Loading...
Item C25 C.25 BOARD OF COUNTY COMMSSIONERS County of Monroe f Mayor Heather Carruthers,District 3 h} ] Mayor Pro Tem Michelle Coldiron,District 2 The Florida Keys Craig Cates,District 1 =E �j David Rice,District 4 `w'P•=w Sylvia J.Murphy,District 5 County Commission Meeting October 213, 2020 Agenda Item Number: C.25 Agenda Item Summary #7430 BULK ITEM: Yes DEPARTMENT: Airports TIME APPROXIMATE: STAFF CONTACT: Richard Strickland(305) 809-5200 NA AGENDA ITEM WORDING: Report of Airport change orders reviewed by the County Administrator/Assistant Administrator. ITEM BACKGROUND: There were four (4) change orders considered and approved by the County Administrator/Assistant Administrator during the month of September 2020. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 27-1998 was adopted in order to provide that the County Administrator may approve separate, non-cumulative change orders for construction projects and professional service contracts in amounts not to exceed $50,0000 (as amended by Ordinance No. 024-2015) or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: N/A DOCUMENTATION: Monthly Change Order Report FINANCIAL IMPACT: Effective Date: Expiration Date: Total Dollar Value of Contract: N/A Total Cost to County: -0- Current Year Portion: Packet Pg. 947 C.25 Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: No If yes, amount: Grant: County Match: Insurance Required: No Additional Details: REVIEWED BY: Beth Leto Completed 10/01/2020 11:20 AM Richard Strickland Completed 10/05/2020 10:29 AM Pedro Mercado Completed 10/05/2020 10:31 AM Purchasing Completed 10/05/2020 12:32 PM Budget and Finance Completed 10/05/2020 1:13 PM Maria Slavik Completed 10/05/2020 1:18 PM Liz Yongue Completed 10/05/2020 1:39 PM Board of County Commissioners Pending 10/21/2020 9:00 AM Packet Pg. 948 (liodeN japio abueqo AI 1uo -L MA3) liodeN japio abueqo Al }uo aju9wgo jj LO C N v6 � U o CL a c a > d 0 46 m. -� °� c 0 c vs c °� c 0 m ems ® c c c 0 0 m c c o 0 a > IL c c c u o c (U +� as c 0 r c 0. c o a) 0o 0 0 i cc o m c 0 o c v 3 e as -o E 0 a v e c o g ` n c c c® "v c .� ® m ® ® 3 v N r o 0 c a 0 0 0 vCL U ` d m �e ryacn m c 0 a® o 0 c ca •� � 0 u u c o c 3 as v cc 0 CA ° E w 0 0 M w Ll w o 0 o ro _ e` 1 0 3 c ®r .2 0 ®_ 0 c ® 72 0 o o mo a > 0 d c m t am e r °> a 0 m B t� °� o c CL ~ o mu � o is V w 0 m en cn c� co ua w Lt Ls m 0 � c � ro ry m c s» to t4 ass ra r< 00 e u CL a o 0 v 0 2 2 tw v 0 0 u c� v 0 0 o o CL cc ac rLE u 0 0 c u o ® 2 ® c g .2 N a w C wM CC cc C C b C ro S m S 2Lanp m ot C C C.25.a Jacobs Key West International Airport 08,2020 Monroe nth° Rehabilitate T"axhvay A Project No. OAKAPIS9 LHAfifiLQUIM PROJECT. CHANCE E C®®_ it t T'sva�ai^ INITIATED O ......_AU ttU 3 t. 2U 0 CONTRACTo--QA&UJ2_._ TO(Cons tore Cameral Asphalt 4850 NW 72°4 Avenue ie i.Florida 3166 CONTRACT AT •September 10, 019 You are hereby authorized middirected to make the alto`%ind cl kee(s)In this Cont c �to c e_� t rl�ett . n®v v � else ealstin�evaas c c{s t c�ntatlbes c`{t the Rt:ovOt d g�c{tacit i� c et°E�to v 1ds nr`e•au taaaeental fe t,v[nc a and 1 { son nttrasKrO, 0 sa The arlg{nal Contract Sunr—. 0 t Nei change by pre%lously°approved C nge ..n...., The Contract Surer will be unchan d by this C{ n e rder....®..