing for possible Weatherization services to their homes. ESG rent clients are visited for the Habitability Study required prior to receiving rental assistance through this grant. Office visits 255 Office visits reflects the number of visitors that come into to all three locations of our Social Services offices throughout the month. Prescriptions 4 $ 302.96 Welfare Shelter 5 $ 1,624.00 ESG 19 $ 12,529.00 BAYSHORE MANOR Bayshore Manor's current census is 15 residents. The current census is three private pay and twelve subsidized residents. Bayshore Manor provided 283.50 hrs. of OA3E respite 6 care and 130.75 hours of CCE care this month. Bayshore Manor has six OA3E clients and one CCE client. There are two clients on the waiting list. Revenue for October 2014 $29,745.40 Expenditures for the same period $22,345.15 Percentage of the budget spent year to date 2.61 LIBRARY • Library usage figures continue to reflect that the increase in offerings of services through technology is widely appreciated by patrons. • People counters at the branches indicated that the number of visits made in person to the Libraries in September, 2014, totaled 31,006, 6% higher than the previous year, giving continuing evidence of the popularity of our onsite services. This was also shown by the circulation count of 28,291 items checked out in that time. Additionally, e-book circulation climbed to 1,647 checkouts, an increase of 51% from September of last year. • New Library cards brought 284 new patrons added to the roll. These additions brought the total of Monroe County Library cardholders to 43,341, a significant percentage of the county population. The above numbers are proof that there is no "summer slump"in Library use in Monroe County. • Reference questions handled by staff via email, text, chat, phone, in-person visits and through social media, totaled 10,993, another example of the still growing popularity of e-reference as well as onsite information resources. • The public access PC sessions recorded as provided to the public for the month remain consistently high, at 7,364 (a 13% increase over the figures from a year ago), while the Wi-Fi usage was estimated at 2,548 (53% over the number a year ago), for a combined total of 9,912 customers using this resource; staff attribute this high usage to the lower cost and proliferation of portable devices, along with the increased bandwidth available to library patrons. Smartphones and other smaller devices are also being used to connect to the public wi-fi unobserved, driving the actual customer number even higher. Library staff have noticed steep increases in library users requiring assistance with e-government websites, such as food stamps and unemployment, as well as job seekers and housing hunters. • E-visits to the Library's online resources reached 486,533 page views, another figure that has been showing consistent increases. These resources include our Library website, online catalog and digital exhibit of historical images. • Looking briefly at a few annual statistics, increases are seen in computer users, both of our public access computers and in the wi-fi audience, as well as in the area of reference services. Most notable, however, is the increase in patron eVisits, as the previous year's total was bettered by 133% in the year just past. This is a tribute to staff and volunteers who worked so consistently on keeping our websites updated and attractive and our digital photo gallery growing and of constant interest and appeal to our onsite followers. 7 EXTENSION SERVICES • Number of services provided: 234 phone calls, 29 office visits, 13 visits to clients, 20 learning events with 817 participants, 6 media submissions, and 626 publications distributed. Total Budget for FY 14/15: $225,012.00; Year to Date Expenditures and Encumbrances: $99,646.86; Remaining Balance: $125,365.14; Percentage of budget spent and/or encumbered year-to-date: 44%. The County Extension Director/Family& Community Development Agent accomplished the following activities: • Held a Monroe County Climate Change Advisory Committee workshop where the group began planning for 2015 including setting priorities and developing a speaker series. • Developed and presented a table display for Monroe County at the two-day Sixth Annual Southeast Climate Compact Regional Leadership Conference for 600 participants to learn about the GreenKeys! Program and sea level rise information. • Hosted the Extension South District Meeting for 50 Extension Agents. The meeting included two "hands-on" activities: exploration of the coral reef, and a horticultural tour at John Pennekamp Coral Reef State Park. Green meeting practices were used, including limiting the disposable waste for coffee, lunch, recycling, and carpooling. The Environmental Horticulture Agent accomplished the following activities: • Set up a horticulture educational booth at the Florida Keys Birding & Wildlife Festival held at Curry Hammock State Park. Four Master Gardeners assisted 129 people about upcoming Plant Clinics and creating backyard "Native Pollinator" gardens. • Was a co-coordinator and speaker at the Advanced Master Gardener Conference held at the Miami-Dade County Extension office. Sixty Master Gardeners from several south Florida counties were in attendance. • Held six regional plant clinics with 13 Master Gardeners assisting 45 clients with plant and/or insect problems. The Florida Sea Grant Marine Extension Agent accomplished the following activities: • Co-taught the Florida Master Naturalist Program's special topics course, Conservation Science, at Mote Marine Tropical Research Laboratory. • Presented information about Florida Keys Water Watch and other program areas at Florida Sea Grant Week in Fort Pierce. This annual event brings Sea Grant agents and specialists from all over the state to present their work and meet with University of Florida leadership. • Attended the Florida Keys National Marine Sanctuary Advisory Council. One of the recommendations was to form an Artificial Habitat working group. EMERGENCY SERVICES FIRE RESCUE • Continued evaluation of the Sugarloaf Firestation for career firefighters to be housed. • Ongoing search on new site for the Summerland/Cudjoe Firestation. 8 • Continued collective bargaining with IAFF Local 3909 to finalize a contract. EMERGENCY MANAGEMENT • Met with Florida Power and Light (FPL ) Emergency Planning Staff to develop a strategy and offer planning feedback for the implementation of the FEMA REP Guidance, Supplement 3, for enhanced protective action recommendations (PAR) for nuclear power plant emergency at Turkey Point Nuclear Power Plant. • In conjunction with County IT and Civic Plus worked on setting up Emergency Management website so that any news, events and alerts automatically post to the County Facebook and Twitter pages. • In conjunction with Florida Division of Emergency Management and Marathon Fire Rescue; coordinated, hosted and co-instructed the 3 day, G-110 Emergency Management Operations Course. • Attended the Current Issues in Emergency Management annual meeting in Tallahassee. • Completed agenda package to obtain Board approval of RC Quinn Consulting Inc., to provide consulting services to update and review the Monroe County 2015 Local Mitigation Strategy Plan. EMS/TRAUMA STAR • Trauma Star flew 10 flights to mainland hospitals for definitive care. • Held Flight Medic assessment tryouts. • Held EMS User group meeting. • Trained and assigned one new Flight Medic for duty on Trauma