Agenda Item Number: C.2
Agenda Item Summary #7703
BULK ITEM: Yes DEPARTMENT: Engineering/Roads
TIME APPROXIMATE: STAFF CONTACT: Debra London (305) 453-8754
N/A
AGENDA ITEM WORDING: Approval of the 1st Amendment to the Interlocal Agreement with
the City of Key West to increase the County's contribution by $73,115.00 to a total of $812,874.00.
This increase represents the County's 35.9 %proportionate share or $7,367.00 of the electrical tie in
and $65,748.00 for construction of the drainage system on Venetia Street that will connect the
Bertha Street system to the City's pump station.
ITEM BACKGROUND:
lst Street/Bertha Street is a County maintained road in the City of Key West (City). The County is
responsible for the roadbed and drainage. The City agreed through an Interlocal Agreement to allow
the County to tie into the Dennis Street pump station thereby eliminating the need for the County to
design and install a pump station for the lst Street/Bertha Street Roadway and Drainage
Improvement Project.
This lst Amendment to the ILA provides for the County to reimburse the City in an estimated
amount of$73,115.00. This amount is comprised per the terms of the ILA, of a 35.9%proportionate
share of the costs of the Dennis Street pump station electrical utility tie in by Keys Energy Services.
In addition, it was determined to be in the best interest of the County to have the City's current
contractor for the Dennis Street pump station construct the drainage structures on Venetia Street at
100% share to be reimbursed to the City by the County.
PREVIOUS RELEVANT BOCC ACTION:
February 19, 2020 — the BOCC approved an Interlocal Agreement with the City of Key West to
contribute proportionate share of 35.9%, or $739,759, to the design, construction and maintenance of
the Dennis Street pump station to handle stormwater flows from Bertha Street.
November 20, 2019 — the BOCC approved Amendment 2 to the EAC Consulting, Inc. design
contract added survey work in the amount of $3,451.55 by the subconsultant Longitude Surveyors
required for the Dennis Street pump station tie in. Funding for this was reallocated from the pump
station design optional service so there was no net increase to the total contract amount.
Packet,Pg. 73
C.2
May 16, 2018 — The BOCC approved a contract with EAC Consulting, Inc. for Engineering, Design,
Permitting and Post Construction Services for the lst Street/Bertha Street (Key West) Roadway
Improvement Project in the maximum not to exceed amount of $451,126.16, including optional
services in the amount of$104,352.35.
CONTRACT/AGREEMENT CHANGES:
Add Venetia Street and Keys Energy Scope
STAFF RECOMMENDATION: Approval of 1 st Amendment to Interlocal Agreement with the
City of Key West for utilization of the Dennis Street Pump Station.
DOCUMENTATION:
1 st Amendment to ILA Dennis Street Pump Station (002) (002)-signed
02/19/2020 Agreement
FINANCIAL IMPACT:
The County's 35.9% of the estimated Keys Energy Services tie in is $7,367.00.
The County's 100% share of the Venetia Street construction costs are $65,748.00.
02/19/20 304-27000 - TRANSPORTATION PROJECTS $0.00
KW ILA O&M
02/17/21 304-27000 - TRANSPORTATION PROJECTS $65,748.00
KW ILA Construction Toppino
02/17/21 304-27000 - TRANSPORTATION PROJECTS $7,367.00
KW ILA Construction Keys Energy
Total: $73,115.00
REVIEWED BY:
Judith Clarke Completed 02/26/2021 3:42 PM
Christine Limbert Completed 02/26/2021 5:16 PM
Purchasing Completed 03/01/2021 8:13 AM
Budget and Finance Completed 03/01/2021 11:16 AM
Maria Slavik Completed 03/02/2021 1:53 PM
Liz Yongue Completed 03/02/2021 3:56 PM
Board of County Commissioners Pending 03/17/2021 9:00 AM
Packet,Pg. 74
C.2.a
IST AMENDMENT TO INTERLOCAL AGREEMENT
FOR ENGINEERING DESIGN, PERMITTING AND CONSTRUCTION SERVICES
FOR DENNIS STREET PUMP STATION (KEY WEST) PROJECT
THIS Is' AMENDMENT TO INTERLOCAL AGREEMENT is made and entered into
as of this day of 2021, between Monroe County, a political subdivision
of the State of Florida, (hereinafter the COUNTY), and the City of Key West, a municipal
corporation organized and existing under the laws of the State of Florida, (hereinafter the 2
CITY).
