Item C08 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: 09/19/01 Division: Public Works Bulk Item: Yes ~ No Department: Engineering AGENDA ITEM WORDING: Approval of Change Order No.1 for Storm Sewer Cleaning II in the amount of $29,736.25. ITEM BACKGROUND: After Hurricane Georges, an assessment of our storm sewer system was made and it was determined that the system needed to be cleaned. Partial funding was received from FEMA and gas tax revenue will pay for the rest. During work, additional underground pipe and catch basins were discovered that also needed to be cleaned. PREVIOUS REVELANT BOCC ACTION: On November 21,2000, the BOCC approved a contract with Synagro Southeast, Inc. to clean the storm sewers in the amount of $230,313.23. CONTRACT/AGREEMENT CHANGES: Add pipe and catch basins to be cleaned. STAFF RECOMMENDATIONS: Approval as stated above. :t TOTAL COST: $29.736.25 BUDGETED: Yes ~ No Gas Tax Revenue COST TO COUNTY: $29.736.25 County will pursue reimbursement from FEMA REVENUE PRODUCING: Yes No-X AMOUNTPERMONTH_ Year APPROVED BY; County Atty _ OMBI;?3/znagement- David S. ~ Connty Engineer ~ ~rt/)U7 Dent Pierce ITEM PREPARED BY: DIVISION DIRECTOR APPROVAL: DOCUMENTATION: Included X To Follow_ Not Required_ DISPOSITION: AGENDA ITEM #-1 <f Revised 2/27/01 Monroe County Engineering Department Contract Change Order No.1 Project Title: STORM SEWER CLEANING II Summary of Change Orders Total Previous Change Order(s) Current Change Order Original Contract Amount Percent of Original Contract Percent After Prior Change Order(s) Revised Contract Amount Original Contract Expiration Revised Contract Expiration $0.00 $29,736.25 $230,313.23 12.9% 12.9% $260,049.48 06/29/2001 06/29/2001 Nature of the change Difference in final quantities as follows: Item # Description Change Amount 5. 12" Pipe Delete 7 If @ $0.96/If ($6.72) 6. 15" Pipe Delete 1162 If @ $1.13 Ilf ($1,313.06) 7. 18" Pipe Add 198 If @ $1.45 Ilf $287.10 8. . I Add 3 If @ $2.64 Ilf $7.92 24" Pipe 9. 30" Pipe Add 531 If @ $4.21 Ilf $2,235.51 10. 36" Pipe Add 117 If @ $6.15 Ilf $719.55 11. 42" Pipe Delete 400 If @ $10.44/If ($4,176.00) 12. 48" Pipe Delete 400 If @ $11.58 Ilf ($4,632.00) 13. 90' Injection Wells Delete 3 If @ $902.02 Ilf ($2,706.06) 15. Catch Basins Add 23 ea @ $870.69 lea $20,025.87 16. Curb Inlets Add 66 ea @ $75.00 lea $4,950.00 17. Round Debris Traps Add 38 ea @ $240.00 lea $9,120.00 18. Outfall Box Structures Add 2 ea @ $2,612.07 lea $5,224.14 $29,736.25 Prepared and Approved by: County Engineer r9d~ #y,p~ fj" It ~O f Date €r'j/7/01 Date Director of Public Works County Administrator Date Above changes are accepted: Contractor ~p--~_. 7//7"/111/ , I' Date Change Order Attachment Per Ordinance No. 004-1999 · Change Order was not included in the original contract specifications. Yes 00 No 0 If Yes, explanation: During the cleaning of the storm water system we discovered additional pipes and catch basins that also needed to be cleaned. · Change Order was included in the original specifications. Yes 0 No []I If Yes, explanation of increase in price: · Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes~ No 0 If Yes, explanation as to why it is not subject for a calling for bids: The additional work was essentially an adjustment in quantities. It is not logical or practical to have another contractor clean the additional pipe or catch basins. Further, it is unlikely that anQther contractor could do the work cheaper since they would have to add mobiliiation costs. · Project architect approves the change order. Yes 0 No 0 If No, explanation of why: N/ A · Change Order is correcting an error or omission in design document. Yes 0 No []I Should a claim under the applicable professional liability policy be made? Yes 0 No []I Explain: