County Commission Meeting
November 17, 2020
Agenda Item Number: Q.7
Agenda Item Summary #7533
BULK ITEM: Yes DEPARTMENT: Sustainability
TIME APPROXIMATE: STAFF CONTACT: Rhonda Haag (305)453-8774
N/A
AGENDA ITEM WORDING: Approval of a grant application to DEP as part of their Resilience
Planning Grant program to develop a Natural Resources Adaptation Plan, requesting $75,000 in
grant funds and offering $67,000 in budgeted match funds, totaling $142,000 in project costs,
approval to be retroactive to the grant submittal date of October 9, 2020.
ITEM BACKGROUND: This item is to approve a grant application to DEP, which if awarded,
would develop a Natural Resources Adaptation Plan with cost benefit analysis. This analysis furthers
the work of the County's Sustainability and Climate Plan ongoing under the GreenKeys plan which
sets forth recommendations to plan appropriate uses and adaptation measures for areas.
Current work is being conducted in Monroe County to update the vulnerability assessment originally
conducted in 2015. This Natural Resources Adaptation Plan would use the outputs from this
vulnerability assessment to identify actions addressing the natural resource vulnerabilities found.
The underlying data for natural resource impacts will be generated currently, but more planning
work will be necessary to determine actual adaptation actions for natural resource impacts.
Specifically, coordination with Federal and State partners on species management issues will be a
part of developing the Adaptation Plan.
Background:
The southeast Florida region, including Monroe County, has long been recognized as area that has
vulnerabilities to climate-related hazards. With the development of the GreenKeys planning process
in 2013-2015 and updated vulnerability assessment (currently in process), the County will have a
better understanding of what those vulnerabilities are specifically related to sea level rise based on
the most recent (2019) projections of the Southeast Florida Regional Climate Compact. Coastal
resources that provide an important first line of defense continue to be lost or reduced in size, thus
further exposing people and property to coastal hazards. Interest is growing in the protective role
that coastal nature-based measures or projects (or green infrastructure), such as reefs and wetlands,
can play in adapting to these risks.
However, a lack of quantitative information on relative costs and benefits is one principal factor
Packet Pg. 2362
Q.7
limiting their use more broadly. We do know that when nature-based measures are implemented in
areas with higher asset value and at greater risk, their cost effectiveness increases significantly.
Nature-based adaptation strategies are emerging as a cost-effective option to reduce the impacts of
storm surge and waves and they use natural features of ecosystems for coastal protection (e.g.,
wetland restoration). A growing body of knowledge and experience supports their effectiveness for
coastal defense. Coastal ecosystems like coral reefs, oyster reefs, mangroves and salt marshes protect
the coast by reducing wave energy, trapping sediments, and attenuating storm surge. Nature-based
measures also offer a dynamic solution to challenges such as sea level rise, because ecosystems may
adapt to, and grow with, their changing environment. That said, it is possible to build a quantitative
economic case for adaptation measures focused on nature-based solutions and at scales relevant for
planning. Conservation outcomes are principally achieved through the protection of intact habitat or
the restoration of degraded habitat. In general, restoration is generally considered a lower priority
action than protection, but recent research shows that both are crucial components of an adaptation
strategy to optimize biodiversity or ecosystem services, and in some circumstances, restoration
should be preferred.
Precipitation-based impacts will be assessed over the next year in a partnership between the South
Florida Water Management District and U.S. Geological Survey (covering all 16 counties within the
South Florida Water Management District). This data could be incorporated into the Adaptation Plan
if the information becomes available for the Monroe County area during the period of this grant.
The County has not had the opportunity to complete a Natural Resource Adaptation Plan and given
the environmental sensitivity of areas throughout Monroe County, this could be a key element of the
County's resiliency strategy. With the completion of an updated vulnerability analysis, this project is
essential to allow the County to start developing an effort solely focused on its natural resource
attributes. This project will provide real-world examples of what this type of implementation will
mean on an individual project level.
While nature-based solutions are gaining momentum as an adaptation strategy, the lack of explicit
quantification of its cost and effectiveness is inhibiting widespread application. Now that the County
will have updated its vulnerability information about assets, infrastructure and general inundation
from sea level rise, and natural resources through the use of SLAMM, the next phase of its planning
process must focus on real natural resource adaptation actions. A cost- benefit methodology and
analysis will 1) identify specific actions, and 2) provide an understanding of what those actions will
cost to better inform the County, state and federal partners of what natural resource adaptation
strategies will look like.