0
WHEREAS, lst Street and Bertha Street are COUNTY maintained roads within the
municipal limits of the CITY; and
E
WHEREAS, the CITY and the COUNTY entered into an Interlocal Agreement on
February 19, 2020 and agreed that the CITY's Dennis Street pump station would be utilized by
both entities and it is was in the best interest of both entities to share the cost for the design,
construction and maintenance of the pump station; and
WHEREAS, the parties have agreed that the COUNTY'S Venetia Street drainage 2
structures will be constructed by the CITY's Contractor for the Dennis Street Pump Station
Project; and
WHEREAS, the CITY now has estimates for the drainage work on Venetia Street to be
performed by the CITY's Contractor and the utility work needed for the Dennis Street Pump
Station project which will now be incorporated by this lst Amendment and specifically set forth
the amounts to be reimbursed by the COUNTY;
NOW THEREFORE, in consideration of the mutual promises and conditions contained
herein, the parties further agree as amend the ILA as follows:
1. Paragraph 1 shall be amended to add the following: 0.
CL
A. The CITY and the COUNTY agree that the Venetia Street drainage structures scope
that was originally designed as part of the COUNTY's 1st Street and Bertha Street
construction project, will be constructed by the CITY's Dennis Street Pump Station
Project contractor (managed by the CITY), and reimbursed by the COUNTY to the
CITY at 100% proportionate share, per the scope defined in "Attachment B" in the
100% share amount of$65,748.00.
0
B. The CITY and the COUNTY agree that the Keys Energy Services (KEYS) costs for
electrical power tie in to the pump station should also be shared at the COUNTY's E
share of 35.9% consistent with the percentage share set forth in the Interlocal
Agreement entered into on February 19, 2020. The COUNTY's share of 35.9% of E
the KEYS' estimate in the amount of$20,521.66 (See Attachment"C") is $7,367.00.
Pt Amendment Key West Interlocal Agreement-Dennis Street Pump Station/Venetia Street —March 17,2021 �
1 �
Packet,Pg. 75
C.2.a
C. The COUNTY will only pay for actual construction pay items and unit costs that are
directly applicable to the work defined in "Attachments B and C". The CITY will
include copies of all contractor pay applications, evidence of payment to the
construction contractor and utility by the CITY, and releases of liens from the E
contractor and all subcontractors (if applicable). 2
2. The 1st Amendment to the ILA will be effective on the date as first written above.
c
3. The ILA dated February 19, 2020, as amended herein, shall remain in full force and
effect.
IN WITNESS WHEREOF, the parties hereto have set their hands and seals the day and year
first above written. E
�t
BOARD OF COUNTY COMMISSIONERS
OF MONROE COUNTY, FLORIDA
By:
Mayor/Chairperson
(SEAL)
N
1d10NROE COUNTY ATTORNEY w
KEVIN MADOK Clerk L tP a 0 1 I
Chi RISI INE LIMBERT•BARROWS
ASSISTANT COUNTY ATTORNEY
By:
TlATE. 119RI91
As Deputy Clerk
1
CL
CITY OF KEY WEST, FLORIDA )
(SEAL)
By:
Mayor
ATTEST: E
Clerk E
I"Amendment Key West Interlocal Agreement-Dennis Street Pump Station/Venetia Street —March 17,2021 �
2
Packet,Pg. 76
C.2.a
ATTACHMENT B
0
2
N
N
0.
CL
Packet,Pg. 77
C.2.a
r
PRICE QUOTATION DATE: 1/26/21 m
City of Key West
Attention:John Paul Castro
1300 White Street,Key West,FI 33040
U
ITEMIZED QUANTITIES
Location: Venetia Street&Bertha, Key West, FI 33040
Scope: Venetia Street Storm Connection&Restoration(as per drawings rcvd)
0
Item Description Quantity Units Cost per Unit Line Item Cost Notes
1 36"Storm 169.0 LF $ 262.00 $ 44,278.00
2 Inlets,S-20A 1.0 EA $ 7,915.00 $ 7,915.00 0)
3 Inlets,S-20B 1.0 EA $ 7,915.00 $ 7,915.00
4 Connection to S-20 1.0 EA $ 4,150.00 $ 4,150.00 ¢
5 Temporary Pavement Markings 1.01 LS $ 1,490.00 $ 1,490.00 N
r
0
0
Subtotal $ 65,748.00
Performance/Payment Bonds $20.00/Thousand 1.0 LS $ $
Mobilization/Demobilization 1.0 LS $ $ -
Total $ 65,748.00
N
Notes: As per plans rcvd
Prepared by: �W-jk2e
Project Manager I.
Charley Toppino&Sons,Inc.
