02nd Change Order 10/16/2020 Jacobs Key West International Airport 10/2020 Monroe County Rehabilitate Taxiway A Project No. GAKAP 159 CHANGE ORDER PROJECT: CHANGE ORDER NO.: 2 Rehabilitate Taxiway A - INITIATED ON: October 16,2020 CONTRACT: GAKAP 159 TO(Contractor):General Asphalt 4850 NW 72"Avenue Miami, Florida 33166 CONTRACT DATE: September 18,2019 You are hereby authorized and directed to make the following change(s)in this Contract: General As halt has experienced delays due to weather and King Tides.The updated contract completion date will be January 7,2021. The original Contract Sum., $ 9„691,602.25 Net change by previously approved Change Orders,........ $ 4,229.83 The Contract Sum will be unchanged by this Change Order...................... $ N/A The new Contract Sum including this Change Order will be............................................... 9,695,832,08 The Contract Time will be increased by........................................ 77 CALENDAR DAYS The new Contract Completion date is ......... January 7, 2021 Signature of the Contractor indicates agreement with the terms of this Change Order, including any adjustment in the Contract Sum and/or the Contract Time. Adjusted cost and time include all direct, indirect and impact costs and time for delays,disruption,inefficiency,acceleration and all other claims. RECOMMENDED: AGREED TO: Jacobs Engineering General Asphalt 4 f '/ 10/l 6/2020 X✓' Date y Date AUTHORIZED: f Key West International Airport Monroe County 3491 south Roosevelt Blvd. 1100 Simonton Street Key West, FL 33040 Key West, FL 33040 D,gad DN Ilya-g dGyF - -M eI...1,1011, Roman Gastesi deyCmondoec ryflgov,ci1-Mi,d- 10/19/2020 °e 202010201445510400 Bey Date By Date NROE COUNTY LFOAAA NEY fItiovE A �;:�Dpl;�O JAER ASSISI W NTY ATTORNEY Date 10/20/20 ��;�)�51�iV(t�tilb�itlyt)lt1~4k»>UD�k1 t SV�11}1 4850 NW 72 Avenue r � { Miami Florida 33166 ��`�� r, „�a,m1, ��7F 53PH',�► T � General Asphalt Co., Inc. Phone: (305) 592-3480 Fax: (305)477-4675 October 15th, 2020 Lasa Ennis, P.E. Jacobs Project Manager-Aviation 200 West Forsyth Street; Suite1520 Jacksonville, FL 32202 Re: EYW Rehabilitate Taxiway A Weather Impacts Lasa, Below are the weather days that have impacted work production.We will continue monitoring the days and record any additional loss of production. Tidal influences on the project have also played a significant role in impacting major items of work. These days also include the impacts of Tropical Storm Laura and the latest Tropical Storm Sally. Also we are formally requesting the following: Connector A7: On this connector we faced significant challenges with the water table. This connector was part of the critical path of the project and not completing this in our scheduled time prevented us from being able to close any other connector. Once a working solution was found work was able to continue and paving took place soon after. The connector was closed for construction on 7/12/2020. Toppino began to place#57 stone in connector 7 on 9/13/2020. The total number of days between the initial closure and full construction with productive advancement was 45 work days. During this time, there were also 7.5 requested weather days. The overlapping weather days are subtracted from the total time extension request. The total impacted work days due to weather and Taxiway A7 is 55 work days or 77 calendar days. The updated Contract Completion date will be January 7th, 2020. General Asphalt will continue monitoring the upcoming days and will notify of any further impacts. Please see attached sheets for the description of the requested weather and Taxiway A7 days. Thank you, Gabriel Martinez 4850 NW 72 Avenue Miami Florida 33166 � General Asphalto., Inc. Phone: (305) 592-3480 Fax: (305)477-4675 Date Time Extension Request Work Day Work Hour Request(Day) Request(Hour) 4/23/2020 Experienced scattered showers on 2 and off impacting our production. 4/26/2020 Tidal/ground water levels above 1 normal condition affecting the placement of limerock, along with scattered showers 5/10/2020 Experienced rain thru the night 1 impacting our efforts 5/11/2020 Tidal/ground water levels above 2 normal condition affecting the placement-of limerock, along with scattered showers. 5/18/2020 Tidal/ground water levels above 2.5 normal conditions affecting the rock placement and impacting the production of electrical work. 5/19/2020 Tidal/ground water levels above 2 normal conditions affecting electrical production. 5/24/2020 Rain and lighting thru the night, arrival at jobsite encountered flooded areas with water at levels beyond existing pavement. 6/1/2020 Experienced heavy rainfall and 2. scattered showers that slowed the paving production. 6/3/2020 Experienced rain and operations 1 were canceled. 6/4/2020 Rain started at 11:43 PM and 6.5 continued to 1:53 AM. Work stopped at 1:30 AM. 6/11/2020 Rain fall caused significant 2. flooding of work areas and adjacent areas. Delayed paving operations. 6/16/2020 Rain started at 3:45 AM. Unable to 2. complete work during the shift.' 7/15/2020 Rainfall thru the day arrived to 2 impacted field conditions. Pumping efforts delayed the progress of work. 4850 NW 72 Avenue Miami, Florida 33166 General Asphalt Co., Inc. Phone: (305) 592-3480 Fax: (305)477-4675 7/21/2020 Rainfall thru the day arrived to 1 affected site conditions 7/22/2020 Field conditions impacted due to 1 previous rainfall and tidal/groundwater 7/23/2020 Experienced scattered showers on 1 and off impacting our production. 8/17/2020 Experienced scattered showers on 2 and off impacting our production 8/20/2020 Experienced scattered showers 5 with thunderstorms and lightening impacting the production. 8/23/2020 Tropical Storm Laura_Airport 1 Closed 8/24/2020 Tropical Storm Laura-Airport 1 Closed 8/26/2020 Tidal/ground water levels above 2 normal conditions affecting the placement of limerock 8/31/2020 Rain began prior to the shift and 5 continued on/off until end of shift 9/1/2020 Tidal/ground water levels above 2 normal conditions affecting the placement of limerock. Ground water required additional work in pumping and controlling. 9/13/2020 Three hours of rain at the beginning of the shift 9/21/2020 Tidal/ground water levels above 1 normal conditions 9/22/2020 Tidal/ground water levels above normal conditions. Not all critical path work was able to be completed due to ground water 9/23/2020 Tidal/ground water levels above 2 normal conditions. Pavement marking application required stop/start. 9/30/2020 Severe weather and rain 1 10/1/2020 Rain and king tides 1 4850 NW 72 Avenue General Asphalt C Inc. iami, Florida 92-34 o. l.� � nc. Phone' (305) 52-3480 Fax: (305)477-4675 7/12/2020— Taxiway A7 45 9/13/2020 Work Day Request 56 Work Hour Re uest 51.6 6.5 Days) Total Work Da Request 62.5 Overlapping Work Ply Request 7.5 GRAND TOTAL WORK DAY REQUEST 55 GRAND TOTAL CALENDAR DAY REQUEST 77 Original Contract Calendar Day Count 200 Updated Contract Calendar Day Count 277 Original Contract Completion Date October 22"d, 2020 Updated Contract Completion Date January 71h, 2021