Item B05 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: 07-27-00 Division: Growth Management Bulk Item:YESl NO Department:Marine Resources AGENDA ITEM WORDING: Approval of the Contract Amendment for a time extension/project cost adjustment and Resolution between Monroe County and A.S.A.P., Inc. for the ~.-J>Klf aids to navigation and regulatory marker project. C 'l'""t"\'l'""t"\v.",',. o-rb ( ITEM: Due to difficulty in 0 taining materials the Contractor has requested a time extension. The Marine Resources Planner upon conducting a second site visit has advised that additional repairs were needed. The project cost is increased from $9,750.00 to $11,250.00 and includes the replacement of two additional pilings and disposal of the old pilings. PREVIOUS RELEVANT BOCC ACTION: Resolution and Contract Agreement approved 2-17-00. STAFF RECOMMENDATION: Approval TOTAL COST: $11.250.00 BUDGETED: Yes COST TO COUNTY: Staff Time Only BIF REVENUE PRODUCING: YES NOl AMT. PERMO. YEAR APPROVED BY:COATTY X OMB/PURCHASING]LRISKMANAGEMENT X W'~ \ DEPARTMENT HEAD APPROVAL: George G DIVISION DIRECTOR APPROVAL: Timothy J. McGarry-Divisio DOCUMENTATION: INCLUDED:-2L TO FOLLOW:_ NOT REQUIRED:_ DISPOSITION: AGENDAITEM#~ MONROE COUNTY BOARD OF COUNTY COMMISSIONERS CONTRACT SUMMARY Contract # Contract with: A.S.A.P., Inc. Effective Date: Expiration Date: / / --- / / Contract Purpose/Description: Community HaJ"bor Timp Rxt"pnc';OD aM ProjPI"t" r.09t Tncrease Contract Manager: Kim McGee (Name) 4511 (Ext.) Marine Projects (Department) for BOCC meeting on 7 ./ 27 / 00 Agenda Deadline: --L./ 10 / 00 Total Dollar Value of Contract: $ Budgeted? Yes No Grant: $ 11,250.00 County Match: $ N/A CONTRACT COSTS 11 ,250 .00 Current Year Portion: $ 11 ,250 .00 Account Codes: EXISTING Estimated Ongoing Costs: $ (Not included in dollar value above) ADDITIONAL COSTS NI A /yr For: (eg. maintenance, utilities, janitorial, salaries, etc.) Date In CONTRACT REVIEW Changes Needed Yes No (~ Ja.11Af t[) Rgnagement O.M.B./Pu~ ( Date Out Division Director -'-I U)f Q) ( LI 1:1-' ()Q ( o liS; tJD( ) (- (/'/\. {:, I f9 I 00 --- County Attorney -'.1 !l1.Qd ( ) ~1/6 ,od -,-/JjD Comments : OMI3 Form Revised 8/30/95 Mep 112 County of Monroe Deoartment of Marine Resources 2798 Overseas Highway, Suite 420 Marathon. Florida 33050 Phone: (305) 289-2805 FAX: (305) 289-2536 ~'f:,-'rt:~;~~...,.. t~ Board of Countv Commissioners Mayor Shirley Freeman. Dist. 3 Mayor Pro Tem George Neugent. Dist. 2 Wilhelmina Harvey, Dist. 1 Commissioner Nora Williams. Dist. 4 Commissioner Mary Kay Reich. Dist. 5 May 15, 2000 To: Kim McGee, Marine Projects Coordinator From: Richard Jones, Marine Resources Planner Re: Community Harbor Channel Marking Project This letter is in reference to the lateral aid/regulatory marker project which is underway for Community Harbor. I visited the site last week to confirm the placement of all the markers and signs which will soon be installed. At that time I observed that the pilings for DBN 3 and 4 are in bad shape and need to be replaced immediately, in addition to the new signs slated to go on the piles. H at all possible, please amend the contract for Community Harbor to reflect the necessary changes. Please call if you have any further questions. Growth Management Division RESOLUTION NO. 2000 RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA, AUTHORIZING AN ALLOCATION FROM THE BOATING IMPROVEMENT FUND FOR THE INSTALLATION OF AIDS TO NAVIGATION AND REGULATORY MARKERS, COMMUNITY HARBOR, KEY LARGO, MONROE COUNTY. BE IT RESOLVED, by the Board of County Commissioners of Monroe County, Florida, as follows: 1. That said Board has been notified of the availability of funds from the Monroe County Boating Improvement Fund for the installation of aids to navigation and regulatory markers, Community Harbor, Key Largo, Monroe County. 2. That the Growth Management Division, Marine Resources-Marine Projects Section acting for Monroe County has determined the eligibility of this project for the use of Boating Improvement Funds in the amount ofan additional $1,500. Total project cost will be $11,250.00. 3. That said Board hereby directs the implementation of this project by the Marine Projects Coordinator. PASSED AND ADOPTED by the Board of County Commissioners of Monroe County, Florida, at a regular meeting of said Board held on_ day of A.D., 2000. MAYOR Shirley Freeman COMMISSIONER Willielmina Harvey COMMISSIONER George Neugent COMMISSIONER Nora Williams COMMISSIONER Mary Kay Reich BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA BY: MA YORl COMMISSIONERS (Seal) Attest: Clerk A.S.A.P., Inc. PO Box 804 Tavernier, FI 33070 May 12, 2000 Kim McGee-Marine Projects Coordinator Monroe County Marine Resources Marine Projects Section 5100 College Rd., Room 410 Key West, FI 33040 Dear Kim, Please accept this letter as a formal request for a two month time extension for the following projects: Community Harbor Hammer Point Safety Harbor This request is made due to difficulty in obtaining materials. Your consideration concerning this matter will be greatly appreciated. Thank you. CONTRACTAMENDMrnNT THIS AMENDMENT TO THE AGREEMrnNT is made and entered into this day of 2000, between the County of Monroe, hereafter County, and AS.AP. Inc., hereafter Contractor, in order to amend the agreement between the parties dated February 17, 2000, a copy of which is attached to this amendment. The County and AS.AP. Inc., amend sections 2 and 4 ofthe February 17, 2000 agreement as follows: 2. The work performed under the Contract shall commence immediately from the date Liaison provides the Notice to Proceed and shall be completed by July 31, 2000. 