1st Change Order 02/05/2021 BOARD OF COUNTY COMMISSIONERS
County of Monroe Mayer Michelle Coldiron,District 2
�, O Y°1 rc
Mayor Pro Perri David Dice,District 4
i Craig Cates,District 1
Eddie Martine,District 3
Mike Forster,District 5
Memorandum
DATE: 2/4/2021
TO: BOCC
cn=Kevin G.Wilson,P.E.,
o=Monroe County,FL(the Florida
FROM: Kevin G. Wilson, P.E. ,`4 .�r� Keys,ou,email—wllson-
kevin@monroecounty-fl.gov,c—US
2021.02.04 12:01:21-05'00'
SUBJECT: Proposed Change Order to be Approved
Attached is proposed Change Order#1 for the Monroe County Sheriff s Office Administration Building
Envelope Repairs project. This change order increases the final contract sum by $9,975.00. The
substantial completion date is increased to 12/30/2020.
Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the
Administrator to approve change orders within specified limits after providing Board of County
Commissioners with at least 24 hours to review them and pose any questions or objections that they may
have.
It is the Administrator's intent to approve the attached change order under that authority on Friday,
February 5, 2021.
MONROE COLTNTY/ENGINEERING/ PROJECT MANAGEMENT
CONTRACT CHANGE OMER
PROJECT TITLE: CHANGE.ORDER.NO:. #1
Monroe County Sheriffs Office Adinrii n i9tration INITIATION DATE: January 28,2021
Building Envelope Repairs CONTRACT DATE- July 31, 2020
TO CONTRACTOR:
keystar, In:c,
506 Floating Street
Ke-Y W.est—FJorida.33040.
The-Contract is changed as follows,
The original (Contract Sum)(Guaranteed Maximum Price) ............ ........... ...........$ 304,954.00
Net change by PTeViOUSly authorized Change ...................... $ -
The,(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was .............$ 304,964.00
The.[Contract.Sum)(Guaranteed Maximum Price)will be (i ncr.eaged)(decreased)(unchanged}.by this
Change Order ..............$ 9i975,00
The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order is ...._1 814,929.00
The Contract-Time will be (increased} (unchanged) by.............. .............6...... 45 Days
(decreased) (unchan
The date of Substantial Completion as of the date of this Change-Order is....................December 30, 2020
Detailed desd6ption Of change order and justification
D orin s che dule d site walklin spection an 0 cto b& 15, 2020 with th a En gin a er of record, it was
determined-1)a s e d on on gin a erin g in din ys.a ad 2 W/tests that a ddition al prini er b e applied to all patchlre2 a'
locations prior to the aLgLj&�_of the llosysil All card Dint. Th9.ml final substantial co mpletion date was
No vo m ber 75, 200..A total of 45 da s have b e en added to th e contract time due to rain dela ys and
additional time needed to-install the primer.
C/I an ge order is 3.3% of bL� al conlraa price.
Not valid until signed by Owner.Architect if aRELicablej and Contractor
ENGINEER:. 01M/2021
C PH,.Inc.. Date
CONTRACTOR:
Keys#ar, Inca Dke
Digitally signed by Cary Knight
Cary Knight Date:2021.02.04 09.,47:15
DIRECTOR PROJECT MANAGEMENT -05'00'
Cary Knight,Director Date
cn-Kevin G.Wilson,P.E.,o-Monroe
County,FL(the Florida Keys,ou,
0, -wilson-kevin@monroecounty-
email
COUNTYIASSISTANT ADMINISTRATOR: fl.gov,C-us
Roman Gastesi Date
Kevin VVils.on
Christine Hurley
I of 2
Change Order Attachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation: During a site visit after initial patch/repairs of the stucco had taken place, the
Engineer of Record decided that an additional layer of primer should be applied to the patch/repair
areas before application of the Dowsil Allguard paint.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes ® No ❑
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain:
2 of 2
���������� ��A���� ������� �������T
�_�.��� �� ��� � ��� ��� CHANGE_ _ ORDER -______
No 3
5,06Rerning St. Project: 2OO23 -K*CB[} Envelope Repairs
Key West FL33O4O 5OD Whitehead Street
305-294'5909 Key VVeatFIL33Q4D
Prime Contract Change Order 3 Add Primer
TO- MoKhewHmwerd- KAonmeCoontyBoandofCountyCao-Fmmirriomara 5O6 Fleming 8t
5OR Whitehead Street KeyVVesiFL3384Q
Key VVeatFL33O4Q 385-294-5909
----------------------------_----------_'_____-__________-_______--__-____________-_________________'_-__-__-____---__-
DateCremted., 12/17/20 Created by: 1 Charles Spottswood
----------------------------- _----------------------------------------------- ------------------------------------------------------------------------ -----------------------------------
Change Status: Open Schedu|e!mpaot: 8 Days
----------------------------------------------------- ___
Exeuutad? 1Nlt" Y es 7, Total Am mt $89750D
Description ofWork Amount
Add Primer 9,975,00
Notes
During our scheduled site walk/inspection on lO/ls/%O%O with the county'a Engineer it was
determined based on his findings and poll tests that we apply primer to all
patch/repairs location prior to Dowail Allgaurd paint' The additional cost to
install the primer breaks down as follows:
-xxateriala, $2'854'87
-Labor, $3'895'13
-Boom Lift, $2'750
-30 additional days for rain
-ls additional days to added primer scope
-oa&e @ s%, $475'00
The original Contract Sum was.......................
..........
....
........
..................
....................................
.............
......
............
..............
..........
..........
384,954.80
Net change by previous Change Orders _ ............ .................................. .....................................-----_-____............ 000
The Contract Sum prior ho this Change Order ............................................. 304�954,80
The Contract 8um will be changed by this Change Order ..............___ ................................... 9.075O0
The new Contract Sum including this Change Order will be ........... 314.929�80
The Contract Time mx|| be changed by ................................ -_____-___-'-- Q Days
Date,�
Monroe County Board of County Commissioners Date.
Keystan|no [}ahs'