Loading...
Item G2 TIME APPROXIMATE BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: April 19.20 2000 Division: Public Works Bulk Item: Yes No x Department: Public Facilities Maintenance AGENDA ITEM WORDING: Authorization to advertise for bids to replacc existing plastic turf grids and install new turfstone type pavers at the Harvey Government Center. ITEM BACKGROUND: Existing plastic grids are deteriorating and posing a safety risk. Thc County's contracted Architect, Mr. Bert Bender, is designing project specifications and coordinating with the City of Key West Tree Commission and Historical & Architectural Review Commission to protect the existing Kapok Trees. PREVIOUS RELEVANT BOCC ACTION: At the February 16, 2000 BOCC meeting, motion was carried to postpone this item to the next Key West Board meeting, and to provide sample of proposed product to the Board including coordination with an Arborist. STAFF RECOMMENDATION: Samc as notcd above. TOTAL COST: Approx. $600 for advertisements Cost to County: same as above BUDGETED: Yes X NO Account # 20501-530- 498 (advertising) (Estimated Cost $88,700 - $105,160 for proj ec t ) REVENUE PRODUCING: YES NO l AMOUNT PER MONTH YEAR APPROVED BY: C~ Atty. OMBlPurchasing _ Risk Managcment Itemprepared~#O 4 Carlos arate, Sr. Duector, PublIc FacIlIties MaIntenance ~O~ PI-JJ~ J6f Dent Pierce, Division Director , DIVISION DIRECTOR APPROVAL: DOCUMENTATION: Included ~ Tofollow Not required AGENDA ITEM # H~ DISPOSITION: March 24, 2000 Mr. Carlos Zarate, Sr, Director Monroe County Public Works Division Facilities Maintenance Department 3583 South Roosevelt Boulevard Key West, FL 33040 HE: Harvey Government Center Site Work Dear Carlos, p.a. As requested, I have analyzed the site work required at the Harvey Govermncnt Center. Based on our meeting and subsequent site visit with Cynthia SnelL the scope of work can be estimated as follows: Site demolition & disposal (lump sum) Pervious pavers with river rock (6,000 sf@ $1O-$12/5f) Concrete sidewalk repairs (lump sum) New concrete sidewalk (400 s.f. @ $10-$12/sf) Sub Total General Conditions & Overhead @ 12% Contractor's Profit @ 10% Sub Total Pennit Bond @ 1.5% TOTAL $3,500 $3,500 $60,000 $72,000 $2,500 $2,500 $4,000 $5,000 $70,000 $83,000 $8,400 $9,960 $7,000 $8,300 $85,400 $101,260 $2,000 $2,400 $1,300 $1,500 $88,700 $105,160 Based on the above, bids should range from $90,000 to $110,000. I recommend that you budget S100,OOO minimum for construction plus whatever additional costs are anticipated for professional fees, testing, or administration. Please call if you have any questions. Sincerely, 23nt-)"&.~d Bert L. Bender, Architect BLB/ddk ~ 1 OAD~.ll S lroll Ke,Well,FlorldaBOH Teleobone (305) 296.1 H7 f It II m II e <3 0 S) 296 - n 27 FI 0 rid. L j t", IIAA CO 02 021 ~~1J;'ij Zarate-Carlos From: Sent: To: Subject: Teasdale-Priscilla Thursday, January 13, 2000 1:18 PM Zarate-Car1os RE: Harvey Govt. Center-Plastic Turfpavers Carlos, I will be down to Key West Tuesday, Wednesday and probably Thursday next week. Anyone of those days would be fine with me Any time after 9:00 am. It is your turn to pick a tiem and date. From: Sent: To: Subject: Zarate-Carlos Monday, January 10, 2000 10:24 AM Teasdale-Priscilla Harvey Govt, Center-Plastic Turtpavers Priscilla: The plastic turfpavers installed at the above referenced county facility have become a potential risk for slip and fall, they continually uplift creating an uneven walk surface, also, the smooth plastic surface creates a walking hazard to the 'public and building occupants. PFM staff has obtained preliminary cost estimated to replace the plastic with turfstone pavers. We've coordinated with Cynthia Snell, City of Key West and she approves of same, she also indicated stone pavers were first recommended for this project but due to budget restrictions plastic was used. The parking area located on the Northwest section of the property requires a concrete walkway be installed to allow safe passage to the building. I would like to meet with you on site to address these issues and obtain your recommendation regarding existing safety conditions posed by these plastic pavers. Please advise when we can meet. Thanks, Car1os. Page 1 County of Monroe P(5) 292-4456 FAX 295-43(>4 BOARD OF COUNlY COMMISSIO~ Office of; Monrop County Safety 5100 College Rd. Key West, FL 33040 Mayor Emeritus Wilhelmina Harvey, Dist. 1 Mayor Pro Tcm G('!()rge Ncuecnt, District 2 Mayor Shirley Fremllun, District 3 Nora Williams, District 4 Mary Kay Reich, District 5 TO: FROM: RE: DATE: MEMORANDUM Carlos Zarate, Facilities Maintenance DirectoJ f:l. Priscilla Teasdale, Safety Administrator r!