4. The Board shall pay the Contractor the total sum of$II,250.00 for the work listed in Exhibit A & B of this Contract. PaYment shall be upon completion by the Contractor and review and approval of the close out documentation by the Marine Projects Coordinator. IN WITNESS WHEREOF, the parties have here on to set their hands and seal, the day and year first written above. BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA By: Mayor / Chairman (Seal) Attest: Danny L. Kolhage AS.AP., Inc. ~(1~. By: By: Title : (Seal) Attest: By: CONTRACT AGREEMENT / ---' # r, AGREEMENT, MADE THIS / day of rC1,D 2000, by and between, A.S.A.P., Inc. . (" Contractor "), and the BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA, of the County of Monroe, State of Florida (Board). The Contractor and the Board, for the consideration named, agree as follows: 1. The Contractor shall furnish all the materials for the installation of regulatory markers and aids to navigation Community Harbor, Key Largo, Monroe County as specified by the maps and specifications attached as exhibits A and B. 2. The work performed under the Contract shall commence immediately from the date the Liaison provides the Notice to Proceed and shall be completed by May 31, 2000. 3. The work performed under the Contract is contingent upon grant funding from the Florida Department of Environmental Protection Boating Improvement Fund. The Contractor understands the rules of the Florida Department of Environmental Protection and shall comply with said rules, along with the rules and procedures instituted by the Board to ensure an orderly progress to the project. Both the intent and the requirements of the Specifications attached as Exhibit B are understood by the Contractor. 4. The Board shall pay the Contractor the total sum of $ 9,750.00 for the work listed in Exhibit A and B of this Contract. Payment shall be upon completion by the Contractor and review and approval of the close out documentation by the Marine Projects Coordinator. No Change Orders will be allowed. S. The attached List, Chart, and Specifications together with this Agreement, form the Contract. They are fully a part of this Contract as if repeated herein verbatim. 6. The Contractor covenants and agrees to indemnify and hold harmless Monroe County Board of the County Commissioners from any and all claims for bodil y injury (including death), personal injury, and the property damage (including property owned by Monroe County) and other losses. damages, and expenses (including attorney's fees) which arise out of, in connection with, or by reason of services provided by the Contractor or any of its subcontractor(s) in any tier, their employees or agents. The purchase of the insurance required in the paragraph 11 does not vitiate this indemnification provision. 7. The Contractor acknowledges hisl her intention to comply with the need to coordinate all work with the appropriate environmental agencies, the U.S. Coast Guard, and the County. 8 . The Contractor agrees to supply the County with a set of photographs of the complete work along with a letter certifying completion of work. The Contractor will be responsible for the camera, film, and development costs. The Contractor also agrees to provide transportation for the Liaison to inspect the completed work. 9. The Contractor understands and agrees that no payment will be made for ithis project without required photographs and written certification of completion. 10. Due to the use of heavy equipment and. at times. dangerous work environment. the Contractor understands and agrees to maint<fin an alcohol and drug free work environment. 11. The CONTRACTOR will be responsible for all necessary insurance coverage as indicated by the an "X" on the attached forms of Exhibit C identified as General Insurance Requirements and INSKLST 1-4, as further detailed on forms WC1, WCJA, GL1, VL1, & WLl. All policies must list Monroe County as additional insured with the exception or the Workers Compensation policy. 