PREVIOUS RELEVANT BOCC ACTION:
Not applicable.
CONTRACT/AGREEMENT CHANGES:
N/A
Packet Pg. 2363
Q.7
STAFF RECOMMENDATION: Approval
DOCUMENTATION:
Monroe County DEP CPI 2020 Grant app -Natural Resources Planning Pilot Project
FINANCIAL IMPACT:
Effective Date: TBD
Expiration Date: TBD if awarded the grant
Total Dollar Value of Grant Application: $142,000
Total Cost to County: $67,000.00 Current Year Portion: TBD
Budgeted: Yes
Source of Funds: $75,000 DEP Grant Funds, $67,000 Sustainability Funds - 001-05008
CPI: N/A Indirect Costs:
Estimated Ongoing Costs Not Included in above dollar amounts: None
Revenue Producing: Yes If yes, amount: $75,000 DEP
Grant: Yes (If awarded the grant) County Match: $67,000
Insurance Required: No
Additional Details:
REVIEWED BY:
Rhonda Haag Completed 11/02/2020 1:48 PM
Pedro Mercado Completed 11/02/2020 2:03 PM
Purchasing Completed 11/02/2020 2:04 PM
Budget and Finance Completed 11/02/2020 2:06 PM
Maria Slavik Completed 11/02/2020 2:08 PM
Liz Yongue Completed 11/02/2020 4:21 PM
Board of County Commissioners Pending 11/17/2020 9:00 AM
Packet Pg. 2364
Q.7.a
C
Application: PPG--262-- c
Wood Environment & Infrastructure, Solutions, Inc.53559RPG--262--RPGRPG
Started at:10/6/2020 02:24 PM-Finalized at:10/8/2020 10:26 PM N
U
0
(n
Page: Eligibility Questions 0)
Applicant Name
Monroe County Board of County Commissioners
Are you a local Florida government or municipality?
Yes
Applicant County
Monroe
tJ
Comprehensive Plan
Yes
L-
CL
Page:Grantee's General Info
EL
Grant Type
RPG
Provide the Applicant's FEID#that matches the registered listing in My Florida Market Place CL
(MFM) (https://vendor.myfloridamarketplace.com(https://vendor.myfloridamarketplace.com))
1.Go to MFMP(https://vendor.myfloridamarketplace.com),and login to validate and obtain the correct sequence number for your entity's payment
information.
(n
2.Enter your User Name&Password. If unknown enter"publicuser"for the User Name& Password 0)
3.Search through the listings under the detail section,that have the following fields that match your application information for where the applicant's
funds are to be delivered to:
• Entity legal name
• Full address(physical)
4.Should you not find a listing that matches,please contact MFMP to get a correct entry listed for the Grantee at:
https://www.dms.myflorida.com/business_operations/state_purchasing/myfloridamarketplace ¢,
(https://www.dms.myflorida.com/business_operations/state_purchasing/myfloridamarketplace)operations.
5.If your question is not answered by the FAQ's link on MFMP's page,please contact the MFMP Vendor Customer Service Desk at
vendorhelp@myfloridamarketplace.com(mai Ito:vendorhelp@myfloridamarketplace.com?subject=MFMP%20Assistance%20Needed)or by phone at 866- CD
CV
352-3776. CD
N
Federal Tax ID Number
CL
59-6000749
Sequence Number
1
tJ
DUNS Number
C
073876757
Provide current contact information for each. Some information may be duplicative.The grantee's grant manager is responsible for
all correspondence with DEP after the grant is awarded and relaying any information necessary to partners and/or subcontractors.
