Loading...
Item O04 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: December 19, 2001 Division: County Attorney Bulk Item: Yes 0 No 0 AGENDA ITEM WORDING: Approval of Reimbursement Contract with KW Resort Utilities Corporation for the preparation of engineering plans needed for the expansion of the Utility's wastewater collection infrastructure Into south Stock Island.. ITEM BACKGROUND: PREVIOUS RELEVANT BOCC ACTION: CONTRACT I AGREEMENT CHANGES: STAFF RECOMMENDAnONS: TOTAL COST: COST TO COUNTY: BUDGETED: Yes 0 No 0 APPROVED BY: County Attorney. OMB/Purchasing 0 RIsk Management 0 DIVISION DIRECTOR APPROVAL: ~.~ T. H DR! K DOCUMENTAnON: Included 0 To Follow 0 Not Required 0 AGENDA ITEM # 1- {)L/ REIMBURSEMENT CONTRACT KW Resort Utilities Corporation THIS CONTRACf is entered into by and between Monroe County, a political subdivision of the State of Florida, whose address is 1100 Simonton Street, Key West, FL 33040, hereafter County, and KW Resort Utilities'. Corp., a Florida corporation, whose address is 6450 College Road, Key West, FL 33040, hereafter UTILITY, for the reimbursement by the County to the UTILITY for the preparation of engineering plans needed for the expansion of the UTILITY's wastewater collection infrastructure into south Stock Island. WHEREAS, the UTILITY desires to expand its wastewater collection infrastructure into south Stpck Island (the "Project"), an area presently served by septic tanks and cess pits, a known source of near shore water pollution; WHEREAS, the County declares such an expansion of the UTILITY's infrastructure to south Stock Island is a public purpose; WHEREAS, the County desires to assist the UTILITY in expanding its wastewater collection infrastructure by reimbursing to the UTILITY its cost in preparing the engineering design and permitting work needed by the expansion; now, therefore, IN CONSIDERATION of the mutual promises and benefits set forth below, the parties agree as follows: 1. The UTIUTY 'agrees to employ the Weiler Engineering Corporation (Weiler), or a similarly professionally qualified PE firm, to perform the engineering services for the expansion of the UTILITY's wastewater collection infrastructure into south Stock Island. A description of the necessary engineering services is set forth in a seven page October 22, 2001 proposal to Mr. William Smith and the UTIUTY from Weiler. A copy of that proposal is attached to this contract as Exhibit A and made a part of the contract. 2. The UTIUTY must enter into a binding contract with Weiler, or a similarly professionally qualified PE firm, by , 2001, for the engineering services described in Exhibit A. The County will reimburse the UTILITY for cost of the engineering services in the following manner: a) All requests for reimbursement must be in a form satisfactory to the County Clerk, must describe the engineering service for which reimbursement is sought, state that the engineering service has been satisfactorily performed, furnish evidence that the engineering service has been paid for by the UTILITY, and state the reimbursement amount. Requests for reimbursement must be submitted to the - - - - Clerk in the first week of each month for work paid for in the prior month. When the Clerk determines the request is satisfactory, the Clerk shall pay the reimbursement to the UTILITY. For reimbursement requests that are satisfactory, payment shall be made within 20 days of receipt. If the Clerk determines that the documentation submitted in the request is insufficient or in some way deficient, he shall return the request to the UTILITY for correction with an explanation of the insufficiency/deficiency . b) The County will reimburse the UTILITY in the followin~ amounts for the following engineering services: . 