Item O1MEMORANDUM Office of the County Administrator TO: Board of County Commissioners FROM: Debbie Frederick Deputy County Administrator DATE: June 2, 2011 SUBJECT: County Divisions' Monthly Activity Report for May, 2011 MONTHLY ACTIVITY REPORT - MAY, 2011 KEY WEST AIRPORT • In May, passenger figures for April were compiled. During that month, the six airlines serving Key West International Airport carried a total of 70,588 passengers. This is a 30.6% increase over April of 2010. The year to date passenger totals are 254,688, up 16.03% over the same four month period for 2010. • After nine years of permitting and environmental legal challenges and one year of constriction, the Key West International Airport Runway Safety Area is now complete. The FAA has nominated this project for the FDOT Project of the year for 2011. • During May, preconstruction work was initiated on the following projects, new elevator in the bag make up building, improvements to the arrivals area including expansion of the rest rooms, additional bag belt and reconfiguration of the airline baggage counters, and work was begun on the FY 2012 Rates and Charges Study. MARATHON AIRPORT • Information regarding based aircraft and operations at the airport and information on the City of Marathon's Marina and user projections has been compiled and forwarded to Customs and Border Protection (CBP) officials in follow up to last month's meeting and site visit regarding a User Fee Facility (UFF). • Project coordination is ongoing for a landscape project by the City of Marathon within right of way adjacent to bike path in front of airport on US 1 from Aviation Blvd to 107th Street. • Coordination has begun with Grantair FBO d/b/a Marathon Jet Center regarding the proposed constriction of an additional hangar on its leasehold premises. • Project coordination is on -going with City of Marathon on the Little Venice Waste Water Treatment Plant expansion project located at the Airport. • Airport Improvement Projects (AIP) for the design of the Airport Terminal Sewer Lateral (90% complete) and a Wildlife Hazard Assessment are on -going. Funding for these projects is through an AIP Grant Agreement. • The Environmental Assessment Project associated with the runway relocation proposal is on -going; preliminary draft has been completed and submitted in January 2011 to the FAA for review and comments; still awaiting reply from FAA. Project funding is through an FAA Grant. EMPLOYEE SERVICES L Website Updates (other than normal position vacancy updates, etc.): Benefits: KPHA Provider Directory Updates Monthly newsletter — Wellness Human Resources: Revised 3 job descriptions IL Turnover Numbers To Date: May 2011 Turnover: 1.93% Turnover 2011: 5% Resignations: 4 1 Terminations:) I Retired: 5 1 Deceased: 0 Lavoffs: 0 Human Resources Pre -determination hearing — 1 Began employment verification checks with E-Verify Meeting with GM Director and Payroll regarding FRS contributions Completed Personnel Policy and Sick Leave Pool Committee elections Met with Airport Director regarding Job Description changes Applicant statistics: New applications: 100 Re -submittals: 49 In -House submittals: 11 Referral information: Newspaper: 11 Employment Agency: 4 Friend: 15 Relative: 9 Walk-in: 6 Channel 76: 2 Internet: 51 No response: 62 Risk Airport Liability meeting with ACE — Insurance Carrier — Key West and Marathon Airports Benefits (Group/Workers Comp) Utilized TIES student for office work Began work with Alchemy in scanning files Quarterly KPHA meeting held Held public meetings and rankings for Health Insurance program vendors 2 Administrator attended webinar on Self -insured funding Met with Field Case Manager and Suzanne Gasse from Selection PT regarding use of their facilities for WC physical therapy Safety ■ SARB meeting held BUDGET & FINANCE Budget Analysts: • Prepared/ posted budget transfers- 98 • Prepared Resolutions for June meeting: 34 • Reviewed and Signed Contracts: 42 • Processed and sent Invoices to Finance: 14 • Signed and entered PAF's into GovMax: 29 • Incoming mail - 11 • Outgoing mail - 24 • Compiled and processed agenda packet for May and June, 2011 BOCC meeting. • Processed and submitted to Finance Dept., MCSO's 911 and Interagency Communications Dec10-Marl1 revenue and interest collections. • Processed and submitted to Finance Dept. DATF, CTT, RSAT and Byrne Grant, March -April 11 reimbursement requests from MC SO, and Guidance Care Center. • Processed and submitted to Finance Dept. UKCP's April 11 reimbursement request. • Work still in progress, the GASB54 Implementation revenue worksheets for Finance Dept. • Input and balance in GovMax TDC's FY2012 revenue and expenditure budget. • Prepared materials needed (resolutions, memos, grant application, pfc application, spreadsheet) for KW Airport RSA grant internal audit meeting. • Prepared April 2011 purchasing card billing, and gather Ipad data information needed by Clerk's office to process payment. • Updated revenue schedules with most recent revenue data and beginning to calculate estimates to be used for fund balances. • Begun fund balance calculation, analyzed and estimated revenues and expenditures in 3 funds. Those three funds are balanced in GovMAx. • Answered and submitted the Fitch Bond Surveillance questions. • Inputted HSAB, State Attorney, Public Defender and Judicial budgets into GovMax. • Calculated retirement rates, using S132100, and inputted those rates into GovMax. Grants: • EECBG Energy Grant: Currently training new Energy Grant Coordinator on all aspects and reporting/compliance requirements for grant. Prepared monthly progress report; collected/compiled programmatic reports and budgets for 9 separate projects. Prepared purchase order for hybrid vehicle purchase. Multiple emails to State requesting determinations on various issues with regard to the County's energy grant; calls to State Energy office related to grant. 