U
Packet Pg. 2365
Q.7.a
C
Applicant's Physical Address O
1100 Simonton St,Gato Bldg.,2nd Floor
Applicant's Physical City
Key West 0)
U
O
Applicant's Physical Zip Code N
33040 O
Applicant's Grant Manager's Name
Rhonda Haag
Applicant's Grant Manager's Title
Chief Resilience Officer
O
Applicant's Grant Manager's Physical Address
CL
tJ
Applicant's Grant Manager's City
U
O
Applicant's Grant Manager's Zip Code
33040 CL
O
Applicant's Grant Manager's Phone Number
3053959928
O
Applicant's Grant Manager's Email Address
CL
haag-rhonda@monroecounty-fl.gov try
O
U
Applicant's Authorized Signer's Name O
O
Roman Gastesi N
O
Applicant's Authorized Signer's Title
O
County Administrator
Applicant's Authorized Signer's Physical Address O
Applicant's Authorized Signer's City O
Applicant's Authorized Signer's Zip Code N
33040
CL
Applicant's Authorized Signer's Phone Number Ca
CL
305-394-1332
Applicant's Authorized Signer's Email Address
O
gastesi-roman@monroecounty-fl.gov O
tJ
O
Applicant's Fiscal Agent's Name
O
Pam Radloff O
Applicant's Fiscal Agent's Title
Finance Director
U
Packet Pg. 2366
Q.7.a
C
Applicant's Fiscal Agent's Mailing Address 2
500 Whitehead Street
Applicant's Fiscal Agent's City
Key West 0)
U
Applicant's Fiscal Agent's Zip N
33040 0)
Applicant's Fiscal Agent's Phone Number:
305-292-3560
Applicant's Fiscal Agent's Email Address
pradloff@monroe-clerk.com ¢
ds
Page: Project Information
CL
tJ
Entity's Name
Monroe County Board of County Commissioner
RPG Project Type CL
3 Adaptation/Resilience Plans
ELL
Project Title
Monroe County Natural Resources Adaptation Plan
ds
List the City(ies)/Town(s)/Village(s) CL
Unincorporated Monroe County
0
Project Location to
Monroe County, FL is Florida's most southern County and is also designated as an Area of Critical State Concern(legally
designated as such)due to the sensitivity of its natural environment and marine resources.
Upload Map
Download File(https://vo-general.s3.amazonaws.com/d0l7b9lf-429c-4ld2-94c6-f764db3489dc/da83b43a-b3bf-4e71-80f3-
4926ef9e075e?AWSAccessKeyId=AKIAJ4PRWO26HAX3IOCA&Expires=1688524300&response-content-
d isposition=inline%3B%20filename%3D%22Monroe%20County%20Natu ral%20Resources%20Adaptation%20Plan%20Map.pdf%22&respor
content-type=application%2Fpdf&Signature=tRAxrL57ikujsa6kyOzTEspyyrI%3D)
State Lands being utilized?
tV
No
CV
PROJECT WORK PLAN CL
tJ
Please review the RPG Project Types and Annual Priorities(https:L rcp.secure
platform.com:443/a/2aoe/RPGProiectWes Annual Priorities)in the title bar.If including any letters of support or other LU
materials, they should specifically address the Work Plan components below.
Project Summary
This project will develop a Natural Resources Adaptation Plan with cost benefit analysis. Current work is being conducted in Monroe 0)
County to update the vulnerability assessment originally conducted in 2015.This Natural Resources Adaptation Plan will use the
outputs from this vulnerability assessment to identify actions addressing the natural resource vulnerabilities found.The underlying
0
data for natural resource impacts will be generated currently, but more planning work will be necessary to determine actual
adaptation actions for natural resource impacts. Specifically,coordination with Federal and State partners on species management
issues will be a part of developing the Adaptation Plan.
Packet Pg. 2367
Q.7.a
C
Project Description O
Monroe County has benefitted from prior state grant assistance(RPG#R1915)and(RPG#R2111)adopting sea level rise projections and applying those
projections to county-specific data such as generalized inundation,critical facilities,stormwater,transportation,water and wastewater assets and providing
the County a clear assessment of its vulnerability to sea level rise.That vulnerability assessment is currently being updated with RPG#2111 and that
assessment includes running the Sea Level Affecting Marsh Model(SLAMM)to determine natural resource impacts.This proposed project further builds on
these efforts by leveraging resources(both expertise and funding)in combination with County staff,other agencies and subject matter experts,to continue N
O
this effort.The County will develop a Natural Resources Adaptation Plan(Project Type 3)and address Annual Priority#3 that will explore carbon 2-
sequestration benefits,land management strategies,specific areas of shoreline impacts,seagrass and/or other marine resource impacts,species issues and
cost benefit analysis of natural resource actions to address vulnerabilities found in the assessment update.This data will add to the CountyaET S previous ug
vulnerability work by creating an actual Adaptation Plan for natural resources with actions within the County.Given the myriad of land ownership in the Keys O
by public entities and protected habitat,this is a critical step for the County to build its resiliency response. IX
r
At least two public meetings providing information on the project and encouraging dialog with the community will be conducted.These meetings will occur
during the project to promote involvement regarding the CountyaET s next steps towards becoming a more resilient community focusing on the vulnerability
of its natural resources.Information will be made available through the County website and live and/or web-based meeting platforms.The County will fulfill
,
the tasks through a combination of in-kind services provided by County staff and contracted services.