Star. • Completed Training and released 2 new Charge Medics. • Provided Orientation training for 4 new provisional paramedics. • Planning meeting for new Paramedic Class with Barry College. • Attended Conference Planning meeting with Department of Health on ebola and began training for field personnel. • Began Phase 2 of ACLS and BLS recertification training with all career Paramedics and EMT's. • Performed Follow up training on the new LUCAS compression device. • Continued with field training of Paramedics on quality assurance/billing issues of ePCR reports. KWIA • Performed AHA BLS Part 2 skills assessment / check-offs for all MCFR personnel. • Coordinated with NASFD and attended Fall Festival (Fire Prevention Fair) on Navy Base. • Provided fire/medical standby for Zombie Ride at East Martello Park; estimated 7,500 attendees. • Conducted quarterly airport safety inspection; AOA throughout month. FIRE MARSHAL • Firefighters visited upper and lower keys schools educating children during fire prevention month. • Participated in annual fire inspection of Mariners Hospital. FIRE ACADEMY 9 • Assigning continuing education and SOP training online thru Target Solutions. • Combining company training with new-hire orientation/probationary evaluation. • Key West Fire Department, Fire Fighter II Class roster posted with BFST; 24 students. • Final drawings on academy classroom scheduled for completion 11-1-14; RFP to contractors advertised 1-1-15. PUBLIC WORKS CORRECTION FACILITIES: Stock Island Detention Facility • Fire Detection and Alarm System replacement project is now closed out • Replaced deteriorated portion of duct work for Air Handler Unit B 1 • Completed repair of Fire Pump Controller Stock Island Jail Complex • Conducted design kick off meeting for HVAC project MCSO Administration Bldg. • Installed and programmed new BAS Building Controller Juvenile Justice Bldg. • Completed replacement of deteriorated ground floor fire sprinkler piping and heads • Installed and programmed Variable Frequency Drive for Air Handler 2-3 Marathon Jail • Upgraded Lift station pumps and piping • Temporary emergency generator has been positioned and hardwired awaiting stationary generator repair Monroe County Detention Center- Stork Island Percentage of customer requested ork orders completed withinclays with,SIN 6.6 of 139 customer requested work orders were completed within 3 clays during September,2014 XPI x requested x 01- 1.60 120 5(A) 0.40 0. 20 KPI' 1.46 U fit 0_# 010 1 3°� 0.€k) #€.Af 11,f I.¢#) 1.V5 134 I :# .e.# 10 x For the period February 2012 through September 2014: Total kilowatt-hour Savings = 1,813,771 Total CO2 Reduction= 1,251 Metric Tons = CO2 Emissions from 140,732 gallons of gasoline consumed Total Energy Dollar Savings = $193,204 Note: MagLev Chiller was out of service for part of 14Mar FACILITIES MAINTENANCE/PARKS & BEACHES: UPPER KEYS: Nelson Government Center: • Eleven (11) events required 5 hours of employee overtime • Assisted Supervisor of Elections on miscellaneous tasks and transporting equipment and voting machines • Replaced a broken faucet and fixed two faucets in first floor women's restroom • Removed visitor signs and painted"VISITOR" on parking bumpers • Anchored/tied down and tested new generator • Contractor repaired R.P.Z. backflow preventer • Repaired and painted walls in the Auditorium Roth Building • Stripped and waxed floor areas of DOH • Contractor repaired R.P.Z. backflow preventer Islamorada Library: • Cleaned ceiling • Repaired rain water filtration issue in community room • Installed two (2)new A/C wall units Ellis Building: • Repaired water leak in first floor men's restroom • Fixed hot water issue in employee restroom • Adjusted and oiled ceiling fans Card Sound office and Toll Booth: • Installed new A/C and electrical outlet PK Carpenter Shop: ll • Repaired container roof and walls. Key Largo Library: • Installed new mailbox • Repaired leaking flush meter Tavernier Fire Dept.: • Fixed three (3) toilets that had low water pressure Key Largo Animal Shelter • Removed tree roots from inside sewer pump station Harry Harris Park: • Repaired fence • Repaired sprinkler pump and adjusted water pressure Sunset Park: • Repaired fence Old Settler's Park: • Contractor trimmed trees and removed one dead tree and one growing through the fence (Garden Project) LOWER KEYS FACILITIES: • Diywood Termite fumigation completed at Bayshore Manor • Diywood Termite fumigation completed at the Harvey Government Center • Started concrete repairs to storm water catch basins on Garrison Bight Causeway • Sealed the African Cemetery Memorial mural • Obtain purchase order for the Big Pine Key Fire Station exhaust removal system upgrade • Made concrete repairs to the Big Pine Key AARP front steps and painted with non- slip paint • Repaired the personnel gate to the Higgs Beach Dog Park • Replaced the water fountain serving the Key West Fleet Management office and garage • Repaired a picnic table and shelter at Bay Point Park • Painted the Road Department office stairs with non-slip paint • Cleaned the Key West Animal Shelter sewer lift station pit • Performed FKAA required backflow testing at the Freeman Justice Center • Currently painting the Gato Building and the Big Pine Key Deputies House decking and rails • Replaced concrete parking bumpers at the Harvey Government Center FLEET MANAGEMENT: • Three garages combined provided preventative maintenance and completed approximately 99 unit inspections • Three garages combined opened and/or completed approximately 231 work orders • Three garages combined processed and/or distributed approximately 8,725 gallons of unleaded gasoline and 3,698 gallons of traditional diesel fuel • Garage staff completed monthly safety refresher training (fire prevention) • Received check in the amount of$172.50 for sale of used motor oil 12 • Ordered and received two new brush chippers for upper keys Public Works; submitted for payment, registration and county property ID numbers thru Finance Department Inventory Clerk • Ordered and received one new zero turn riding mower for upper keys Road Department • Completed major repair of Sugarloaf Fire Department emergency generator • Completed major repair of Key West Road Department front end loader • Completed installation of new emergency power generator at Murray Nelson Building • Ordered new skid steer loader with attachments and new equipment transport trailer for upper keys Road Department • Assisted Airport Director with new vehicle order • Began process to order new mini vans for Tech Services Department, two new sweeper trucks and one sewer cleanout truck for the Road Department, an extended cab pick-up for Corrections Department, and two new vehicles for Engineering ROAD DEPARTMENT: LOWER KEYS: • Chip/Brush-20 miles • Rights of Way mowed-24 miles • Weed Eating-5 miles • Cold Patch Pot Holes-3 tons • Road Sweeping-7 miles • Clean out Storm Drains on Ave D, Big Coppitt. • Clean out Storm Drains 3rd&4d'Avenue Stock Island • Fill Right of way with 10.76 tons of 1/z"Rock on 5`h Avenue, Stock Island • Fill Right of way with 38.2 tons of 1/z"Rock on 81h Avenue Stock Island • 23 mulch deliveries for a total of 89.5 tons saved $11,053.25 in tipping fees • Sign Technician-43 locates/67 signs/27 post Roads support: • Repaired parking area at East Martello Towers for Zombie Bike Ride • Cut down and removed Australian Pine tree at East Martello Towers • Set up and picked up barricades and cones at Higgs Beach for Zombie Bike Ride • Cleaned out drains on Stickney Lane for Key West International Airport • Transported barricades and cones for Fantasy Fest to and from Key West Court House • Assisted with sweeping Duval Street for Fantasy Fest clean up UPPER KEYS: IT. Buzz Bar/Chipper Operation-- 24.83 miles III. Miles of ROW Mowed-- 76.35 miles TV.Pot Holes cold patch-- 18 pot holes/1,640 lbs. of cold patch used V. Shoulder Work Key Largo-- 385 ft./l ton of crushed rock used VI. Shoulder Work Card Sound-- 846 ft. /12.50 lbs. Cold Patch used VII. Tree Work/Stump Grinding-- 5 trees cut down off of ROW/20 stumps ground down 13 VIII. Trench Drains-- 70 ft. of trench drain refurbished/6 tons of#4 and 1 ton of#57 rock used IX. Swales installed-- 63 ft. of new swales installed/3 tons of#4 and 1 ton of#57 rock used X. Sign Department-- 76 new Street/Speed/and Watch for Children signs installed/II new posts installed/II locates performed XI. Transport Fill to John Pennekamp State Park-- 4 Loads XII. Transport fill to Rockland Key Property-- 10 Loads XIII. Sweeping Operation-- 8 Subdivisions XIV. Trash Pick Up-- 50 bags XV. Safety Meeting held 10/17/2014 XVI. Safety Mask Fitting conducted 10/17/2014 CARD SOUND: III. Buzz Bar/Chipper Operation-- 8 miles XVII. Mowing Operation-- 8 miles XVIII. Trash Pick Up-- 2,740 lbs. XIX. Miles of roadway driven for trash pickup-- 110 SOLID WASTE MANAGEMENT: Recyclin6 • Staff was in Waste Management, Marathon Garbage and Keys Sanitary service areas with the ongoing inspections of commercial and residential recycling practices • Staff inspected the Eastwind Apartments after receiving e-mails with complaints about yard waste being disposed of improperly on the property. Staff found numerous piles of yard debris, trash and 50 to 75 shopping carts from local businesses from around the area. Staff contacted City of Marathon and we are in the early stages of organizing a community clean-up and beautification project. The City of Marathon, Monroe County Solid Waste, high school volunteers, and Monroe County Sheriff's Office will help with this project. Some of the local stores will help to retrieve the 50 to 75 grocery carts from the premises. Once completed this will be an ongoing effort with the stores and the city of Marathon to help maintain the property. Staff will also be in contact with Marathon Garbage Service to provide recycling carts next to all the dumpsters and 18 gallon bins for the convenience of the 130 units on site that have not been provided this service in the past. Staff will provide each unit with Monroe County's recycling informational flyer and magnets to be placed on their refrigerators as a reminder on proper recycling 14 i r r i � t t • Staff has been compiling a list of locations that were missed in the initial delivery of the new 64 gallon recycling carts and will provide the list to each franchise hauler and insure they have been delivered in November • Staff met with The City of Key Colony Beach and has made arrangements to participate in America Recycles Day Event located in Key Colony Beach. Monroe County's Recycling, Household Hazardous Waste and Solid Waste Department will provide recycling/hhw information along with providing an e-waste collection for this event. • The Marketing Development Director of Coca Cola is going to provide a donation letter with a request to place Coca Cola vending machine at some county parks. They will in turn provide the 55 gallon barrels we need for trash and recycling cans. Coca Cola already has vending machines in numerous county parks so there would only be a few added at their request. Coca Cola has already delivered 50 more 55 gallon barrels to their Big Pine Key Facility for our use; they will also provide donated by Coca Cola stickers to be placed on each can. Staff is awaiting Coca Cola's letter of intent. Staff will bring this letter and example cans with final cost to the County Commission for approval. • Staff was at the Nelson Government Center to address the issue of replacing an aging recycling can outside the front door and recommends replacing the can with a dual trash and recycling can at this time, and also place one of these units inside the lobby since this government center is used quite often for special evening events. Each complete unit cost between $180 and $250; staff plans to order two units 15 f ,d I „,q J) )�yw ixiV� �lYf rr lil�I�V rYl I �VVI h � u��1 �I • Staff met with Commissioner Sylvia Murphy's executive assistant Pam Johnson about the new recycling carts being delivered in the upper keys. Mrs. Johnson has had numerous calls about carts being left by the street at vacant homes, carts missing and the fees for a replacement cart. Staff informed Mrs. Johnson of the proper procedure for missing carts, deliveries, missed deliveries, unwanted carts and fees for replacement carts. Mrs. Johnson was given the contact information for the franchise haulers and the Recycling Department to help with any future unresolved issues. • Staff spoke with the Lower Keys Chamber Of Commerce Executive Director about attending a business luncheon provide by the Chamber on November 7'h. Staff will distribute informational brochures and speak to attendees about the cost savings benefits associated with starting a recycling program. Household Hazardous Waste and E-Waste Recyclint!/Disposal • The Household Hazardous Waste Department held seven collections in the month of October; staff accepted material from 83 Monroe County participants. • Our Hazardous and E-Waste Commercial Collection participants include Faustos, Key West(840 lbs. electronic waste), Strunk Ace Hardware, Key West(1,840 lbs. HHW paid $1,104.00), Waste Management, Key West(100 lb. HHW and 1240 lb. E- Waste), Tropical Tech, Summerland Key(500 lbs. electronic waste) and KW Vacation Rentals, Key West(580 lbs. of HHW) 16 i ;, illy 1 • Staff shipped out 28 pallets with 20,840 lbs. of electronic waste to be recycled by Intercon Solutions • Monroe County Staff collected 1,120 lbs. of lead seal batteries that were recycled by Interstate, recycled 575 gallons of contaminated fluids through EMC Oil Corp., and fed 232 fluorescent bulbs through the bulb eater containing the mercury gas and glass waste for proper recycling. • Staff recycled evacuated 176 aerosol paint cans, filtering the gases and recycling the byproducts fill J; 1. City of Marathon Staff held a collection for the City of Marathon on Saturday October 25'h helping 12 residents, and collecting 120 lbs. of electronic waste and 1,420 lbs. of household hazardous waste. 