Sheet 1 of 1 CL
Date: 1/26/21
fE7
J
0
r
U
Packet,Pg. 78
C.2.a
ATTACHMENT C
0
2
N
N
0.
CL
Packet,Pg. 79
C.2.a
enev-gy
s4earvices
UTILITY BOARD OF THE CITY OF KEY WEST
P.O. BOX 6100
KEY WEST FL 33041-6100 DATE MR#
12/15/20 MR21-23
REMIT TO:
SAME AS ABOVE
O
Bill To: JOBSITE:
City of Key West-Toppino's Re-rout Primary&Return to Normal 1900 Blk Venetia-Between Dennis&Bertha
r
O
O
DESCRIPTION QTY RATE AMOUNT
Director of Engineering Labor&Transportation(Labor Hours) 1.00 103.13 103.1
Engineering Supervisor Labor&Transportation (Labor Hours) 1.00 65.22 65.:
Autocad Operator Labor&Transportation (Labor Hours) 1.00 50.54 50.E
Eng. Field Rep. Labor&Transportation(Labor Hours) 2.00 50.54 101.(
Line Crew(5-Man )Labor&Transportation(Labor Hours) 40.00 413.53 16,541.;
Line Leader Labor&Transportation(Labor Hours) 40.00 88.58 3,543.( tV
SUBTOTAL LABOR&TRANSPORTATION 20,404.3
General Materials(1) 102.00 1.15 117.: tV
SUBTOTAL KEYS MATERIALS 117.3
1.
TOTAL DUE 20 521.ECIL
State Tax Charged to KEYS but Not Paid by Customer:
tt7
Please Note: This cost has been prepared based upon current published tariffs which are subject to change if not paid within 90 days. Additionally,this cost may I
recalculated if the customer initiates or causes any changes to the site plans.KEYS will schedule work upon receipt of payment. In the event this cost becomes pa
of an Agreement between Customer and KEYS,the terms of the Agreement will prevail.
O
r
Packet,Pg. 80
�Rcouft
g Kevin Madok, CPA
+°"�... Clerk of the Circuit Court&Comptroller—Monroe County, Florida
C.
Es
DATE: February 21, 2020 0.
TO: Judith Clarke, PE, Director
Engineering/Roads&Bridges 2
y
ATTN: Nicole Tyman
FROM: Pamela G. HancoC. e
SUBJECT: February 19'BOCC Meeting
Enclosed are two duplicate originals of the following item, executed on behalf of Monroe
County, for your handling. =
C4 Interlocal Agreement with the City of Key West to contribute proportionate share E
to the design and construction cost of a new Dennis Street Pump Station that will handle 2
stormwater from Bertha Street in the estimated amount of$739,759.00 or 35.9%of the total cost.
Upon completion, the County will pay its proportionate share (35.996) of annual operations and
maintenance costs. e
Please be sure to return a fully executed original to our office once signed by die City for
the record. Should you have any questions, please feel free to contact me at(305) 292-3550.
y
0
N
N
cc: County Attorney '
Finance
N
File
KEY WEST MARATHON PLANTATION KEY PK/ROTH BUILDING
500 Whitehead Street 3117 Overseas Highway 88820 Overseas Highway 50 High Point Road
Key West,Florida 33040 Marathon,Florida 33050 Plantation Key,Florida 33070 Plantation Key,Florida 33070
305-294-4641 305-289-6027 305-852-7145 305- packet Pg. 81
C.2.b
Tot
{ ..
Cheryl Suuth,lVIIC, CPM City Hall
1300 White Street
y Clerk THE CITY 0 F K EY WEST 3051 809-3831
4 P.O. BOX,1409CL
.. Csmithna,cityofkeywest=fl.g&
J KEY WEST, FL 33041-1409
-* . www.cityofkeywest-fLgov-
0
y
March 4, 2020 a
Judith Clarke, Director of Engineering Services
Engineering Department
1100 Simonton Street 2
Key West, FL 33040
Dear Ms. Clarke,
Enclosed you will .find a signed-original of the following item, on behalf of the City of
Key West.
Interlocal Agreement with the City of Key West to contribute proportionate share to the
design and construction cost of the new. Dennis Street Pump Station. E
a �-
0
S' ce ly,
0
Cheryl Smith, MM PM
City Clerk E
CS:np
Enclosure
(Res 20-050, Agreement) `=
N
Key to the Caribbean - Average yearly temperature 770 F.
