Loading...
Item G1 FROM : FAX NO. : Mar. 12 2001 03:45PM P1 BOARD OF COllNTY COMMISSIONERS AGENDA ITEM SUMMARY Meet;ng Da\e: 3.2 t --.---'- Divjsion:_~irporl~__ _ Bulk Item: Yes No~ . Department: County Administrator AGENDA ITJ<:M WORDING: 1. Report on Airline Network conference. 2. Update on Airport Master Plan ITI<:M BACKGROUND: PREVIOUS REVELANT BOCC ACTION: CONTRACT/AGREEMENT CHANGES: ST AI"F RECOMMF.NDA TIONS: TOT AL COST: 00.00 -.' COST TO COUNTY: BUDGETED: Yes No X RI<:VENUE PRODUCING: Yes No AMOUNT PER MONTH Yenr APPROVED BY: County Any OMBlPurchasing _ Risk Management _ MARATHON AIRPORT MANAGER APPROVAl.: ~ n ~Q The~ila Coo~ DIVISION DIRECTOR APPROVAL: ~ -7" ~~ James Roberts County AdminiSlrator DOCUMENTATION: Included To Follow Not Required_ x _ DISPOSITION: AGENDA ITEM # / - C Icfl Revised 2/27/01 PURCHASE I SERVICE ORDER FOR MONROE COUNTY To: URS Purchase Service Order No. 00/01-18 Re: PSA Agreement, Dated 7-1-96 Resolution No. Project Name: Runway Extension Feasibility Study - MTH Description of Services: (See attached Scope of Services) Multiple of Direct Salaries Lump Sum x Reimbursable Expense Days to Complete 180 Fee this Service Order $ 10.780.00 Payment for Services shall be in their entirety as per PSA, as amended. Prepared by: Recommended by: ~~- Milford A. Re eft ~~o Date: 3-19-01 Date: g- Zl-Ol Approved by: Date: 3-19-01 Date: N :IURSldcidresIC502520.55\(XlOl-lS.wPD I G I (b) DRAFT Scope of Services Runway Extension Feasibility Study Marathon Airport TASK 1) Site Reauirements - Coordinate with client to review basic assumptions, the planning criteria for the study, established goals and objectives, and identify potential runway development preferences. The following information and basic requirements need to be discussed: · Basic assumptions for study scope of services; · Review functional runway design requirements including identification of critical design aircraft (e.g. ADG C-II 70-seat Regional Jets/Cabin-Class Business Jets, Charters, etc.), probable stage lengths, takeoff weights, minimum takeoff and landing lengths, etc. · Review FAA Part 77 and TERPS approach surface criteria - charted obstruction heights, threshold siting criteria, and other potential obstruction issues restrictions in approach zones. · Review and confirm runway design and geometric requirement criteria - Review all the applicable FAA runway design and geoemetric planning criteria and established guidelines with the client (FAA Coordination?) for study and planning purposes. · Review runway extension requirements including pavement strength requirements, NA V AIDS, safety setback and geometric layout requirements etc. · Review physical site constraints i.e. existing runway/taxiway geometry, OFA, OFZ, BRL etc. TASK 2) Develop Preliminarv Runwav/Extension Lavouts - Using the agreed upon planning criteria, concept alternatives (no more than 4) will be developed showing alternative runway extension or shifting options. · Runway/Taxiway layout would include: runway extension, safety areas, OFA's, OFZs, POFA's, lighting, NAVAIDS etc. · Determine runway length based on critical aircraft, takeoff weights, stage lengths, winds, and temperatures. (6,500' runway is the objective) · Check existing aircraft parking apron capabilities to accommodate ADG C-II aircraft · Determine land required for the runway extension · Check airspace for obstructions within approaches · Use declared distances on at least one option . M:\MarathonITask l.doc 3/14/01 tify potential environmental impact issues (i.e. Noise, Wetlands, etc.) associated with these extension options. TASK 3) Review - Submit alternatives for review and comments to client TASK 4) DeveloD Preferred Runwav Extension Plan · Develop a preferred runway extension plan · Determine land that needs to be acquired if any · Determine potential impacted surrounding land use area · Determine land that needs avigation easements if any TASK 5) Review - Submit preferred alternative with preliminary project cost for review and comments. TASK 6) Recommended Plan - As a result of the preferred alternative review, a recommended plan shall be prepared incorporating the Airport Staff, thoughts and ideas. TASK 7) Draft ReDort - A draft report will be prepared which would include: summary of recommendations, the planning criteria used, the recommended runway extension plan proposed and budget cost estimates. Upon completion, a draft document shall be presented to the Airport Staff for review and final approval. TASK 8) Final ReDort - Upon receiving approval from the client, a final document shall be prepared. M:" Marathon'Task I.doc 3/14/0 I 'DIRECT LABOR 1. Classification Project Director Senior Planning/Engineer Planner/Engineer CADD Technician/Graphics Word Processor 2. Out of Pocket Travel: Per Diem Printing: Miscellaneous: Manhours Salarv Rate Cost 8 $ 135 $ 1,080 60 $ 95 $ 5,700 16 $ 65 $ 1,040 24 $ 60 $ 1,440 8 $40 $ 320 Subtotal $ 9,580 Air - 2 round trip TP A to EYW @ $350.00 Auto - Rental Car @ $50/day x 2 days @ - $50.00 a day x 2 days x 1 person (Reports, Blueprints, etc.) (Phone, Mail, FAX, etc.) $ 700 $ 100 $ 100 $ 200 $ 100 Subtotal $ 1,200 TOTAL PROJECT $10,780