Loading...
22nd Change Order 05/26/2021 `v BOARD OF COUNTY COMMISSIONERS County of Monroes , Mayer Michelle Coldiron,District 2 The OI"1 r Mayor Pro Tem David Mice,District 4 Craig Cates,District 1 i f Eddie Martinez,District 3 Mike Forster,District 5 Memorandum DATE: 06/02/2021 TO: BOCC cn—Kevin G.Wilson,P.E.,o Monroe County, FROM: Kevin G. Wilson, P.E. Reim Floridacountu,.gov,cwilson- ` L,�"'� '�4�..C.�,w kevin@monroecounty fl.gov,SUS f d 2021.06.0213:26:11 0400 SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order#22 for the Monroe County Library & Adult Education Marathon Branch project. This change order increases the final contract sum by $30,850.42. The substantial completion date is increased to 6/21/2021. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority on Thursday, June 3, 2021. MONROE O / N E G/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 022 Monroe County Library and Adult Education INITIATION DATE: 5/26/2021 Center,Marathon Branch CONTRACT DATE:03121/2019 TO CONTRACTOR: Pedro-Falcon Contractors, Inc. 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: The original(Contract Sum)(Guaranteed Maximum Price) ...........................................$7,016,385.00 Net change by previously authorized Change Orders.................................................. $ 947,693.64 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was .............$7,964,078.64 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased)(unchanged)by this Change Order.............$ 30,850.42 The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order is......$ 7,994,929.06 The Contract Time will be(increased)(decreased)(unchanged)by................................. 65 Days The date of Substantial Completion as of the date of this Change Order is........................ 6/21/2021 Detailed description of change order and justification: During library setup, It was determined that some building features did not provide the required functionality to accommodate library operations. Exterior rear and side doors did not have the appropriate hardware to provide the required functionality of a delayed egress alarm system. To provide adequate security, additional magnetic lock hardware with delayed release capabilities and audible alarm is to be installed and tied to the existing fire alarm system to satisfy fire code. The locking mechanism for the shower room door also requires replacement to accommodate the desired functionality of the shower room. Additionally,it was determined that the urinal screen in the men s bathroom did not provide adequate privacy and will be replaced with a larger privacy wall to match existing bathroom stalls. At this time, this additional work is not expected to impact the ongoing library operations but requires a time extension to accommodate payment Increase Substantial Completion by 65 calendar days to facilitate payment of owner-requested changes. ,Change order is 0.44%of original contract pfice. IN g Nct valid until si red by Owner Architect If a Iia le an Contract r ARCHITECT: R S _R ON i Date � CONTRACTOR: Pedro-Falcon Contractors, Inc. Oate Cary Kn i g h t Digitally signed by Cary Knight Date:2021.06.02 09:15:01-04'00' DIRECTOR PROJECT MANAGEMENT Cary Knight, Director Date P f cn=Kevin G.Wilson P E o Monroe County, FL( kevtn@m n onrroec untyflgov c US COUNTY/ASSISTANT ADMINISTRATOR: 20210604104619 0400 Roman Gastesi Date Kevin Wilson Christine Hurley Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: These owner-requested changes were determined to be required during construction. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5% of contract price(whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: e Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: N/A ul � a � r, cD 40 oo ). 4A yam' �u �u � v v LA Qcrcr r. w1 � ui o00 gbl Y Y Y O O O 4A 33: 3 MGl W v cc Q Q Q ul Q a Q cc L C O W- c v E aEi c Q m v a v v U AL L Y i6 c U C N J `1 O J W C F O N y cc O Z, Q O kA Cd� O W W N M w �Q -Q Z 0 0 0 4 u u u u .1 8 cl o o o o of N . o >o o lo 114 O o ci ry So ai o g g 10 W, -1 R LLI LU CL lu luyW at ;F 0 z z 3 LU z crvas cli 15, -E 72 z z = z z 0 0 0 > 0 0 cl 0. 0 C) Lr; 2 2 2 2� tL 0 ad w 0' o - I A A L A ............................. OF u d cu !Z L x 'It U 0 0 88 81. 88 as 9.8m LLJ uj R V) lot CL LLJ Y q^ t t t 0 LU 0 o c a d nu 12 t 0 a 0 .22 - as 2 12 -E ; -E S' -V t: ti.0 0 0 0 0 0 . w o >2 I U ¢ lj - 2 6 0 0 0 LU z z ZI z 6 6 6 6 6 cii. s. Ln co VF ol z z z -E A Isry 75 .j E 7. L6 0 0 0 OI 91-81-a-91,19,8 LU _6 uj m 9; vr Lf) 9 z z z LLJ z < 12 r 0 o o M 3 IF t5 E 0 0 a oc o u q z 0 z 3: 9 z A Lu o z 0 u PEDRO FALCON CONTRACTORSt INC. y 31160 Avenue C, Big PineKey,FL 660 -4516 605)672-2200-Fax( 05)872-22 9 EC 00241 B CGC 150761 www.pedrofalcon.com Request for Change Order g May 1 Project: Marathon Library PCO Number: 01 Additional Urinal Screen Description: Provide Revised Urinalc e "s Room PFU RevisedUrinal Screen.............................................................................................. 799.47 Labor to Remove&Replace Urinal Screen 16 MHS @ 41.40..................................................................................................... 662°40 PFCOverhead @ 5 ................................................................................................... 73-09 PFCProfit @ 5%.........................................................................................................$73.09 SalesTax..................................................................................................................... 55.96 subtotal PFc......:............... ................................................................... 1,6 . 1 1.1 i Cost................................................................. 1 . 0 Total Requestfor Change OrderAmount:........................................$1.,682.31 Materials Ie (8 to 12 weeks )will exceed contract completion ate. This item shall be consideredminor not affect substantial completion by authoruation ' cane order request. Respectfully Submitted, Ken Bygler Project Manager industrial-Commercial-Inst i i$Residendal-Utility Established 1984 ......_.__ [JEW *10 HO it HI 7-7 -777 t I j _ f ( i I f t I f,� --- -- 146 RESTORATION PLUS CORP ESTIMATE 12150 SW 128 CT SUITE 135 MIAMI,FL 33186 Date Estimate# PHONE#: 305-387-5623 5/24/2021 1464916 Name/Address Ship To PEDRO FALCON CONTRACTORS,INC. MARATHON LIBRARY&ADULT EDUC CENTER 31160 AVENUE C 3490 OVERSEAS HWY BIG PINE KEY,FL 33043-4516 MARATHON,FL 33050 KEN BYGLER 305-731-6978 Item Description Qty Unit Rate Total SCRANTON-TP SOLID PLASTIC HDPE SCREEN, I THICK I EA 799.47 799.471' MATERIAL,48"X 55",CONTINUOUS ST ST BRACKETS,PLASTIC SHOES(BLUEBERRY COLOR),COLOR BLUEBERRY,OP TEXTURE, CLASS B FIRE RATED NOTES: DELIVERED INCLUDED INSTALLATION NOT INCLUDED 4- PRICE INCLUDES DELIVERY TO THE JOBSITE. Subtotal $799.47 Sales Tax (7.0%) $55.96 Total $855.43 ODRO FALCON 1150 AvenueCONTRACTORS ING, r ire L 33043-4516 . �Q ( 05)872m 2200.Fax( 5)872-221 EC 100151 CGC 1507617 www.pedrobicon.com Request for Change Order 24 May 1 Marathon Library PCO Number: 02 Description: 5 Doors with Delayed ................................................................................................................................................ Automated 1 . .o s Three(3)Magnetic Locks and One Power Supply Installed at Ext. Storefront Doors 3-121s,3-142, and 3-103 ...............................................$18,832.00 Barnes Alarm Provide Fire Alarm Tie in at Five (5) Delayed Egress Doors 3-121,3-205,3-121a,3-12,and 3-103s................................................................ 5, 22.60 SubtotalSubcontractor........................................................... ...........$24,254.6o FC Management Fee @ 5%..................................................................................$1,212.73 Subtotal co ct ...................................................................$259467-33 PFC Wire One Power Supply..........................................................................................$700.00 Patch&Repair Walls/Ceiling 40 @41.40...........................................................$1,656.00 SubtotalPFC.......................................................................................................... 2,356.00 Overhead@ 5%.........................................................................................................$117.80 Profit@ 5%................................................................................................................ 117.80 Subtotal ......................................... ........................... ....... .. 4� 47� o S T T L............................................................................... ... 1 2 4`� $ :. Industrial®Commercial-Institutional-ResidentialLffifity Established 1984 I.I%ofTotal Cost...............................................................$334-456, $308,65 Total Requestfor Change Order Amount:..................................... a�-- -; Additional ' this ' procurement is very-inconsistent. We have been told that materials are available me. Current Material understanding that the County would like this work completed by 1 June .2o2l.PFC Will make every reasonable effort to make this completion date. Respectfully Submitted, a Ken yler Project Manager "p 00 d O O N O N O O M y y Lr) O Ol c* 00 +TS± •� A/)- (3 ill� 00 00 O O O O d O O O O � N r1 rn M O 3t 00 m z V y M 0n � c 4D C. u d � m Q 3 IA 4J 3 LM I-� 4O v i•i m on c t 0 ® N 3 C '3 41 o m a) m Y u c m ® c "' J m 4 c c, 00 0 4 v E c a C L- a, 0 on 00 s Z u m U p v m 12 CL 'p ® N CL +, C of f0 •w'� c t m a) 3 V1 N i 0- 11 _ L o E N p tco U +�_+ 0 tio M A 0 u c E .3 c f0 \ W `— m C C (Aa L m M a)0 co U ai L ii c ® ++ Lj C +, } 00 a 0 j E 3 a U Ln Ln O d 3 7 ai N :3 �n L ® O Q d 0 U 3 0 C m X L D O U L C c c L to L ai 0 p 0n +(+ 0 � C c 0 t ; > m m -0 p 0 p 2 3 Z I U B- ARN S Quotation 5800 Overseas Highway, Suite MARATHON, FL 33050 Quote um Relays