~ Driveway at Harvey Government Center January 18,2000 This shall confirm our meeting with Mark Anderson, Facilities Maintenance Senior Technician at the Harvey Government Center Parking Lot. The lot is paved with plastic grids within the drip lines of the trees to provide the Kapok trees with water on the drip line. These plastic grates'are placed in an area that cars use constantly as a thoroughfare. These grates are typically used in an area that does not get frequent traffic creating an excessive use for their intent. The plastic grate has caused many concerns for the safety of the public and the employees. Some of the issues we agreed were hazards to the public include: · In some areas of the parking lot the grates have been run over so many times they disintegrated and have been removed creating a dirt & mud area to drive and walk. · The plastic grates are slippery in the areas where their surface is exposed. · The grids have many uneven surfaces and are difficult to walk on. · The grates move with the traffic flow causing buckling of both the grates and the pavement. · The roots of the Kapok trees raise the grates to cause a tripping hazard in some places. · Re-bars have been used to hold down the grates and now the re-bars are protruding to cause a trip hazard in some places. · The public has a tendency to drive on the sidewalk at the front entrance of the building. A bumper of some type should be placed at the edge to prevent the traffic from flowing onto the sidewalk. It is my understanding that you have met with Cynthia6nell, Key West Biologist to discuss replacing the grids. She has agreed to the concept of replacing the grates with an interlocking brick with small open holes filled with sand to allow water to penetrate through the pavers. It is my recommendation to remove the grids as they are and replace them with pavers. Redoing the present plastic grids would be an ongoing process every few years and would not solve some of the safety issues. Thank you for your Cooperation in this matter. W~~~~ ................................ ............................... INTEROFFICE MEMORANDUM ......~.__...._.. -_.-.0--.. ._..... .-........ .. ............--..----.-...-...-. .................-.....-....... . "".. .... .....---....-..... ...... . . . ...... .....-..-... ......... ....... ..--.....-..... . .............. ..-.......... TO: CARLOS ZARA TE, SR. DIRECTOR OF PUBLIC FACILITIES MAINTENANCE FROM: JOHNW KING, SR ADMINISTRATOR BLOG, MAINTENANCE ~ _ h:--- SUBJECT: HGC TURFSTONE ESTIMATE DATE; 01/07/00 CC: nu.: ............................-. . ......... '. ..-.....-..............-....... AS REQUESTED. I HAVE BEEN WORKING WITH MARK ANDERSON AND CYNTHIA SNELL OF THE CITY OF KEY WEST TO COMPILE A SCOPE OF WORK AND COST ESTIMATES TO INSTALL APPROXIMATEL Y 5,000 SQUARE FEET OF TURFSTONE PAVERS AT THE HARVEY GOVT CENTER THE TYPE Or: PAVERS AND MATERIALS TO BE USED AND THE METHODOLOGY OF THE INSTALLATION, HAS BEEN APPROVED, BY CYNTHIA SNELL OF THE CITY OF KEY WEST HER MAIN CONCERN WITH THE REMOVAL OF THE EXISTING PLASTIC TURF CONTAINERS AND THE SUBGRADE SOIL, IS THE POSSIBILITY THAT THE TREES ROOT SYSTEM COULD BE DAMAGED THERE IS A LIST OF, " ITEMS OF SPECIAL CONCERN", IN THE SCOPE OF WORK THAT HAS RECEIVED HER APPROVAL THE QUANTITIES SHOWN IN THE ATTACHED PROPOSAL(S) WILL HAVE TO BE CHANGED FROM 4,000 SQUARE FEET TO 5,000 SQUARE FEET, DUE TO THE ADDITION OF THE REAR DRIVEWAY SECTION. THE ATTACHED WORK SHEETS AND PREVIOUSLY REQUESTED PROPOSALS, ARE TO BE CONSIDERED. "FOR ESTIMATING PURPOSES ONLY., IF THE FOLLOWING ESTIMATE IS EXCEPTED AND THE PROJECT ALLOWED TO GO FORWARD, THEN PROPER BID DOCUMENTATION WILL HAVE TO BE COMPILED, AS PER POLICY AND PROCEDURE I ESTIMATE THAT THIS PROJECT, USING A CONTRACTOR FOR ALL WORK AND MATERIALS WILL COST BETWEEN $28 -32,000.00, THIS WORK WILL REQUIRE A PERMIT FROM THE CITY OF KEY WEST AND WILL AFFECT PARKING AND EGRESS AT THE HARVEY GOVT CENTER FOR THE DURATION OF THE WORK THIS AMOUNT WILL WARRANT BOARD APPROVAL, ETC, AND MORE THAN LIKELY MAJOR JUSTIFICATION WHY WE ARE REPLACING THE EXISTING SYSTEM, I KNOW THAT SAFETY, DUE TO TRIP AND FALL IS A CONCERN AND THAT SOME OF THE INTERLOCKING PANEL ARE UPLIFTING AND CRACKING, PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNING THIS MATTER. -/'" _____'4 ~...__ . -....7...-~ -~.~-;.~ -~,.- ._-~---.-. ~ """"7 - - ~ y ~ --- ;T. , - - ---- -- " ~ ......,.,.,~ _~_"f...- t. -4 ..-' . ---:;- .-.'