3 Legislative session: Monitored legislative actions/bills. Prepared a Summary of Legislative Actions for the FY 2011 Session. 2012 HSAB: Reviewed all HSAB applications. Prepared materials, advertised, and facilitated annual HSAB Funding Recommendation meeting on May 24th at Mosquito Control in Marathon was secured for May 24. Prepared spreadsheet of finalized recommendations for Budget Director for incorporation into FY 12 budget. Assigned new cost centers for former BOCC line items that are now in HSAB. 2011 HSAB and BOCC Line Items Funding Cycle: Monitor ongoing grant activities; addressing/resolving various reimbursement request and contract compliance issues; completing certifications for all contracts; follow ups with funded organizations. 2011 State JAG grants: Monitoring grant activities for these five grants, processing invoices and reports to State. Completed quarterly program and fiscal reports. Completed desk monitoring request for FDLE. • 2011 State RSAT grant and Clerk's Drug Abuse Trust Fund: Monitoring grant activities for these grants; reviewing/processing reimbursement requests. • FEMA: Continued closing out large projects from Hurricane Wilma; only one large project remains. Filed reimbursement requests for the large projects for Ilse. • Miscellaneous: Baker Act funding: Continued working on Baker Act payment issues. Assigned new cost centers for non -discretionary Baker Act payments for GCC and LKMC and removed these from discretionary BOCC line item funding. CJMHSA Implementation Grant: Worked with MCSO on Advance Payment request and agenda item. Purchasing Department: Totals for the month of May 2011 are as follows: Total purchase orders processed 285 Total orders placed for departments 83 Total orders entered for departments 100 Office Depot orders processed 75 Staples Orders processed 4 We opened 3 bids and processed another 3 which was average from the previous months. Addendums entered 3, contracts reviewed 46, and bills paid 6, and voided 10 purchase orders. We also processed 800 pieces of mail which was average from previous months. COMMUNITY SUPPORT SERVICES In -Home and Nutrition Services (IHNS) OAA, Older Americans Act Programs: Nutrition (Information in this section is for the period 4/21/11 — 5/20/11): • C-1 Congregate Meals totaled 1190 units, reflecting the departure of the seasonal clients, yet still exceeding the monthly goal of 1175 units. C-2 Home -Delivered Meals totaled 2947 units, bringing the year-to-date achievement to within 1% of the targeted goal. There are 15 high risk clients on the Home Delivered Meal waiting list. In -Home Services (Information in this section is for the period 3/21/11-4/20/11): 4 • III-E In -Home Respite: 40.5 units this period, 62 units year-to-date, 7.4% year -to - date -achieved. • III-E Facility Respite: 378 units this period, 1012.5 units year to date. 22% year-to- date achieved. We have achieved 18%, 15.34% underachieved year-to-date. We have added new clients to both In -Home and Facility Respite, which should improve this result. Non-OAA Programs: CCDA (Community Care for Disabled Adults) for April 2011: • Case Management: 13.50 units for the month were produced; 101.5 units year-to- date. • Homemaking: 142 units for the month were produced; 1273.5 units year -to date. • Home -Delivered Meals: 110 meals for the month were provided; 1435 meals year-to-date. • Personal Care: 45 units for the monthly were produced; 448.75 units year-to-date. Overall Program Achievement was 75.21%, 8.12% underachieved. CCE (Community Care for the Elderly) for the period 3/21/11-4/20/11: • Case Management: 74.75 units for the period and 320.75 units year-to-date. 31.3% achieved year-to-date. There are 180 clients on the waiting list. • Intake: 3 units achieved and 45.5 units year-to-date. 85% achieved year-to-date. • Chore: No units achieved and 2 units year-to-date, 13% achieved year-to-date. • Homemaking: 590.5 units for the period and 6521.5 units year-to-date. 69% achieved year-to-date. There are 154 clients on the waiting list. • Personal Care: 392.5 units for the period and 5214.25 units year-to-date. 124% achieved year-to-date. There are 77 clients on the waiting list. • Respite: 22 units for the period and 1695.25 units year-to-date. 130.7% achieved year to date. There are 26 clients on the waiting list. CCE overall is at 84.5% achievement, which is 1.16% overachieved. Case managers continue to monitor current clients for reductions in care plan cost. • ADI (Alzheimer's Disease Initiative) for the period 3/21/11 — 4/20/11: 343.5 units were produced in the period and 1981.75 units year to date. 83.92% year-to- date achieved, .57% overachieved, which is in the target range. Three clients on the waiting list. • HCE (Home Care for the Elderly Program) for the period 4/16/11 - 5/15/11: 19.5 billable units this period, 201.5 billable units year-to-date. 58.24% year-to-date achieved, 33.43% underachieved. We have requested that all wait listed clients be activated. Case Managers are working to identify more eligible clients. Monroe County Transit Department Activity for May 2011 • One-way trips provided: 1751 Unduplicated clients served: 219 Special Needs Clients registered: 432 • Awarded the 5310 FDOT Grant for the funding of a new Paratransit bus and the 5316 FDOT Grant for funding the Mobile Data Terminals/software for the Trapeze Dispatching and Reservation System. The awards and agreements will be brought to the board in the fall BOCC meetings. Deposited Revenue: $1,724.45 Expenditures: $57,162.07 Percentage Spent Fiscal YTD:6.8 % Incoming calls, provision