12/15-79 Gravity Drainage Well, Catch Basin Cleaning & Testing MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date September 1, 2020 Task Order No. 12/15-79 403-635108-560630 Client Project No. GAm85-530310 Engineer Project No. E9Y37979 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 15, 2017 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized—Gravity Drainage Well and Catch Basin Cleaning and Testing Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 10 page(s). Pricing / Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of$__49 754.00 N/A Other(Describe): NROE COU ATTORNEY tHOVE FORM Schedule w PED.. J Services may commence on F &cojig_n . ASSI NTY ATTORNEY Services will cease by 1 095 da Date 8/31/20 Recommended: BOARD OF COUNTY COMMISSIONERS By ,. 8/31/20 OF MONRO UNT FL RIDA Dir for of Airpo -s By-- _- Asst. / County Administrator CONSULTANT: JACOBS PROJECT MANAGEMENT CO Jeffrey D. Digitalysigned by Jeffrey D.Acton DN:at=Jeffrey D.Acton,o=Jacobs, ou,email-JeffreyActone;acobs.com, Acton =US DlpBery signed by Jackie Rosa BY Date:2020A83111:1605-04'00' Jackie DN•cn=Jackie Rosa,c-US, amaihjpuNsrama®aoi com Witness ROSS We:2M08 31 1121011 Title S. Region PM/CM PM/CM Svcs. Group feeder File: MSTR APS--Monroe County Page I of 1 Exhibit A-Scope of Work (12/15-79) Monroe County The Florida Keys Marathon International Airport Exfiltration Trench and Pond Modification Amendment 2: MTH Gravity Drainage Well and Catch Basin Cleaning and Testing PURPOSE The purpose of this scope of services is to provide Monroe County professional hydrogeologic support services at the Florida Keys Marathon Airport to include a performance evaluation of two drainage catch basins and two drainage wells. Services will also include cleaning and retesting the catch basins and drainage wells to help develop a plan and strategy to improve the overall drainage capacity of the Airport.The final flow rate and capacity of the two drainage wells will be used as the basis for estimating the capacity of other drainage wells on airport property for the Stormwater Master Plan (PSO 12/15-68) existing conditions model. The work provided under this scope of services will be in accordance with the terms and conditions of the Master Agreement for Professional Service between Jacobs Project Management Co.and Monroe County, FL, dated February 15, 2017. SCOPE OF SERVICES These services include flow testing and cleaning of: 1. two stormwater drainage catch basins and 2. two stormwater drainage wells. The two catch basins are located southeast of Runway 7-25 and adjacent to the Marathon Jet Center ramp.The two drainage wells are located adjacent to the airport hangars as shown on Figure 1. It is our understanding that the two catch basins were constructed to collect and drain stormwater via gravity to the underlying aquifer system to minimize flooding of the nearby jet parking area. The catch basins are not likely connected to any drainage wells and are assumed to be constructed deep enough to hydraulically connect to the underling aquifer system. Due to the flooding of areas around the catch basins and the drainage wells, it is assumed that the drainage systems have been blocked with accumulated debris and trash. Activity 1: Develop Action Plan Pre-fieldwork planning will be accomplished with the support services contractor to plan the execution of the work,coordinate with airport staff,and develop a summary of any action items that need to be accomplished prior to the team arriving onsite. During this time coordination with the subcontractor and the health and safety plan will be developed prior to work commencing. Activity 2: Cleaning and Testing Drainage Catch Basins and Wells Catch Basins Two catch basins have been selected for flow testing and cleaning. The testing and cleaning of the two catch basins is described below. Pre-cleaning performance testing of the catch basins Prior to cleaning,each catch basin will be flow tested using potable water to evaluate the general performance of the catch basins to drain water to the underlying aquifer system. Flow tests will be conducted by connecting to an existing fire hydrant south of the hangars shown in Figure 1. Jacobs will coordinate with Florida Keys Aqueduct Authority(FKAA) to schedule an install temporary hydrant meter for the water supply to be used for cleaning and flow testing. During flow testing,potable water will be introduced into each catch basin for approximately 15 to 30 minutes. The flow rate and water level in the catch basin will be monitored periodically and adjustments to the flow rate will be made to establish a relatively stable water level in the catch basin. The flow rate and water levels will be recorded as a means of estimating drainage capacity of the catch basin and will be described in terms of gallons per minute divided by rise in feet of water level in the catch basin (gpm/ft). The team may repeat the capacity testing in each catch basin over two or more constant flow rates to get other data points depending on the actual conditions encountered during the tests, performance of the catch basins,and the time available. Cleaning of the catch basins The catch basins will be cleaned manually to remove trash and debris that has collected in the basins. Potable water maybe used to help dislodge and breakup sediment or other foreign material removed from the catch basins. Basins may be pumped out as part of the cleaning process. If the basins are pumped out,then