Agenda Item Number: C.36
Agenda Item Summary #7444
BULK ITEM: Yes DEPARTMENT: Airports
TIME APPROXIMATE: STAFF CONTACT: Richard Strickland(305) 809-5200
NA
AGENDA ITEM WORDING: Approval of Jacobs Project Management Co.'s Task Order No.
12/15-84 in the amount of $289,702.00 for Aircraft Overflow Parking Design Phase 1 at the Key
West International Airport. The project was identified in the Master Plan completed in 2019 due to
increased aircraft activity and the need for aircraft apron parking. The Task Order is being funded
by Airport Operating Fund 404
ITEM BACKGROUND: Services include coordination, design and permitting for the expansion of
the general aviation apron as the airport continues to experience increased need for aircraft apron
parking. Phase 1 will develop a 30% design package and includes permit submittal to the United
States Army Corps Engineers.
PREVIOUS RELEVANT BOCC ACTION: Approval of Master Agreement for Professional
Services with Jacobs Project Management Company for General Consulting Services for both
Monroe County Airports on February 15, 2017.
CONTRACT/AGREEMENT CHANGES:
new PSO
STAFF RECOMMENDATION: Approval.
DOCUMENTATION:
Jacobs PSO 1215-84 Aircraft Overflow Parking Phase 1 (Executed Version)
FINANCIAL IMPACT:
Effective Date: Upon execution
Expiration Date: 365 days after execution
Total Dollar Value of Contract: $289,702.00
Packet Pg. 1091
C.36
Total Cost to County: -0-
Current Year Portion: $289,702.00
Budgeted: yes
Source of Funds: Airport Operating Fund 404
CPI:
Indirect Costs:
Estimated Ongoing Costs Not Included in above dollar amounts:
Revenue Producing: If yes, amount:
Grant:
County Match:
Insurance Required: Yes, under Master Agreement
Additional Details:
10/21/20 404-63001 - KEY WEST AIRPORT O & M $289,702.00
REVIEWED BY:
Beth Leto Completed 10/05/2020 2:19 PM
Richard Strickland Completed 10/05/2020 2:57 PM
Pedro Mercado Completed 10/05/2020 4:56 PM
Purchasing Completed 10/05/2020 5:01 PM
Budget and Finance Completed 10/05/2020 5:32 PM
Maria Slavik Completed 10/05/2020 7:00 PM
Liz Yongue Completed 10/06/2020 9:22 AM
Board of County Commissioners Pending 10/21/2020 9:00 AM
Packet Pg. 1092
C.36.a
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
TASK ORDER FORM 0
le
00
Ln
Effective ate Task Order No. 121115-84
Client Project No. Engineer Project No. E9Y37984
0
This Task Order is entered into on the effective date noted above pursuant to the "Master
CU
Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS
MANAGEMENTPROJECT CO. "Consultant"), dated February1 , 2017 ("Agreement"). The
Agreement is incorporated erein and forms an integral art oft is Task Order.
Services Authorized—Aircraft Overflow Parking—Phase
Client authorizes Consultant to perform the Services described in Exhibit A attached hereto an 2
°
incorporated herein, which Exhibit A is marked with the above noted Task Order No.
consists of 6 page(s).
S
Pricing .2
N/A Time and ExpenseAgreement Appendix B tot e Agreement.
Firm Fixed rice of 02.00
NIA Other(Describe):
Pj X
Schedule
PEDRO
Services may commence on ExecutionICI° 17-
Services will cease 5 ys t a T
)
Other
(SEAL) BOARD OF COUNTY
ATTEST: KEVIN MADOK, CLERK OF MONROE COUNTY, FLORIDA
y
Mayor/Chairman
00
Ln
JACOBS PROJECT MANAGEMENTCAN
Dsgdtally signed by kffsey D.Acton
Jeffrey D. 0M cn-jeffrey 0.Acton,o:. abs
(.sFMCass.o+a, t)
emad a ceffveyAct iacrabs.com,c-US CL
Jacqueline CX ,=,am«wlks a Pow,,,c-U&
e
0
ReRoss 0gion PM/CM Group Leader
[4e.vMc t0Q G7A2'32.CuW
Witness Titlecri
m .......�...............m. ......._...................--
U
File: MSTR APS-Monroe County
Page I of I
Packet Pg. 1093
C.36.a
Exhibit A— (12115 - 84)
Scope of Services >
Monroe County Airports le
00
Key West International Airport (EYW) L an
Aircraft Overflow Parking — Phase 1 Cn
CL
SCOPE OF WORK
i
Jacobs will provide project management, coordination services, design, and permitting
for the expansion of the General Aviation Apron at Key West International Airport (EYW).
EXISTING CONDITIONS
0
Key West International Airport continues to see increase in aircraft activity and the need
for aircraft apron parking. In accordance with the Master Plan completed in 2019, the
additional Overflow Apron is recommended to support this increased demand.