—....,,._. The new Contmel Suitt including this Cl n e Order �~ to Contract Time will be Inc 0 CL Signature of the Contrachir indicates ngreeniciti with the team;of this Change Order,including any adjustment In the Contract Surn chiller the Contract Time, Adjusted cost said time include all direct.indirect and impact costs and tinic For deli,a.disruption,hierficlency,occchiration said all other claaines. RECOMMENDED: ACR TO: Jacobs Engioeming General Asphalt us zo r. y' a fate AUTHORI Key West International Airport Monroe County 491 South Roosevelt Blvd. f IGO SIM0111011 Street ny Walsall.f 3 40 Key t. L BJr Date By r OVE FORMEC ArmnNEY ASS P NTY A�TT:ORNiEY Packet Pg. 950 C.25.a Change Order Aftachment r Monroe CountySection Change Order was not included in the original contract specifications. Yes( x ) No( } If Yes, explanation: The existing supplemental windcone is voltage driven. To connect to the runway edge circuits, it will need to be converted to current driven. However,the existing wind o CL cone is not compatible with the Runway edge circuit. This change order includes a new supplemental L-806 windconeand isolation transformer. Change Order was included in the original specifications. Yes No ( ) CU If Yes, explanationincrease in price: 0 � Change Order exceedsr %of contract pric (whichever Is greater). ()No( } If Yes, explanation as to why it is not subject for a callingfor bids: 0 CL Project architect approves the change order. Yes( ) No( } r I no,explanation of Change r r is correcting an error or omission in design document. Yes (x No f } Shouldclaim under the applicablerof ion I liability lic ? Yes( } o(x) Explain: U Packet Pg. 951 C.25.a h XTRA WORK-WORK ORDER Ba6e Walk arder TO " t Company ame:Jacobs F-PP n 1 o n:Ja3c nnts, . . L n@lon: @ fnr5 € on hone: 1 I"sIt Tr QU7a" CL 1 L® 1 Intl on I t ,i .,� Sub-Contractor — Subtotal ._ .3 Contractor Total $3.645.30 — .0 GrandTotal $4,229.830 I 9� 0 CL i CU 21 0 U Page toll Packet Pg. 952 C.25.a WX Project. Florida Keys Electric,Inc. IA Rehabilitate Taxiway A 5730 2nd Avenue 3491 South Roosevelt Key West FL.33040 Key West, L 33040 305-296-4028(o) 05-2 ® 2 3 July 22,2020 Subcontractor/Vendor 0 CL Contra ate: / Contract o.: /A Change Order o.: 003 Scope of Work: Hall-Br 7 ,18 Inch,internal,Single,L-810 Windo it for Line#30 L-107-2 Relocated u le nal Wind Cone on NewFoundation The contract Is herebyrevised y the following Items: Labor and Material. $ 3,845.30 I ate. The original contract value was 2,951,444.51 The net change by previously authorized Change Orders Is 34,324.80 r The Contract Value prior to this Subcontract Change Order was 1,985,769.31 0 CL The Contract Value will be changed by this Subcontract Change Order in the amount 3,84530 The new Contract Value Including this Subcontract Change Order will b $ 1,989,614.61 The Contract duration will be changed by 0 Days Please sign and return all copies o our office ith!n 7 days.After our signature,a co py will be returned o . , CONTRACTOR _ SUBCONTRACTOR/VENDOR General Asphalt Tlorlda Keys Electric,Inc, 0 4850 NW 72nd Ave. 530 2nd Avenue Miami,FL333166 Key West,Florida 33040 Gabriel Martinez .:Raymond Vazquez U SI nature. Signature: Title: Project ManagerTitle:President Date: Date: Packet Pg. 953 (liodeN japio abueqo AI 1uo -L MA3) liodaN japio abueqo Al }uo aju9wgo jj LO C N v a tp IL 00 �a Go� CR mo # Cs u -a � cs .°� CA in Ln n "' CL uj (D � w N ' ON n a E ca ^d °� ca en 2 � 3 r�, •5 ,� Ca In 0 6A $S A B e ,*nd60 W0 LA bs 6n c Do .� C a ® u E 0 Ln as w CA. ar° .- q O `y .n �e � � o LU ® E9 C.25.a ShadeFLA 561 NE 79TH ST SUITE 330 } MIAMI, FL 331383 US ( )759-7423 arg sa efla.corrt ° It www.shadefla.com LIVE OUTDOORS-STAY SHADED Estimate ADDRESS SHIP TO ESTIMATE# Est-20- 105 0 CL Kevin Groner Kevin Groner DATE 07/20/2020 D.L. Porter Constructors, Inc. D.L. Porter Constructors, Inc. 6574 Palmer Park,Circle 6574 PALMER PARK CI Sarasota, FL 34238 SARASOTA, FL 3423 -2777 us 21 DATE ACTIVITY QTY RATE AMOUNT Change Order Welder &Wall Opening Welding 1 1,37.60 1,307.60 Certified Welder >` uj to weld( ) plates to existing frame r_ Repairs 1 450.00 450.000 CL Cut out CMU wall Finish of wail by others ..... ............ ..................................... "ShadeFla reserves the right to charge additional costs Incurred due TOTAL to:underground utilities and obstructions encountered,rock andior tree roots struck during the tooter excavation,a high water table level, site access restriction,increased material costs(steel,aluminum, concrete)after the 30-day time limit has elapsed,repair of grass,or the replacement. 0 U Accepted By Accepted Date *Please mote that SALES TAX Is DUE IN FULL with first payment. Packet Pg. 955 C.25.a Proposal UNITED V011111 MECHANICAL We. 6170 Mainline Parkway Fort Myers,FIL 33912 239-9394602 fax 239-939-4225 Attn: erem csher ierem l orter.ccm PROPOSAL SUBMITTED TO: PHONE FAX DATE DL Porter 786-423-0864 24 August,202 STREET JOB NAME 1805 Staples i Airport Departure Hall, Restroom, Servicei 9 and Hold Room Ex ion CITY JOB LOCATION 0 CL t ---reft e hereby submit specifications and estimates for: � HVAC Work as described below, U e include the follosvin& Fabrication of flatten ductwork to avoid cutting beam 0. revision to ductwork and locations on where to transition the ductwork for both supply and return. Work final design in the fled with GC:approval in conjunction with RCP e exclude the follo{virr ire s® 0 • Demolition,Structural,Engineering,Roofing,painting,patching,concrete sin s and supports,concrete cutting and patching,asphalt cutting and patching,plumbing,ceiling and electrical work including disconnect switches and r� starters runless specified to be furnished by the equipment manufacturers and fire alarm including provision of duct smoke detectors(we install only). • Commissioning Regauirementso ®" Permit and bond fees, We can bond this work if requested,Add l%to our bid if bond is required. 0 ProposeCL We hereby to furnish material and labor a complete in accordance with the above specifications,for the suet of Threesus nd Nine HundredT iIl y- ne Dollars and 00/1003, 31. Payment to be made as follows. Monthly as work progresses Standard AIA Sub-contract a Oeineq _ cri All Inmulaidal Is guarantaad to be as specified. All work to be completed In a worlunionlNe manner accordling to standard practices. Any allitied.s or davl®liens f n the above speoditca4ons Invdvfrag a costs will be executed only upon written orders and will become an extra chrege over and above the estimate. At agree nls contingent upon strikes,accidents or delays beyond our control. owners to carry fire,wind darrage and other necessary insurance.Our workers are fully covered by W n'a Compensation Insurance Authorized NoW Was may withdraw this proposal If not accepted within 30 days. Signature 0 Dustin Clark, Project Manager Note:United Mechanical,Inc.is not tax exempt,therefore,applicable sales i is Included in the cost of materials unless the customer has as tax exempt staters. ice t nc Proposal — The above prices,specifications and conditions are saOsfactory Signature and are hereby accepted, You are authatized to do the work as specified. Payment will be made as outlined above Doke of Acceptance: Si nature cri Packet Pg. 956 C.25.a MECHANICALUNITED United Mechanical, Inc. - Proposal Summary Jab; KY Departure Full 6170-4 Mainline Parkway Dustin Clark Id. RFI#16 Womens Keane Tie Beam Ft.Myers,FL 33912 dcWrk ,urrlihvacnccrn Date: 01 412 20 P 239-939-4502 Client: DL Porter F 239-939.4225 Labor Pate Mhrs Cescrl Harr Total 110 n Inaerin 125.00 0 $ 110 Pro aol Agana er 94.00 4 $ 360.00 111 Pro eot 9ana or Assistant 6 ,00 4 240.00 123 AutaCad Technician 94.00 a 109 Su ervisor 0.00 tt 40.00 0 102 Pi ®Fitters 7a.a0 0CL 102 Pi Fitters CT 105. 0 0 103 Shaaelmetal 70.00 12 840.00 103 Sheetrnetal OT 105.00 0 y 104 Plurnbin 70.00 0 � 104 Piurnbin OT $ 105.00 0 105 Service Technician 110.00 0 105 Chiilr r Technician is 110.00 0 10 Pair! rCondlStart_C ,00 Labor Total 2080.00 Material unit Cost �t . Sub total 7�/0 Tax Surtax Total 21 203 [duct seal,hangers $ 50.00 1 M50.00 $ $ $ 53.50$ 0 $ $ 0 $ 0 - $$ 0 $ $$ 0 $ $ 9� $ 0 $ - $ $ $ 0 $ - $ $ $ uj $ 0 $ $ $ - $ - $ 0 $ - $ - $ 0 $ 0 $ - $ $ CL $ 0 $ $ - $ $ a $ $ $ $ Alaterla!Total 53. 