it is assumed discharged water can be directed into the adjacent grass swales. Hay bales will be provided to filter discharged water prior to directing to grass swales. Trash or other foreign debris will be collected and disposed of in appropriate trash locations/containers provided by the subcontractor. Post-cleaning performance testing of the catch basins After cleaning debris from the catch basins,each catch basin will be retested for drainage capacity as described in the"pre-cleaning performance testing"procedures above. The pre and post cleaning flow testing results will be compared and evaluated to determine if cleaning the catch basins is effective at increasing the drainage capacity of the basins. This will help the airport team determine a best path forward in improving drainage in the area around the existing catch basins. Drainage Wells Two drainage wells near the airport hangars as shown in Figure --were selected for flow testing and cleaning. Testing and cleaning of the two selected drainage wells is described below. Pre-cleaning performance testing of the wells Prior to cleaning,each selected well will be flow tested with potable water to evaluate the general performance of the drainage wells to accept and drain stormwater to the underlying aquifer system. Flow tests will be conducted by connecting to the existing fire hydrant south of the hangars shown in Figure 1.Jacobs will coordinate with Florida Keys Aqueduct Authority (FKAA) on the scheduling and anticipated flow rates prior to the performance testing. During flow testing, potable water will be introduced into each well for a period of up to 15 to 30 minutes. The flow rate and water level in the wells will be monitored periodically and adjustments to the flow rate will be made to attempt to establish a constant water level in the well. The flow rate and water levels will be recorded as a means of quantifying drainage capacity of the well and will be described in terms of gallons per minute divided by rise in feet of water level (gpm/ft). The team may repeat the capacity testing in each well over two or more constant flow rates to get other data points depending on the actual conditions encountered, performance of the wells,and time available. Cleaning of the drainage wells The drainage wells will be cleaned to remove trash and debris that has collected in the wells. Wells will be cleaned primarily using air-lifting methods that are standard well development techniques of the industry. Airlifting of the wells will be accomplished by installing a temporary tremie pipe in the drainage well at an appropriate depth and then applying compressed air to the well through the installed pipe. Air will enter the well at the bottom of the pipe and then quickly travel up the well to the surface expanding in volume as it moves upward. In that process,water is evacuated from the well at a relatively high rate that results in debris and sediment being removed from the well. As water is evacuated from the well,the cycle is completed by the well being recharged from the aquifer system which helps flush and clean the borehole of the well. The well can be surged or constantly air lifted to enhance development and cleaning of the well rather quickly. It is anticipated that airlifting of the well will be completed within an hour after the beginning of the initial air application. During well air lifting, it is assumed that the discharged water and debris can be directed into the adjacent grass swales.The trash or other foreign debris will be collected and disposed of by the subcontractor. If necessary,the team will install sandbags and hay bales around the wells being air lifted to help contain and prevent any trash or foreign material removed from the well from re-entering the well. Post-cleaning performance testing of the wells After air lifting the wells,each well will be retested for drainage capacity as described in the"pre- cleaning performance testing"procedures above.The pre and post cleaning flow testing results will be compared and evaluated to determine if cleaning the wells using air lifting techniques is effective at increasing the drainage capacity of the wells. This will help the airport team determine a best path forward in improving drainage in the area around the existing drainage wells and improving the drainage capacity of the remaining drainage wells. Activity 3: Reporting and Recommendations A technical memorandum (TM)will be prepared to summarize the methods and approaches used during the cleaning and testing work. The TM will also provide results and recommendations for approaches to be used during future improvements. DELIVERABLES The following deliverables will be submitted as part of Activities 1-3 1. Email summary of Action Items 2. Final TM summarizing methods and results of Activity 2 cleaning and testing as well as recommendations for future improvements GENERAL ASSUMPTIONS The following assumptions are included as part of Activities 1-3 • Jacobs does not guarantee that airlifting the wells and manually cleaning the catch basins alone will improve their drainage capacity. • Airport Staff will address action items prior to the team's arrival onsite to perform the work.The airport will designate a staging area to store equipment near to the area of work. • Aircraft should be moved prior to work and kept 50 feet from catch basins and 100 feet from wells. • Jacobs will contract directly with Complete Services for support services