15th Change Order 11/18/2020 BOARD OF COUNTY COMMISSIONERS
County of Monroe Mayer Heather C urruthers,District 3
( tt
Florida � ,, � Mayor bra Terry Michelle C;oldiran,District 2
The i ',i Craig rig Crates,District t
David Dice,District 4
Sylvia Murphy,District 5
Memorandum
DATE: 11/17/2020
TO: BOCC
cn=Kevin G.Wilson,P.E.,o=Monroe
County,FL(the Florida Keys,ou,
FROM: Kevin G. Wilson, P.E. :,. '� email=wilson-kevin@monroecounty-
fl.gov,c=US
2020.11.17 15:58:14-05'00'
SUBJECT: Proposed Change Order to be Approved
Attached is proposed Change Order#15 for the Monroe County Library & Adult Education Marathon
Branch project. This change order increases the final contract sum by $28,349.90. The substantial
completion date is unchanged.
Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the
Administrator to approve change orders within specified limits after providing Board of County
Commissioners with at least 24 hours to review them and pose any questions or objections that they may
have. It is the Administrator's intent to approve the attached change order under that authority.
It is the Administrator's intent to approve the attached change order under that authority on Thursday,
November 18, 2020.
h
rr
I
i
�tlt
MONROE E MANAGEmENT
CoNTRAcr CHANGE ORDER
�j
g
i
PROJECT TITLE- 1 �I(
Monroe County Library and AdI i INITIATION DATE: 11/1312020
Center,Marathon Branch / 1/ 1
TO CONTRACTOR:
Pedro-Falcon Contractors, Inc.
[I
31160 Avenue C
Big Pine Key, FL 33043
i
The Contract is changed s follows: y
The original (Contract Sum)(Guaranteed Maximu Price)........................................... 7.016,385.00f
Net change by previously authorized Change Orders.. 72 , 10.11
The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was ............. 7,738,695.11
The(Cant ct Sum)(Guaranteed Maximum Price)will be ancreased (decreased)(unchanged)by this
Chan r.............$ 28,349.90
The new(Contract Sum)(Guaranteed axi u rice)including this Change Order i ...... 7,767, . 1
The Contract Time will be(increased)(decreased)(0ghgng@D by................................. 0 Days '
The date of Substantial Completion as of the date of this Change Order is........................ 310612021
Detailed description of change order and justification:
During construction, it was determined the Architect via l#24 that the electrical equipment was to be
mounted at an elevation of+10. 4 to meet FEMA requirements. The need to raise the electrical equipment
was a result of the elevation grade changes required to correct a previously identified survey to error.
To properly elevate and access the equipment, an aluminum platform, guardrails, access ladder, and
foundation is required to be designed, fabilicated, and installed. This change order incorporates all labor,
equipment, and materials to complete this additional work.
i
o additional contract time is required for this change.
Chanoe order is 0.40%of or final contract price,
Not valid until si ned bv Owner.Architect if al2plicabld,aid Cot t
ARCHITECT:
Sy lovsj,. LLC Date
I
CONTRACTOR:
e ro-Falcon Contractors, Inc. Date
Cary Knight Dig ita l ly signed by Cary Knight
DIRECTOR PROJECT MANAGEMENT
Date:2020.11.17 15:35:25-05'00'
Cary Knight, i ctr Date
cn=Kevin G.Wilson,P E,o Monroe County,
�+ /,
1 kevin@mlonrdoe ountyuflgov,Ic UISon- �
IA IST T A I I T AT : i 2020.11.1908:3042 OS 00'
Roman Gastesi Date
Kevin Wilson
Christine Hurley
i
I
t
I
�IGGi
G
Change Order Attachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes E No El
If Yes, explanation: This additional platform is the result of required grade changes due to a survey
datum error.
• Change Order was included in the original specifications. Yes F1 No Z
If Yes, explanation of increase in price:
• Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes El No Z
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes Z No El
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ENo El
Should a claim under the applicable professional liability policy be made? Yes E No El
Explain: Yes, Monroe County contracted Avirom &Associates, Inc. to conduct Boundary, can High
Water Line, and Topographic Surveys of the Marathon Library project site to be utilized by Synalovski
Romanik Saye LLC for design purposes. The survey utilized incorrect datum resulting in multiple design
revisions to meet FEMA elevation requirements. The addition of this access platform is a result of
elevating the electrical equipment to the corrected elevation and then simply having no way to access
it due to its height.
PEDRO FALCON
CONTRACTORS, INC.
31160 Avenue C, Big Pine Key, FL 33043-4516
(305)872-2200-Fax(305)872-2219
EC 130034161 CGC 1507617
www*edrofalcon.com
Request for Change Order
lo November 2020
Pr 0J Ject: Marathon Library
PCO Number: 023
Description: Platform at Electrical Equipment
.................................I......... ........ ........... ............................. ..............
Skyline Steel
F&I Platform(see attached).............................................................................$20,944-00
PFCManagement Fee @ 5%.................................................................................$1,047.20
Subtot:al Subcontractor...................................................................$21.99:t.20
PFC— Concrete Foundation
Excavation.............................................................................................................$1600.00
Materials................................................................................................................$1,200.00
Labor56 @ $41-40.................................................................................................$2,318.40
ConcretePump.........................................................................................................$400-00
SubtotalConcrete Foundation...............................................................................$5,418-40
PFCOverhead @ 5%.................................................................................................$270.92
PFCProfit @ 5%.......................................................................................................$270.92
SalesTax on Materials...............................................................................................$90.00
Subtotal PFC Concrete Foundation..................................................$6,050.24
P&P Bond i.i%of Total Cost.............................................................$308-46
Total Requestfor Change Order Amount......................................$28,349-90
espec
en Bygle
Project Manager
Indusidel-Commercial-institudonal-Residendal-UVW
Established 1984
E STEEL
hL I
NOVEMBER 1 #19046
CO 5
PEDRO FALCON CONTRACTORS,INC.
BIG PINE KEY,
FL 33043
-
ATTN:MR.KEN BYGLER : er g`(,+ii�edro '�,ilco�i.com
: MARATHON L
PER EMAM RECEIVED 11/3/2020
We propose to finnish the of items for the above-mentionedoF.O.B.jobsite
1) Mill finish Aluminum Grating Platform 12' - V? / "High widi
Aluminumr and multiline Guardrails "High Three(3)Sides
SignedeDrawings
TOTALLUMP SUM FOR I ..........................
TOTAL MATERIAL..................................... $S,!i54.00
SHOP LABOR... ............6 S60 .......... $3,900.00
DRAFTHOURS.............2 65 ........... $1,560.00
ENGINEERING.............. . x S1 .......... smo.000
FINISII..................................................— Mill Finish
DELMERY...... ......... ......... .................
EQUIPNOM.............. ........ ......... ........ /
INSTALL...................... 5 .....-». $5,440.00
TOTAL_ . ......... ......_._...... ......... ......... 520.944.00
PLE ASE SIGN TO SIGNMY APPROVAL
CONTRACTORSRESPECTFULLY SUBMITTED,
APPROVAL
PEDRO FALCON
MUM DAVIS DATE
STEEL,SKYLINE .
4987 NW 2 venue. Fort Lauderdale, Florida *1 9684912*Fax: ( )968-7077
%W"WW.s linesteel.not
REQUEST FOR INFORMATION
DATE: 9/15/2020
RFI#: Twenty-four
PROJECT: MARATHON LIBRARY&ADULT EDUCATION CENTER
FROM: Pedro Falcon Contractors, Inc.
CONTRACTOR
31160 Ave C Big Pine Key,Florida 33043
ADDRESS
305-872-2200 305-872-2219
PHONE FAX CELL
FROM: Pedro Falcon Electrical Contractors, Inc.
SUBCONTRACTOR
31160 Ave C Big Pine Key,Florida 33043
ADDRESS
305-872-2200 305-872-2219
PHONE FAX CELL
TO: SynalovskiRomanikSaye
ARCHITECr
1800 Eller Drive Suite 500 Fort Lauderdale,Florida 33316
ADDRESS
954-961-6806 954-961-6807
PHONE FAX CELL
DESCRIPTION:
Please provide bottom elevation of Electrical Equipment located at Mechanical Enclosure.
Attached photo indicates location.Steel Mechancical Equipment Stand is at finish floor
elevation.A pad will be required for electrical equipment.Response will dictate whether
details on pad will be required including steps and railings.
CONTRACTOR
RECOMMENDATION:
COST IMPACT: Response Will Dictate if there is Cost Involved
Ken Bygler 9/15/2020
NAME DATE
RESPONSE: Bottom of Electrical Equipment required to be+10.04, same as Mechanical equipment.
Disconnects must all be accessible per NEC requirements. If stair and landing required,
the landing must be a minimum of 42"deep in front of the equipment.
Merrill Romanik per converstaiton w/Dario Senalle(Delta G)
NAME DATE 09.21.20
}
t 1
1
I
}}}}}}
Ht F
1 1
-
l1r T�� rrl
} S t y j+J li4s `}t 45���� � _ �������}�''i�i} ��;'•r'n� ,sp-.-�}��`~3 � �- - �- =`-
i
Pf)tt
-
,
s
r i r is 4j rit S �
�—
�
--
2i -
1 i�}�}���i'}A11f�tj'Vi{1r� tlk yir rnirt�i}1 rb i1 {siu'it'}i`};trrsiry � 1 }
j } }
-
}i r4ryjs }} s}1r+ rl it V� s»sjti $ti �
yE£}ir�11}i��
}
rrrr
{ r