01st Change Order 04/16/2021 Change Order Request
Project: Marathon International Airport Interior Terminal Rehab Change Order#: 1
Address: 9400 Overseas Highway,Marathon,FI,33050 Date Issued: 4/5/2021
Architect Project#:
Owner: Monroe County Board of Commisioners GC Project#: Airport
1100 Simonton Street Contract For: Rehab
Key West,Florida,33040
Architect: Jacobs Contractor: Design Center Inc
3150 SW 38th Avenue,STE 700 6677 Overseas Hwy
Miami,Florida,33146 Marathon,Fl,33050
We Herein request changes in the Contract Sum and Contract Time for proposal Modifications to the Contract Documents described herein(Description Below)
I accordance with Change Directives:
Material ! Labor, ' to Subcontract Materials Labor,, <Subcontract, ,
itemriescript)an„1' �tt,�t;� �`d�rr`} -ra�,,.,,,'jlr, � ,;�),}� ' 'llant5 11Olf I''rri' U'njtCiait)"",',., UnitC4 Unit�Cast t:i� C4str�vu,�,Costr,�i,��y Gc9t t 4f Total,
Ct ty"a j j )
Credit
Adjust CBP Desks for Terrazzo Flooring 7 hr .$80.00 -$560.00 -$560.00
Install CBP Terazzo Flooring 14 sf .$41.20 $0.00 -$576.80 -$576.80
Re-install CBP Desks 7 LS -$80.00 -$560.00 -$560.00
Additional
Purchase CBP Smartcell Pads 1 LS $0.00 $3,738.40 $3,738.40
Labor to Install CBP Smartcell Pads 8 hr $45.00 $360,00 $360.00
subtotal ;, 1,>l, hr a ;r ;�4i', S `'.st ri„ tf< r °i t�....�,P ,,t ) ,1"9a ii��7 '„�.,;, $2,401.60
OH&P(15%) $360.24
Bond&Insurance(2%) $48.03
PM Time for review,comment,pricing&coordinating 1 hr $105,00 $105.00 $105.00
$2,914.87
Monal Requested $2,914.87
Additional Days Requested 0
Attachments:
Requested by:Design Center Inc Accepted By(Signed):
Chris Nolan,E.I./Project Manager 4/5/2021 Accepted By(Print):
04.16.2021 _ ?
4/16/21
4.16.2021
3/16/2021 SmartCells Quotation
SmartCells Quotation SATECH Contact o o o S m a r t(3e I'J's,
Date: Mar 16, 2021 Brendan Downs SATECH Inc.
Expiration Date: May 15, 2021 tel: 3606880496 PO Box 1264, 1769 Bishop Rd
Num: 46899 cell: 3606880496 Chehalis, Washington 98532
Delivery Method: Ship bdowns@smartcellsusa.com tel: (360) 748-8711
fax: (360) 748-8822
Bill To Ship To
Design Center Inc. Design Center Inc.
Chris Nolan Chris Nolan
Marathon, FL 33050 Marathon, FL 33050
US US
tel: 631-680-4223 tel: 631-680-4223
chris@royal-crest.com chris@royal-crest.com
Order Details
Product Description _ _ Price Qty I Total
_......®.._..�_._ _�...__._�_.�....m _...,_.._...®._._�.....��___ .._..Custom Mat .____,�.n...__...
PLTFRM05 Black SmartCells Anti-fatigue Pad, 1/2"thick w/Smooth Top Surface(per sf) $14.83° 138 $2,046.54'
PLNTCON Plant Configuration of Custom Platforms(per sq ft) $1.80 138 $248.40
BRUBRAMP05 Black Rubber Connecting Ramp for 1/2"thick Pads(0 to 1/2"over 2.5",per In ft) $5.65* 52 $293.80
ISCRN05 Inside Comer Ramp for 1/2"thick Pad(ea) $10.00 2 $20.00
OSCRN05 Outside Corner Ramp for 1/2"thick Pad(ea) 1 $10.00 6 $60.00
Subtotal $2,668.74
* A discount has a been applied. Your total order price without Totals
the discount would have been $4,182.97; you have saved Taxable Product Total $2,668.74
$444.57. on-taxable Items Total $0.00
Names of Files Attached:
Design Center Mat.PNG Shipping $869.50
Sales Tax: 7.5 /o $200.16
Total $3,738.40
Comments: ***Mat Fab*** Measurements are INCLUSIVE of Ramp.
Signature Name & Title Date
https://www.smartcellsusa.com/cc/print_as_quotation_old.php?show_discount=on&show_payment_method=&show_terms=&show_sub_areas=&show... 1/1
Change Order Attachment per Monroe County Code Section 2-58(b)
• Change Order was not included in the original contract specifications. Yes ( ) No (X )
If Yes, explanation:
• Change Order was included in the original specifications. Yes ( ) No (X )
If Yes, explanation of increase in price:
• Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes( ) No(X )
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order.Yes(X ) No ( )
If no,explanation of why:
• Change Order is correcting an error or omission in design document. Yes ( ) No (X )
Should a claim under the applicable professional liability policy be made? Yes( ) No (X )
Explain:
This Change order is changing the original intent and scope of work for the Terrazzo Flooring
occurring in the CBP office area