HomeMy WebLinkAboutTask Order 06A 04/15/2020 11
sa ° °w Kevin Madok, CPA
, , `
,1 Clerk of the Circuit Court&Comptroller—Monroe County,Flodda
DATE: November 16, 2020
TO: Rhonda Haag
Chief Resilience Officer
Liz Yongue
Executive Assistant
FROM: Pamela G. Hanc }LC.
SUUJECF: April 15th BOCC Meeting
Attached is an electronic copy of the following item for your handling:
E2 Task Order No. 6A for a no-cost extension to Task Order No. 6 under the On-
Call Contract with Wood Environment and Infrastructure, Inc. for Category B Canal
Infrastructure Engineering Services; for the design, permitting and procurement assistance for
installing a replacement air curtain system at the mouth of Canal #266 located on Wi0ers Lane in
Big Pine Kcy to replace the air curtain destroyed by Hurricane Irma;retroactively extended from
August 27, 2019 through March 31, 2020.
Should you have any questions please feel free to contact me at(305) 292-3550.
cc: County Attorney
Finance
File
KEY WEST MARATHON PLANTATION KEY PK/ROTH BUILDING
500 Whitehead Street 3117 Overseas Highway 88820 Overseas Highway 50 High Point Road
Key West,Florida 33040 Marathon,Flodda 33050 Plantation Key,Honda 33070 Plantation Key,Florida 33070
305-294-4641 305-289-6027 305-852-7145 305-852-7145
TASK ORDER#SA FOR CATEGORY B ON CALL PROFESSIONAL
ENGINEERING SERVICES FOR CANAL RESTORATION SERVICES
BETWEEN
MONROE COUNTY AND
WOOD ENVIRONMENT& INFRASTRUCTURE SOLUTIONS, INC.
FOR HURRICANE IRMA DAMAGE REPLACMENT FOR THE CANAL#266
BIG PINE KEY CANAL DEMONSTRATION AIR CURTAIN PROJECT
INCLUDING DESIGN, PERMITTING, AND PROCUREMENT SERVICES IN,
MONROE COUNTY, FLORIDA
In accordance with the Continuing Contract for On Call Professional Engineering
Services made and entered on the 15th day of March, 2017 and Amendment No.1 dated
December 13m, 2017 and Amendment No.2 dated June 20, 2018 between Monroe
County, hereinafter referred to as the "County" and Wood Environment & Infrastructure
Solutions, Inc. hereinafter referred to as "Consultant"where design services are allowed
if construction costs do not exceed $2,000,000.
All terms and conditions of the referenced Contract for On Call Professional Engineering
Services apply to the Task Order, unless the Task Order modifies an Article of the
Agreement of which will be specifically referenced in this Task Order and the
modification shall be precisely described.
WITNESSETH
WHEREAS, this is a no cost time extension and continuation of services
approved under the task order 6; and
WHEREAS, the Consultant has been timely providing the submittals required for the
project however due to issues with obtaining the County permit, coordinating with
Contractor and CEI firm for construction commencement, and responding to FEMA
requests for additional information for reimbursement the schedule has been delayed;
and
WHEREAS, the task order is hereby extended from August 26, 2019 until March 31,
2020 to provide sufficient time to address the aforementioned tasks; and
WHEREAS, no new funds are required for this time extension.
NOW, THEREFORE, in consideration of the mutual promises, covenants and
agreements stated herein, and for other good and valuable consideration, the sufficiency
of which is hereby acknowledged, County and Consultant agree as follows:
This Task Order is retroactive to August 26, 2019 and shall expire March 31, 2020.
Hurricane Irma Damage Replacement
For Canal#266 Big Pine Key
Canal Demonstration Air Curtain Project
March 18,2020
Page I of 3
Article II Scope of Basic Services, Paragraph 2.1.1 is amended as follows:
Task 1: Design Plans
Consultant will modify the current design documents to include an evaluation of hardening
the structure for future storm events and king tides. Upon analysis,the plans will be revised
to include the following components:
• Construction Plans—depicting site impacts, equipment layout,technical
specifications and utilities.