to assist with cleaning and testing activities • Airport Staff will provide Jacobs with access to the sites as needed • The subcontractor will operate equipment and furnish manpower to remove the covers from the catch basins and drainage wells. • Discharge water can be directed to and contained in nearby grass swales. Flow control measures consisting of sump pumps and discharge piping to stormwater inlets is not needed. • The quantity of trash and debris collected from the wells can be disposed of in an equipment trailer being provided by the subcontractor. • Jacobs will provide all field equipment necessary to collect manual water level and flow measurements during testing • Cleaning and testing of the basins and wells can be conducted during the day and will occur over 1 week. Subcontractor services are assumed to be accomplished within 4 days. • Maintenance of traffic and taxiway closure signage/markers will be furnished erected as needed by Airport staff • No permitting services are included in this scope of work. Clearing debris in underground stormwater pipes between drainage structures are not included in this scope of work.This scope is limited to cleaning and testing of catch basins and drainage wells. PAYMENT FOR SERVICES The total estimated fee for Activities 1-3 is%49,754.00 as shown in Attachment 1.The fee will be a lump sum basis of payment for this scope of service,for engineering,expenses,and subcontractor mobilization and materials.The subcontractor cleaning services will be charged at a daily rate at$4,000/day. SCHEDULE It is anticipated that the services as described in this scope of services will be completed within 3 months of Jacobs'receipt of the Notice to Proceed (NTP; Purchase Order).This schedule is only preliminary and may be accelerated or delayed based on review times and contracting times. The approximate duration of each activity is included in Table 1. Table 1.Approximate Duration of Activities Marathon Airport-Drainage Well and Catch Basin Cleaning and Testing(Phase 1) e Activity 1:Develop Action Plan 3 Weeks (Upon Receipt of NTP) Activity 2:Cleaning and Testing of Drainage Catch Basins and Wells 1 Week (Start after completion of Activity 1) Activity 3:Reporting and Recommendations 3 Weeks (Start after completion of Activity 2) FIGURE 1 Marathon Airport Drainage Well and Catch Basin Cleaning and Testing WELL W-01 WELL W-02 CATCH BASIN 1 CATCH BASIN 2 i r1 Z / i + 50' RADIUS 100' RADIUS / i \ FIRE HYDRANT tt _ Sz{;.x n ��+k t�r� �; �;a m�1i�tw,��aviwn Complete Services �' rt, ��SERVICES'�` �` G Proposal 9785 Well Water Rd Dustin Dykes,PE Jacksonville,FL 32220 Jacobs (912)659-9087 phone Project Manager Make j axwelldrillin .cots 904.813.1274 Cell 704.544.4051 Office dust n,dvkes'di srbs.com Refernece: Marathon Airport 1 LS Provide equipment and labor to mobe and demobe from the site including air compressor and dump trailer,misc fittings,and PVC airline.Also includes obtaining a meter from the water authority and up to 100,000 gallons of water. $10,370.00 4 Days Daily rate for equipment and crew to perform the work as described in your Draft Work Scope @$4,000 per day. $16,000.00 TOTAL $26,370.00 Please note that our quantities and total price are estimates only based on scope as provided by the information provided. If any changes occur,prices will be adjusted accordingly. Payment Terms: Net 15 The foregoing prices are subject to Federal,State,and Local Sales and Use Taxes.This Quotation will automatically expire if Purchaser does not deliver a written acceptance to Contractor by 30 days. The undersigned accepts the above proposal at the prices shown,subject to any necessary revision in the list of estimated quantities, and hereby authorizes and instructs Contractor to proceed with the described work.Purchaser's pumps,motors,parts,and/or accessories may be stored by Contractor for thirty(30)days from the date of invoice or other written notice from Contractor.After thirty days,disposal of equipment may be made by Contractor without incurring any liability. Purchaser: Jacobs Engineering Contractor:Complete Services .0 17/are,9r. L.Blake Hare,Jr. Attachment 1 Estimated Fee JACOBS PROJECT MANAGEMENT CO. JOB HOUR AND FEE ESTIMATE Monroe County Airport: The Florida Keys Marathon International Airport Project: Exfiltration Trench and Pond Modification Amendment 2:MTH Gravity Drainage Well and Catch Basin Cleaning and Testing FEE SUMMARY BASIC SERVICES Hours Fee DBE AMOUNT Phase 1:Gravity Drainage Well and Catch Basin Testing 228 $ 49,754 Total Basic Services Lump Sum Fee 228 $ 49,754 $ - Total MTH Stormwater Master plan Lump Sum Fee 228 $ 49,764 $ DBE Percentage 0.00% JACOBS PROJECT MANAGEMENT CO. JOB HOUR AND FEE ESTIMATE Monroe County Airport: The Florida Keys Marathon International Airport Project: Exfiltration Trench and Pond Modification Phase 1:Gravity Drainage Well and Catch Basin Testin Sr.Proj. Project Project WORK ITEM Pro':Director Mana er Mana er En''Weer En meer Desi raer Clerical TOTAL 1 Develop Action Plan 6 8 6 8 12 40 2 Cleaning and Testing of Gravity Wells and Catch 8 48 48 104 Basins 3 Reporting and Recommendations 2 10 6 12 34 16 4 84 TOTAL HOURS 8 26 6 18 90 76 4 228 RATE $ 200.00 S 174.00 $ 147.00 $ 112.00 $ 93.00 $ 76.00 $ 54.00 PAYROLL ESTIMATE $ 1,600 S 4,524 $ 882 1$ 2,016 $ 8,370 S 5,776 S 216 S 23,384 TOTAL PAYROLL S 23,384 Subconsultants Complete Services $ 26,370.00 $ 26,370.00 Subconsultants $ 26,370 Lump Sum Fee Total $ 49,754 TOTAL FEE S 49,754