17 w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w Electronic onic Waste Electron[c Waste 201, , 2014 1 � � t Respirator Fit Test In keeping with our motto, "Safety First," staff participated in a respirator fit test provided by Monroe County's safety officer Mark Gongre. Thank you Mark! 18 III UII , III"�I�Iylu�Y��iVlll�lpfll��'� u Y l , yIIV VVVVVVV V yWi u�y i �V i IIYIIIuuuuuuuuuuuuu4 ��, ��i'i ' I, uui Long Key also received a visit from Sally the Croc. ENGINEERING Old SR 940 Leg A (Watson Boulevard) Bridge — Received record drawings from Consultant; submitted final reimbursement request to FDOT. 19 • US 1 Bayside Trail — Contractor mobilized, installed silt fence and has begun drainage structure installation. Design consultant preparing landscaping design for addition to the project. • US 1 Bayside Pedestrian Bridge — Metric Engineering, Inc. incorporated all FDOT comments to 100% plans. Awaiting Coast Guard and USACOE permits. Staff working with FDOT and Consultant to prepare submerged land easement. • No Name Key Bridge Repair Project — Contractor mobilized on October 27th Currently installing maintenance of traffic, building/assembling containment system, identifying and marking spall locations on top of bridge. • Sexton Cove Roadway and Drainage Improvement Project—Consultant preparing 60%plans; progress meeting scheduled for November 6`h. • Lake Surprise Estates Roadway and Drainage Improvement Project — Environmental review, geotechnical work and topographical survey complete. Utility coordination is ongoing. Design development review meeting held on October 14th. Reconstruction or mill and resurface plan developed. Anticipate 60%phase submittal at the end of November. • Card Sound Bridge Repair Project — Successfully negotiated $3,325,208 of Small County Outreach Program grant funds to partially fund construction and CEI phases of project being programmed into FDOT FY 16. Anticipate design and permitting complete in early 2015. Construction will be bid July, 2015. • CR905 Bike Lanes — Construction is 80% complete. Executed change order to add additional striping requested by public to increase safety. • Bridge Inventory Management Project — Staff reviewing draft cost proposal for design of Sugarloaf Bridge replacement. Working with capital project staff to prepare capital project worksheets and outline anticipated bridge costs in future years. • Duck Key Security District — Discussion item for installation of speed humps on county roads on November agenda. • Stock Island Roadway and Drainage Improvement Project — received four responses to the RFQ on October 22"d. Staff reviewing and scoring; public ranking meeting scheduled for November 19`h. • Card Sound Toll Study— Staff reviewing final scope/proposal for toll study. • Pigeon Key Ramp Repair Project — LAP agreement for design funds approved at October BOCC meeting. Forwarded to FDOT. Staff prepared RFQ for design services and submitted to FDOT for review. FDOT approved on October 30, 2014. • County Maintained Traffic Signals - Staff met with FDOT Traffic Operations personnel and FDOT consultant to discuss county traffic signal needs. County requested that FDOT consider undertaking a Signal Engineering Master Plan (SEMP) to identify and prioritize signal hardware, maintenance, operations and training needs within the County. • Garrison Bight Bridge — Staff successfully negotiated having $972,631 of Small County Outreach Program (SCOP) grant funds programmed into FY 17 to fund (75%) construction and CEI phases of the planned Garrison Bight Bridge Repair Project. Design funds previously programmed in FY 16. 20 PROJECT MANAGEMENT • ADA Compliance Segments #1 and #2 - D.L. Porter reached substantial completion on October 21", and is expected to complete work on their final completion date of November 22"d • Bayshore Manor Emergency Repairs New emergency contract for restroom renovations executed. Construction to begin the week of November 10tn • Big Pine School Crossing — Sheriff's Department began providing a crossing guard on October 21, 2014. County Traffic Consultant is reviewing the BOCC direction provided on October 17, 2014 to determine the appropriate signage for the school. • Big Pine Swimming Hole — The Request to Advertise for design services is posted to Demandstar and will close on November 26, 2014. The traffic analysis was initiated in October 2014 following BOCC approval. • Big Pine Community Park Scenic Overlook — Design is underway for a water observation platform on the east side of the park. • Blimp Road Boat Ramp Repairs — The bid opening is set for November 5th to select the lowest bidder for the Boat Ramp repairs. • Crawl Key Training Facility - Final drawings and specifications should be completed by October 3 1"then out for RFP. • Freeman Justice Center Acoustics — Burke Construction awarded bid. Renovations expected to begin near the end of November. • Higgs Beach Road — Traffic data, survey, and aerial photography are complete. Preliminary alignment will be submitted by the consultant in December 2014. • Higgs Beach Fitness Trail —A request for proposals was drafted and submitted to the County Attorney's Office for review. • Higgs Beach/Reynolds Street Pier (scenic overlook) — Design is underway for spall repairs, entry feature, and deck replacement. • Key West Lighthouse (TDC) - Contract with Bert Bender and Associates was approved at the BOCC meeting on October 17t". Waiting for drawings and specifications then out for RFP • Magnolia St. Public Works Facility — Demolition permits issued. New construction plans 95% complete. • Marathon Airport Customs Facility—Construction to begin November 14, 2014. • Marathon Library-Monroe County School Board agreed to move forward with an ILA for construction and maintenance of Marathon Library. Interlocal Agreement is now in draft review with Monroe County legal. • MCSO and Jail- Design services for replacement of chillers and air handlers under contract with TY Lin. Design kick off meeting to be held this month. • Old 7 Mile Bridge Repairs — FDOT released the 60% Plans for review in late October. Comments are due to FDOT by November 17, 2014. • Plantation Key Court House —Continued design services negations. Current form of agreement under legal review. 21 • Parks and Recreation Advisory Board — Next meeting is scheduled for January 12, 2015. Anticipated discussion/public workshop items include Atlantic Boulevard realignment, Reynolds Street Pier/Overlook, Big Pine Community Park Overlook, and Big Pine Swimming Hole. • Pigeon Key Roof Replacement (TDC)- Contract with Bert Bender and Associates was approved at the BOCC meeting on October 17th. Waiting for drawings and specifications, then out for RFP. • Rockland Key- Pre-design meeting with Bill Horn and Alan Perez was held on September 5th to discuss Civils and temporary structures for MC Road and Fleet. • Rowell's — Price quotes have been requested for exotics removal, mangrove trimming, and removal of shoreline construction debris. The traffic analysis was initiated by the county's traffic consultant in October 2014 following BOCC approval. • Senior Nutrition Center — Construction documents in permitting with the City of Key West. • Sewer hookup Marathon Courthouse/Clerk's Office/Library and Sheriff's Station - Bids were received on October 21 s`. apparent low bidder was Greentech Group solutions LLC. Legal is doing their due diligence and checking on the contractor for any outstanding legal issues. Personal references have been checked by MC/PM. • Skate Parks at Key Largo and Big Pine Parks — Revised rules and waivers were hand delivered to the vendors at both facilities. Public Works is making new signs for both facilities. • Sugarloaf Fire Dorm— Structural evaluation of the building began last week. Report is expected for the November BOCC meeting. • Summerland Fire Station — Looking at alternate properties for the Summerland Fire Station. • Traffic Engineering Agreement — The third quarter reimbursement request was submitted to FDOT for payment. FDOT was billed $77,074.45 in reimbursable expenses for the county's traffic consultant and transportation planning staff. • W Martello Building Renovation - Work should be completed by the end of November. Most interior work is completed and new roof. Awaiting arrival of the new doors. • Watson Field— The County Attorney's Office is in the process of retaining a real estate attorney to assist with the transfer. TECHNICAL SERVICES Availability of Entire Network - Last Month Availability of Entire Network 98.78% Monroe County Mobility Summary report for network 22 'MX_Controller' I October 2014 • Distinct clients: 11858 (Daily average: 1117) • Data transferred: Total: 2.54 TB (12.29 TB T 259.67 GB) Top applications by usage Application Usage■ %Usage 1 Netflix 412.38 GB 15.9% 2 iTunes 260.89 GB 10.1% 3 Miscellaneous web 216.33 GB 8.3% 4 CDNs 209.12 GB 8.1% 5 Google Video 203.91 GB 7.9% 6 Miscellaneous video 180.14 GB 6.9% 7 Facebook 160.70 GB 6.2% 8 Google Drive 134.97 GB 5.2% 9 Miscellaneous secure web 134.86 GB 5.2% 10 apple.com 108.52 GB 4.2% Top clients by usage Operating Description Manufacturer system Usage* %Usage 1 LTMANNY Cisco-Linksys Android 84.95 GB 3.3% 2 Kriss-iPhone Apple Apple iOS 41.66 GB 1.6% 3 Administrators- Apple Other 41.09 GB 1.6% MacBook 4 J Samsung Other 35.19 GB 1.4% 5 RESCUE13TPCR Apple Apple iOS 29.49 GB 1.1% 6 BRANDON-HP Universal Other 29.43 GB 1.1% Global... 