Packet,Pg. 82
INTERLOCAL AGREEMENT
FOR ENGINEERING DESIGN,PERMITTING AND CONSTRUCTION SERVICES
FOR DENNIS STREET PUMP STATION(KEY WEST)PROJECT
0.
THIS INTERLOCAL AGREEMENT is made and entered into as of this day of
CL
FA 2020, between Monroe County, a political subdivision of the State of Florida,
(hereinafter the COUNTY), and the City of Key West, a municipal corporation organized and 2
existing under the laws of the State of Florida, (hereinafter the CITY).
T)
WHEREAS, lst Street and Bertha Street are COUNTY maintained roads within the
municipal limits of the CITY and,
0
WHEREAS, the County needs to utilize the City of Key West's Dennis Street Pump
Station to manage stormwater flows from Bertha Street for the 1st Street and Bertha Street Road
Improvement project, and
WHEREAS, the CITY has completed the engineering design and permitting phase of
the Dennis Street Pump Station Project(Project) with Black&Veatch, Inc. (Consultant) ; and
WHEREAS, the CITY has received bids and awarded a construction contract for the
pump station, and
WHEREAS, the CITY and the COUNTY have agreed that the CITY's Dennis Street
pump station can be utilized by both entities and it is in the best interest of both entities to cost
share the design, construction and maintenance of the pump station as defined in "Attachment
A"; and c
NOW THEREFORE, in consideration of the mutual promises and conditions contained
herein, the parties agree as follows:
1. The COUNTY, will enter into an Interlocal Agreement with the CITY for the cost sharing of y
the Dennis Street Pump Station Project (managed by the CITY) , specifically per the terms and
conditions in Attachment A. c
2. The Work will be performed in accordance with COUNTY and Florida Department of
Transportation(FDOT) standards.
3. The CITY will provide to the COUNTY with the request for reimbursement, copies of all
consultant pay applications and evidence of payment to the consultant by the CITY.
4. Additionally, in the construction phase of the project, the COUNTY will reimburse the CITY
for a total of 35.9% of the itemized construction cost of the Dennis Street Pump Station (to be
determined at substantial completion). The COUNTY will only pay for construction pay items
and unit costs that are directly applicable to that work.
cv
Dennis Street Pump Station City of Key West Interlocal Agreement—February 19,2020
Packet,Pg. 83
C.2.b
The CITY will make requests for reimbursements to the COUNTY based upon the Consultant's
invoices, Construction Contractor's pay applications, and Maintenance Work Orders. The CITY
will include copies of all contractor pay applications, evidence of payment to the construction
contractor by the CITY, and releases of liens from the contractor and all subcontractors (if 0.
applicable), and proof of maintenance procedures such as photographic documentation.
CL
5. The separate contracts for engineering design and construction and maintenance will be
between the CITY and its contractors; the COUNTY may monitor the work but is not a party to
the contract. T
6. This Interlocal Agreement in no way relieves the CITY from its obligation to maintain any of
the items for which it is responsible, nor does this alter the COUNTY's liability and
responsibility regarding maintenance of the roadway from curb face to curb face and associated
drainage of the road. This Agreement shall not alter the CITY or COUNTY'S maintenance
responsibilities as proscribed by law.
7. This Interlocal Agreement shall become effective immediately upon execution by both parties
and will remain in effect unless terminated.as outlined in paragraph 11 below or if use of the
pump station is discontinued E
8. In the event of any failure of compliance by either party hereto with any of its material
obligations to the other party as provided herein, such action shall constitute a default under this
Agreement.
9. Upon any such default, the non-defaulting party shall provide to the defaulting party a written
Notice of such default, which Notice (a "Default Notice") shall state in reasonable detail the
actions the defaulting party must take to cure the same. The defaulting party shall cure any such
default within 30 days following the date of the Default Notice.
10. Notwithstanding the provisions of this Section, if any such default by the defaulting party
remains uncured at the conclusion of any specified 30 day cure period, and if the nature of the y
defaulting party's obligations are such that more than 30 days is required to effect the cure, then
the defaulting party shall not be in default hereunder and the non-defaulting party shall not have c
the right to exercise its termination rights granted herein as a result of any such default, if the
defaulting party commences the cure within the applicable cure period and thereafter diligently
pursues the cure to completion of performance.
