3rd Change Order 01/26/2021 I
CHANGE Distribution To:
j
ORDER Owner Architect Contractor
Field , Other
1
PROJECT: KWIA Maintenance Storage Facility CHANGE ORDER NUMBER: Three(3)
3471 S Roosevelt Blvd INITIATION DATE: 1/26/2021
Key West,FL 33040 GC'S PROJECT NO. 2006
f
CONTRACT FOR: KWIA Maintenance Storage Facility
TO(CONTRACTOR)D.L.PORTER CONSTRUCTORS,INC. CONTRACT DATE: 6/26/2020
6574 Palmer Park Circle
Sarasota,.FL 34238
You are directed to make the following changes in this Contract:
You are directed to make the following changes to the contract:
f
1) Increase in steel quantities,shop,fabrication,and labor, ADD $ 6,104.80
(CORS6)
r
2/11/21
02.16.2021
Total of COfl3 $ 6.104.80
Not valid until signed by both the Owner and Engineer.
Slgnelure of the ConVactor indicates his agreement herewith Including eny adluslmenl in the contract Sum or Contract Time. _
The original Contract Sum was $ 2.375.633.00
Net change by previously authorized Change Orders $ 42,213.73
The Contract Sum prior to this Change Order was $ 2,417,846.73
The Contract Sum will be increased by this Change Order $ 6,104.88
The new Contract Sum including this Change Order will be $ 2,423,961.61
The Contract Time will be Increased by 0 Days
The Date of Substantial Completion as of the date of this Change Order therefore Is 6/30121
ENGINEER CONTRACTOR OWNER
McFarland Johnson,Inc. D.L.Porter Constructors,Inc. Monroe County Board of County Commissioners
ADDRESS ADDRESS ADDRESS
2409 N Roosevelt Blvd,Suite 4 6574 Palmer Park Circle 3491 S Roosevelt Blvd
Kerr at FL 33040 Sarasot�FLI Ke West FL 33040Y BY __ BY
C
Date �- � Date __ Dale ,,,�
o v 00 C. V) t- 000}
O � h ' vNy 0000 � 0
fJ O LL Cli
69 69 69 69 fA Vl (A
Gn
p C '
Pi p H
c '-
Y O
t $ LL.
v) (A
,
�iiQa2O ot� '� IA v►
LL' a •S m o
� o aG G 'N^
U Q lu7 S `'d `4 a�► v► to
3 � W
A $ N 00
J �
O
1�
0
.d
C � •a \° •� N
.YI b Q rX ogCn ...
GL
vLU
oc
tn
Yp
W
G Q •� v 8
.60
a o LTi " a aF d � a
d cn � v) Aa)
m nu i t a au
M6M®�R
TRIDENT �r�,o><
eunolxcsysreel$uc
'. ABUIUIGNpJPfAYINff
Change Order REQUEST for Project: Key West Maintenance Facility 20-046-05
DL Porter Constructors, Inc. Date: 12/28/2020
Attn:Jesse Hill Bond Rate:
6574 Palmer Circle, Sarasota, FL 34238 Davis Bacon Wage: No
mallto:lesset'dldlporter.com
CHANGE ORDER REQUEST.01
Trident Building Systems,LLC proposes to provide material and labor per returned approvals received on
12/17/20.
MATERIALS quantity unit rate TOTAL
Deduct In beam size -3510 Ibs $ 1.00 $ 3,510.00
W 10 x 15 900 Ibs 1.50 $ 1,350.00
W 10 x 19 2280 Ibs 1.50 $ 3,420.00
L 4 x 3-1/2 231 Ibs $ 1.50 $ 346.50
3/4 x 2 aiv A 325 96 ea 1.25 126.00
Shop fabrication 10 hrs $ 45.00 $ 450.00
Drafting 8 hrs $ 65.00 $ 520.00
Subtotal Material: $ 2,696.50
Delivered to: Monroe County Surtax: $ 40.45
Surtax Rate: 1.50% State Sale Tax: $ 161.79
Subtotal Material PlusTax: $ 2,898.74
LABOR 7N20
unit rate8.75 TOTAL
Iron workerJ m/hrs J $ 6 $ 1,375.00
is -
Subtotal Labor: $ 1,375.00
EQUIPMENT uantit unit rate TOTAL
Hand tool/Consumables %of Labor 1 15% $ 206.25 s
Freight In/Out: $ -
Subtotal Equipment:
Total Material,Labor&Equip.: $ 4,479.99
Overhead and Profit: 15% $ 672.00 f
Bond Cost: $ -
Total ADD to CONTRACT $ 5,152.00 I
NOTE:PLEASE ADD THREE(3)ADDITIONAL DAYS TO THE PROJECT SCHEDULE.
By acceptance below,Customer agrees to Issue a change order and payment as per terms and conditions of original contract.
Accepted By: Print Name and Title: Date:
819nalure AuUlodzed 8lgner
S
Submitted By: Gary Bergstrom Trident Building Systems, LLC GB/mic
I
2812 Tallevast Rd,Sarasota,FL 34243 P:941-755-7073 F: 941-755-7073 tridentbuildingsystems.com
CGCO69531
Change Order Attachment per Monroe County Code Section -5 ( )
• Change Order was not Included In the original contract specifications. Yes(X ) No( )
If Yes, explanation:Labor, materials and tools necessary for structural steel to support the
Increase In steel size and quantities based on revised scope of work.
• Change Order was Included In the original specifications. Yes O No (X )
If Yes, explanation of Increase In price:
• Change Order exceeds$50,000 or 5%of contract price(whichever Is greater).Yes()No(X )
If Yes,explanation as to why It Is not subject for a calling for bids:
- Project architect approves the change order. Yes(X) No ( )
If no,explanation of why:
• Change Order is correcting an error or omission In design document. Yes O No(X )
Should a claim under the applicable professional liability policy be made? Yes( )No(X)
Explain: