1st Change Order 01/25/2021 BOARD OF COUNTY COMMISSIONERS County of Monroe Mayer Michelle Coldiron,District 2 �, O Y°1 rc Mayor Pro Perri David Dice,District 4 i Craig Cates,District 1 1 � � Eddie Martine,District 3 Mike Forster,District 5 Memorandum DATE: 1/22/2021 TO: BOCC cn=Kevin G.Wilson,P.E.,o=Monroe County,FL(the Florida Keys,ou, FROM: Kevin G. Wilson, P.E. r 'y {{'Ct email=Wilson-kevin@monroecounty- fl.gov,c=US 2021.01.22 15:12:29-05'00' SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order#1 for the Monroe County Historic Jail Demolition and Asbestos, Lead, and Mold Abatement project. This change order increases the final contract sum by $49,966.84. The substantial completion date is increased to 2/24/2021. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority on Monday, January 25, 2021. MONROE CouNriy/ENGINEERING/ ]PROJECT MANAGEMENT CONTRACT GE ORDER PROJECT TITLE: CHANGE ORDER NO: 1 Monroe County Historic Flail Demolition INITIATION DATE: ,January 20,2021 and Asbestos, Lead,and Mold Abatement CONTRACT DATE. September 16,2020 TO CONTRACTOR. D.L. Porter Constructors, Inc. 5574 Palmer Park Circle Sarasota, Florida 34258 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) ... ......... .................. .......... 175,49 .00 Net change by previously authorized Change Orders,........................ ....... .......... 0.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was .. ......... 175,492,00 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order............. 4 ,966, 4 The new(Contract Sure}(Guaranteed Maximum Price)including this Change Order is ...,., 225,458.84 The Contract Time will be(increased) (decreased)(unchanged)by............ .................... 12 Bays The date of Substantial Completion as of the date of this Change Order is... .................... 02/24/2021 Detailed description of change order and justification: Based on Drefiminaa lead asbestos and mold assessments only two ma'or areas in thestructure were identified fore ulre a ent. Upon start, f demolition additi nal lead was uncove ed throu haul the building. In order_to roceed with the DMIOCt, the renMainin amounts of lead mustbe encapsulated. This addition i work adds 12 days to Lhg jgMect rnovin the S bstantial Com leer'Qi2date from fthruaa 1,2 2Q21 to Februga 24 MI. Change order is 28.5%of okinal contract price Not valid until signed by.Owner Architect if applicable),and Contractor ARCHITECT: David Salay W1,1,21 NZ01139� Sender&Associates Architects, P.A. Gate DL Porter Constructors, Inc. Date Cary Knight Dig itaIlysignedby Cary Knight Date:2021.01.22 14:52:11-05'00' DIRECTOR PROJECT MANAGEMENT Cary Knight Date cn=Kevin G.Wilson,P.E.,o Monroe County, a �+ �-+ y b,I{ % r FL(the Florida Keys,ou,email wilson- COUhITYIASSISTANTADMINISTRATOR: � �f 2021.0 .2516: 0:25-0 '00' c—US 2021.01.2516:00:25 OS'00' Roman Gastesi Gate Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes Z No [I If Yes, explanation: Initial environmental testing for the original specifications discovered two main areas requiring abatement work. Upon start of demolition work, numerous additional areas of lead were uncovered, requiring encapsulation efforts. • Change Order was included in the original specifications. Yes 0 No Z If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5% of contract price whichever Is greater). Yes [:1 No Z If Yes, explanation as to why It is not subject for a calling for bids: • Project architect approves the change order. Yes Z No E] If no, explanation of whys • Change Order is correcting an error or omission in design document. Yes No 2 Should a claim under the applicable professional liability policy be made? Yes El No Z Explaing. CHANGE Distribution To: ORDER Owner Architect Contractor Field Other PROJECT: Monroe County Historic Jail Remediation CHANGE ORDER NUMBER: One(1) 500 Whitehead Street INITIATION DATE: 1/19/2021 Key West,FL 33040 GC'S PROJECT NO, 2008 Monroe County Historic Jail CONTRACT FOR: Remediation TO (CONTRACTOR) D.L. PORTER CONSTRUCTORS, INC. CONTRACT DATE. 9/18/2020 6574 Palmer Park Circle Sarasota, FL 34238 You are directed to make the following changes in this Contract: You