11. In the event the defaulting party fails to affect any required cure as provided for herein, the
defaulting party shall be deemed to be in uncured default hereunder, and the non-defaulting 0)
party shall have the right, but shall not be obligated, upon written Notice to the defaulting party, 2
to terminate this Agreement.
cv
12. If such Notice is given, this Agreement shall terminate on the date set forth in the Notice and
the parties shall be relieved of all rights and obligations hereunder, except for any rights and
obligations that expressly survive termination. `V
Dennis Street Pump Station City of Key West Interlocal Agreement—February 19,2020
2
Packet,Pg. 84
C.2.b
13. To the extent permitted by law and subject to the provisions and monetary limitations of c
Section 768.28, Florida Statutes, the COUNTY and CITY do hereby agree to defend, indemnify Es
and hold the other, its officers, agents or employees, harmless from and against any and all 0.
liability, damages, costs or expenses (including reasonable attorney's fees, costs, and expenses
at both the trial and appellate levels) arising from the acts of omissions of the respective parry or CL
any third parry vendor contracted by the respective party in connection with this Agreement.
Notwithstanding the provisions of Sec. 768.28, Florida Statutes, the participation of the CITY y
and the COUNTY in this Agreement and the acquisition of any commercial liability insurance
coverage, self-insurance coverage, or local government liability insurance pool coverage shall
not be deemed a waiver of immunity to the extent of liability coverage, nor.shall any contract
entered into by the COUNTY or CITY be required to contain any provision for waiver.
14. Notices
All notices, requests, demands, elections, consents, approvals and other communications
hereunder must be in writing and addressed as follows, or to any other address which either
party may designate to the other party by mail:
If to COUNTY: Roman Gastesi, Jr.
County Administrator
Monroe County Historic Gato Bldg.
1100 Simonton Street ,
Key West, Florida 33040
0
With a copy to: Christine Limbert-Barrows
Assistant County Attorney
P.O. Box 1026
Key West, Florida 33041-1026
If to CITY: Greg Veliz
City Manager
City of Key West
P.O. Box 1409 c
Key West, Florida 33041
With a copy to: Shawn Smith, Esq.
City Attorney E
City of Key West 2
P.O. Box 1409
Key West, Florida cV
cv
Any Notice required by this Agreement to be given or made within a specified period of '
time, or on or before a date certain, shall be deemed to have been duly given if sent by certified `V
Dennis Street Pump Station City of Key West Interlocal Agreement—February 19,2020
3
Packet,Pg. 85
mail, return receipt requested, postage and fees prepaid; hand delivered; or sent by overnight
delivery service. c
15. Attorney's Fees and Waiver of Jury Trial. 0.
Subject to the sovereign immunity limits of F.S. 768.28, in the event of any litigation 0.
arising out of this Agreement, the prevailing party shall be entitled to recover its attorneys' fees
and costs, including the fees and expenses of any paralegals, law clerks and legal assistants, and
including fees and expenses charged for representation at both trial and appellate levels. T)
In the event of any litigation arising out of this Agreement, each party hereby
knowingly, irrevocably, voluntarily and intentionally waives its right to trial by jury.
16. Adjudication of disputes or Disagreements
COUNTY and CITY agree that all disputes and disagreements shall be attempted to be
resolved by meet and confer sessions between representatives of each of the parties. If the issue
or issues are still not resolved to the satisfaction of the parties, then any party shall have the
right to seek such relief or remedy as may be provided by this Agreement or by Florida law.
17. Cooperation
In the event any administrative or legal proceeding is instituted against either party relating to
the formation, execution,performance, or breach of this Agreement, COUNTY and CITY ,
agree to participate, to the extent required by the other party, in all proceedings,hearings,
processes,meetings, and other activities related to the substance of this Agreement or provision
of the services under this Agreement. COUNTY and CITY specifically agree that no party to
this Agreement shall be required to enter into any arbitration proceedings related to this
Agreement.
18. Governing Law. y
This Agreement shall be construed in accordance with and governed by the laws of the
State of Florida. Exclusive venue for any litigation arising out of this Agreement shall be in
Monroe County, Florida, lower Keys Division of the Circuit Court or the Southern District of c
Florida. This Agreement is not subject to arbitration.
19. Entire Agreement/Modification/Amendment.
0)
This writing contains the entire Agreement of the parties and supersedes any prior oral
CD
or written representations. No representations were made or relied upon by either party, other
than those that are expressly set forth herein.
cv
No agent, employee, or other representative of either party is empowered to modify or '
amend the terms of this Agreement,unless executed with the same formality as this document. "'
Dennis Street Pump Station City of Key West Interlocal Agreement—February 19,2020
4
Packet,Pg. 86
C.2.b
20. No Assignability. c
This Agreement shall not be assignable by either party unless such assignment is first 0.
approved by both parties.