°
The footprint of the proposed Aircraft Overflow Parking is located west of Taxiway Al
(131) and adjacent to an existing salt pond. The proposed Aircraft Overflow Parking will
have two stub taxiways connected to Taxiway A. Refer to Figure 1 for the proposed
overflow parking apron.
ty cri
CL
,sl ttt t: sP is tilt s?i sJ t t stst�i ttt i}!7 }tl;;lrir slri! +�s �ss f l i s t'.. U}
cri
CL
Taxiway A
O
Proposed �-
`} Aircraft Overflow
r
Parking
00
% � b% 1) 1 is s s lassti7 }
s �t `� s t t ) tt r tl7 1Alt. t lA)
(tt #lYt�Y 11d ti S 1 t � i ll S J}
Mill" 1 }!) t ! r!S t}4?Stt} ({ - t t 04
O
U)
ds5 r ProposeCL
"INd, urvee
��,,'n " ,
s}} ,
� i } £t}�s11}�i llls }r \4i #(y�tS{{71f ttrl zstl � t R `s i{s£{� t :,�NS1}ssyv �t ssi ss s ,,
4 U f}hof}��f(lt}s tlx: ?� sl - rs
t t �,; U
�(\} 4s tt �' St! iii t£�asbi l tiS s l tt���
cri
Figure 1: Proposed Aircraft Overflow Parking and Survey Area
U
Page 1 of 6
Packet Pg. 1094
C.36.a
DESCRIPTION OF WORK
Phase 1 of the General Aviation Overflow Apron Expansion project includes the following le
00
elements: Ln
1. Develop a 30%design package for the proposed Overflow Apron
2. Develop a 30%design package for the on-site and off-site mitigation areas CL
CL
3. Submit a United States Army Corps Engineers (USACE) for the proposed salt pond 0
impacts and mitigation areas
CU
GENERAL SCOPE
One construction package will be developed for this project. For this construction
package, Jacobs will provide the following services:
1. Management of the project from data collection, 30% design package, and
USACE permit submission
2. Coordination with the geotechnical subconsultant, survey subconsultant, and
permitting subconsultant.
i2
3. Coordination with Monroe County, USACE, and SFWMD as required.
4. Preparation of minutes of meetings and phone conversations.
5. Program verification and site investigations.
x
ASSUMPTIONS/DESIGN PARAMETERS
CU
1. This project will be funded with state, local, and CARES monies.
CL
2. Jacobs will develop plans at a 30%design level for review.
3. USACE and SFWMD permits are required based on the current scope of the project.
CU
4. A pavement design report is required and will be based on the airport's current CL
general aviation fleet mix. 2
5. The taxiway design criteria will be based on Taxiway Design Group 2. It is assumed
that this project will not utilize paved shoulders.
6. It is assumed the Airport will provide an escort for the survey.
7. The design will be in accordance with the most current FAA-AIP Advisory Circulars. U_
8. This scope of work does not include bid services, construction administration,
00
resident project representative nor quality assurance testing. This scope of work also Ln
does not include the development of a construction management plan. These
services along with a construction management plan will be provided under a Cn
CL
separate purchase order.
9. It is assumed that this project does not require the creation of an AGIS project. 0
CU
10.Any cost estimates provided by Jacobs will be in a basis of experience and judgement.
Since consultant has no control over market conditions or bidding procedures, Jacobs
U
V
Page 2of6
Packet Pg. 1095
C.36.a
does not warrant that bids or ultimate construction costs will not vary from these cost
estimates. >
le
00
ARTICLE A—DATA COLLECTION AND PRELIMINARY DESIGN Ln
Data Collection:
U)
1. Prepare for and attend project design kick off meeting.
U
CU
2. Coordinate with subconsultants including but not limited to survey, geotechnical, and
environmental permitting as well as other Project Team members.
3. Perform a detailed topographic survey of existing apron, proposed apron expansion
footprint, mitigation areas, and wetland delineation as outlined in the attached survey
scope of work by O'Neal Surveying Company.
4. Perform a geotechnical investigation to assess the existing soil strata classifications in
the proposed mitigation areas. Geotechnical investigation will also include
cores/bores to determine existing pavement thickness, soil strength, estimated 0
ground water level, and estimated seasonal high ground water level table. The
geotechnical investigation will be performed as outlined in the attached scope of
work by Tierra South Florida.
U
a)
5. Jacobs to provide full time badged escort for the geotechnical field crew. It is
assumed that the geotechnical field work will take approximately 5 - 8 hour shifts to
complete.
CL
6. Research record drawings for underground utilities. (i.e. sewer, water, electric, gas,
communication, etc.).
CL
7. Perform an inventory and inspections of the existing taxiway edge light bases and
guidance sign panel messages.All of the taxiway guidance signs at the airport will
need to be updated to accommodate the two additional stub taxiways. 0
8. Perform site walk through survey to locate and note any special site conditions that
would affect construction techniques or materials. Take photographs of the site and
le
provide written documentation, sketches, notes, or reports to confirm and record the 00Ln
general conditions of the existing site. Field verify that all existing features in the field
were picked up during the topographic survey.