12. The Contractor warrants that it has not employed, retained or otherwise had act on its behalf any former County officer or employee subject to the prohibition of Section 2 of Ordinance No. 010-1990 or any County officer or employee in violation of Section 3 of Ordinance No. 020-1990. For breach or violation of this provision, the owner may, in its discretion, terminate this contract without liability and may also, in its direction, terminate this contract without liability and may also, in its discretion, deduct from the contract or purchase price, or otherwise recover the full amount of any fee, commission, percentage, gift, or consideration paid to the former County officer or employee. 13. A person or affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases real property to a public entity, may not be awarded or perform work as a contractor, supplier. subcontractor, or consultant under a contract with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO ($10.000.00) for a period of 36 months from the date of being placed on the convicted vendor list. 14, The Board may terminate this Agreement with or without cause at any time upon giving the Contractor up to 10 days notice in writing. The Contractor, upon receipt of the notice, shall irnrnediately cease work. The Board must pay the Contractor the percentage of the contract price which is satisfactory to the Board up to date the contractor received the notice of termination. 14. This Contract is governed by the laws of the State of Florida. Venue for any litigation arising under this contract must be in Monroe County. IN WITNESS WHEREOF the parties here to have executed this agreement by the day and year first written above. ", BOARD OF COUNTY COMMISSIONERS OFMO~CPU~Ty,F~DA dh~-:rJ~ BY: Mayor/Chairman Witness: 7" ~~~/~ Witness~cf~ By: Business Name: A. S .A. P. , ~~/ ~~ //C I' Title: f/ ~_ /lr/// '-' I Inc. ;::XHIBIT A COMMUNITY HARBOR LATERAL AID/REGULATORY MARKER PROJECT We are ready to move ahead with the navigational aid/regulatory marker project for Community Harbor. Please see that the project is implemented as described below. Shallow-Water markers (rather than standard pilings) should be installed where indicated. LATERAL AIDS: Aid Name DBN 3 Discreoancy Change in ownership/aid number Work to be oerformed Install new lateral aid signs (DBN 1), and; Install regulatory signs beneath (I of each) IDL"EED NO~ PER..\1IT NO. 98-038 co. ORD. 05 I -1997 DBN4 DBN 11 DBN 12 RESUMXORMAL SAFE ~TION PER..\1IT NO. 98-038 co. ORD. 051-1997 Change in ownership/aid number Change in ownership/aid number Change in ownership/aid number Install new signs (DBN 2) Replace pile and signs (DBN 3) Replace pile and signs (DBN 4) REGULATORY MARKERS: For this site we will be installing standard sized shallow-water markers (as used at Little Torch). Five markers are to be installed at locations indicated in the accompanying diagram. Language on the markers should read as follows: Aid Tvpe Discr~9ancy Regulatory marker Need new markers Work to be performed Install shallow-water markers (5 total) IDLE SR "!!tt! (entering into the zone) WAKE PERMIT NO. 98-038 CO. ORD. 05 I -1997 RESUME NOs~AL ~ (leaving the zone) OPERA TION PERMIT NO. 98-038 CO. ORD. 05 I -1997 EX&'1PLE *Verbage according to Specifications !5- OJl:l\NGE REFLECTiVE ~AND 11-X'..... ORANGE 8YMISOL (TWO &IDES) ~l:~'" z- 5LAC~ LElTE~ (1'WO .,.~el 2- "lAC;;' lElTER5 (TWO 81DEe) ............. Z- OAAHGE REFlECTlVE DAN 17 4" fPreJc;..t; Compoe~ ,.11., ,- .,LAC;:' Ll:ll ce 'i....i~ 85-1!!IIOO " GENERAL CONTRACT SPECIFIC~ TIONS FOR INSTALLATION OF AIDS TO NA VIGATION REGULATORY BUOYS/SIGNS. AND OTHER MARINE PROJECTS 1. SCOPE OF WORK: The Contractor shall be responsible for providing all supervision. labor, equipment, tools, fees and taxes required to complete this project to the satisfaction of the County. The Contractor's procedure and work methods must satisfy the requirements of these specifications and all necessary environmental permits. 2. MATERIALS AND WORKMANSHIP: The Contractor shall provide the necessary materials and equipment to safely complete the job. The Contractor agrees that all work shall be performed by competent employees who are experienced and qualified to do the work specified, and that all work will be performed in accordance with the best commercial practices. Precaution shall be exercised at all times for the protection of persons and property. The safety provisions of the Occupational Safety and Health Act of 1970 ( Public Law 91-596) and other applicable laws, including building and construction codes shall be observed. The Contractor shall store materials and shall be responsible for them during the contract time frame and until final acceptance of the completed work. If any of the materials become lost, damaged, or destroyed by any cause or means whatsoever, the Contractor shall satisfactorily repair, replace and/or remove, or not receive payment for work unsatisfactorily performed. Suitable and sufficient guards and barriers must be utilized at night, and must be suitable protection for the prevention of accidents. 3. ASSIGNMENTS OF CONTRACTOR AND SUBCONTRACTORS: It is expressly understood that the Contractor is in all respects an independent Contractor for this work, not withstanding under certain conditions. He is bound to follow the directions of the County, and is in no respect an agent, servant, or employee of the County. Neither the Contract, nor any part thereof, nor any Monies due or to become due there under, may be assigned by the Contractor without the prior written approval of the County . The Contractor is fully responsible to the County for the acts and omissions of his subcontractors and of persons either directly or indirectly employed by said subcontractor, as he is for the acts and omissions of the contract documents and shall abide by the terms and the conditions. It is the responsibility of the Contractor to pay all the obligations incurred with subcontractors in an expedient manner. -+, LICENSE. POLLUTION CONTROL ACT. AND TRAFFIC PROVISION: The Contractor shall comply with all applicable local, State and Federal requirements pertaining to the terms of the Contract. The Contractor will be responsible for obtaining, at his own expense. any license that may be required. The Contractor shall comply with all the requirements of the Federal Pollution Control Act. The Contractor shall conduct his operations so that he shall not close any thoroughfare nor interface in any way with traffic on highways, or on water, without the written consent of the proper authorities. Work shall be done at any time that shall interrupt or disturb members of the public. Consideration should be given all times to the welfare of the public. 5. INSURANCE: The Contractor must obtain all insurance required by the County and submit proof of same to the County immediately after notification of low bid or quote but no later than ten working days after. All insurance shall be maintained until work has been completed and accepted by the County. The Contractor shall furnish the following certificates of insurance for review by the County's Risk Management Division. Certificates of Insurance: provide proof that the Contractor has obtained the insurance coverage required in paragraphs a,b,c,d,and e below. a. Workers Compensation Insurance as required by Florida Statues. b. General Liability Insurance in the amount of $300,000. c. Vehicle Liability Insurance in the amount of $100,000 d. Water Craft Liability Insurance in the amount of $500,000. e. Federal Jones Act Coverage. All insurance policies required above shall be issued by companies authorized to do business under the laws of the State of Florida. All policies must list Monroe County as additional insured with the exception of the Workers Compensation Policy. 6. COMMENCEMENT, DELAYS AND COMPLETION OF WORK: After receiving Board of County Commission approval of the Contract, and after reconciliation of any details or conditions which may directly or indirectly interfere with the Contract, the County will issue a "Notice to Proceed with Contract Work" officially authorizing the Contractor to commence. The Contractor shall commence work on said date or shortly thereafter. If the Project is considered and emergency the Notice to Proceed may be issued prior to the execution of the Contract. If the Contractor should be delayed in the progress of the work included in the Contract by unforeseeable cause beyond his control, the time for the completion of the work may be extended upon agreement of the County's representatives. Requests for the extension of time must be submitted in writing to the County's representatives. Extensions of time cannot legally be approved unless the written request is submitted in time to permit it to be acted upon before the Contract expiration date. To allow sufficient time for administrative procedures the written request must be received by the County representative at least ten (10) calendar days prior to the contract expiration date. Liquidated damages resulting from factors beyond the control of the Contractor which occur too late to allow time for action by the Board of County Commissioners approving a time extension may be waived by the County Commission. Such wavier shall be granted only when the county representatives determines that the delay is beyond the control of the Contractor, and in this event the Contractor shall not be charged with liquidated damages or any excess cost when the delay in the completion of the work is due: a. To any issue order by the County or the State Department of Environmental Protection changing the Contractors approved work schedule. b. To unforeseeable cause beyond the control and with out the fault or negligence of the Contractor. c. To any delays of subcontractors or suppliers occasioned by any of the cause specified in the subparagraphs (a) and (b) above. Provided further that the Contractor shall within ten (10) days from the beginning of such delay notify the county, in writing, of the causes of the delay. The County's representative will ascertain the facts and the extent of the delay and notify the Contractor within a reasonable time of her decision in the matter. If the Contractor fails to complete the work within the time limit, and if the County should nevertheless permit the Contractor to continue and complete the same without official extension of time in writing, such permission shall not modify nor waive any liability of the Contractor for damages arising from non- completion of work within the time limit. 