of information and referrals 892 Unduplicated Welfare client households that received service 66 New Welfare cases receiving service 23 Low Income Home Energy Assistance Grant Program cases- 10 $2,400.00 Low Income Crisis Assistance cases — 26 $5,156.53 Home and field visits 11 Office visits 450 Interesting Community Support Services Updates: • Edith attended a 3 day training seminar to learn about consulting services to long- term care operators (Assisted Living Facilities, Adult Family Care Home, Adult Day Care Centers and Homemaker Companion and others). • Field monitor for the Wap Progam came to Key West to review 4 new cases for payment. Everything went well. Bayshore Manor (BSM) Bayshore Manor's current census is 13 residents. The current census is five private pay and 8 subsidized. BSM provided 178.75 hours of OA3E respite care and 0 hours of Medicaid Waiver this month. Bayshore Manor has three OA3E clients. There are three clients on the wait list. Revenue for May 2011 $33243.59 Expenditures for the same period $76500.66 Percentage of the budget spent year to date 65.98% T TRRARV • While the winter residents and snowbirds have returned to their northern residences, Library usage figures continue to speak to the locals' appreciation and use of Library facilities and services: • 191 new Library cards were issued during the month, bringing the number of Monroe County cardholders to 53,125, well over half the total population of the County • Reference questions for the month were handled in person, over the phone, and via e-mail and chat, the last two of which methods are growing increasingly more popular, as they exceeded the previous month's numbers by 38% • 142,908 e-visits to the Library's website, photo archive and catalog were logged for the month, an increase of 4% over the previous month, and an indication of our resident patrons' interest in using our offsite access facilities as well as the growing enjoyment and appreciation of our historic online photo collection • Our spending continues on pace with the fiscal year so far, and the budget request for FY 2012 was submitted and discussed at the Administration/OMB roundtable. EXTENSION SERVICES • Number of services provided: 463 phone calls, 39 office visits, 46 visits to clients, 11 group teachings with 545 participants, 7 media submissions, and 364 6 publications distributed. Total Budget for FY 10/11: $186,491.00; Year to Date Expenditures and Encumbrances: $154,683.77; Remaining Balance: $31,807.23; Percentage of budget spent and/or encumbered year to date: 82%. The Extension Director accomplished the following activities: • Taught a two-hour course on solar technologies to 25 Florida Extension Agents as part of a University of Florida in-service training on "Emerging Energy Issues for Florida." • Testified at the Gulf of Mexico Fishery Council's Annual Catch Limits public hearing in Marathon. • Attended the Green Living & Energy Education (GLEE) 4th Annual Green Living Awards ceremony where Monroe County received the annual Green Government Award. • Participated in a four -person OF/IFAS Extension Review Team to evaluate the Collier County Extension Office. • Attended a Gulf of Mexico Fishery Council meeting of the Scientific and Statistical Advisory Committee in Tampa to review and make recommendations on the NOAA SEDAR 22 yellowedge and golden tilefish assessments, Spanish mackerel and cobia quotas, and updated harvest projections for red snapper and red grouper. • Presented a summary of the Monroe County Community Listening Session, held in April, to OF/IFAS Extension Deans and leaders for incorporation into the statewide planning process. • Completed the final report on the yellowedge grouper and golden tilefish population assessment for the NOAA SEDAR 22 Assessment. The Environmental Horticulture Agent accomplished the following activities: • Helped Keys Energy Services with their 16th Annual Tree Giveaway, along with 25 Master Gardeners. • Set up a vermiculture booth at the Keys Expo for Young Scientists (K.E.Y.S. Expo) at Stanley Switlik Elementary School. Four Master Gardeners and Interns assisted in educating 162 youth and 10 teachers. Topics discussed were the importance of composting and how to compost using worms. • Attended the "Community Involvement to Break the Cycle of Dengue" workshop. • Organized two Islamorada workshops, "Whitefly Management in the Landscape," with Dr. Catharine Mannion as guest speaker. The morning workshop was for landscapers and pest control operators (22 attendees); the afternoon session was for Master Gardeners and homeowners (28 attendees). • Attended North Carolina State University's IIth Annual Vermiculture Conference in Las Vegas to learn more about composting with worms. • Held four plant clinics with 12 Master Gardeners assisting 22 clientele with plant and/or insect problems. • Made 25 site visits throughout the Keys, mostly to identify the Rugose Spiraling Whitefly. The Family & Community Development Agent accomplished the following activities: • Worked with the High School Financial Literacy classes, all of which have completed 9 units. VA • Coordinated the May meeting of the Monroe County Climate Change Advisory Committee, where the bylaws were adopted and a work plan was set in place with advisory assignments by subject area. • Attended the Sea Level Rise Adaptation in the Florida Keys workshop. • Worked with the new sustainability coordinator on using grant reporting spreadsheets and grant administration including review of the grant process. • Collaborated with staff and municipal partners to coordinate development of the educational and greenhouse gas activities as part of the EECBG grant funding. • Worked on energy grant activities including coordination of reporting requirements and timelines for accomplishments, and worked with the City of Marathon and Key West on coordination of match funding under grant activities. Collaborated with staff on energy strategy contract compliance. EMERGENCY SERVICES Fire Rescue • Updated several Monroe County Fire Rescue Standard Operating Procedures (SOPS) and Forms. Some of May's revisions related to treatment of minors, rescue staffing, attendance and punctuality, and Key West Airport Station 47 visitor sign -in and security identification display area. • Submitted SAFER grant quarterly report and payment request for period from 12/20/10 through 03/19/11 and received revenue in the amount of $50,045.92. • Attended annual summit for patient care reporting and technology issues related to Fire Rescue • IAFF negotiations held in the Marathon Government Annex. Fire Marshal • Conducted the following: Monroe County School inspections, Six Department of Children & Families inspections and Mariners Hospital inspection. • Attended the Florida Fire Marshals annual Miami education seminar reviewing new codes. Training • Completed the State Certified Firefighter II class. • Conducted Vehicle and Dumpster Live Fire Training for Station 22. • Conducted Live Fire Training for Ocean Reef Public Safety. • Conducted a State Certified Firefighting Strategy and Tactics I class. • Conducted First Aid training for a group of women at Geiger Key Campground. Trauma Star/EMS • Completed training of all paramedics and EMTs in Critical Trauma Patient care, treatment and transportation procedures (4 hour class). • Recruited and trained one new qualified flight medic for service on Trauma Star • Attended EMS Awards Luncheon at Lower Keys Medical Center in honor of EMS Week 8 • Trauma Star transported 28 Trauma, Cardiac, Stroke and Critical care patients from the Keys to higher level hospitals on the mainland Emergency Management • Worked with the State Division of Emergency Management on their 2011 revision of the State's Turkey Point Nuclear Power Plant Site Plan • Submitted Shelter Retrofit information to Florida Division of Emergency Management for the Base Grant required Emergency Management Scope of Work • Participated in a Statewide Hurricane Exercise by partially activating the County EOC — County participants included Emergency Management, Department of Health, County Social Services, County Public Works, American Red Cross, City of Key West, Key West Weather Station, Monroe County Sheriffs Office Public Information Officer, City of Key Colony Beach, City of Layton, FKEC and Florida State Region 7 Coordinator • Emergency Management Hurricane preparedness and information ads have been submitted to local newspapers for publication • Attended the Regional Domestic Security Task Force (RDSTF) Meeting to provide the Emergency Management Workgroup Charter for group review, discussion, and approval and shared highlights from the State Working Group meeting regarding grant funded equipment. PUBLIC WORKS • Pollution Control removed 26 tons of debris illegally dumped in County rights of way and 19.05 tons for other departments/agencies: 18,040 lbs. from the Key West Garage; 2,620 lbs. of tires from the Marathon Garage; 13,960 lbs. of debris for the Land Authority and 2,3601bs. of brush from the Marathon Airport • Also accepted six of the stranded whales that died at the Cudjoe Key Transfer Station weighing 4,5201bs. • Purchased and received a fluorescent bulb crusher for Long Key Transfer Station • Assembled new desk, lateral and shelves at the Marathon Gov't. Center • Painted exterior of entrance to Marathon Public Defender's Office • Painted interior of Marathon Health Department • Installed new rain gutter guards on Marathon Courthouse roof • Completed annual pre -hurricane season generator fuel tank polishing and cleaning, generator oil sample, lab testing, and fuel tanker trick and F-550 bucket trick preparation (inspection, maintenance and repairs) • Received and put in service a new pickup trick, replacement tractor, and pull behind right-of-way cutter for Card Sound Toll Authority • Received and put in service, a new replacement F-550 flatbed trick for the Road Department • County now scheduled to receive .85 cents per gallon for used oil, up from .80 cents per gallon previous month • Prepared request for surplus bid package for Public Works and other multiple county departments • Completed walk-thru safety inspection of all three garages in Key West, Marathon and Plantation Key 9 • Implemented new oil change format, extending life of oil in light -usage vehicles and equipment, to reduce cost of changing motor oil and filters for County units and departments • Began testing head light housing polishing kits for potential savings in reducing number of head light housing replacements • Completed testing of synthetic and re -refined recycled motor oils; determined it's in the County's best interest to use re-refined/recycled motor oils along with the used oil buy back recycling program that's available to the County at this time, as the most environmentally -friendly and cost-effective for the County • Fleet mechanics successfully diagnosed and repaired a malfunctioning high -profile generator at the Marathon Jail where approximately seven (7) different outside generator technician's had failed; associated cost savings to the County for this single repair was estimated by contractors to be in access of $10,000 • Received thirty-nine (39) individual factory safety recalls for county vehicles; began documenting/ processing the safety repairs at Ford dealers located in Homestead and Key West • Prepared new job descriptions with new CDL Commercial Driver License requirements for all county mechanics • Began researching