Loading...
2020-06 Planning Services, Phase 2 MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Upon Execution Task Order No. 2020-06 Client Project No. GAKD135 Wor GAKD147 Engineer Project No. 18221.13 This Task Order is entered into on the effective date noted above pursuant to the"Master Agreement for Professional Services" between Monroe County, Florida ("Client") and McFarland Johnson Inc. ("Consultant"), dated February 15, 2017 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized: Planning Services for Phase 2 of the Evaluation of the Fishhook NDB Relocation at the Key West International Airport Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X__ Firm Fixed Price of$37,434.00 N/A Other(Describe): Schedule pR E COUNTY ATTOnNEY A1avEc Services may commence on Execution (� 7 , Services will cease by 180 da s. h S�S�A 0' ATTORNEY NTM Other Date 311121 Approved: Approved B 03.01.2021 Sr.Director of Airports As t./County ldmmistrator CONSULTANT: McFARLAND JOHNSO\INC. BYy._. .. .., Witness r Title-- e / _- .. P°llw Page I of 1 } McFarland EXHIBIT cc SERVICESSCOPE OF FOR KEY T INTERNATIONAL AIRPORT FLORIDAMONROE COUNTY, FISHHOOKI I — PHASE 2 McFarland-Johnson,Inc.(CONSULTANT)shall provide the professional services to Monroe County,Florida (SPONSOR)for planning,evaluation,and siting for the relocation of the Fishhook Non-Directional Beacon (NDB). Services will include planning, preliminary engineering,and agency coordination for consideration of relocating the existing Fishhook NDB to an alternate site within or adjacent the property limits of the Key West International Airport(EYW). EXISTING FISHHOOK NDB LOCATION F w i o F , Key West International Airport Fishhook NDB Relocation Evaluation—Phase 2 McFarland 1 41 XkFarland Johnson PROJECT DESCRIPTION The project consists of the planning and preliminary engineering for the relocation of the Fishhook NDB. The NDB is currently located at 1001 Atlantic Blvd, Key West, Florida and is within the Clarence S Higgs Memorial Park. Monroe County and the Key West International Airport(EYW) prefer to relocate the NDB to a location within the property limits of the EYW that is beneficial for maintenance and current/future land use. The CONSULTANT will prepare a planning document that includes a narrative outlining findings, recommendations,and site layout options for the relocation of the Fishhook NBD. The document will be used as the basis for a future design document or indicate no other sites are feasible. SCOPE OF WORK The CONSULTANT shall provide the following professional services to complete the PROJECT. The CONSULTANT will be supported by efforts from the SUBCONSULTANT as indicated above and throughout this Scope of Work. TASK 1.0 PROJECT MEETINGS, I I I COORDINATION This task was complete under the Fishhook NDB Relocation Evaluation—Phase 1. TASK 2.0 PRELIMINARY SITING VALU I N AND LAYOUT ALTERNATIVES This task was complete under the Fishhook NDB Relocation Evaluation—Phase 1. TASK 3.0 FINAL PLANNING AND PRELIMINARY SITING LAYOUT The following items are included in this task: • Incorporate Review Comments: The CONSULTANT will review all comments received from the SPONSOR and incorporate the applicable comments. The CONSULTANT will provide responses to the comments indicating if the comment was incorporated and reasoning. • Final Planning and Preferred Site Layout: The CONSULTANT will prepare the final relocation and site planning based on coordination with the SPONSOR,and FAA as appropriate,to identify the preferred site layout for relocation of the Fishhook NDB. This will include a technical memorandum outlining the relocation evaluation, considerations, and preferred site layout in a project narrative.The intent of this technical memorandum will be to document the study analysis for use in coordination with the FAA and support of a request to relocate the Fishhook NDB to the proposed site. Key West International Airport Fishhook NDB Relocation Evaluation—Phase 2 >sJohnson k McFarland • Cost Estimate: The CONSULTANT will finalize order or magnitude preliminary cost estimates for the two(2)alternatives for relocation of the Fishhook NDB. Contingencies will be included as appropriate for the level of preliminary site layout accomplished. • Review Meeting:The CONSULTANT will attend one(1) review meeting at a location identified by the SPONSOR to review the final documents. The CONSULTANT will be prepared to discuss each element of the planning and siting evaluation to make the necessary revisions and updates. Written meeting minutes will be prepared by the CONSULTANT and distributed to all attendees. TASK 4.0 FAA COORDINATION AND SUBMITTAL: The CONSULTANT will submit the final document to the FAA for review and consideration. One (1) coordination meeting (audio or virtual meeting) will be held with the FAA and SPONSOR to discuss the relocation study and preferred site layout. If upon FAA review and determination, an acceptable site is identified, the CONSULTANT will coordinate with the SPONSOR to complete the design and relocation under a separate contract. PROJECT DELIVERABLES The primary project deliverable will be a technical memorandum documenting the analysis and results of the relocation evaluation/study for use in coordinating the relocation request with the FAA. All deliverables will also be submitted in electronic format for SPONSOR's use. PROJECT SCHEDULE The CONSULTANT agrees to complete the work under this phase of the Agreement in a manner satisfactory to the SPONSOR within six(6) months after receipt of an executed copy of this contract from the SPONSOR accompanied by a resolution from its governing body authorizing said execution or within such extended periods as agreed to by the SPONSOR. BASIC ASSUMPTIONS 1. Any assumptions made during the planning analysis will be documented and confirmed/modified during the design phase of this NDB relocation. Design will be complete under a separate contract. 2. Topographic and Physical Features survey will not be included in this project. 3. No environmental field investigations or surveys will be completed. Environmental conditions will be obtained from existing available environmental information. End of Scope of Services--- Key West International Airport Fishhook NDB Relocation Evaluation-Phase 2 ttt�e Md-arland Johnson 3 Key West International Airport-FishHook NDB Relocation Evaluation -Phase 2 Monroe County October 2020 FEE SUMMARY McFarlandJohnson DESIGN/PLANNING SERVICES 1. DIRECT TECHNICAL LABOR $37,434.00 2. DIRECT EXPENSES 3. SUBCONSULTANT COSTS 4. TOTAL FEE ESTIMATE $37,434.00 S.TOTAL LUMP SUM FEE FOR ALL SERVICES $37,434