7. CHANGES AND INSPECTION: The navigational and/or regulatory aids herein considered are to be installed, repaired, or relocated for the County by the Contractor in accordance with the Specifications. The County may give instructions or directions to supplement the Specifications and upon all of his subcontractors. employees and agents of every kind. All work and every process and operation shall be subject to inspections at all times, by the County and their representatives and they shall have free access to all access to all aspects of work. The Contractor shall remove, or make good, as may be directed, without charge, any defective materials. The right is reserved to change the Specifications consistent with regard to the general intention of the Contract for any pan of work or materials, either before or after work has begun. Notice of such changes shall be given in writing to the Contractor. 8. AUDIT RIGHTS: As a provision of the grant from the State of Florida to the County, and if so requested by the State, the successful bidder agrees to provide access to all records and allow the audit of any books, documents and papers related to this project for up to one year during and after termination of the Contract. 9. CONTRACT AWARD: The County reserves the right to evaluate the submitted bids and to award a contract to bidder other than the bidder submitting the lowest bid. 10. PREWORK CONFERENCE: A meeting may be necessary involving a representative of the County, the Contractor and the other parties with direct involvement, prior to the commencement of the work. .The time and place of this Conference will be set by the County representatives. At this time the Contractor shall provide the County with a work schedule. The Contractor must also provide transportation to the proposed project site for placement of temporary markers if the project involves the installation of regulatory buoys or aids to navigation. 11. EXECUTION OF CONTRACT DOCUMENTS: Due to the time frame involved with this project, the Contractor upon notification that he is to be awarded the Contract, shall return said documents properly executed along with his insurance within ten working days. With the Contractor's cooperation, if this period can be reduced, it will assist in excelleration of the execution of the contract documents. The Contractor, by virtue of signing the Contract, acknowledges that he and all his subcontractors have satisfied themselves as to the nature and location of work, the general and local conditions, including, but not restricted to, those bearing upon transportation, handling, and the care of equipment and facilities needed to perform the work. Failure on the part of the Contractor to completely or properly evaluate any factors of his costs prior to bidding shall not form a basis for additional compensation if he is awarded the Contract. If for any reason, not acceptable to the County, the Contractor does not perform, the County shall have the right to levy liquidation damages against the Contractor. Liquidated damages shall be assessed against the Contractor for any bid item awarded to him which is not completed and accepted in the Contract. Liquidated damages are accumulative. 12. NOTICE TO PROCEED: The Contractor shall commence upon this project on the effective date of the Notice to Proceed and perform in a continuous manner until completion and acceptance by the County. For Contracts wherein a specified number of days for completion is stated in the Contract the effective date of the "Notice to Proceed with Contract Work" will establish the " beginning date" of the project. 13. TERMINATION OF CONTRACT: This Contract may be terminated by the County, without cause, giving up to ten (10) days written notice to the Contractor; said notice shall be sufficient if delivered to the party personally or mailed by certified mail to his mailing address as specified on the acceptance bid. 14. FINAL CLEAN UP: Upon completion of the work specified herein and before acceptance and final payment shall be made, the Contractor shall remove from the sites all machinery, equipment, surplus and discarded materials, rubbish and debris shall be made at legal disposal site. 15. Certification: Bidder must also certify, upon completion of the project, all installations where in accordance with these specifications, the Florida Department of Environmental Protection permit requirements, the US Coast Guard permit requirements, and the US Army Corp of Engineers permit requirements and associated attachments. 