7 Alejandros-iPad Apple Apple iOS 28.20 GB 1.1% 8 Dustins-Pad Apple Apple iOS 26.36 GB 1.0% 9 Carlos-Barbas- Apple Mac OS X 24.43 GB 0.9% MacBook-Pro 10 6c:70:9f:2a:c1:e6 Apple Other 23.73 GB 0.9% Top operating systems by usage Operating system #Clients• %Clients Usage %Usage 1 Other 10926 92.1% 1.65 TB 65.0% 2 Apple 537 4.5% 530.11 GB 20.4% 23 3 Android 795 6.7% 311.54 GB 12.0% 4 Windows 37 0.3% 29.51 GB 1.1% 7/Vista Mac OS 5 X 14 0.1% 28.16 GB 1.1% 6 Windows idows 24 0.2% 9.68 GB 0.4% XP 7 8 Windows 28 0.2% 2.26 GB 0.1% Debian- 8 based 3 <0.1% 438.7 MB <0.1% Linux 9 Wii 2 <0.1% 6.5 MB <0.1% Top client device manufacturers by usage Manufacturer #Clients* %Clients Usage %Usage 1 Apple 5239 44.2% 1.37 TB 53.8% 2 Other 5718 48.2% 291.46 GB 11.2% 3 Hon Hai/Foxconn 142 1.2% 149.18 GB 5.7% 4 Samsung 744 6.3% 145.86 GB 5.6% 5 Cisco- 1 <0.1% 83.92 GB 3.2% Linksys 6 Intel 265 2.2% 69.34 GB 2.7% 7 Lite-On 91 0.8% 61.73 GB 2.4% 8 Murata 254 2.1% 49.78 GB 1.9% Manufacturing 9 HTC 157 1.3% 35.84 GB 1.4% 10 Private 87 0.7% 30.08 GB 1.2% 1)),4 wi> ,(w by Meraki Dashboard.(110,In in f(, unsubscribeCounty Internet Use View Options HELP LAST Ii:JdONTH nterface Aggregate Chart-Averafg,e bps In L3�a o.w�rtr: SLIM I I= Crt. 1.,.3 h4cr 25 Sst, t,r'1..4 Solis rVgrJ Orlor.Core Ssrvcas23142,1 24 We completed 325 work orders, assisted, continued to rolled out new computers, continued to install new network switches, moved all equipment and network connections from AT&T to QTS in Miami, had 31 Android installs and 140 new IOS installs of Monroe County app,continued development of version 2.0, updated library computers, had 122 Facebook likes, now have 741 Twitter followers, had 39,227 website visits (+4327), developed new greenkeys.info site, moved more data into the SAN for Alchemy and pushed out Microsoft updates. VETERANS AFFAIRS Clients assisted: VA phone calls: 704 Office visits: 333 New clients: 39 Field visits: 15 Benefits Delivery at Discharge: 4 Transportation program: Transportation calls: 387 Veterans transported: 142 Financial data: The financial data for the month of October totals $1,089,815.84 and indicates the amount of new revenue brought into Monroe County derived from claims filed by the entire department. The financial data captured monthly will vary due to the Veterans Administration's variable time frame in adjudicating awards. GROWTH MANAGEMENT GROWTH MANAGEMENT DIVISION ACCOMPLISHMENTS —SEPTEMBER 2014 25 GROWTH MANAGEMENT REVENUE vs. EXPENSES FY 2011, 2012, 2013, 2014 Total Total Revenue Total Revenue Total Total Revenue Total Revenue Account Number Revenue FY'12 FY'13 BUDGETED FYTD as of FYTD as of FYI Revenue FY'14 September 2013 September 2014 REVENUE Administrative Engineering 001-000000-341921-SG $19,866 $7,636 S4,125 $7,0001 $4,125 $1,823 Boat Improvement Fund 157-347270-SP/34727 I-SP $699,750 $674,826 $682,080 $705,000 $682,080 $616,647 Building Book/Copy/etc. 180-369001-GM $10,836 $8,283 $14,689 $8,000 $14,739 S32,441 Building-Income from Permits/Applica 180-322005-SG $2,180,439 $1,928,235 $2,303,328 $2,100,000 $2,292,019 $3,198,594 Certificate of Competency/Contractor F 180-322103-SG $18,817 $158,515 $22,665 $160,000 $22,665 $142,798 Code Compliance 148-341916-SG/148-354001-SG $532,445 $423,630 $488,442 $443,0001 $485,621 $502,006 Education Fees-Building 158-322005-SG $24,677 $23,496 $45,799 $0 $25,552 S32,778 Education Fees-Environmental 158-322006-SG $14,254 $14,242 $15,614 $0 $15,694 S 19,360 Environmental Mitigation 160-351400-SP $155,042 $240,275 $128,478 $100,000 $128,478 $500,863 Fire Marshal 148-341906-SG $15,240 $18,188 $26,775 $25,000 $26,529 S30,960 Flood Review(sub-account of Building 180-322005-SG - $0 $0 $17,067 $1,360 Flood Variance 148-341907-SG $0 $50 $0 $0 $0 $0 Historic Preservation 148-341913-SG $0 $800 $50 $0 $50 $100 Impact Fees 130-131-132-133-134-135-136 $163,363 $165,601 $0 $0 $148,027 $431,155 Conservation Land Purchase(ROGO B 158-341905-SG $0 $0 $0 $0 S12,697 Marine Resources 157-62613-3)43700-SP/I 57-00000 $3,079 $1,300 $0 $0 $0 $0 Planning Admin/Research/Copy/etc. 148-369001-GM $295 $1,979 $896 $0 $859 $492 Radon/DCA 180-341904-SG $26,526 $23,780 $31,160 $26,500 $31,025 S42,795 Recovery/DBPR 180-341908-SG $26,551 $23,780 $31,099 $26,000 $31,025 S42,795 Wastewater 310-000000-325 1 00-GM $0 $561,067 $555,000 $90,318 $128,985 Zoning/ROGO/Environmental 148-341905-SG $471,401 $425,308 $511,695 $480,000 $519,679 $900,797 Total 1 $4,362,5811 $4,139,924 $4,867,982 $4,635,500 $4,535,5521 $6,639,446 EXPENSES Total Actual Total Actual Total Actual Total Total Expenses Total Expenses Fund-Cost Center Expenses Expenses Expenses BUDGETED FYTD as of FYTD as of FYI FY12 FY13 Expenses FY14 September 2013 September 2014 Boating Improvement-County$ 157-62613 $106,379 $248,216 $352,305 $426,970 $333,880 $398,459 BoafinghWrovement-State$ 157-62520 $364,167 $218,771 $245,441 $1,706,013 $245,441 $305,103 Building Dept. 180-52502 $2,351,380 $2,208,997 $2,133,467 $2,623,920 $2,135,251 $2,294,324 Building Dept.Education 158-52501 $14,303 S28,152 Code Compliance 148-60500 $995,330 $1,045,479 $1,236,940 $1,397,326 $896,512 $1,040,693 Comprehensive Plan 148-51000 $240,249 $202,756 $127,921 $270,0001 $127,921 $145,278 Environmental Resources 148-52000 $295,142 $355,116 $440,918 $592,251 $441,136 $544,396 Environmental Resources Educ. 158-52503 $5,604 $6,035 Environmental Restoration 160-52002 $158,229 $120,893 $141,751 $174,246 $142,009 $164,412 Geographic Info.(GIS) 148-50002 $168,827 $172,444 $170,288 $202,049 $170,288 $162,931 Growth Mo.Admin. 148-50001 $909,891 $434,698 $397,252 $733,923 $412,492 $426,841 Planning 148-50500 $1,052,377 $1,182,900 $1,250,154 $1,239,450 $1,254,965 $1,157,969 Planning Commission 148-51500 $81,844 $76,030 $73,875 $81,000 $73,875 S74,556 Total $6,723,815 $6,266,3001 $6,570,312 $9,447,148 $6,253,677 $6,749,149 Difference Revenue-Expense -$2,361,234 -$2,126,376 -$1,702,330 -$4,811,648 -$1,718,125 -$109,703 26 27 n N " a U GROWTH MANAGEMENT Off REVENUE WAKEN IN BY OFFICE RECEIPT# tv i des- rm_i.xey -3 5.'- ..'£.®mb® Xd. tk r Three Month - Yearly Comparison x{A,xa vv xid $1,000,000 $qoo 1 $800,00099 651 $700,000 W0,000 K30 0j000 5200,000 $100,000 1111.701 t, JLJQ 1 kg-2 }1 Ate -201 SAP-201 i ypp-201 'Upper Keys S1S, S 7.11 s S51,6 7,17 S20,879.72 1 ,71 ,10 77a5 1,� IN MOP Sl. .t S717s 7.7� 7 S,S 7 7 S77 s(A, .S6 S10,64430 S49.4,6%29 Lover Keys S 1 7,0,)7. S S282,S34R l ls31 7 3110f8817 511 ,2 1.41 S 7 ,11 , S I(A Al.. 5292399,34 5 77,50 . 7 S1 , 1 .27 W'7, 1�1.9 y282.144.81 S , 0.