are directed to make the following changes to the contract: 1) Additional Asbestos and Lead Abatement as outlined in attached in COR#1 RZ ADD $ 49,966.84 (COR#1 R2) Total of CO#1 $ 49,966,84 Not valid until signed by both the Owner and Engineer, Signature of the Contractor indicates his agreement herewith,including any Mustrnent in the Contract Sum or Contract Time. The original Contract Sum was $ 175,492.00 Net change by previously authorized Change Orders $ The Contract Sum prior to this Change Order was $ 175,492.00 The Contract Sum will be increased by this Change Order $ 49,966.84 The new Contract Sum including this Change Order will be $ 225,458.84 The Contract Time will be increased by 12 Days The Date of Substantial Completion as of the date of this Change Order therefore is 2112121 ARCHITECT CONTRACTOR OWNER Bender&Associates Architects D.L. Porter Constructors, Inc. Monroe County Board of County Commissioners ADDRESS ADDRESS ADDRESS 410 Angela St 6574 Palmer Park Circle 1100 Simonton Street LaWest, FL 33040 Sasso)a;f L 31 S Key West, FL 33040 __ BY By C--e'l BY Date Date 2-0--IL Date CHANGE ORDER REQUEST PROJECT: Historic Jail Remediation CHANGE ORDER RECtUEST One Rev-2(IU) 500 Whitehead St. DATE OF ISSUANCE: 1/1912021 Key West,FL 33040 ARCHITECT'S PROJECT NO, GC PROJECT NO: 20M OWNER. Monroe County BOCC CONTRACT FOR: Renovation 1100 Simonton St. Key West,FL 33040 ARCHITECT: Bender and A,,sociatesArt'h'tocts CONTRACTOR:D.L.Porter Constructors,Inc. 41.0 Angela St. 6574 Palmer Park Circle Key West,Fl, 33040 Sarasota,FL 34238 We herein request changes in the Contract Sum and time for proposed modifications to the Contract Documents described herein(see description belowb Complete additional demolition of unforeseen concrete rernavals at the irvalkways(thickness 6-8+inches),additional asbestos&lead abetment at areas around demolition zone with lead oberment consisting of; Remove existing categor/I nonfriable asbestos-coruahi mg roof flashing(mastic in courtyard area. 1st Floor Work 1,020 SF-Prep,wet scrape,wet sand,wire brush,wipe down and remove existing delaminated(non intact)LBP walls and skim coat down to intact substrate where applicable.Followed by supplying and encapsulate walls w/Fiberlock LBC compound&white encapsulant. 2,623 SF-Prep,wet scrape,wet sand,wire brush,wipe down and remove existing delamiriating(non intact)LBP corrugated metal ceiling/beams down to instact substrate where applicable, Followed by supplying and encapsulate walls with Fiberlock Leadshieldt clear encapsulant. 17 Ea-Prep,wet scrape,chemical strip/grind,wet sand,wire brush,wipe down and remove 18"of existing LBP around window/door surround,,for future spilling repairs To be done at another tinle, 2nd Floor Work 420 SF-Prep,wet scrape,wet sand,wire brash,wipe down and remove existing delarninating(non intact}LBP walls and skim coat down to intact substrate where applicable.Followed by supplying and encapsulating watts with Fiberlock LBC compoundO white encapsulant. 2,075 SF-Prep,we,scrape,',vet sand,wire brush,wipe down and remove existing delarninating(non intact)LBP corrugated metal ceiling/beams down to insiact substrate where applicable. Followed by supplying and encapsulate wills with Fiberlock Leadshielft,clear encapsulant, 160 SF-Prep,wet scrape,wet sand,wire brush,wipe down and remove existing dclarnhiatin.-(non intact LBP grates down to intact substrate Where applicable.Followed by supplying and encapsulating walls with Fiberlock LBC compound1t,white encapsulant.(Includes associated masorike wall demolition). 10 LF-Prep,wet scrape,wet sand,wire brush,wipe down and remove existing delaminatin.