16. PA YMENT: Payment shall be upon completion by the Contractor and review and approval by the Marine Projects Coordinator. The Contractor must submit complete documentation, including the required photographs for the work for which payment is being requested. The contractor must provide transportation, upon request by the Marine Projects Coordinator, to the project site for review of work either in progress or completed . In addition, property public or private. if damaged during the work. shall be repaired or replaced prior to final payment for contracted work. Specifications For the RepairlReplacementlInstallation of Aids to Navigation, Regulatory Markers, and Information Markers for Monroe County, Florida For all piline:s: · Pilings shall be of timber treated with chromated copper arsenate (C.c.A.). · Pilings shall be of timber which will withstand the driving for which they are intended. · A straight line drawn from the center of the butt to the center of the tip shall not at any point face further away from the center of the pile than a distance equal to I % of the length of the pile. · Piles to be sufficient length to provide a minimum of four foot penetration into the substrate and the base of the day board must be eight feet above mean high water. · Black. cone head, round piling caps of the appropriate size should be mounted atop the piling using four stainless #6 nails (this includes all sign replacements). · Any pilings replaced will be removed and properly disposed of. For all sie:ns: · Signage to be constructed of .125 gauge aluminum. · Signage must be USCG approved. · All signs should be pre-made (text, borders, etc.) by a County approved manufacturer. · Signs should be mounted so that the piling is not visible above the signs. · Hardware should all be stainless steel, including: 3/8" all-thread and 3/8" lag screws, I W' (o.d.) flat washers and 3/8" nuts. 1 W' Co.d.) plastic or nylon (or similar material) washers shall also be used to separate the aluminum signs from the stainless steel flat washers and nuts. ..................................................................................................................................................................... Standard size markers: Signs for thesc markcrs have J. 1 nm nomlnJ.1 range. The standard size for such signs is- 3' x 3' green square. 4' x 4' red triangle. 3' x 3' diamond (danger). and 4' x 3' regulatory, and information signs. 12" diameter pilings (approximately) will be used for all standard size sign installations. For standard size signs mounted at the top of standard size pilings: A 12" long 2" x 4" pressure treated backing board should be installed horizontally 2" below the top of the piling (to provide room for the piling cap) and attached to the piling with four stainless # 16 ring shank nails to prevent the board from rotating. The board will be beveled to provide a flat surface for the downward angle of the sign. The board will be installed so as to mount the signs to the appropriate approach angle of the marker route. Two lag screws and two all-threads will be used to mount the signs. One lag screw (4" long) will be installed at the top of the sign, through the backing board and into the piling. The other lag screw (3" long) will be installed at the bottom of the sign into the piling. The two all-threads will be installed on the sides of the signs. Washers and nuts are to be used. both in front and back of the signs. to assist with adjusting the approach angle and ensure proper tightening of the hardware. For standard size regulatory and information signs mounted below standard size lateral aid signs: The 4' x 3' signs should be mounted 4 inches below the lateral aid sign. Signs should be mounted flat against the piling using two 3" long lag screws with washers, one at the top and one at the bottom. An all-thread will be installed at the sides of the signs. Washers and nuts are to be used, both in front and back of the signs, to assist with adjusting the approach angle and ensure proper stiffness of the sign assembly. Smaller size markers: For certain situations smaller size signs should be used (this will be indicated on the work order). These signs will have a 12 nm nominal range. The standard size for such signs is- 1 Y2' x 1 12' square green, 2' x 2' red triangle, and 3' x 2' regulatory and information signs. 8-9" diameter pilings will be used for all small size sign installations. For smaller size lateral aid signs: Signs should be mounted flat against the piling using two 3" long lag screws with washers, one at the top and one at the bottom of the sign. For smaller size regulatory and information signs: Signs should be mounted flat against the piling using two stainless 3" long lag screws with washers, one at the top and one at the bottom of the sign. An all-thread will be installed at the sides of the signs, with washers and nuts in front and back. If mounted beneath a lateral aid sign, a space of 4" should be provided. ~":.c.,~t' '--..,\ \ \ Ie "":.--r \e(~,~ -\oo~~ I I \ ~ '- . ..:..'~ , I I I ,- -%- ~ -l I ---~ r 1 2 " n:~-\~c..\;~ \OO~ 1..e.r I I ../,.. 