CL
21. Severability.
If any term or provision of this Agreement shall to any extent be held invalid or
unenforceable, the remainder of the Agreement shall not be affected thereby, and each
remaining term and provision of this Agreement shall be valid and be enforceable to the fullest
extent permitted by law.
22. Independent Contractor.
The COUNTY and its employees, volunteers, agents, vendors and subcontractors shall
be and remain independent contractors and not agents or employees of the CITY with respect to
all of the acts and services performed by and under the terms of this Agreement. This
Agreement shall not in any way be construed to create a partnership, association or any other E
kind of joint undertaking, enterprise or venture between the parties.
23. Waiver.
c
The failure of either party to this Agreement to object to or to take affirmative action
with respect to any conduct of the other which is in violation of the terms of this Agreement
shall not be construed as a waiver of the violation or breach, or of any future violation,breach or
wrongful conduct.
24. Funding.
Except as set forth in this Agreement, the parties agree that the COUNTY's y
responsibility under this Agreement is to primarily to provide a 35.9% portion of funding
relating to the Dennis Street Pump Station scope of work.
25. Survival of Provisions. c
Any terms or conditions of this Agreement that require acts beyond the date of the term
of the Agreement, shall survive termination of the Agreement, shall remain in full force and
effect unless and until the terms or conditions are completed and shall be fully enforceable by 0)
either party. 2
26. Counterparts.
cv
This Agreement may be executed in several counterparts, each of which shall be deemed
an original and such counterparts shall constitute one and the same instrument. `V
Dennis Street Pump Station City of Key West Interlocal Agreement—February 19,2020
5
Packet,Pg. 87
. C.2.b
IN WITNESS WHEREOF, the parties hereto have set their hands and seals the day and
year first above written.
BOARD OF COUNTY COMMISSIONERS
OF MONROE OUNTY, FLORIDA CL
Mayor ha' e on
KEVIN MADOK, Clerk
By: E
Deputy C erk MONROE COUNTY ATTORNEY
4PPAQ�ED AS TO FO� / �,
CHRISTINE LIMBERT•BARROWS
ASSISTANT COUNTY ATTORNEY _
DATE:_2L4120— tB
U
CITY OF WEST, FLORID
(S
By.
=- M yor
A -- -"
n
t: C cV
s '
r
cV
ry
Dennis Street Pump Station City of Key West Interlocal Agreement—February 19,2020
6
Packet,Pg. 88
C.2.b
ATTACHMENT A
Es
0.
CL
T)
0
0
2
N
CD
a)
T-
N
Packet,Pg. 89
C.2.b
ATTACHMENT A
0.
1.Initial Capital Costs
CL
1.1 The capital related costs of the Dennis Street Pump Station("Pump Station")shall include all
costs related to planning., design, and construction of the Pump Station. The City of Key West("City") ¢'
has represented that the total of these costs is estimated to be$3,042,704. This amount represents the Initial y
Capital Cost of the Pump Station, which shall be apportioned between Monroe County ("County") and
the City.
0
1.2 The amount calculated as the Initial Capital Cost may be offset, or reduced,by the amount of
grant monies obtained by the City for the sole purpose of, and whose monies are specifically restricted for
use toward, the Pump Station. In such a circumstance, the total planning, design, and construction costs,
minus the amount of applicable grant monies received by the City shall represent the Initial Capital Cost
of the Pump Station,which shall then be apportioned between the County and the City.
1.3 The City represents that the total amount of grant monies whose use is specifically restricted
to the Pump Station, and whose amount shall serve as an offset to the Pump Station's planning, design,
and construction related costs,is estimated to be$982,094. Therefore,the Initial Capital Cost of the Pump m
Station shall be calculated as follows:
Planning, design and construction costs—Applicable grant funds =Initial Capital Cost 76
$3,042,704—$982,094= $2,060,610 0
2
2
1.4 In the event that the actual cost of planning, designing, and constructing the Pump Station, or
the amount of the applicable grant funds, differs from the amounts identified above,such amounts shall be
adjusted to actual cost amounts.
1.5 The Initial Capital Cost shall be apportioned between the County and the City based on the
proportional use of the Pump Station's peak capacity by the County and the City, respectively. The peak
stormwater flows attributable to the County and the City, as represented by the City, are as follows:
Peak stormwater flow attributable to County=8.55 cubic feet per second("CF/s")
0
Peak stormwater flow attributable to City= 15.28 CF/s
Therefore, the proportional use of the Pump Station's peak capacity shall be as follows:
County portion= 8.55 CF/s - (8.55 CF/s + 15.28 CF/s) = 35.9% .W.