-(non intact)LBP cross beams down to intact substrate where applicable.Followed by supplying and encapsulating wall,with Fiberlock,LBC compound(@ white cricapsulant IS Iva-Prep,wet scrape,chemical strip/grind,wet said,wire brush,wipe down and remove 18"of existing LBP around window/door surrounds for future spalling repairs tea be done at another time. Breakdown of chauges below 4 Unit M2,, Cosi) t.,'ab,(Unk Cog) Material Labor Subcontract Other Additional asbestos Abatement I Is $ - $ S - S $ '179(3.00 S S 790.00 Additional Lead Abatement i Is S - S - S $ 38,992,00 S S 38,992.00 Supervision(l%V)Part-time 2 weeks S - S 2,080.00 S - S 4,160.00 S - S S 4,160.00 PM(S!')time reviewing change with subcoritractor(s),gathering pricing, preparing OC OR,preparing PO's and sub chan.?e orders upon aceeTtance' inp to EYW for site meciiia and coordinating the added work. I wk $ 2,40d.0G S - S 2,400,00 S S 2,400,00 Subtotal S - 5 6,560.00 $ 39,782,00 5 S 46,342-00 D.L.Porter Overhead&Profit(5%)on Subcontractors $ 1,989.10 D.L.Porter Overhead&Profit(10%)on Self Perform S 656A0 Additional Bond Charge&Insurance(2%) S 979.74 ftem'Foual Page 1 of 2 Signatures on page 2 Add Additional funds requested: 49,966.84 Add Additional days requested; 12 Av=hments.Sunshine Environmental&N=Iiflon Quote REQUESTED BY:D.L.Porter Constructors,Inc. ACCEPTED BY. (Signature) roject marsager Bender&Associates Architects Page 2 of 2 Sunshine nvir l menla' Demolition January 16,2021 Mr. Steven Loer D.L. Porter Constructors,Inc. 6574 Palmer Park Circle Sarasota,FL 3423 Email stevenoddigorter.com 12.E Change Order Request 41 (Revised 1-16-21) Monroe County Historic Jail Demolition,Asbestos and Lead Abatement 00 Whitehead Street, Ivey West,Florida 3304+0 Sunshine Environmental &Demolition, LLC (Sunshine E D)is pleased to submit this revised change order request (COR 1) to provide additional professional asbestos and. lead abatement services for the above-referenced project. The quantities and scope of work for this CGR 1 are based upon previous field observations,meetings/walkthrotrglrs, sampling for Asbestos-Containing,Materials, and a review of the results of the"Lead Paint Control Plan—Addendum ff 1:Update for 2021" ,prepared by Gallagher Basssett Teclurical Services (GBTS), dated January 15,2021. The following section contains a. detailed description of the scope of work and associated costs required for completion of the above-mentioned additional work for this project. Scope of Work: Remobilize to the subject project site with all required labor, operators, supervision,materials, equipment, and dumpsters to complete the following scope of wore; 1, Submit a"Courtesy"EPA NESHAPS "Notice of Asbestos Removal Project" form and corresponding fees to the local Monroe County FDEP South District Branch Office for the subject buildings. I Provide a copy of all applicable"lire-Job"submittals including, btit not limited to the following, copies of AHERA Asbestos,Lead and Mold Supervisor and. Worker training certifications,and copies of"OSHA-required medical surveillance/personnel clearances, respirator training, and fit testing documentation. 3. Post"Asbestos and Lead Warming" .English and Spanish signs and barrier tape around the perimeter of the work areas to notify all personnel of asbestos and lead abatement, COO V AddtlAshestos&Lead Ahatenient Monroe CountjHistorieJail Kej, West, Porilla Page 2 Scope of Work (Cont.): 4. Supply workers with all required personal protective equipment (PPE) including HEPA-filtered respirators,disposable coveralls, gloves, eye, skin, face protection, hard hats, steel toes boots, fall protection, etc. S. Supply and install 6-mil polyethylene sheeting around the perimeter of each work area including temporary coverings over affected floors,windows,doors and other openings, 6. Utilize airless sprays to continuously racist the work area and control the release of fugitive lead dust. 7. Perform the following additional detailed tasks as part of the overall scope of work for this COR#1: Description/Location Quantity Units Remove Existing Category 1 Nonfriable Asbestos-Containing Roof FlashinglMastic in 15 LF Courtvard Area I,"Floor Work Areas Prep, Wet Scrape, Wet Sand, Wire Brush, Wipe Down and Remove Existing Delaminating (Non Intact) LBP Walls, and Skim Coat Down to Intact Substrate, 1,020 SF where applicable, followed by Supply and Encapsulation of Walls with Fiberlock LBC CompoundR White Encapsulant Prep, Wet Scrape, Wet Sand, Wire Brush, Wipe Down and Remove Existing Delaminating (Non Intact) LBP Corrugated Metal CellinglBeams, Down to Intact 2,623 SF Substrate, where applicable, followed by Supply and Encapsulation of Walls