'B 11_ f' ' \1::. ~/~-" +-- ---- ---...._-- , ~'-- .; -s '0.'''-- I. "--e'r:'lD (<''.\(_41 ;I. I . I 0 o-bovc ~ ,^..a;V\ ~er- ( - -:.-> c :: =--=> c:: I ~~- ~~ I c:-: ~""~~ ""--- ! I . _? ! --::::::.. ~ I I i I ----. ~ I ! I ~ ./ f: - - - . - !:::...~- - - -=- CO_' __ . '!). - --... - ~ i) I -- ------- i , , '~I I I I I I I I I ....J /...., / ' " . (-;., , - /;' //~ I ~ --...J,_Ct"C-":"'""::"\, -=- ' \ .... \ f: ~ ~ - .....~ ?~ - -:,i;. ~~~\ I "-~~ I \' I ~~}) \ // ~ I /' .c-='-l L . I @ ~j~ \.,)--.e.l...;) S.c:o\c - I \ 1/ = \ ./~--~ ~- ~ -~-.. --- - - .::5,k \..) \ cW " r- - - - _ .---.~ I 'I /J II ." II' . . ~ I I --~- '-. 'i:-:s:. -;. c . ~ ~..------------- i I :<!) I ! i I '@ I I i I , I I I I I L_ "'--- . ~ -~ u....."-O-~~_i ': \.I'll"'-. .':.c... I - . (., . :- -~-- ..~ ---.._- , - -" . . ii - -..... - --- -'- f-' r' '--- I i ,--.J "I I. @ ..--.-.--- " l ~ I @/ I -L-_@ r /...-- ----...--....-----. I . ~ I I I --+'-- -tTo.tr V:\c.. W '_. ,~ l ~ _1 C,o..~ ,I = \ I ./ s\~c V \Clv ..-/"'- - ~, -I ~ ~- ,.-.....;,~,.... ----- -_r~"- -. I ) 1) :"/ 11 i' iI I F-~I ::> r II - - - I . HI .': d -j; L.,. I _L1l,.. --~F ;; ,I i/ II 1/ ~Cl ....--- { I., !/ "I :I~ . -';/17 '-- "1U' 11 , I -"::-,'':='' - -:- 'iJl::1 ~ lK c_-t I , \2 ~ r I I '_ L __ _ y :=:XHIB IT 3 fC, "~~; ..".........'..-,. ~~~~. < . i:AIIIBIT C 1996 Edition \10NROE COUNTY, FLORIDA INSURANCE CHECKLIST FQR VENDORS SUBMITTING PROPOSALS FOR \VORK To assist in the development of your proposal, the insurance coverages marked with an "X" will be required in the event an award is made to your firm. Please review this fonn \-\lith your insurance agent and have himlher sign it in the place provided. It is also required that the bidder sign the fonn and submit it with each proposal. WORKERS' COMPENSATION AND EMPLOYERS'LIABILITY WCl WC2 WC3 WCUSLH X \V orkers' Compensation X Employers Liability Employers Liability Employers Liability US Longshoremen & Harbor Workers Act X Federal Jones Act Statutory Limits $100,000/$500,000/$100,000 $) 00,000/$ 5 00,000/$ 5 00,000 $1,000,000/$1,000,000/$1,000,000 Same as Employers' Liability Same as Employers' Liability WClA INSCKLST 1 Administration Instruction 114709 2 i 996 Edltlon GENERAL LIABIL;:T'{ As a minimum, the required general liability coverages will include: · Premises Operations · Blanket Contractual · Expanded Definition of Property Damage Required Limits: GL1 x GL2 GL3 'GL4 Required Endorsement: GLXCU GLLIQ GLS . Products and Completed Operations Personal Injury . $100,000 per Person; $300,000 per Occurrence $50,000 Property Dan1age or $300,000 Combined Single Limit $250,000 per Person; $500,000 per Occurrence $50,000 Property Damage or $500,000 Combined Single Limit $500,000 per Person; $1 ,ooo,oqo per Occurrence $100,000 Property Damage or . $1,000,000 Combined Single Limit $5,000,000 Combined Single Limit Underground, Explosion and Collapse (XCU) Liquor Liability Security Services All endorsements are required to have the same limits as the basic policy. Administration Instruction # 4709 2 rNSCKLST 2 1996 Edition VEHICLE LIABILi'~rY As a minimum, coverage should extend to liability for: · Owned: NOn-O\\l1cd: and Hired Vehjeles Required Limits: BRl MVC PROl PR02 PR03 POLl POL2 POL3 EDl ED2 GKl GK2 GK3 WLl x VLl VL2 VL3 VL4 x Admtnlstralion (nstrucllon # 4709 2 $50,000 per Person: $100,000 per Occurrence $25,000 Property Damage or $100.000 Combined Single Limit $100,000 per Person; $300,000 per Occurrence $50,000 Property Damage or $300,000 Combined Single Limit $500,000 per Person; $1,000,000 per Occurrence $100,000 Property Damage or $1,000,000 Combined Single L,irnit $S,OOO,OOO Combined Single LiI1].it MISCELLANEOUS COVERAGES Builders' Risk Limits equal to the completed project. Motor Truck Cargo Limits equal to the maximum value of anyone shipment. Professional Liability $ 250,000 per Occurrence/$ SOO,OOO Agg. $ SOO,OOO per Occurrence/$l,OOO,OOO Agg. $1,000,000 per Occurrence/$2,000,000 Agg. $ SOO,OOO per Occurrence/$l ,000,000 Agg. $1,000,000 per Occurrence/$2,000,000 Agg. $5,000,000 per Occurrence/$l 0,000,000 Agg. $ 10,000 $100,000 Pollution Liability Employee Dishonesty Garage $ 300,000 ($ 25,000 per Veh) Keepers $ 500,000 ($100,000 per Veh) $1,000,000 ($250,000 per Veh) Watercraft Liability $500.000 INSCKLST 3 1996 Edulon fNSU~<\NCE AGENTS ST3,TE?