Cn
CL
9. Assist Birkitt Environmental Services with preparation and attend Pre-Application
meeting with SFWMD. 0
CU
10.Assist Birkitt Environmental Services with preparation and attend Pre-Application
meeting with SFWMD.
U
Page 3of6
Packet Pg. 1096
C.36.a
11. Perform a wetlands and protected species impact and mitigation detailed site review
for the proposed Aircraft Overflow Parking area, three on-site mitigation areas, and le
00
one off-site mitigation area. The environmental investigation will be performed as Ln
outlined in the attached scope of work by Birkitt Environmental Services, Inc.
12. Perform QA/QC. CL
U)
ARTICLE B-30% DESIGN U
i
Based on the information collected under Article A,the 30%design documents will be
developed for all elements identified in this scope of work.
1. Prepare for and attend one (1) design review meetings with the Airport to discuss
project progress and review the design submittals.
2. Prepare preliminary pavement design report. All analytical methods, results, and
recommendations will be summarized in a detailed written draft report.
0
3. Coordinate with Birkitt Environmental Services for the USACE permit.
4. Develop preliminary on-site and off-site mitigation design and report. The
designs, mitigation plans, and reports will be completed as outlined in the
attached scope of work by Birkitt Environmental Services, Inc.
5. Develop preliminary dewatering, shoulder stabilization, and erosion control
CU
Aircraft Overflow Apron to be constructed adjacent to salt ponds.
CL
6. Develop the following anticipated plans:
CU
CL
Overflow Apron /Mitigation Areas
30% Design Package
Sheet Name Number of Sheets
U
Title Sheet00
1
Index of Drawings and 1 Ln
Notes
General Notes 1 Cn
CL
General Plan 2
U
CrJ
Survey Control Plan 3
Existing Conditions Plan 8
U
Page 4 of 6
Packet Pg. 1097
C.36.a
Geotech/Borings Plan 8
Demolition/Clearing & 8
le
Grubbing Plan 00
LO
Geometry Plan 2
Typical Sections 3 en
CL
Grading Plan 8
0
Drainage Plan 2
Landscape Plan 6
Landscape Details 2
Erosion Control/Dewatering 2
Plan
Erosion Control/Dewatering 3
Details
Electrical Demolition Plan 2
Electrical Plan 2
Miscellaneous Details 4
Total Sheet Count 68
x
7. Jacobs will perform preliminary drainage design and attend the necessary pre-
application meeting with the South Florida Water Management District. Drainage CL
improvements will include connecting existing storm sewer systems to the newly
installed injection wells that were installed under a previous project.
CU
CL
8. Jacobs will perform preliminary airfield electrical design. The preliminary airfield
electrical design will include the installation of new taxiway edge lights,
installation of guidance signs, and providing new guidance sign panels due to the
re-naming of the taxiways.
U
9. Prepare preliminary cost estimate for 30%design.
00
LO
10.Coordinate, distribute and print the following copies of the 30% design drawings V-,
(plans and design report) for review by the Airport:
Cn
CL
Monroe County: 2 copies of plans (1 full size; 1 half size); 2 copies of engineering
report U
cri
USACE: 2 copies of plans (1 full size; 1 half size); 2 copies of engineering
report
U
Page 5of6
Packet Pg. 1098
C.36.a
11.Conduct an in-house QA/QC prior to the 30% design submission. The in-house >
QA/QC check will involve an experienced independent individual, depending on le
00
each discipline, to conduct a comprehensive check on all documents to be L;
submitted (e.g. plans and reports). Time will be required for engineers and CADD
technicians/designers to correct items listed under the in-house QA/QC checks.
Cn
CL
12.Address comments from 30%design submission.
0
U
Services for Article B will be provided under a lump sum basis.
i
a�
PROJECT SCHEDULE
The tentative project schedule from the Notice to Proceed date will be as follows:
Project Schedule
Article A— Data Collection NTP + 30 Calendar Days
and Preliminary Design
Article B— 30% Design NTP + 75 Calendar Days 0
Submit 30% Plans to January 2021 E
Q)
USACE Permit
U
Q)
x
Q)
M
cri
CL
cri
CL
Q)
U
00
LO
V_
04
V_
U)
CL
U
cri
Page 6 of 6
Packet Pg. 1099
C.36.a
JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE
i
Monroe County >
Airport: le
Key West International Airport 00,
Project: Ln
Aircraft Overflow Parking-Phase 1 01
V-
FEE SUMMARY U)
CL
BASIC SERVICES Cn
Hours Fee DBE AMOUNT 0
U
Article A:Data Collection and Preliminary Design 212 $ 124,152 $ 96,388.00
I
Article B:30%Design 882 $ 165,550 $ 63,822.00
Total Basic Services Lump Sum Fee 1,094 $ 289,702 $ 160,210
UJ
TOTAL LUMP SUM PROJECT FEE 1,094 $ 289,702 $ 160,210