� 28 29 ............................................................................................................................................................................................................................................... MONROE COUNTY GROWTH MANAGEMENT REVENUE TAKEN IN BY OFFICE RECEIPT# SEPTEMBER 2014 Lower Keys 72,502 Upper Keys tx $333,490 Middle Keys $493,659 Docs not mchude"B_-a7 iprov�,— Fu "D ievenje. rc Ste, 0 7 Ml 1 P t,�dEe- C.)1{.cr.? ea r NA i d K cy%:5�x, a 1)ut k f e E)F;I fm F a. e 05 f?x c d cm k1a,a.n o n.G r a.n.w K vy o La V,vr s a m cm--a ca.an,0 Lx, ,NA,a e,u r,ve® =Gppe,I eys;No=of'T avel-�e,C reev ge UP 7C C),ear Reel .............................................................................................................................................................................................................................................. MONROE COUNTY GROWTH MANAGEMENT REVENUE TAKEN IN BY PERMIT "WORK" LOCATION SEPTEMBER 2014 ttttttttttmm 111mmmmmmmmmm&. 111mmmmmmmmmmm& Lower Keys x. $307,646 Upper Keys $428,226 mmmg mmmm,mmmr mmm xx mmF Middle Keys $49,199 Other DuL- I POUdL' Rev -J $114,580 04 /A Fa c" a D 6,Key y A ml-u p p ui vp N of of Tavw Eei C t. k B I I d P aL.0 a F I R e t5 30 BUILDING DEPARTMENT MONROE COUNTY GROWTH MANAGEMENT BUILDING DEPARTMENT PERMIT ACTIVITY BY OFFICE Includes all Reviewinglinspecting Departments:Building,Fire,Planning and Environmental ,5 ISSUED PERMITS PLAN REVIEWS INSPECTIONS 300 Isar?.oniv PtIss or fAil N*ws 3,000 2,500 12,8791 1,500 1,000 500 New IN all aw IM IN IM 0 ME IMMUNE MUM- a M.M MPI-Nk ..M Sep-2013 Sep-2014 Sep-2013 Sep-2014 Sep-2013 Sep-2014 an Lower Keys 129 243 477 673 776 1,014 m Middle Keys 35 34 46 108 149 176 tipper Keys 190 299 642 798 11269 11689 TOTAL 355 566 1,165 1,579 2,194 2,879 icA=i Area=' %ver<ey5:5t P, ,ry Vw"r kvlavav—�r( O.Mqoupo"njr, 31 ................................................................................................................................................................................................................................................................. MONROE COUNTY GROWTH MANAGEMENT BUILDING [DEPARTMENT - JO B VALUATION OF ISSUED PERMITS BY PERMIT "WORK" LOCATION Comparison by office 30,0(X),E)00 25, 2(),()(x)jxx)000NO 15,000,000 10,0(x),000 M-NNNNNNNO MsEsEsEsma �)AX)RWO 0 0000000091 Sep-2013 Sep-2014 %Lower Keys $1,614,661 $10,095,702 M Middle Keys $138,045 $2,403,714 Upper Keys $5,778,790 $17,007,205 0 TOTAL $7,531,496 $29,506,621 .................................................................................................................................................................................................................................................................. MONROE COUNTY GROWTH MANAGEMENT BUILDING DEPARTMENT - PLAN REVIEW ACTIVITY BY PERMIT"WORK" LOCATION Se 4,e3 zUpeT K, Comparison by Office .................................................................................................................................................................................................................................................................................................................................................................................................. 450 4,90 350 300 250 150 100 ....... ......... .............. .............. ............... . ......... ......... ......... ......... ........ ........ ......... ......... ....... ............. .............. ............................11.............V � ..............a 0 ..................... ....................... ....................... ....................... .................W....................... ........................ ....................... ....................... ....................... .. .................................................................. ELECT EXAM ME04 JILUMB E�ECT EXAM MECLI PLUME, ELECT EXAM MECH RUMB LcyveT Lom W1,11M Loeser Middle a9 1t ie Middle Middle Upper Upper W1' r Upper Keys Keys Keys Keys Keys Keys Keys Keys Keys Keys Keys Keys I Sep-2,914 68 185 W 42 13 2F 11 10 95 232 38 53 ............................................ ....................... ....... Sep-2,913 67 123 41 38 :: : 2 12 4 8 79 194 32 -'1 .........................................:....... ...................................... ................... 32 t M NR{ E COUNTY GROWTH MANAGEMENT ZiA�e7 mr S.a.,satG,t €.�s BUILDING DEPARTMENT - INSPECTION ACTIVITY �cf.. , . Ek u c r r �r�,st:ar..m-5. BY PERMIT"WORK" LOCATION P rt aa. Eu up r a trt` Comparison by Office 1200 goo 600 ... 40 200 .. ,...x -761 Lildi€g E P0Iir. Mer.:y€ri plumb-ill , B €ldiu, Elearir mr(I.16 -,lu bin BuildirrK Ilealk KI-r.lrai fll€are. ,.i kart p K calf_" K iellkp 2 Carer Dvier tiger L Dvxr Middle Nil,iddle ' Middle Middle : Upper Upper Upper Upper Keys Keys Keys Keys Key; Keys Keys Keys Keys Keys Heys Keys Sc p 2 1u 452 35 61, 93 68 Z.> 9 33 681 186 69 281 Sep 231_r 390 99 D 92 :a2 3 8 1t1 3$1fa rfs 2411 GIS OFFICE GIS Projects-Data/Map Requests/Technical/Programming - Public Lands—Analysis —Attorney's Office - Street Addressing—Florida Department of Law Enforcement - ATON Mapping—Marine Resources - Canal GIS Data—Marea Technology - GIS Data Request - TPL - LiDAR Mapping—Ocean Reef—Joel Reed - Aerial Map Book scanning ('89 & `69 aerials) GIS Addressing - 32 New physical address assignments 33 MARINE RESOURCES OFFICE Channel Marker Program: Channel Marker/buoy Replacements 50 4t 0 2{} 10 0 S o 0' Oct Nov DecJan Feb March April May June July Aug Sept 2013 2014 October 2013 $1,800.00 November $0.00 December $4,990.00 January 2014 $500.00 February $2,147.50 March $43,253.00 April $2,500.00 May $17,149.00 June $4,900.00 July $0.00 August $3,750.00 September $0.00 Total $80,989.50 34 Total annual costs for marker/buoy replacements for the past twelve month period were approximately 19%higher than the same timeframe in 2013 ($67,963). Derelict Vessel Program: Derelict Vessels Removed 16 12 4 0 Oct Nov Dec Jan Feb March April May June July Aug Sept 2013 2014 October 2013 $24,529.00 November $10,400.00 December $6,800.00 January 2014 $17,585.00 February $14,029.00 March $6,529.00 April $13,894.00 May $2,867.00 June $15,279.00 July $2,500.00 Aug $11,175.00 Sept $8,535.00 Total $134,122.00 35 Derelict vessel removal costs for the past twelve month period were approximately 5% lower than the same timeframe in 2013 ($140,439). Vessel Pumpout Program: Number of Pu pouts 1800 1600 1400 Quota 100 100 0 0 400 0 0 t Nov Dec Jan Vela March April May June July A � Slat 2013 2014 36 Sewage Removed ved(gal.) 35000 30000 250 200 15000 10000 5000 0 t Nov Dec Jan Feb March April May June July A gg Sept 013 2014 Pumpout numbers have risen steadily over the past year, with monthly pumpouts exceeding the (initial) quota of 1300 per month in nine of the past ten months. CODE COMPLIANCE DEPARTMENT The Code Compliance Department responds to complaints received from various sources, walk-ins, phone calls, e-mails, staff and other outside agencies and departments. Staff also, is proactive identifying code violations while conducting routine field inspections. Department Totals New Cases 141 Inspections 1340 New Citations 1 37 ......................................................................................................................................................................................................................................................... 