PROJECT NEED AND BENEFIT
If the project will address any of the Annual Priorities,provide that information in box C. More information can be found in the
document RPG Project Types and Annual Priorities(https://frcp.secure-
platform.com:443/a/page/RPGProjectTypes Annual Priorities)in the title bar. NOTE:Some Project Types and Annual _
Priorities have required deliverables.Please consult the Project Types and Annual Priorities document for more CCL
a
information on required deliverables. W
U
O
A.Explain the demonstrated need,which the project addresses.
The southeast Florida region,including Monroe County,has long been recognized as area that has vulnerabilities to climate-related hazards.With the CL
development of the GreenKe s planning process in 2013-2015 and updated vulnerability assessment current) in process),now the Count will have a much
p Y p 9p p Y (currently p ) Y
better understanding of what those vulnerabilities are specifically related to sea level rise based on the most recent(2019)projections of the Southeast
Florida Regional Climate Compact.Coastal resources that provide an important first line of defense continue to be lost or reduced in size,thus further CL
exposing people and property to coastal hazards.Interest is growing in the protective role that coastal nature-based measures or projects(or green O
infrastructure),such as reefs and wetlands,can play in adapting to these risks.However,a lack of quantitative information on relative costs and benefits is
one principal factor limiting their use more broadly.We do know that when nature-based measures are implemented in areas with higher asset value and at O
greater risk,their cost effectiveness increases significantly.
Nature-based adaptation strategies are emerging as a cost-effective option to reduce the impacts of storm surge and waves and they use natural features of U
ecosystems for coastal protection(e.g.,wetland restoration).A growing body of knowledge and experience supports their effectiveness for coastal defense.
Coastal ecosystems like coral reefs,oyster reefs,mangroves and salt marshes protect the coast by reducing wave energy,trapping sediments,and O
O
attenuating storm surge.Nature-based measures also offer a dynamic solution to challenges such as sea level rise,because ecosystems may adapt to,and
grow with,their changing environment.That said,it is possible to build a quantitative economic case for adaptation measures focused on nature-based
solutions and at scales relevant for planning.Conservation outcomes are principally achieved through the protection of intact habitat or the restoration of
degraded habitat.In general,restoration is generally considered a lower priority action than protection,but recent research shows that both are crucial
components of an adaptation strategy to optimize biodiversity or ecosystem services,and in some circumstances,restoration should be preferred.
Precipitation-based impacts will be assessed over the next year in a partnership between the South Florida Water Management District and U.S.Geological ,
Survey(covering all 16 counties within the South Florida Water Management District).This data could be incorporated into the Adaptation Plan if the O.
information becomes available for the Monroe County area during the period of this grant.The County has not had the opportunity to complete a Natural O'
Resource Adaptation Plan and given the environmental sensitivity of areas throughout Monroe County,this could be a key element of the CountyaETMs
resiliency strategy.With the completion of an updated vulnerability analysis,this project is essential to allow the County to start developing an effort solely O
focused on its natural resource attributes.This project will provide real-world examples of what this type of implementation will mean on an individual project
level.
N
While nature-based solutions are gaining momentum as an adaptation strategy,the lack of explicit quantification of its cost and effectiveness is inhibiting Q
widespread application.Now that the County will have updated its vulnerability information about assets,infrastructure and general inundation from sea level CL
rise,and natural resources through the use of SLAMM,the next phase of its planning process must focus on real natural resource adaptation actions.A cost- L)
benefit methodology and analysis will 1)identify specific actions,and 2)provide an understanding of what those actions will cost to better inform the County, CL
state and federal partners of what natural resource adaptation strategies will look like.