0 x erase Total 301 Bond 302 Trawl-Per Dlern $ 50.00 303 Crj Trawl-Lod Ira 160.40 304 Travel-1'ruck 1 a.00 305 Rental Equipment $ 30 Crams $ 307 Trailer Expense Total 360 ! Stab Contracts Quote Quoted b Total 100 Insulation Cunt K45O.00 Fill 450.00401 Insulation Pi a 4a2 Water Treatment 403 Sheet Metal Fabrication A I bout $ 629A2404 Electrical 405 Controls $406 Start-u $ 407 Test and Balance 406 General Construction-Concrete ads $ $ 409 General Construction-Conn __$ 412 En ineerin $ Excluded: $Sub Contract Total 179A2 0 Sub Total 3 59 .92 10%OH $ 151.29 5%Profit $ 167.21 Total $ 3 931.42 Requested Change Order 3,931.00 Packet Pg. 957 (liodeN japio abueqo AI 1uo -L MA3) liodeN japio abueqo Al }uo :ju9wqoejjV w Lo N CD U a r^ CL p 0 M CNII ("° 5 3 \ CN om .. ® L � ui z > LA ® e " . .. .,„ 1 c i dCD a ux es! u< 0LIJ UJ u_ LU a z L y 1 u u v CZZ N �? 6) t35; Ln 42 .0 r . 0 CL Aw 3 c v a > e IT ar `� 0 0 ai y 0 ® er = c CD 4 � 2 ,� LU L c Co .� �� ca m co J oa ` a s ® cc „� ea 113 a. C.25.a AttachmentChange Order C i - Change Order was not included in the original contract specifications. Yes(X } o( ) If Yea, explanation® Unforseen condtion, column placement and size conflicted with the original design 0 CL Change Order was included in the original specifications. Yes No ( } If Yes, explanation of increase in price. CU Change Order exceeds$50,000 or5%of contract price(whichever isgreater).Yee(} o } 0 i If Yes, explanation as to why it is not subject for a calling for ids: 0 CL Project architect approves the change or er.Yes(X) No ( ) If no,explanation of y: CU Change rder is correcting an error or ornission in design document. Yes ( ) No ( } Should a claim under the applicable professional liability policy be made? Yes( } No ( 0 Explain, U Packet Pg. 959 C.25.a PROJECT : NIP Constructionf : KWBTS Building INVITATIONApril CONTRACTOR:TO Contracting r ,Inc. September 1 1560 Matthew Drive,Ste B o CL Fort Myers, FL 33982 The Contract is changed as follows: The original(Contract ) (Guaranteed xi u Price).......................................... 5,928,071.69 Net change previously authorized Change rders.................................................. 0.0 The(Contract Suml prior to this Change order was..................................................... 5,928,071.69 The(Contract Sum)will be decreasedy this Change Order........................................ 433,708.S6 The new(Contract Sum)_including this Change Order is............. ................................ $5,494,363.13 The Contract Time will be(increased)(decreased) y............................... 0 days The date of Substantial Completion as of the date of this Change Order is...............September 11,2020 i Detailed scri ion of change order and justification: Unused Contingency: t: -$350,000.00 Unused Hurricane i i t: -$32,000.00 Unit 319 Optedram: Deduct -$57,750.30 o Additional work per the attached break AmountNet of Change Order: $433,708.56 This Change Order is negative e 8%>of the original contract price. t valid it signed 4y,,qwner c IContractor CONSTRUCTION MA A /ARCHITECT: — ate o CONTRACTOR: ®ate E U DIRECTOR OF AIRPORTS to COUNTY:MONROE s ./Coun Ad inisrator at FROE CO ATTOFINEY VE PED ASSWT NfTYATTORNEY Date____2/_23/20 Packet Pg. 960 C.25.a MonroeChange Order Attachment per i • Change Order was not included in the original contract specifications. Yes ( ) o O If Yes, explanation: • Change Order was included in the original specifications. Yes No ( ) 0 If Yes, explanation of increase in price: CL ® Change Order exceeds$50,000 or %of contract price(whichever is greater).Yes() No( ) If