City portion= 15.28 CF/s-(8.55 CF/s + 15.28 CF/s) =64.1%
1.6 The County's proportional use of the Pump Station's peak capacity shall be thirty-five-point-
nine-percent(35.9%)and the County agrees to repay the City for thirty-five-point-nine-percent(35.9%)of
the Initial Capital Cost of the Pump Station. Based on the cost estimates provided by the City,the County's
share of the Initial Capital Cost of the Pump Station is$739,759, which has been determined according to
the following calculation.
Initial Capital Cost x County portion= County share of Initial Capital Cost
$2,060,610 x 35.9%= $739,759
Packet,Pg. 90
C.2.b
1.7 If the City elects to use grant funding whose purpose is at the discretion of the City,and whose o
funds are not specifically restricted for use toward the Pump Station, such grant monies shall not serve as
an offset in the calculation of the County's share of the Initial Capital Cost. However, the City may use 0.
such funds to pay for its own share of the Initial Capital Cost.
CL
1.8 County Payment of Initial Capital Cost:
The City shall substantiate all applicable Initial Capital Costs associated with the Pump Station and provide ¢'
such cost substantiation to the County. The Initial Capital Cost apportioned to the County shall be paid to �+
the City by the County upon substantial completion of the construction of the Pump Station and within 45
days of the County's receipt of cost substantiation documentation from the City.
2. Capital Repair and Replacement Costs:
2.1 From time-to-time over the service life of the Pump Station, certain capital repairs and/or
replacements may be needed. The decision to undertake repair acid/or replacement work on the Pump
Station shall be at the sole discretion of the City. The City shall notify the County at the earliest time
practicable that the City will incur Capital Repair and Replacement Costs associated with the Pump
Station.
2.2 The County shall be responsible for, and pay to the City, thirty-five-point-nine-percent m
(35.9%)of all future Capital Repair and Replacement Costs related to the Pump Station.
CD
2.3 Future Capital Repair and Replacement Costs apportioned to the County shall be recoverable
76
from the County and payable to the City in the fiscal year in which the Capital Repair and Replacement
Costs are made.
2.4 Capital Repair and Replacement Costs will be identified as such solely by the City and
differentiated from on-going operating and maintenance expenses by the City on a case-by-case basis using
the following criteria:
a. The repair and/or replacement work completed is not routine in nature.
b. The repair and/or replacement work completed extends the expected service life of the Pump
Station. y
c. The total cost of the repair and/or replacement work completed exceeds the minimum
capitalization threshold for the City. 76
2.5 The County shall pay the City for its proportionate share of the Capital Repair and o
0.
Replacement Cost within 45 days of the County's receipt of cost substantiation documentation from the 0.
City.
3.Future Upgrades and Expansion of Capacity:
W
3.1 If additional capacity is determined to be needed at the Pump Station due to increased City or
CD
County stormwater flows, the City may undertake capacity expansion related work on the Pump Station
at its sole discretion. The City shall notify the County of plans to upgrade and expand the Pump Station
during the planning phase and prior to the construction of such upgrade or expansion. The parties shall c®
work in good faith to arrive at an agreement of the proportion of the upgrade or expansion that shall be
apportioned between the County and the City based on the proportional use of the peak capacity that has N
been added. -
Packet,Pg. 91
C.2.b
3.2 The Upgrade Capital Cost apportioned to the County shall be paid to the City by the County c
upon substantial completion of the construction of the Pump Station upgrade or expansion and within 45
days of the County's receipt of cost substantiation documentation from the City. 0.
4. Operating and Maintenance Expenses:
CL
4.1 The County shall be responsible for, and pay to the City on an annual basis, operation and
maintenance("O&M")expenses associated with the Pump Station for each year that the Pump Station ¢'
provides stormwater pumping service to the County. y
4.2 On-going O&M expenses associated with the Pump Station shall include costs incurred by
the City related to the day-to-day operation and maintenance of the Pump Station. Such expenses may
include,but not be limited to, salaries and wages, employee benefits, indirect costs, electricity, supplies,
materials,routine repairs and maintenance, and incremental contractual management costs incurred by
the City or its contract operator associated with operating and maintaining the Pump Station.
4.3 The County shall be responsible for,and pay to the City,thirty-five-point-nine-percent(35.9%)
of the annual O&M expenses identified by the City as pertaining to the Pump Station.
4.4 To determine the dollar amount of O&M expenses related to the Pump Station that the County
shall be responsible for, and pay to the City in each year, the City shall use the following method:
Actual Cost Method: The annual amount of O&M expenses shall be determined by the City
subsequent to the end of the fiscal year based on the total costs related to operating and maintaining
76
the Pump Station,as reflected in the City's financial records for the fiscal year,and then multiplied
by thirty-five-point-nine-percent(35.9%).