1) 2) 3) 4) 5) survey design and permitting bidding construction administration & certification reimburs.able expenses including prints aRd application fees $35,000 $94,750 $16,750 $46,800 $ 6,000 As to each of the above services, no payment shall be due until the corresponding product has been delivered, i.e., (1) a sealed survey sufficient for design and permitting of any phase of the Project has been delivered; (2) all required permits for any phase of the designed Project have been issued; (3) a construction contract for any phase of the Project has been bid; (4) construction of the Project is substantially complete; and (5) tbe reimbursable product has been delivered. In no case is the County's obligation to reimburse the UTILITY under this contract to exceed $199,300. Travel expenses may only be reimbursed in the amounts set forth in Sec. 112.061, FS. 3. The parties agree that this contract is for their mutual benefit only and is not intended to create any beneficial interests or rights in third parties. The UTILITY agrees that Weiler (or whomever is employed by the UTILITY for the Exhibit A engineering services) may not seek payment for the engineering services from the County, that the County is under no obligation to pay Weiler (or whomever is employed), and that Weiler (or whomever is employed) may only look to the UTILITY for payment. A sentence similar to the foregoing must appear in the UTILITY'S contract with Weiler or with whomever the UTILITY employs for the engineering services. 4. The Exhibit A engineering services are ultimately being paid for with public funds. Therefore, the UTILITY agrees that all plans, documents, and other work product, however formatted, that are created pursuant to the UTILIlY's 2 contract with Weiler (or whomever employed) are public records under Chap. 119, F.S., and must be made available to members of the public upon request during normal business hours (M-F, holidays excepted, 9 AM - 5 PM). A failure to make such documents available to the public upon request is a material breach of this contract and entitles the County to terminate the contract without liability to the UTILITY and will further obligate the UTILITY to repay to the County any and all reimbursement amounts previously paid. 5. The UTILITY agrees to not add, or attempt to add, the engineering costs reimbursed by the County to its cost basis utilized by t.fie Public Service Commission to calculate a reasonable return on invested capital. The UTILITY further agrees not to use the engineering costs reimbursed by...the County in calculating any impact fees, connection charges, or other like charges imposed on UTILITY's customers. 6. This. contract commences on the signature date of the last party to sign it and continues until the engineering services described in Exhibit A are complete to the satisfaction-'of the UTILITY or until , 200_, whichever occurs first. After , 200_, the County will be under no further obligation, duty or liability to reimburse the UTILITY for any engineering services performed after that date even though the services are described in Exhibit A, unless the parties mutually agree in writing to extend the termination date beyond _ ,200_. If the completion date for the Exhibit A engineering services extends beyond one year from the effective date of this contract, then the County's obligation to reimburse the UTILITY for those services performed after the initial year is contingent on an annual appropriation from the County's Board of County Commissioners. 7. All communications between the parties required by this contract should be in writing and addressed to: Monroe County Administrator 1100 Simonton Street Key West, FL 33040 KW Resort Utilities Corp. 6450 College Road Key West, FL 33040 Reimbursement requests to: Danny L. Kolhage Clerk of the Circuit Court P.O. Box 1980 Key West, FL 33041 8. This contract is governed by the laws of the State of Florida. Venue for any litigation arising under this contract must be in a court of competent jurisdiction in Monroe County, Florida. 9. The UTILITY agrees to have its president (or CEO however denominated in the charter or by-laws) execute the County ethics form attached to this contract as Exhibit B. Exhibit B is made a part of the contract. - - ~ - 3 10. Both parties have carefully read this contract and have had the opportunity to obtain legal advice. Therefore, this contract is not to be construed against, or in favor of, either party on the basis of authorship. 