engine idle limiters for county vehicles, which are designed to help save fuel and protect the environment by limiting the time that an engine is permitted to remain idling when the vehicle is parked • Installed surge protector for Nelson GC elevator • Replaced fan motor belts at air handler 42 and 46 at Nelson GC and at Ellis Building, Property Appraiser's office a/c • Replaced a/c condensing unit at KL Park duplex unit 42 • Replaced two grinder pumps at the Harry Harris Park wastewater treatment plant • Replaced kitchen cabinets at the Harry Harris Park leased trailer • Completed Harry Harris Park restroom renovations • Placed 50 rip rap bags at the Harry Harris Park beach revetment • Installed No Parking signage at designated area of Burton Drive per BOCC resolution ENGINEERING • Geiger Creek Bridge —Materials audit by F14WA performed on 5/10/11. No deficiencies were noted. Staff is finalizing FDOT submittals and closing out project. • US 1 Bayside Shared Use Path — Public Meeting for ranking respondents to RFQ for Design Services was held on 5/26/11; request to negotiate on June Agenda. • Tom's Harbor Channel Bridge — Design development phase deliverables received and reviewed by staff, consultant is preparing constriction documents and permit applications. • Card Sound Road Repair Project — Staff prepared constriction project manual and submitted to County Attorney/Public Works staff for review. • Replacement of Culverts at W. Ortega Lane (Doctors Arm) Big Pine Key — Staff prepared scope of services task order to obtain design proposal. Watson Boulevard Leg A Bridge Project - Staff completed FDOT, LAP and NEPA classification recommendation for and submitted to FDOT; anticipated notice to proceed: July 2011. Bimini Drive Bridge on Duck Key — In conjunction with Planning Dept., Engineering staff prepared an application for FDOT Enhancement Funds to widen bridge. Bus Shelter Installation and Maintenance — Completed draft RFP and submitted to County Attorney for review; request for approval to advertise on June agenda. PROJECT MANAGEMENT • Marathon Courthouse — Courthouse staff to vacate old trailer 6/28/11. Estimated arrival of new trailer 7/11/11. TDC PROJECTS • East Martello Brick & Mortar —Project is 60% complete on Phase 41. • East Martello Interior/Exterior Doors — TDC approved $25,000. Waiting for contractor pricing. • West Martello Fencing — TDC approved $45,000. Amending Architect contract for additional drawings/specifications; then out to contractors for bids. • West Martello Brick & Mortar — Brick and Mortar restoration 100% complete on Phase 41. WASTEWATER • Big Coppitt / Duck Key Central Service Area — Resolution for a capacity fee (w/ inflation adjustment component) to be charged on properties developed after the wastewater assessment levy imposed; request for approval on June agenda. TECHNICAL SERVICES We completed 209 work orders, installed the rest of the 50 new machines ordered at the beginning of April, continued to work on the content of our new website specifically content relating to the County Administrator, Growth Management and Emergency Management, connected new copper wired link from the EOC to the library, uploaded additional data to Alchemy, increased number of Spanish capable computers in the libraries to 13 with at least two in each library, updated the other computers in the library, disposed of old computers and printers, and pushed out new Microsoft security updates. VETERANS AFFAIRS Clients assisted: VA phone calls: 772 Office visits: 289 New clients: 47 Field visits: 6 Benefits Delivery at Discharge: 12 Transportation program: Transportation calls: 594 Veterans transported: 190 Financial data: The financial data for the month of May totals $80,028.00 and indicates the amount of new revenue brought into Monroe County derived from claims filed by the entire department. The financial data captured monthly will vary due to the Veterans Administration's variable time frame in adjudicating awards. GROWTH MANAGEMENT Growth Management Revenue 2009, 2010 & 2011 GROWTH MANAGEMENT EXPENSES EXPENSES ENDING APRIL Total Total Total FY 2011 FY 2010 FY 2009 % Variance Budgeted Expenses Expenses Expenses Expenses Expenses Expenses Expenses FY 2010 FY 2009 Ending Ending Ending Ending FY 2011 April April April April FY 2011 from April FY 2010 Growth Mgmt. $773,577 $419,431 $448,743 $417,691 $203,492 $231,490 205% Admin. Geographic $199,855 $209,676 $231,399 $95,333 $105,265 $89,551 91% Info. (GIS) Planning $1,189,704 $990,168 $985,726 $539,614 $525,211 $444,076 103% Comp. Plan $260,000 $301,385 $46,045 $110,186 $22,997 $7,843 479% Planning $84,167 $80,563 $84,698 $43,780 $40,454 $46,589 108% Commission Environmental $297,679 $280,108 $269,072 $159,336 $141,770 $171,669 112% Resources Code $1,203,570 $1,155,600 $1,048,251 $578,190 $605,608 $519,456 95% Building Dept. $2,203,968 $2,384,816 $2,434,746 $1,234,617 $1,170,717 $1,178,594 105% Boating Imprv. $750,774 $306,309 $320,737 $157,235 $53,371 $133,788 295% Environmental $192,444 $153,611 $127,392 $83,893 $57,845 $46,462 145% Restoration 12 Account April, 10' April, I F 2007-2008 2008-2009 2009-2010 Administrative Engineering 001-000000-341921-SG 0.00 469.00 9,582.00 44,814.40 2,052.00 Impact Fees 130-131-132-133-134-1 12,927.92 4,724.20 314,544.44 326,206.06 177,100.48 Zoning/ROGO/Env ironmental 148-341905-SG 42,872.00 34,130.00 491,321.50 522,411.45 450,206.49 Fire Marshal 148-341906-SG 2,288.00 1,092.00 172,499.95 80,908.05 45,363.00 Flood Variance 148-341907-SG 0.00 0.00 100.00 0.00 50.00 Historic Preservation 148-341913-SG 0.00 0.00 600.00 200.00 0.00 Code Compliance 148-341916-SG/148-35 63,435.71 29,117.11 137,960.34 341,038.70 343,874.31 Planning Admin/Research/Copy/e 148-369001-GM 179.65 131.50 25,102.06 