5.Discontinuation of Service:
0
If the Pump Station is taken out of service or retired prior to the completion of a fiscal year based
on Actual Cost Method,used to compute the amount of O&M expenses due from the County, the County is m
responsible for 35.9%up to the point when service is discontinued.
0
76
0
0.
0.
cv
cv
cv
Packet,Pg. 92
C.2.b
E Jo Z GBPd
'ubzsap oq pagPTaa sgsoo uzpgaao aoj AgTD aqq asanquizaa
oq A4unoO aqq MoTTP PTnoM gozgM 'quawaaab
V TPooTaaqul 0.
CL
pagDP4gP aqq Jo TPAoaddp spuawwooaa jjpgs 'SVHUHHM
y
PUP !squawgDpgqP sqz
5uipnTouz 'quaw caaa5V TPooTaaqul pagDPgqP aqq uz ggaog qas y
sp uozgiegs dwnd aqq ;o aoupuaqutpw pup uotgonagsuoo 'uBTs@p
aq4 aaPgs gsoo oq saigTqua ggoq ;o sgsaaaquz gsaq aqq
uz st qT 4Pgq aaaBp sazgapd ggoq pup 'goaCoad quaulaAoaduil
m
PPOH gaaags Pggaag pup gaaags gsaTa aqq ao; gaaags 2
Pggaag uioa; smOTJ a@gPmwaogs abPuPw oq uoTgpgs dwna gaaagS
c
szuuaa s ,AgTD aqq asn oq spaeu Aqunoo aqq 'SK'a-daHM
0
Pup !sgZwzT Agto gsaM AGX
;o sgiwzT Tpdzozunw aqq uzggTm 'AqunoO aoauow A.q pauzpqutpw
Gap gaaags Pggaag pup gaaags gsaTa 'SVH-dHHM
0
2
HSya
HAISOHaaH kM 2IOa oNIaIAOUcl 1 SINZDUSnraK
SHoana ARYSSHOHN ANY oNIZIHOHdnV
lZSHM AHx ao ASIO HHS amy Ammoo zouxorq
NHHMSHS nloz oud(ZSHM AHx) NOISVSS dWnd CD
mm'dis sINNHa uoa saolAxHs NollonxssNoo 2
CD
auv oxis.Lixuaa 'N9ISHa oNIdHHNIONH
CD
HOa LxMgZZuf)d rivoo'IHHJ.NI., aHHOY.L.Ly HHS
oNlAouadv •valxoza •,Lsam AHx ao ASIo HHs
ao NOISSINKOO ASIo HHs ao NOlsnzoszd v
N
oso-oz •oN Noi nzosau
Packet,Pg. 93
C.2.b
permitting, construction and maintenance services for the
Es
Dennis Street Pump Station; and 0.
CL
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION
OF THE CITY OF KEY WEST, FLORIDA AS FOLLOWS:
0
Section 1 : That the attached "Interlocal Agreement
for Engineering Design, Permitting and Construction Services
for Dennis Street Pump Station (Key West) Project" between
Monroe County and the City of Key West is hereby approved.
Section 2 : That the City has completed the
engineering design and permitting phase of the project, and
awarded a construction contract, with the county anticipated
to reimburse the City up to 35 . 90 of the Dennis Street Pump
scope of work, and any necessary budget adjustments are hereby
0
authorized.
2
Section 3 : That this Resolution shall go into effect
immediately upon its passage and adoption and authentication
by the signature of the Presiding Officer and the Clerk of
cv
the Commission.
cv
Page 2 of 3
Packet,Pg. 94
C.2.b
c
0.
CL
Passed and adopted by the City Commission at a meeting
held this 3rd day of March 2020 .
Ln
Authenticated by the Presiding Officer and Clerk of the
Commission on 4th day of March 2020 .
Filed with the Clerk on March 4 2020 .
Mayor Teri Johnston Yes
Vice Mayor Sam Kaufman Yes
Commissioner Gregory Davila Yes
Commissioner Mary Lou Hoover Yes
Commissioner Clayton Lopez Yes
Commissioner Billy Wardlow Yes c
Commissioner Jimmy weekley Yes
0
E I JOHN ON, MAYOR
AT E
0
CHERYL SMITH, k4ITY CLERK >
2
CD
CD
CD
N
CD
Page 3 of 3
Packet,Pg. 95