11. This written document is the contract that represents the parties' final mutual understanding. This written contract may only be modified by a written amendment signed by both parties. IN WITNESS WHEREOF, the parties hereto have set their hands and seals on the date(s) written below. : (SEAL) ATTEST: DANNY L. KOLHAGE, CLERK BOARD OF COUNTY COM~ISSIONERS OF MONROE COUNTY, FLORIDA By By Deputy Clerk Mayor/Chairperson Date: ATTEST: KW RESORT UTILITY CORPORATION By By Secreta ry President Date: jdconKWRUtility 4 . . .... "'. a","" j-WWW P.004/0JO F-5T5 October 22, 2001 "::."':, ~'!il'n(t.. Tn EngjIlCCriT1~" 20020 YeuraJU Blvd.. Suire 7-9 Pon ClurloRlC. FL 33954 (941) 764-6447 ph (~l) 764-8915 fu THE WEILER ENGINEERING CORPORATION Mr. W1lliazn Smith, p .A. " }(eyWm.ResonUtilities 1 1 East Adams Sneer., Suite 1400 Chicago, m 60603 . . Rc: Proposal for ~ Services - Key West Resort - Collection System Rxpansion Dear Mr. Smith: Pursuant to your request, the following is a proposal by The Weiler Enginc:ering CoIpOration to pmYidc professiOnal engineering services to expand the Key West Reson Utilities - Collection System. to serve Stock Island. Our general understanding of this projea includes preparation of plans and documentation necessary tQ permit and OOnstruCt a vacuum collection S}'StCm on South Stoclc Island based on the M8ster Plan prepared in 1998 by WEe (copYinc1uded)~ , Pursuant to your request this ProPosal includes: · A PI'climinary estitn.qted COst of consttUCtion to complete the expansion. · An estimRted schedule and fee to complete plans, repons, and docun}~tatioD D~ for rcguJatory approval and COnstnJclioD to C!JtpcJd the collection system utili2:ing a vacuum S)'Stem to sen-icc Stock bland. P~'fmfD~ry CoDStnlcdoD COlt Eltimate We have spoken with representatives from AirVac and they are confident that the 1999 estimate should be relatively accunue today but I feel that the Dumbc:s should be adjUSted --....~.-....JllCIJ EXHIBIT A - - .. - . .W.' ..... ''II Ill;."""'....n, OUKN: , IlRAHltlGAll 31 Z9397165 T-999 P.005/010 F-57~ by approximately 15% for budgetary purposes. It is hard to ldl where we might be able to reduce COsts right now but I am confident that it will be pos.~Dle to lKljust COsts once the design is funher along and we have bad a chance to consider altcrnatM:s. This estimate does not include costs to install semces or to modify existing systemS DOl CUlTeQtJy controlled by KWRU Or for property acquisitions. Based on the information we have at this time. foUowing is a ~iyqinJUY constrI1Ction cost estimate complered in 1999 and adjusted by 15% to 2001 prices to expand the sewage coUection system. The estimate is divided into three phases as foUows: Prelitniaary Estimated OpJnion of Cost Phase I - $2,481,208 . Phase n - Sl,lS1,q'73 Phase ill . $767;269 ........ cop.aoa -1IllQ. ...... 2OlI1 2 . --"'- - ....,.....\fl...~' ~1'.~W({1i5 T-999 p.DDe/DID F-575 l ~ CIIAPJDC Sl:Aiz ---- -- .-...........-.. . . - .. ~... . '-_I ...a...rr .. J .-...........- \ ----. ~. ~ --:-: J..eGENo : .... ---- :1\--0....-.1: ,.::p r.~ -. - -- ~ ICIC&..., ., ~\.~~ . --"1Cl {.on..: _ -...: N X\:I:U ~_ - 30cIII ~ -.....1i4Q ra "-G' . .m _J _J - ~ QEAI W 10001( .......... ~ IUoIs NZII '" rt . ~~-Il'q - ~ ~ .... CaG1.c: ~ -~p...-....,,- - ~ MASTER WASTEWATl;RluN ' FOR KEY WEST RESORT -... .........~._ .. ""W''''IHI~~ ..lll.......O:l T-999 P.DDlID1D F-57n. SCOPE OF ENGINEERING SERVICES The design and pennitting for a phase can be staned once the $JtVey is complete for a panicu1ar phase. We cstimtuc that the survey for the first phaSe can be completed in approximately 30 days after the date of euqJtion and the second and thin! phases in approximately 4S days for a total of75 days. Each phase will take approximl1r"ly 30 to 45 days to complete the design aDd approximately 60 days for the Florida Depamnent ofEnviImWlemal Protection to issue a permit and 30 days should be allowed for County review. Once the design fui'the first phASe is complete and in for