• Estimate of Construction Cost—The cost for the canal restoration will be refined
throughout the design process and a detailed Engineer's Opinion of Probable Cost
will be prepared and submitted with the construction documents.
The design plans and specifications will be submitted to the County for review and comment.
Comments received will be addressed and resolved to the satisfaction of the County as soon
as practicable so as to not delay the project.
Due Date: March 31,2020
Task 2: Permit Application Assistance
Consultant will submit modifications to the existing permits dependent on design changes
with the incorporation of the resiliency items aforementioned.The applications will be
submitted to the following agencies:
• SFWMD
• USAGE
• FKNMS
• County
Consultant will respond to Requests for Additional Information(RAI)for each permit
application. Permit fees to the SFMWD are included but permit fees to the County are not
Included as they are not known at this time.
If impacts to wetlands or benthic resources are identified,Consultant will coordinate
appropriate mitigation either onsite or through the purchase of mitigation credits. Costs to
purchase mitigation credits are not Included in the cost estimate as It is unknown at this time
if mitigation will be reauired
Due Date: March 31, 2020
Task 3: Support in Procurement of a Construction Contractor
Upon completion of the Construction Documents,the Consultant will assist the County,who
will be procuring the construction of the project,with the necessary procurement documents
and meetings.Consultant will provide the following services to assist the County in the
procurement of a contractor for the construction of the air curtain:
a) Prepare a Request for Proposal Package which will include the 100%Construction
documents completed by Consultant
Hurricane Irma Damage Replacement
For Canal%266 Big Pine Key
Canal Demonstration Air Curtain Project
March 18,2020
Page 2 of 3
b) Respond to applicable Proposers' Requests for Information(RFI's)and assist in the
preparation of answers.
c) Attend a Pre-Proposal Conference and site walk-through and prepare meeting
minutes.
d) Conduct a Responsibility Review of the Proposals.
e) Attend a Pre-Award Conference with the County,to discuss the Proposers
qualifications and understanding of the Project, if required.
Due Date: March 31,2020
Article VII, Paragraph 7.1.1 is amended to include the following:
The Consultant shall be paid monthly for time and expenses based on hourly rates and
the following not to exceed amounts(except where noted):
Task 1: Design Plans $ 8,842.20
Task 2: Permit Application Assistance $ 5,878.20
Task 3: Support In Procurement of a Construction Contractor $ 6,016.20
Total (not to exceed) S 20,736.60
IN WITNESS WHEREOF, each party caused the Task Order to be executed by its duly
authorized representative.
CONSULTANT: WITNESS:
WOOD ENVIRONMENT
8 INFRASTRUCTURE SOLUTIONS INC.
Z—kb -to 7' l,Le//L Z/ 2v
Signature Date re ate
1 NROE ATTORNEY
.((��AA��,PP,1,, i FORM
J ,WhGy}�� _o ,r :,1 r
ft P
%s to p�� 2/26/2020 ATTORNEY ..
0 ri
AS
BOARD OF COUNTY COMM1SSIONLatS
tt T: KEVIN MADOK, CLERK OF MONROE COUNTY, FLOIDA "� -i
Ci) 2
By: by:
Deputy Clerk Mayor/ airm .p- -- 0
Date: arad is zo w
Hurricane Irma Damage Replacement
For Canal#266 Big Pine Key
Canal Demonstration Air Curtain Project
March I8,2020
Page 3 of 3
EXHIBIT A
CONSULTANT'S PROPOSAL
| 2§ § /p . : |..(; |
iq
T,,,., _ ! �'1 1
!o . |':!;!'| .} ||(:| ||
|o q! •e�a § a.
E 9 }
| I l ;I, | , |§§i §
|! '
§ 1 1 | -_ , - |/i _!-
! ) I
,. . fI' .
! i_
.• - , �;EgUg I. in
\ ! F ., ,§ i . !
| .
El
!• § | | SE El
EX , . SI -,
A P 11 § F
[ §
! i ;
\ E [(||E | Ig■ §
ui
o
2 \!
)
| ! ,
- § \
\Q/ 1SaSI3 |
| !! !;!| » |
! !/!#| ! | hp
| §g§| | : §j