1800 1688 1735 1721 1728 1593 4600 1521 1516 1509 1431 1425 1400 1340 1282 1289 J200 E I 800 600 400 200 ....................... ............................................................................................................................. UPPER KEYS - NEW CASES 35 INSPECTIONS COMPLETED 358 SM I CITATIONS ISSUED 0 CEB 0 38 ........................................................................................................................................................................................................................................ 400 358 350 WTOTAL NEW CASES 300 a NEW CASES BY INSPECTOR 250 wTOTAL INSPECTIONS 200 COMPLETED 157 WINSPECTIONS 146 1 50 COMPLETED BY INSPECTOR WCASES HEARD 100 BEFORE SPECIAL MAGISTRATE 55 50 35 9 4 0 0 0 A\� 10 3p Q o .0 00 Z�- 00 0; 0; so R _ZZ MIDDLE KEYS - NEW CASES 41 INSPECTIONS COMPLETED 615 SM 8 CITATIONS ISSUED I CEB 7 39 .............................................................................................................................................................................................................................................................. 700 615 TOTAL NEW CASES 600 NEW CASES BY 500 INSPECTOR 'TOTAL 400 INSPECTIONS COMPLETED INSPECTIONS 300 COMPLETED BY INSPECTOR 200 CASES HEARD BEFORE SPECIAL 153 136 MAGISTRATE 130 126 100 CASES HEARD 70 BEFORE 41 CONTRACTORS 17 0 0 8 7 BOARD 2 1 9 3 0 0 Y- Sp U, -3 R-11 S� (y, op <� 4z 4 0 1� S, A-4e 4e LOWER KEYS - NEW CASES 65 INSPECTIONS COMPLETED 367 SM 18 40 CITATIONS ISSUED 0 CEB 0 400 W 67 TOTAL NEW CASES 3 350 63 NEW CASES BY INSPECTOR 300 UTOTAL INSPECTIONS COMPLETED 250 li INSPECTIONS 200 COMPLETED BY INSPECTOR W 1 CASES HEARD BEFORE 150 41 SPECIAL MAGISTRATE 100 85 w CASES HEARD BEFORE 71 CONTRACTORS 70 65 BOARD 50 LL2 21 2 18 12 10 I c 0 10 lz� I 4; 0 0 41) (,0 41 PLANNING AND ENVIRONMENTAL RESOURCES DEPARTMENT CURRENT PLANNING CATEGORY Alcoholic Beverage In progress...............................................................................................2 Conditional Use, Major, Applied............................................................................................. 1 Conditional Use, Major, Permit, In Progress...........................................................................3 Conditional Use, Minor, Permit, In Progress...........................................................................2 Conditional Use, Minor Deviation, Applied............................................................................ 1 Conditional Use Minor Deviation In Progress.........................................................................2 Conditional Use Minor Deviation Complete........................................................................... 1 Conditional Use Major Deviation Applied.............................................................................. 1 Conditional Use Major Deviation In Progress......................................................................... 1 Conditional Use Minor-Time Ext Complete............................................................................ 1 Conditional Use, TRE, In Progress..........................................................................................2 Conditional Use, TDR, Applied............................................................................................... 1 Conditional Use, TDR, In Progress .........................................................................................2 Development Agreement, In Progress.....................................................................................2 Development Agreement Completed....................................................................................... 1 Public Assembly Permits, In Progress.....................................................................................4 RoadAbandonment Applied.................................................................................................... 1 Road Abandonment, In Progress .............................................................................................5 Variance, Administrative, Applied..........................................................................................3 Variance, Administrative, In Progress..................................................................................... 14 Variance Administrative Issued...............................................................................................2 VariancePC, Applied..............................................................................................................2 VariancePC in progress...........................................................................................................3 PermitReviews .......................................................................................................................200 VacationRental Applied..........................................................................................................3 Vacation Rental, In progress....................................................................................................5 VacationRental Issued ............................................................................................................7 Vacation Rental Mgr. License, Applied ..................................................................................4 Vacation Rental Mgr. License, In Progress .............................................................................7 Plats, In Progress...................................................................................................................... 1 LUD Map Amendment, In progress ........................................................................................5 MCC Text Amendment, In progress........................................................................................9 MCCText Amendment, Completed........................................................................................6 ROGOExemptions, Applied...................................................................................................5 ROGOExemptions, in progress ..............................................................................................5 ROGOExemptions Completed................................................................................................2 LDRD's, Applied..................................................................................................................... 1 LDRD's, In progress................................................................................................................3 LDRD's Issued......................................................................................................................... 1 Pre—App Conferences .............................................................................................................2 Historic Preservation COA Applied........................................................................................2 42 Historic Preservation COA in Progress...................................................................................7 Historic Preservation COA Complete...................................................................................... 1 ADMINISTRATIVE MEETINGS Development Review Committee— 1 meeting, 5 items Planning Commission Meeting— 1 meeting, 4 items PLANNING & ENVIRONMENTAL RESOURCES COMPREHENSIVE PLANNING - Examples/Details AMS MH ES TOTAL CP/LDR Text Amendment, Completed............................................. 1 1 FLUM/LUD Map Amendment, hi progress ..................................... 