\1E~T I have reviewed the above requirements with the bidder named below. The following deductibles apply to the corresponding policy. POLICY DEDUCTIBLES Liability policies are Occurrence Claims Made Insurance Agency Signature BIDDERS STATEMENT I understand the insurance that will be mandatory if awarded the contract and will comply in full with all the requirements. Bidder Signature lNSCKLST 4 Admmistratlon Instruction #4709.2 1996 Edition GENERAL LIABIJ~TY INSURANCE REQUIREMENTS FOR CONTRACT I BET\VEEN MONROE COUNTY, FLORIDA AND Prior to the commencement of work governed by this contract, the Contractor shall obtain General Liability Insurance. Coverage shall be maintained throughout the life of the contract and include, as a minimum: · Premises Operations · Products and Completed Operations · Blanket Contractual Liability · Personal Injury Liability · Expanded Definition of Property Damage The minimum limits acceptable shall be: " $300,000 Combined Single Limit (CSL) If split limits are provided, the minimum limits acceptable shall be: $100,000 per Person $300,000 per Occurrence $ 50,000 Property Damage An Occurrence Form policy is preferred. If coverage is provided on a Claims Made policy, its provisions should include coverage for claims filed on or after the effective date of this contract. In addition, the period for which claims may be reported should extend for a minimum of twelve (12) months follov,ring the acceptance of work by the County. The Monroe County Board of County Commissioners shall be named as Additional Insured on all policies issued to satisfy the above requirements. GLl Admlnlstrallon InstruclIon 114709.2 1996 Edition WORKERS' COMPEl':-oATION INSURANCE REQUIREMENTS FOR CONTRACT , ' BET\VEEN MONROE COUNTY, FLORIDA AND Prior to the commencement of work governed by this contract, the Contractor shall obtain Workers' Compensation Insurance v.~th limits sufficient to respond to Florida Statute 440. In addition, the Contractor shall obtain Employers' Liability Insurance v.;th limits of not less than: $100,000 Bodily Injury by Accident $500,000 Bodily Injury by Disease, policy limits $100,000 Bodily Injury by Disease, each employee .' Coverage shall be maintained throughout the entire term of the contract. Coverage shall be provided by a company or companies author{zed to transact business in the state of Florida. If the Contractor has been approved by the Florida's Department of Labor, as an authorized self. insurer, the County shall recognize and honor the Contractor's status. The Contractor may be required to submit a Letter of Authorization issued by the Department of Labor and a Certificate of Insurance, providing details on the Contractor's Excess Insurance Program. If the Contractor participates in a self-insurance fund, a Certificate ofInsurance will be required. In addition, the Contractor may be required to submit updated financial statements from the fund upon request from the County. wel Administration Instruction #4709.2 1996 Edition WORKERS' COMrEN3A TION INSURANCE REQUIREMENTS FOR CONTR-\CT , ' BET\VEEN MONROE COUNTY, FLORIDA AND Recognizing that the work governed by this contract involves Maritime Operations, the Contractor's Workers' Compensation Insurance Policy shall include coverage for claims subject to the Federal Jones Act (46 U.S.C.A. subsection 688) with limits not less than those specified for Employer's Liability. The Contractor shall be permitted to provide Jones Act Coverage through a separate Protection and Indemnity Policy, in so far as the coverage provided is no less restrictive than would have been provided by a Workers' Compensation policy. } WCJA Administration Instruction ~ 4709 2 t ()Qfl Edll,()n VEHICLE LIABILI1~' I:"SURA~CE REQUIREMENTS FOR CONTRACT BETWEEN MONROE COUNTY, FLORIDA AND Recognizing that the work governed by this contract requires the use of vehicles, the Contractor, prior to the commencement of work, shall obtain Vehicle Liability Insurance. Coverage shall be maintained throughout the life of the contract and include, as a minimum, liability coverage for: · Owned, Non-Ov.'I1ed, and Hired Vehicles The minimum limits acceptable shall be: $100,000 Combined Single Limit (CSL) " If split limits are provided, the minimum limits acceptable shall be: $ 50,000 per Person $100,000 per Occurrence $ 25,000 Property Damage The Monroe County Board of Counn' Commissioners shall be named as Additional Insured on all policies issued to satisfy the above requirements. VLl .\dmlnlstrallon InstruclIon #4709 "2 xo 1 Q96 EditIon \VATER CRAFT LIABJLq.~ INSURANCE REQUIREMiNtS FOR CONTRACT I I B ET\\'EEN MONROE COUNTY, FLORIDA AND Prior to the commencement of work governed by this contract, the Contractor shall obtain Water Craft Liability Insurance with terms no less restrictive than those found in the standard "American Institute Hull Clauses" (June 2, 1977 edition). Coverage shall be maintained throughout the life of the contract and include, as a minimum: · Injury (including death) to any Person · Damage to Fixed or Movable Objects · Costs Associated with the Removal of Wrecked Vessels · Contractual Liability with Respect to this Contract If the policy obtained states that coverage applies for the" Acts pr Omissions of a Vessel", it shall be endorsed to provide coverage for the legal liability of the shipo\\'I1er. The minimum limits acceptable shall be: $500,000 Combined Single Limit (CSL) Coverage provided by a Protection and Indemnity Club (P&I) shall be subject to the approval of the County. The Monroe County Board of County Commissioners shall be named as Additional Insured on all policies issued to satisfy the above requirements. WLl AdmInIstration In~trucllon 114709 2