pelmining the second phase can begin. Design and Pern.itrl"2 - CoIIecIion System The scope for each phase (t1ased on the pr~imin~lY design) of the collection systems expansion may vary slightly but win genaa11y include: · CooJdination and meetings with client, opaaror, the County, the Florida Departmenr of Enviromncntal Protection and othtt associaIed regulatory agencies. ePre-application meetings with the associated regulatory agencies. · Prepare a topographic swvey of area in which work is to be completed. e Preparation of existing conditions Plan and overall proposed Sewer Utility Plan · Sewer Plan and Profiles and · Details of items not necessarily apparent on the larger scale dmwings and lift station plans and details if Df".t'P.<Iczary · Preparation of repom"1U1d applications necessary for submittal to the Florida Dcpanmcnt ofEn~eatal Protection and Monroe County. e Responding to reguhuory concam during pennit review. Bidding Bidding should begin once the peonit is complete and willlikdy requite 60 days for the tirsl phase and might be reduced for phases two and three. During the Bidding ~ WEC will: Assist clieut to prepare bidding documents, to collect bids from qualified cOntracUmr, respond to questions finm Contractors during bidding, pJep3lc bid tabulations and make rc:comml'J1tJation to client. ~~.~""'2alI 4 . . -.........,h..U. ..,;"",,,,"'- . OKMlI j liAIt 3129397765 T-999 P.008/010 F-575 Construction AdlDinistration and Certification Construction should begin within thiny days of completing the bidding phase and will likely take 12 months to complete the entire project if aU phases proceed wilholU imc:rruption. During the Construction Phase services wiD iucIudc: · Attend p-e..comuuaion meetings. · Review shop drawings and other documppm1on sulmUued by Contraetor.. · Review Change Orders and make~OD$ to Owner. '.. · Review pay requests and make rcctJ.. II I lendations to Owner.. - .- In order 10 assUre compliance and cenifY tlu: S)G1em complete in QCCOTt:/ance with c/uzp1Br 62. F-cC. it will be necsuary 10 p7'Dvids on-nre obsenwion Jw.;"g COPUfnlCIio1l. testing and al Slanup. WEe will]J1'OVkk an esrim4led fee /br observation aJrer a con1rQctor u c},o.ren and a'i:01U~ scAedu1e determined. AddItionally. WECWil/ coordintue i1l.rpeC11onlobserval/on effOm wilh Client and Operator In orcler 10 reduce COS13 for IRis task. Upon completion of construction. WEe wiD: · Make l'CCOJ4wendatioD for Final Payment · Prepare RCCOrd Drawings ba3c:d on information supplied by Contractor) COIUrl!ctorts SUIVeyor and WEe inspecror. · Prepare Certificates of Completion to Regulatory ag01cies. Based on the information aya!lable to WI at this time and the ~ plan inchxJed with this ~ an estimate of me tofal prof~al fees for.u lbrcc phase is as follows: Survey $35,000.00 S94, 750.00 $16,750.00 $46,800.00 $6,000.00 Design aDd PennJttfng Bidding CoDStnldioJl ~tion and Certification RdmhlUSable Expen.es iudlldiug PrinCl &: AppIkatfcm rees Total FeesrorDeslgu, Permitting It Cettiacation $199,300.00 Not iDdadiag collSCnlctioll oIJsenadou ..u..- ~-... GIIoI ~I - - 5 . "--.' .... "" ''''MMl;,)"n. OUI\1\t , tlKMftlliM 31 Z9391165 T-9S9 P. 009/01 0 F-5T5 ' Additional work, ifrequired or requested. will be billed according to the following schedule of fees. Professional Engineer Project Engineer CE.I.T.) Senior Designer CoDSttUction Inspector ,Design TecbDician Cadd TechDician Manual Draftsman Clerical $105.00 per bout $85.00 per hour $75.00 per hour $55.00 per hour $65.00 per hour $55.00 per hour $35.00 per hour $2.5.00 per hour . . Misn>J1aneous RehnblirsabJe Expmsa Blueprints Reproducible Mylar Ovemigbr mail Transponadon to Key west OvemigbrLodging $ 2.00 per sheet m.oo per sheet cost + 'lSIi $2SO.00 per person per trip S2S0.00 per ptI'SOD per night Outside services, if teqUired. will be billed at invoice plus 15% ru.nclling and are QOt included in lump sum fees or estima~. In atJdirioD, UDless otherwise indi~ 1f1js proposaIlcoDUaCl does not i~ude permit applicalion filing fees. reproduction costs. consrruction supervisIon or consuuctioD surveying, aerial