3 4 7 FLUM/LUD Map Amendment, Completed ...................................... 2 2 Other Report or Special Project, In progress: 10 year Water Supply Plan Update,Impact Fees,Military Acquisition. ...............5 1 2 8 Development Review Committee Meeting .......................................1 1 2 Planning Commission meeting.......................................................... 1 1 1 Board of County Commission Meeting ...........................................1 1 2 Other intergovernmental or community group meeting: South Florida Regional Planning Council; Workforce Housing Roundtable ...... 1 2 3 Keith & Schnars Teleconference meeting ........................................ 1 1 2 Keith & Schnars Contract Management—invoices .......................... 5 5 Keith & Schnars Contract Management—amendments.................... 1 1 2 Entire draft CP Keith & Schnars Contract Management—scheduling....................... Meetings, notices, advertising Keith & Schnars Contract Management - deliverables Review of draft CP elements and LDRs.............................................20 2 21 43 Pre-Application Conferences............................................................. 1 1 Conditional Use, Major or Minor, Permit in Progress ...................... 1 1 Beneficial Use, In Progress ............................................................... 1 1 Coordination on Legal Appeals/Cases............................................... 2 2 Coordination &Assistance -other County Departments: WW, Land Authority, Fire, etc ..................................................................3 3 Training completed............................................................................ 1 1 Budget/Gov/Max/Climate/PDRP/Annual Training/NROGOIAPA conference/ JAT&performance ENVIRONMENTAL RESOURCES PERFORMANCE REVIEW Overview The services provided by Environmental Resources include the review of building permit applications for compliance with landscaping, stormwater and land clearing regulations 43 and FEMA required review of potential endangered species impacts under the Permit Referral Process (PRP). Environmental Resources staff also conducts review of applications for Conditional Use approvals, variances to dock & shoreline regulations and prepares amendments to the Comprehensive Plan and Land Development Code (including Tier Overlay District map amendments). In addition, Environmental Resources staff provides staff support to the County's Climate Change Advisory Committee and the Southeast Regional Climate Change Compact. Staff received two (2) applications for Letters of Current Site Conditions in September. Buildinp,Permit Application Review Biologists review building permit applications for compliance with Land Development Codes related to: Storm water management • Land Clearing • Landscaping • Fencing • Shoreline setbacks • Docking facilities • Wetland fill • Endangered Species impacts (PRP) Building permit reviews for the month of September 2014 consisted of 309 plan reviews not associated with the PRP. Biologists conducted over 80 field reviews in September in support of permitting services, either to aid in the review of current applications or inspections of permitted activities. Biologists also review building permit applications for compliance with the Permit Referral Process (PRP), which requires the County to evaluate applications for new development for potential impacts to federally listed species under the Endangered Species Act. During the month of September, staff reviewed 132 applications for compliance with the PRP. The U.S. Fish & Wildlife Service has revised the Species Assessment Guides used in the review of permit applications, and Environmental Resources staff has processed an amendment to the Land Development Code to reflect these revisions. Non Permit related Services Conditional Use Applications & Pre-application meetings The Sr. Administrator for Environmental Resources provides review of applications for Conditional Use approval and participates in pre-application conferences (along with the preparation of Letters of Understanding). There was one (1) pre-application conference in September. Development Review Committee Hearings Environmental Resources staff participated in the DRC meeting on September 23. 44 Planning Commision Hearings Environmental Resources staff participated in the Planning Commission meeting on September 24. BOCC Hearings Environmental Resources staff participated in the special BOCC meetings on sea level rise on September 3 and the regular BOCC meeting on September 17. Land Acquisition Initiatives Environmental Resources plays a key role in the development of strategies for the County's land acquisition initiatives and participated in 1 meeting (ARC) in May. There were no meetings in September. Committee/Task Force support The Environmental Resources office provides staff support for the County's Climate Change Advisory Committee and the Southeast Florida Climate Changepact. In addition, the Sr. Administrator of Environmental Resources co-chairs the Lands & Natural Systems committee of the Climate Compact, and continued efforts to develop a Vital Signs Network for monitoring climate related impacts to the natural resources of Southeast Florida. There were two meetings in September. Comprehensive Plan & Land Development Code updates and amendments As with the Growth Management Division in general, Environmental Resources is very busy participating in the update of the Comprehensive Plan. Other non-permit related services provided include coordination and meetings with numerous individuals and agencies, including the following: • Monroe County Climate Change Advisory Committee Southeast Florida Climate Change Compact USFWS Permit Referral Process coordination Public Speaking/Education Events The Environmental Resources staff routinely interacts with the residents of Monroe County to explain Land Development Codes, to help identify plants and animals that residents inquire about, and to engage interested parties in workshops or meetings related to improving County services. Endangered Species Coordination The U.S. Fish & Wildlife Service notified Environmental Resources staff that the Service was preparing to recommend additional species endemic to the Florida Keys for listing as endangered under the Endangered Species Act. Environmental Resources staff continues to participate (along with additional Growth Management staff) in bi-weekly coordination conferences with FWS regarding the future listing of these species and the designation of critical habitat on Big Pine Key and No Name Key. 45 Solar Challenge The U.S. Department of Energy (DOE) awarded a $1.6 million Rooftop Solar Challenge II competitive award to Broward County and their team, of which Monroe County participates, to make it easier for Floridians to obtain grid-tied solar installations. Go SOLAR Florida is one of eight recipients nationwide to receive the grant, which will be used over the next two and a half years to increase the use of and access to solar energy among residents and businesses by reducing market barriers, lowering non-hardware related installation costs and providing access to financing options. Environmental Resources Department staff is assisting the Sustainability Office in the efforts associated with meeting the grant requirements. A Request for Proposals (RFP) was issued at the direction of the BOCC and responses were received. The selection committee will review the proposals in October. 46