O
O
O
tJ
O
O
O
O
O
O
U
Packet Pg. 2368
Q.7.a
C
B. Explain how the proposed project fits into one or more of the Project Types.
This scope of work addresses Project Type 3:Adaptation Plans or Resilience Plans,which use outputs,such as the Monroe County updated Vulnerability
Assessment,to identify actions addressing the vulnerabilities found in the natural resource area.A deeper dive into the vulnerability data will pinpoint specific
projects that could be implemented and the cost benefit of them to the County as a whole.An Adaptation Plan in the a€ceProject Types and Annual
Prioritiesa€❑for the RPGs states that adaptation plans use the outputs from a vulnerability assessment to identify potential actions to address the
vulnerabilities found.By combining this Project Type with Annual Goal 3(natural resource vulnerability),this scope of work specifically creates a Natural N
Resource Adaptation Plan.This is a critical next step towards adaptation planning for Monroe County with project-level response and analysis for natural 2-
resources.
(n
Resiliency planning has become a critical component of how Monroe County conducts business today.This elevated discussion has already improved lines 0)
of communication and information transfer necessary for efficient resiliency planning.But not only does this scope of work clearly implement Project Type 3& IX
Annual Priority 3,the proposed project fulfills a need for the next step in adaptation planning for Monroe County-focusing on natural resources.
Recommendations from the GreenKeys Plan that could be entirely or partially implemented based on this scope of work and Project Type 3/Annual Goal 3
include: cu
,
aEo 2-10:Cooperate with the U.S.Fish and Wildlife Service,FWC,and conservation organizations to monitor populations of endangered species,track
habitat trends,and,as necessary,implement relocation experiments under conditions of drastic habitat loss for endangered species due to sea level rise.
aEo 2-38:Identify intact corridors for future tidal wetland migration corridors as a potential criterion for future land purchase and flood mitigation initiatives
within Monroe County.For example,land acquisition priorities.
aEo 3-16:Conduct an analysis of where maintaining living shorelines would be beneficial.Identify and map natural inundation buffers which could also
provide sea level rise adaptation benefits.
aEo 3-18:Identify areas for habitat maintenance where the removal of exotics could serve as a natural or a€cesoft protection optiona€❑and inundation CL
buffering opportunities. u
aEo 3-19:Calibrate the Sea Level Affecting Marshes(a€ceSLAMMa€o)Model results with historic land cover change and field observations and coordinate
with land acquisitions. �
aEo 3-23:Specify priority areas where shoreline protection structures should be removed and continue discouraging the use of hard protection unless no 0)
other feasible alternative is available.
aEo 3-24:Increase efforts to protect and maintain natural habitats,especially a€cecore areasa€o with the best chances of persistence during sea level rise, CL
including marine ecosystem mitigation as possible overlay component and offering incentives for protection of natural resources.This will facilitate
development of a land acquisition strategy based on sea level rise impacts.
aEo 3-25:Incentivize a€cesoft optionsa€o like living shorelines and mangrove restoration as an alternative to traditional bulkheads for near-term stabilization CD
of eroding coastal areas and long-term marine ecosystem migration.Require detailed evaluation of soft options in an alternatives analysis and require the
use of soft protection where feasible.Incorporate sea level rise and storm surge into the siting and design of any soft protection projects.
Monroe County continues to demonstrate leadership in vulnerability assessments,updating them and analyzing actual adaptation actions.This scope of work
CL
provides the next chapter in those efforts,and in an area as environmentally sensitive as Monroe County,its clear a more defined approach to incorporating N
natural resource elements into the CountyaET s resiliency response is clearly needed. U
C. Discuss how the project is feasible and can be completed by the grant period deadline.
Count staff is prepared to move forward with this Natural Resource Adaptation Plan upon contract execution and will begin preparatory work upon notice of
Y p p p p 9 p p Y p
pending award.The consultant selection process will be initiated upon notice of pending award so that a team is under contract and ready to proceed when
the funds are available.The County has demonstrated previous success in finalizing other RPG awards with needed capacity and on budget.