with Fiberlock LeadshieldR Clear Encapsulant Prep, Wet Scrape, Chemical StriplGrind, Wet Sand, Wire Brush, Wipe Down and Remove 18" of Existing LBP WindowlDoor Surrounds for Future Spatting Repairs 17 EA (By Others) 2"4 Floor Work Areas Prep, Wet Scrape, Wet Sand, Wire Brush, Wipe Down and Remove Existing - Delaminating (Non Intact) LBP Walls, and Skim Coat Down to Intact Substrate, 420 SF where applicable, followed by Supply and Encapsulation of Walls with Fiberlock LBC CompoundRWhite Encapsulant Prep, Wet Scrape, Wet Sand, Wire Brush, Wipe Down and Remove Existing Delaminating (Non Intact) LBP Corrugated Metal CellingiBeams Down to Intact 2,075 SF Substrate, where applicable, followed by Supply and Encapsulation of Walls with Fiberlock Leadshie ldfz Clear Encapsulant Prep, Wet Scrape, Wet Sand, Wire Brush, Wipe Down and Remove Existing Delaminating (Non Intact) LBP Grate Down to Intact Substrate, where applicable, 160 SF followed by Supply and Encapsulation of Walls with Fiberlock LBC CompoundR White Encapsulant Includes Associated_Masonite Wall Demolition) Prep, Wet Scrape, Wet Sand, Wire Brush, Wipe Down and Remove Existing Delaminating (Non Intact) LBP Cross Beam Down to Intact Substrate, where 10 LF applicable, followed by Supply and Encapsulation of Walls with Fiberlock LBC CompoundR White Encapsulant Prep, Wet Scrape, Chemical Strip/Grind, Wet Sand, Wire Brush, Wipe Down and Remove 18" of Existing LBP WindowlDoor Surrounds for Future Spatting Repairs, 18 EA as Applicable jQyqjhersj 8. After removal is completed, all work areas wilt be thoroughly HEPA vacuumed, wet wiped and mopped as appropriate. 9. All designated bags of asbestos waste will be stored on-site and then transported to a State of Florida licensed"Asbestos Landfill"facility(Enterprise Landfill, Dade City, Florida), COR 4.1 A&WlAsbestos&LeadAbalemew A10 11 ro e Co it 11 IJP Histo)IC Jail If'y N"est, Florida Page 3 Scope of WorI((("onL): 10. Provide a copy of al I applicable"Post-Job" submittals including, but not limited to the following-, copies of Sunshine E&D's Daily Work logs, F�'xposure Logs, OSHA personal air monitoring results,, and a copy of the applicable asbestos waste manifest/waste shipment receipt forms (WSRS). 11. Coordinate and perform all additional asbestos and lead abatement work in conjunction with the planned renovation schedule. 12, Perform a multi-step cleaning including HEPA-vacuuming, wiping-down and/or mopping of all horizontal surfaces/floors,stairs, sills,frames, etc. within the designated lead abatement work areas using EPA-registered LSZ"Ledizolvn"(all anionic liquid detergent)or Trisodiuni Phosphate (TSP) or similar product equivalent to remove residual lead dust contamination to a proposed industry/commercial standard clearance level of<320 ug/ft2. or by Others: I. Provide temporary water and electric service dUl'iIlg the entirety of all asbestos and lead abatement operations. 2. Provide adequate staging area for dumpsters, trailer,service vehicles and other materials and equipment required for completion of this project. 3, 'I"hird party independent consultant for ambient and final clearance asbestos and lead final clearance wipe surface testing and analyses services, Licensing: Sunshine E&D is a State of Florida licensed Asbestos (F0333/7A544) and all EPA and OSHA Certified Lead Coiitractor/Supervisoi-/Workers, Estimated Costs: Sunshine E&D will supply all transportation, labor, materials,equipment, insurance and disposal required to complete the above-mentioned scope of work as follows; Additional Asbestos Abatement. i..--_3 790.00 Additional Lead Abatement— ....---$38,992.00 COR#I Grand Total $39,782.00 Schedule for Completloll: The above-referenced scope of work and overall pricing was based upon completion of all work within up to twelve(12)work days and one(1)mobilization. Sunshine E&D appreciates the opportunity to submit this COR #1 to you for this project. Please do not hesitate to call us at(813)465-8006, if you should have ally questions. Sincerely, Approved: Gregory I Godec, President&CEO Sunshine Environmental &Demolition Signed &Dated: 16116 6"' Street E.I Redington Beach, Florida 33708