Yes, explanation as to why it is not subject for a calling for bids: 0 i • Project architect approves the change order. Yes ) No If no,explanation of why: o CL • Change Order is correcting an error or omission in design document. Yes No( ) - Should a claim under the applicable professional liability policy be made? Yes( ) o ( ) 0 Explain: 0 U Packet Pg. 961 C.25.a Change Order Request Project: Key West by The Sea Building C Owner: Monroe County Board of County Commissioners Date: 9/1/2020 Item#1: Unit C-220 Frame Down Closet Door and Install New Door Material Cost: - $100.00 Labor Cost @$75.00 per hour: 16 hrs. x 75 - $1,200.00 Bi-Fold Door Cost(1)total $75.00 Sub-Total: $1,375.00 General Contractor overhead @ 10% $137.50 O CL General Contractor profit @ 10% $137.50 Sub-Total $1,650.00 Item#2: Unit C-202 Sheet Rock in Entry Hall 4) i Material Cost: $25.00 x 5 $125.00 Labor Cost @$85.00 per hour: 85 x 21 = $1,785.00 Sub-total $1,910.00 General Contractor overhead @ 10% 191.00 General Contractor Profit @ 10%: $191.00 21 Sub-Total $2,292.00 Item#3: Unit C-203 Frame Down Closet Door and Install New Door O I Material Cost: - $100.00 � Labor Cost @$75.00 per hour: 16 hrs. x 75 $1,200.00 Bi-Fold Door Cost(1)total = $75.00 ?- LU Sub-Total: $1,375.00 General Contractor overhead @ 10% $137.50 CL O General Contractor profit @ 10% $137.50 Sub-Total $1,650.00 i ftem#4 Unit C-21.2 Asbestos Abatement of Popcorn Ceiling Material Cost: _ $405.00 Labor Cost @$75.00 per hour: 75 x 27 = $4,050.00 CrJ Sub-Total: $4,455.00 Sub Contractor overhead @ 10% $445.50 Sub Contractor profit @ 10% $445.50 O General Contractor Profit @ 5%: $225.75 Sub-Total $5,571.75 U Page 1 Packet Pg. 962 C.25.a Item#5 unit C-317 Frame Doyen Closet Door and Install New boor Material Cost: _ $100.00 Labor Cost @$75.00 per hour: 16 hrs. x 75 = $1,200.00 Bi-Fold Door Cost(1)total = $75.00 Sub-Total: $1,375.00 General Contractor overhead @ 10% $137.50 General Contractor profit @ 10% $137.50 Sub-Total $1,650.00 Item#6 unit C-215 Frame Down Closet Door and Install New Door Material Cost: _ $100.00 Labor Cost @$75.00 per hour: 16 hrs. x 75 - $1,200.00 BI-Fold Door Cost(1)total - $75.00 0 CL Sub-Total: $1,375.00 General Contractor overhead @ 10% $137.50 General Contractor profit @ 10% $137.50 Sub-Total $1,650.00 Item#7 unit C-113 Move unforeseen Electrical in Exterior Wall Crj Material Cost Conduit and Wire: $100.00 Labor Cost @$85.00 per hour: 85 3 $255.00 21 Sub-total $355.00 Sub-contractor overhead @ 10%: $7&00 0 Sub-contractor profit @10%: $78.00 I General Contractor Profit @ 5%: $39.00 Sub-Total $550.00 >" LU item#8 Additional condensate lines and pumps 0 CL Material Cost PVC: $800.00 Labor Cost @$85.00 per hour: 85 16 $1,360.00 Sub-total $2,160.00 Sub-contractor overhead @ 10%: $78.00 Sub-contractor profit @10%: $78.00 General Contractor Profit @ 5%: $39.00 Crj Sub-Total $2,355.00 Item#9 Power sensin0 relay for damper installation: 0 Material Cost relay: $150.00 Labor Cost @$85.00 per hour: 85 4 $340.00 Subtotal $490.00 Sub-contractor overhead @ 10%: $49.00 U Sub-contractor profit @10%: $49.00 General Contractor Profit @ 5%: $24.50 Sub-Total $612.50 Page 2 Packet Pg. 963 C.25.a Item#7 Material Cost Difference Window vs Door Units CIII C214 C217 Material Cost Difference: (,Ip1.,445.27) x 3 - -$4,335.81 Sub-Total -$4,335.81 Itern#11 Door Chas been infilled.Provide deduct for Door C105&C11 : Material Cost: $3,092.00 x 2 -$6,184.00 Labor Cost @$85.00 per hour: 85 x 8 -$680.00 Sub-total -$6,864.00 Sub-Total -$6,864.00 Item#12 Eliminate infill of AC units at 4 locations: 0 CL Material Cost: $15.00 x 4 -$60.00 Labor Cost @$85.00 per hour: 85 x 8 -$680.00 Sub-total -$740.00 Sub-Total -$740.00 Crj TOTAL CHANGE ORDER AMOUNT: $6,041.44 2. 0 LIJ 9� 0 CL Crj i 0 U Page 3 Packet Pg. 964