The project also builds on data and analysis previously developed over years of work by the County so there is efficiency in its execution.After its first
Vulnerability Assessment from 2013-2015,the County has developed improved data and resources available to conduct future analyses.In particular, ,
elevation data has been a significant financial and time commitment on the part of the County to generate.The County ran a natural resources analysis using
SLAM in that first vulnerability assessment,but SLAM has been updated and now provides output related to carbon sequestration benefits and
seagrasses.While the County is running those overall updated vulnerability assessments now,there is not a singly focused planning effort to develop
adaptation actions related to natural resources.Therefore,the underlying data and vulnerability assessment to support a Natural Resources Adaptation Plan
will be completed by this year.The only other data collection or analysis would be related to anything thataET s new for use at the beginning of this grant
period,other stakeholder data that was not available at the time and some additional mapping to scale for further development of adaptation actions in the
Plan.Finally,the cost-benefit attributes would have to developed in concert with the actions proposed in the Plan.The County is very confident this Natural CV
Resources Adaptation Plan can be developed by the grant period deadline. Q
CL
tJ
0
tJ
0
0
U
Packet Pg. 2369
Q.7.a
C
D. Explain how this project addresses one or more of the Annual Priorities found in the Project Types and Annual O
Priorities document. (RPG)
This scope of work addresses Annual Priority#3(natural resource vulnerability)to develop an Adaptation Plan for natural resource impacts throughout the
County(Project Type#1).This will specifically address existing GreenKeys recommendations(already identified previously)to move beyond infrastructure
and asset analysis to determine how natural resources may shift or be impacted by sea level rise in the future.Maps will be utilized or developed at a smaller
scale to better understand actual impacts and strategies to address them.A cost-benefit analysis will be conducted focused on natural resource protections N
and may address carbon sequestration benefits produced as a consequence of the updated SLAM modeling currently being conducted.Nature-based U
adaptation actions can also offer other environmental and ecosystems benefits beyond coastal protection that would further increase their benefit to cost O
ratio.For example,restored ecosystems can provide important tourism and recreational benefits,including recreation and fishing that may also play a vital O
role in identifying and prioritizing restoration and conservation priorities from a socio-economic perspective.Hence,it is important to manage coastal O
ecosystems to reduce stressors so they can be healthy and more resilient to sea level rise and climate change to provide both risk reduction and
environmental benefits.Adaptation action such as wetland accretion can help building land with a rising sea and healthy oyster reefs have also been shown ru
to be able to keep up with sea level rise.The next step in a cost-benefit analysis will be to identify the options and alternatives to be quantified which could O
include elements such as the value of public access to recreational and conservation lands,amenity values such as ecological protection or recreational use. cu
This analysis may also stimulate a rethinking of the places where restoration projects are prioritized.
The County has specifically structured this scope of work such that more complete and updated data can be incorporated into the existing vulnerability work,
but based on that more extensive portrayal of vulnerability risks to natural resources,to support funding strategies and other Resiliency program
implementation.Again,being an areas of Critical State Concern,a natural resource-based Adaptation Plan(Annual Priority#3)is a critical need for Monroe ¢
O
County.
Project Outcomes CL
tJ
Project Outcome#1:Memorandum on Approach,Cost Benefit and Best Practices Review of Natural Resource Resiliency Strategies.This Memorandum will
consistent of review and research on the recently complete vulnerability assessment update and review of case studies to identify natural resource ¢
U
adaptations and approaches for resource-based cost benefit analysis. O
Project Outcome#2:Agency coordination with State and Federal stakeholders and land management entities.Agency coordination with the Florida Keys CL
National Marine Sanctuary,US Fish and Wildlife Service,Florida Fish and Wildlife Conservation Commission,Florida Department of Environmental ¢
O
Protection(and others)is extensive given the unique regulatory and land ownership complexities in Monroe County.This will be a significant and key element
of the project that is likely to result in additional data to consider in the Plan development. CL
CD
Project Outcome#3:Public meetings,outreach.The County will hold a minimum of two meetings with the public,through live and online meetings.Web
materials and coordination with the CountyaET s Public Information staff will also be outcomes. O
Project Outcome#4:Natural Resource Adaptation Plan with Cost-Benefit Analysis.The Natural Resource Adaptation Plan with Cost Benefit Analysis will
include an analysis of the adaptation actions and cost-benefit analysis to support their consideration. 0)
U
O
Future Recommendations&Estimated Costs O
N
Future recommendations would include design-specific cost estimates for each of the adaptation actions generated in the Natural Resource Adaptation Plan. O
This proposed project likely does not include enough time or budget to develop precise design-level cost estimates for the adaptation actions,but based on
case study research and anecdotal data related to other natural resource projects in the Keys which have already been carried out,cost estimates will be
sufficient enough to undertake cost benefit analysis.Costs for such detailed design are likely to be phased over time as projects become necessary to O
implement,so it is difficult to project a cumulative cost for all of the natural resource adaptation options explored.Per project,this would be estimates for
design and permitting to be$75,000.
Page: Budget Information t8
O
Budget Narrative Description
Total project budget is estimated at$142,000($75,000 grant funds+$67,000 County funds)based on contractor estimates and flat task&deliverable rates. CV
Cost amounts were based on estimated firm participation based on the amount of meetings and estimated hours to complete each deliverable.Amounts also
are based on experience from task and deliverable efforts undertaken in other resilience planning grant scopes.Document and graphics production costs are CV
included within the deliverables.Mapping costs were derived from comparable scopes of work.
CL
tJ
OTHER PROJECT FUNDING SOURCES
Other Funding Source Names
Funding Source Name:County funds
Task#:4 O
Task Amount: 67000
O
O
O
O
O
Work Performed by: O
Sub-Contractor Only U
Packet Pg. 2370
Q.7.a
Sub-Contractor's Information. O
O
All Sub-Contractors who will be performing work on this project,to be paid out using the requested funds from DEP,must be listed in the table below. ¢'
M
Sub-contractor 1 Company Name
Wood Environment&Infrastructure,Solutions,Inc. N
O
U
O
Sub-contractor 1 Contact Person Name O
Greg Corning O
Sub-contractor 1 Phone Number
O
3149208359
Sub-contractor Email 1
greg.corning@woodplc.com
O
Sub-contractor 1 Address
5845 NW 158th Street CL
Miami Lakes FL 33014 C)
U
Sub-contractor 1 Amount Table O
Tasks
CL
Task#: 1 �-
Amount: 7500 O
CL
O
O
Task#: 2
CL
Amount: 11000 N
O
U
O
O
O
Task#: 3
Amount: 6000
O
Task#: 4 O
Amount: 46500
O
N
N
aliasa198695ab7ae43468be558ce6553e4d2
Yes
CL
Sub-contractor 2 Company Name
Erin L. Deady, P.A.
O
Sub-contractor Contact 2 Person Name
Erin Deady
O
O
Sub-contractor 2 Phone#
954-593-5102 O
O
U
Packet Pg. 2371
Q.7.a
C
Sub-contractor 2 Email Address
erin@deadylaw.com
Sub-contractor 2 Address
54 1/2 SE 6th Avenue N
O
Delray Beach Florida 33483 US 2-
O
O
Sub-contractor 2 Amount Table
Tasks
Task 2: 1
Amount: 7500
Task 2: 2 O
Amount: 11000
CL
tJ
Task 2: 3
O
Amount: 6000
CL
Task 2: 4
O
Amount: 46500
CL
O
U
O
aliasd9268b360dde40b8a8445f6a6f2dacb6 O
No O
Page:Tasks&Deliverables O
PROJECT TIMELINE with
TASKS&DELIVERABLES DETAILS
This is where each task is listed with the title,due date for submission of all deliverables by task,and total of task funding amount
requested. To avoid late submittals and financial consequences,be sure to allow enough time for submitting O
deliverables.
Details for each task to include: CD
N
Title, CD
N
Goal, CL
• Description, (,
• Listing of deliverables, CL
• Total task amount,and
• Budget category
O
O
O
U
Packet Pg. 2372
Q.7.a
C
RPG Project Timeline Chart
Task#s
A.Task#: 1
B.Task Title: Memorandum on Approach,Cost Benefit and Best Practices Review of Natural Resource Resiliency Strategies
C.Task Goal: Develop a clear analytical approach summarizing the most current data,methods for cost benefit analysis and
natural resource-based adaptation actions. 2
D.Task Decription:This Memorandum will consistent of review and research on the recently complete vulnerability assessment
update and review of case studies to identify natural resource adaptations and approaches for resource-based cost benefit
analysis. Given that there are numerous considerations in conducting a cost benefit analysis related to adaptation actions, let
alone those that pertain specifically to nature-based project costs and benefits(including co-benefits such as recreational values,
etc.),this Memorandum will be a critical step to develop the Natural Resource Adaptation Plan.This Memorandum will also identify
all key agencies for coordination efforts.
E.Task Deliverable(s) 1:
Kick-Off Meetings ,
Other Data Request to Outside Agencies 0.
Other Draft Approach Memorandum 0.
Other Final Approach Memorandum ¢
F.Task Due Date: 11/30/2021
G.Total Task Amount: 15000
H.Task Budget Category: Sub-Contractor Only(CS) CL
Ca
U
A.Task#: 2
B.Task Title:Agency coordination with State and Federal stakeholders and land management entities CL
C.Task Goal:The County Team will coordinate with all local,state and Federal agencies needed to complete the Adaptation Plan
including those entities with natural resource or species ownership or management responsibility.