photography services. costs incuned as a result of manipulatioD or eocroatohuJent of easements. alleys or riglu-of- ways, off-site improvemenrs other than indicated, environlT1P.l1tal impacts. COS[$ associaled with traffic etJgjrlN'ring or smdies Or COSts incuned as a result of non- compliance DO[ caused by WEC. INVOICES: Progress invoices will be suNnintd to [be client monthly and a fiDal bill will be submitted upon completion of me services. Each invoice is due on PfPMWauoa. and is past due thiny (30) days from Utv9ice dare. CJJenr agrees to pay canying cbarge of one llIld one-ha1fpercem (1112~) per mouth on past due accounts. In ad~ition. Client agrees to pay any aud aU fees Or COStS (mcJudiDg but DOt limited to COUlt costs and reasonable attoniey fee's) required should collection proceedings be ~wy. LIMlTATION OF LIABILITY: The liability of rhe Design Professional and any of the Design Professional's COnq,J~ ro the a.iem. for any ~, damages, claUm, ~~nrJs. j~, losses. costs, and expenses arising om of Or Iesubing from the Design ProfessioPaJ's or Us CODSullamst uegUgem actS, emus, or omissions is liwiled 10 the amount of lbe professional liability insurance tmintained by the Design Professiona1 and available at the thne of ~ of liability. CouQJ1tam CUrreutly mafnr~ins $1,000,000 professionalliabiIity insuraDce and agrees to ~jl1!aio like amDUlU throughout the renn of the project. The diem agrees not to peISOna11y charge any employee of WEe with any liability arising 0lU of the performance of this Agreemem. ~ oopoaia8.... .....llllIl - - - - 6 .;, "I".~.l/Il:l I-999 P.DID/DID F-515 CONTRACT ASSIGNMENT: This PropQsauComracr is for the exclusive use of the cliem and is not a~lIfgDable to or assumable by any third pany wirhout prior Wrinen COnsent of this firm. TERMINATION: Either pany upon 30 days written QOrfce may W1nina~ this agrcf:1lkou1 allUJy bmc. CUem agrees ro pay WEe aU IDODeys due al time of renni~1ion aDd to complcre any work dw may be 11fI(:tsSiU}' to . satisfy tenniDation. . . TERM: This prDposa1 is va1fd for lbiny (30) days from the dare frvJj"ired.. above. WEe resenes me rigJu to renegotiate rile fees set tDrth above if this Proposal is uorapproved within thirty days and. if after execwing Uie CODttact the project is PIll OD hold or delaYed (DOt caused by WEC) f9r DJOre than sixtY (60) days. The Weiler ~eeriDg eorponuioq Or in o1ticers reserve the right 10 SU$pCZJd or terminate wort UDder this agreemem upon failure of the cliem ro pay invoices as due. Please sign and date below and retUrn a copy with the required mainer to us as our authorization to proceed. APPROVED: CLIENT DATE: T1acW"~. [.Wc~ R. Jetr WeiJeT; P.E., Presidaat DATE: ..........,..... - -- ......1 - - ... - 7 I, of the city of according to law on my oath, and under penalty of perjury, depose and say that; 1) I am Proposal for the project described as follows: . the bidder making the 2) The prices In this bid have been arrlve~ at Independently without collusion, consultation, communication or agreement for the .purpose of restricting competition, as to any matter relating to suC;h prices with any other bidder or with any competitor; 3) Unless otherwise required by law, the prices which have been quoted In this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to bid opening, dlrectiy or Indirectly, to any other bidder or to any competitor; and 4) No attempt has been made or will be made by the bidder to Induce any other person, partnership or Corporation to submit, or not to submit, a bid for the purpose of restricting competition; 5) The statements contained in this affidavit are true and correct, and made with full knowledge that Monroe County relies upon the truth of the statements contained In this affidavit In awarding contracts for said project. STATE OF (Slghature of Bidder) COUNTY OF DATE PERSONALLY APPEARED BEFORE ME, the undersigned authority, who, after first being sworn by me, (name of Individual signing) affixed hlslher signature In the space provided above on this day of .19 NOTARY PUBLIC My commission expires: OMB - MCP FORM #1 EXHIBIT B