3,671.90 3,593.19 Marine Resources 148-62610-343700-SP 385.00 354.00 3,060.00 4,090.00 3,605.00 Boat Improvement Fund 157-361005GI/3690015 64,936.23 62,879.23 563,685.86 683,174.73 668,103.49 Education Fees - Building 158-322005-SG 1,808.00 1,814.36 22,559.00 28,287.75 27,148.00 Education Fees - Environmental 158-322006-SG 1,180.00 1,420.00 4,287.00 12,335.00 14,444.00 Environmental Mitigation 160-351400-SP 15,272.46 3,055.72 652,980.11 100,230.54 133,368.06 Deferred A/C Fees 180-223005-SG 0.00 0.00 15,052.00 2,541.00 0.00 Flood Review 180-322005-SG 4,480.00 5,180.00 68,220.00 76,027.00 64,700.00 Income from Permits/Applications 180-322005-SG 160,206.00 151,362.60 2,632,019.72 2,462,965.42 2,071,290.01 Certificate of Competency/Contrac 180-322103-SG 3,857.50 2,592.50 174,110.00 29,782.50 159,942.50 Radon/DCA 180-341904-SG 143.07 1,821.49 5,219.18 2,925.34 2,459.97 Recovery/DBPR 180-341908-SG 143.07 1,821.49 5,219.18 2,922.32 2,459.97 BuildingBook/Copy/etc. 180-369001-GM 1,365.70 1,168.35 9,493.37 9,071.52 9,707.23 Total 1 1375,480.311303,133.55 5,307,615.71 4,73 3,60 3.68 4,179,467.70 13 'PTO ROE COUNTY GRO%VTH%,,L4k-N A GENIE-N T RE VENUE A,PRIL.220 I I I SI, Upper Keys Wy-fiddleKey s * Does not include "Boat Improvement Fund" income -receipts only H, Lower Revs 14 Revenue 2011 vs. 2010 Office Feb._ 10` Feb._ I F March_ 10` Ntarch_ I F Aril_ 10` Aril_ I F FY - Aril_ 10` FY - April- I F L' er I e s '76.290.16 94.973. 58,. 9.'9 5133.2 1.24 S90.309.62 S6''.' 12.60 818.22 7.14 Middle Keys _020.2 7 15'.5 61.61 587_096.09 S154_789.0s 559_�0_s.�4 Sl s0. )1').78 5568.021. 0 1.020.9� . 36 Lot; er Keys 24.072.44 }s.900 529.3 29.19 s2`.4.2 S21090.08 52.910.22 522._ 02. 169.029.`0 TOTAL 156.382.87276.441.86 S200.165.07 S315.514.89 S1?2.003.34 S240.254.32 S1.447 6 6.65 2.007.224.20 GIS Office Projects - GIS Server/Intranet Site Maintenance and data updates/editing (on -going) - TDRC — BOCC Meeting and Preparation - AICUZ/Census Analysis - Marine Approach Channels Mapping — Planning and Marine Resources - USFWS Focus Areas/Tier Map Project - AICUZ/ROGO Properties Mapping — Planning - Existing Land Use Mapping and Review — Land Authority and Keith & Schnars GIS Data/Map Requests/Technical/Programming - Adobe Flex vieNver development in conjunction with the ArcGIS Server upgrade in - progress - Accessing SQL Server GIS tables via a sql query- from Excel, support for Tiffany 15 - Support for Kathy and Tiffany, ArcNlap bug discovered exporting to dbf — recommended -,-,-orkaround is to disable the background processing from geoprocessing options - Support for Tiffany, performing a table join N-6thin Excel, storing the sql query (including the join) N-,-ithin odc - SDE maintenance, increased max sde service connections - Updated parcel layer GIS Addressing - 29 Address Assignments PLANNING & ENVIRONMENTAL RESOURCES CURRENT PLANNING CATEGORY Appeal to Planning Commission Applied................................................................................ 1 Appeal to Planning Commission in Progress........................................................................... 2 Appealto DOAH in Progress................................................................................................. 3 AlcoholicBeverage Applied.................................................................................................... 1 Alcoholic Beverage in Progress............................................................................................... 3 Code Enforcement Referral (estimated at 1 per week per Current Planner (4 ........................ 16 Conditional Use, Major Permit in Progress............................................................................. 1 Conditional Use, Minor Permit Issued.................................................................................... 1 Conditional Use, Minor Permit in Progress............................................................................. 1 Conditional Use Minor Deviation Applied.............................................................................. 1 Conditional Use Minor Deviation Completed......................................................................... 2 Conditional Use Minor Deviation in Progress......................................................................... 1 Conditional Use, Major Deviation in Progress........................................................................ 1 Conditional Use, TDR in Progress........................................................................................... 1 Development Agreement in Progress...................................................................................... 1 Public Assembly Permits Applied........................................................................................... 3 Public Assembly Permits issued.............................................................................................. 4 Public Assembly Permits in Progress...................................................................................... 5 RoadAbandonment in Progress............................................................................................... 4 Variance Administrative Applied............................................................................................ 1 Variance Administrative, Completed....................................................................................... 1 Variance Administrative in Progress....................................................................................... 3 Variance, Planning Commission in Progress........................................................................... 4 Permits Reviewed & Processed............................................................................................... 117 ROGO related applications ROGOExemptions Applied.................................................................................................... 2 ROGO Exemptions/Denials Issued.......................................................................................... 3 Mixed Use Category MCC Text Amendment Initiated............................................................................................. 1 MCC Text Amendment, In progress........................................................................................ 13 16 Customer Service In -person inquiries estimated at 5 per day per planner (2)............................................... 300 Telephone inquiries estimated at 10 per planner (7) per day ................................................... 2100 Email inquiries estimated at 5 per planner (7) per day............................................................ 300 Request for Research Applications.......................................................................................... 3 Lettersof Understanding.......................................................................................................... 1 Administrative Meetings Development Review Committee — 1 meeting, 7 items Planning Commission - 1 meetings, 5 items COMPREHENSIVE PLANNING CATEGORY Kathy Grasser, Comprehensive Planner I. COMPREHENSIVE PLAN UPDATE Reviewed and edited the Element by Element Assessment Report.......................................1 Analyzed LOS for Parks and Rec..........................................................................................1 Reviewed Parks and Rec Element and sent to K&S..............................................................1 Sentlist of Libraries to K&S.................................................................................................1 Reviewed update to Contract for K&S..................................................................................1 Reviewed of Technical Document elements..........................................................................1 ReviewedContract.................................................................................................................1 Reviewed Budget and Invoices..............................................................................................4 Reviewed Econ Report from K&S........................................................................................1 Fire Safety inclusion with CIP Element.................................................................................1 II. PROJECTS Updatedweb page..................................................................................................................1 UpdatedComp Plan on Web Page.........................................................................................1 Population Projections for Stock Island -gathered data..........................................................1 III. REPORTS IV. STAFF Combrehensive Planning Staff Meetings Metwith Staff........................................................................................................................2 Assisted Staff Excelhelp...............................................................................................................................2 V. MEETINGS 110 AICUZPopulation Meeting...................................................................................................1 Element by Element Meetings...............................................................................................5 Fire Safety Element Meeting with Fire Chief........................................................................1 Met with Consultants on Element by Element Review.........................................................1 Met with EIS Committee to discuss K&S Contract...............................................................1 Parks and Rec LOS meeting with Board...............................................................................1 Parks and Rec LOS meeting with Public Works...................................................................1 WebPage maintenance.........................................................................................................1 VI. CAPITAL IMPROVEMENT IMPLEMENTATION VII. INFORMAL MEETINGS Met with Assistant County Attorney, staff to review contract..............................................1 VIII. COMMUNICATION Various Telephone calls received..........................................................................................5 Various Telephone calls made...............................................................................................5 EmailsReceived....................................................................................................................500 EmailsSent............................................................................................................................350 IX. PROFESSIONAL DEVELOPMENT COMPREHENSIVE PLANNING Comprehensive Planning - Mitch Harvey........................................................................4/11 Development Review Committee Meeting............................................................................1 Planning Commission Meeting..............................................................................................1 Comp Plan Update teleconference with Keith & Schnars to review progress ......................2 Reviewed Element Assessment & provided comments to K&S...........................................1 Reviewed Military Compatibility section of Technical Document.......................................1 Reviewed Florida Keys Proposed Rule 28-20.......................................................................1 Revisedstaff reports.............................................................................................................. I Attended NAS EIS Oversight Committee meeting...............................................................1 CompPlan Team Meeting.....................................................................................................1 Responded to E-mails and phone calls.................................................................................20 ENVIRONMENTAL RESOURCES PERFORMANCE REVIEW CATEGORY: CodeEnforcement Referral..................................................................................................6 Long Dock Variance Application..........................................................................................1 18 Permit Application Site Visit (est).........................................................................................51 WetlandDelineation..............................................................................................................2 PreApp Conference...............................................................................................................1 OTHER: Misc Bio................................................................................................................16 KEYWEPvs UMAM review.................................................................................................4 TierDesignation Review.......................................................................................................40 Site Visits (Miscellaneous) Turtle Stranding.........................................................................1 WRITTEN CORRESPONDENCEBIOLOGICAL ASSESSMENTS Code Enforcement Assessment Memo..................................................................................2 Conditional Use Staff Report.................................................................................................2 GISMap Assorted..................................................................................................................27 Interagency Coordination DEP, ALOE, FKEC, FL Park Serv, FWC, DCA, FWS, FEMA .10 Long Dock Variance Memo/Approval..................................................................................1 Letterof Understanding.........................................................................................................1 OTHER: Permit Application Review/Assessment................................................................................40 MEETINGS: ContractorsSummit..............................................................................................................1 DRC.......................................................................................................................................1 PlanningCommission...........................................................................................................1 PhoneCalls [Estimated].........................................................................................................400 Front Counter Walk Ins [Estimated] 400 19 CODE COMPLIANCE ACCOMPLISHMENTS FOR APRIL 2011 UPPER KEYS 250 200 150 100 w lG�yti� 4oa�P� �����. Qoo�Pa c� �Q boa �qP oo� P oo yoP �Pv yop� DP p \6� a� �Q�t aeyS �Qk, 114� `',�4, MIDDLEKEYS 300 250 200 150 100 e QeltiF41QSol ae0 �Pk L � 01 , Cr'Y��`oaE���QF�yQ,o�y���P� co a o� o�y LOWER KEYS 200 250 200 150 100 So 0 c, gp'LP �Pa �Ser v�F• �� �P� 4 ����� l4�°0 114, w TOTALS 1800 1608 1600 7 1400 �4 ski 1223 1200r�161 1067 1000 976 q 839 800 600 �l 400 � I 200 r' is 0 ! Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jan-11 Jul-11 Aug-11 Sep-11 Oct-11 �s;;,?d2 �stts2l�sttddl�sttddl�> „ s � .3 . 4�` i?r?s##??s#�??s#�??s# }� s ass\�;,,rikt}s`ksss�ssssssssssssss�ssss�ssss��s 21 BUILDING DEPARTMENT PERMITS INSPECTIONS PLAN REVIEW Upper Keys 334 1,243 1,095 Middle Kees 183 1158 889 Lower Kees 81 - 80 TOTAL 598 2,401 2,064 INSPECTIONS Feb., 10, Feb., I V March, 10, March, 11' April, 10, April, 11' FY- 4/10 FY - 4/11 Building 1,025 936 1,173 1,110 739 1,201 6,971 7,239 22 Plumb/Mech 1,061 953 1,164 1,038 648 956 5,957 6,956 Electrical 281 337 357 414 217 433 2,044 2,517 Total 2,367 2,226 2,694 2,562 1,604 2,590 14,972 16,712 April, 2011 Total # Average-20 days Acker, Scott Upper Keys -Building 382 19.10 Albarran, Mike-Lower/Middle Keys -Electrical 271 13.55 Bowden, Mike-Lower/Middle Keys -Building 228 11.40 Kasprzak, Adam-Upper/Middle/Lois,-er-Elec/Plumb/Mech/Bldg 335 16.75 Kostic, Harrv-Lower/Middle Keys -Bldg & Plans Examiner 81 4.05 Phinnev, Tucker-Lower/Middle Kees -Building 307 15.35 Sellers, Corev-Upper/Middle/Loii--er-Plumb/Mech 271 13.55 Sullivan, Steve -Upper Keys-Building/Elec/Plumb/Mech 440 22.00 Tugivell, Paul -Upper Keys-Plumbing/Mechanical 86 4.30 23 Total ofInspections -April- 2011 500 450 400 _50 300 `00 1-50 100 0 0 ' -NN ` e- A, 1. PLAN REVIEW Feb., 10' Feb., 11' March, 10' March, 11' April, 10' April, I F FY - 4/10' FY - 4/1 F 3,119 1,895 3,659 2,433 2,734 2,064 22,530 15,027 24 Channel Marker Program: Marine Resources Office 25 May 2010 $0.00 June $1,725.00 July $1,500.00 August $15,795.00 September $0.00 October $1,950.00 November $4,695.00 December $0.00 January 2011 $700.00 February $0.00 March $0.00 April $848.00 Total 527,213.00 Derelict Vessel Program: 26 May 2010 $17,449.00 June $70,183.00 July $37,734.40 August $23,504.00 September $43,627.00 October $11,13 8.00 November $24,077.75 December $10,015.00 January 2011 $15,473.00 February $9,175.98 March $11,781.00 April $0.00 Total 5274,158.13 Vessel Pumpout Program: 27 May 2010 $320 June $320 July $230 Aug $280 $4,968 Sept $110 Oct $250 Nov $360 $2,251 Dec $60 Jan 2011 $430 Feb $270 March $360 $4,255 April $3 5 5 Total: $3,345 $11,474 28