D.Task Decription:Agency coordination with the Florida Keys National Marine Sanctuary,US Fish and Wildlife Service, Florida CL
Fish and Wildlife Conservation Commission, Florida Department of Environmental Protection(and others) is extensive given the
unique regulatory and land ownership complexities in Monroe County.This will be a significant and key element of the project that
is likely to result in additional data to consider in the Plan development.This coordination will also yield review of adaptation
actions that are related to species management. CL
E.Task Deliverable(s) 1:Stakeholder Contact List (n
Other Stakeholder Contact List 0)
U
Kick-Off Meetings
Other Up to 4 meetings/or web-based meetings
Other Identification of agency datasets or concerns 0)
Other Memorandum on Agency Coordination Efforts
F.Task Due Date:4/30/2022
G.Total Task Amount: 22000
H.Task Budget Category: Sub-Contractor Only(CS) t8
A.Task#: 3
B.Task Title: Public Meetings&Outreach
C.Task Goal: Implement an informative and engaging process that conveys important milestones about the project and receives
feedback from the community.
D.Task Decription:The County will hold a minimum of two meetings with the public,through live and/or online meetings. tV
Meetings with be recorded and can be made accessible to an email list of stakeholders or through the Countya€—S website. Project Q
web materials and coordination with the CountyA4ETMS Public Information staff will also be developed to maximize meeting CL
attendance. At least one County Commission briefing will occur before the project is finalized. Maps and other presentation Ca
materials will be created and available through the stakeholder list. CL
E.Task Deliverable(s) 1:Public Contacts List
Other Public Contacts List
Other Two Public or Online Meetings
Other 1 County Commission Presentation
Other Social Media Posts
tJ
F.Task Due Date:4/30/2022
G.Total Task Amount: 12000
H.Task Budget Category: Sub-Contractor Only(CS)
A.Task#:4
B.Task Title: Natural Resource Adaptation Plan with Cost-Benefit Analysis
C.Task Goal: Produce a Natural Resource Adaptation Plan that informs the County of the Costs and Benefits of natural adaptation
Packet Pg. 2373
Q.7.a
actions.
D.Task Decription:The Natural Resource Adaptation Plan with Cost Benefit Analysis will include an analysis of the adaptation
actions and cost-benefit methods to support their consideration.The ultimate Natural Resource Adaptation Plan will provide a
detailed analysis of location-specific adaptation actions that will benefit the various natural resources identified as vulnerable in the
previous vulnerability assessment currently being undertaken.The Plan will include identification of adaptation actions and an
overview of the methods and assumptions used in the cost benefit analysis of the various adaptation actions. Mapping will also
accompany the final Natural Resource Adaptation Plan to identify locations for adaptation actions.
E.Task Deliverable(s) 1:Outline of Natural Resources Adaptation Plan
Other Outline of Natural Resources Adaptation Plan
Other Draft of Natural Resources Adaptation Plan
Other Final Natural Resources Adaptation Plan with Cost Benefit Analysis W
F.Task Due Date:4/30/2022
G.Total Task Amount: 93000
H.Task Budget Category: Sub-Contractor Only(CS) ,
Page:Certification Page
CL
Grantee's Certification Statement
"By signing this Statement page,the undersigned certifies that:
U
a. This application is in all respects fair and submitted in good faith without collusion or fraud; 0)
b. If selected through this application process,the recipient will work in good faith and in partnership with the Florida Resilient CL
Coastlines Program (FRCP)to manage its subcontractors in a timely and accurate manner;
c. Any funds awarded as a result of this application pprocess will not be used to supplant or replace any state or local funds; CL
d. Any funds awarded as a result of this application process will not be used as matching funds to apply for or recieve other state
funds;
e. The applicant's local governement's adopted comprehensive plan has been found to be in compliance with Chapter 163, Part II,
F.S.; CL
f. The undersigned has full authority to bind the applicant."
Please be advised that the selection of the checkboxes below are acting as a signature box on your behalf,as indicated in the field
titles.
Grantee's Authorized Signer's Name LU
Roman Gastesi �-
Do you Agree to the Certification Statement?
I agreeCL
t8
CN
CN
tJ
CL
tJ
0
0
U
Packet Pg. 2374