FA 2021 FalconPedro I ri I Contractors Quoteate 31160 Avenue C May 24, 2021 Big Pine Key, FL 33043-4516 Paqe 1 Customer ID Good Thru Payment Terms Sales Rep pedrofOl 6/23/21 Net 15 Days finesOl Quantity Description Unit Price Extension This Quote is to install Door Release Relays for Mag-Lock release upon Fire Alarm activation for the Marathon Library 3490 Overseas Hwy Marathon, Fla 33050 5.00 Relay Control Module 102.00 510.00 1.00 Cable, Connectors, Boxes and Hardware 500.00 500.00 1.00 Preferred Contractor Discount on Materials 202.00 ' -202.00 40.00 Labor to Install, Program and Test 142.00 5,680.00 8.00 preferred Customer Discount on Labor 142.00 -1,136.00 Note 1: BAS will come off nearest SLC device to install the addressable relays. Exact locations TBD. Note 2: Others responsible for connections to access control equipment to release doors. Note 3: If any additional work is needed another quote will be generated. Subtota 5,352.00 Voice: 1-305-743-7334 Fax: 1-305-728-0580 Sales Ta 60.60 Freigh 10.00 State Certified EF2000042 Tota 5,422.60 -7 PEDRO FALCON ff r, CONTRACTORS, 31160 Avenue C, Big Pine Key,FL 33 516 (305) 72-2200-Fax(30 )672-2 10 EC 13003416!CGC 1507617 Request for Cl Be Order oiJune2021 Project: Marathon Library PCO Number: 043 Change Lock at Shower Room 3-261 Description: Replace Lock at ShowerRoom t - Lock ................................................................................................................................................ PFC RevisedLock.............................................................................................................$518.87 Labor to Remove Replace Lock 4 S41.40............................................................................................................ 165.60 PFCOverhead @ 5 ................................................................................................... 34.22 PFCProfit @ 5%......................................................................................................... 34.22 SalesTax..................................................................................................................... 38.91 Subtotal PFU..........................................................................................$ 1. 2 &PBond 1.1 of Total cost...................................................................$ .71 Total Requestfor Change Ottler Amount:.....:.................................... 00.5 Materials le (8 to 12 weeksestimated)will exceedcontract completion te. This item shall be considered it and not qffect substantial completion t ti ofthis change order request. Respectfully Submitted, n Bygler Project Manager Industrial-Commercial-Ins w t test-U61hy Established 1984 Project: 2019337FSC - Marathon Library &Adult Education Center Contemplated Change Order# 13 AHC-13 New privacy with indicator for door 3-261 -1 Single Door#3-261 Corridor 3-207 from Lock/Shower 3-261 180 LHR 1 Single Door#3-261 Corridor 3-207 from Lock/Shower 3-261 180 LEER 1 Mortise Lockset L9440 06A L283-722 LHR 626 SC Section Totals Finish Hardware 518.87 Pre-Tax Total 518.87 Taxes F1,000-Fl,Florida State Tax 31.13 FL044-FLMONCTY Monroe County Tax - Tax Total 31.13 Grand Total 550.00 May 28,2021 4:09pm Page 1 of 1 ' rn'a a �s.rd„�E st „• . �,,,s Choose from these variations of thumbturn locks that help you meet the demands of specialized projects. t' y„ �i}li Ifi } fir. `I j 4 Yl �l. £;.�e� t v 11 A �4 �<<'� %� , Standard turn ADAturn Coin turn Emergency button Ligature resistant turn Cylinder turn 09-509 09-509 x L583-363 L283-124 K510-330 09-029 09-90x Available with all For lock functions For lock functions For L463 and L9463 j thumbturn-function L L9044 and L9444 L9040 and L9440 classroom function Series locks except with rose trim. deadlocks L9463 and L463 t� N escutcheon Indicators The 180 degree visibility indicator offers1 � ,� unparalleled visibility and flexibility.The unique features of the indicator make it ideally suited for oa classroom security applications as well as traditional occupied/vacant applications. 2"x'/z"display for easy viewing atadistance ,l��ir`sr�{s�i�s{�7}tEl� }4ffZst`ln "'` " sr �'�r {s� �tl r ,r }ass+��3>s 1800 window for visibility at any angler= Sectional Indicatorsst I High-mount placement for quick assessment `s High contrast colors for ease of reading � xr; Available for over 30 functions,inside or outside of door(see Functions section for availability) Cylinder Thumbturn Cointurn Emergency key iryF Retrofit kit allows indicator upgrades to already t installed L Series mortise locks �1ki\% Indicator text available in English or French �,} In NSB'G'ItY1 L1$3.70 o&3-7E2 Ua3-713 1'283 71. rs Outside trim L2B3721 L2133-T22 L2(13-723 L283-724 W e L ;,,t y.F, c , '9 4 Hotel occupancy Indicator 09-611 For lock function L9486P,used with A or B roses on section trim.Three available messages:"OCCUPIED", # y "DO NOT DISTURB"or"LOCKED". 17 Schlage L Series L e,,e m((,,i h a, C" Schlage ANSI Schlage ANSI Schlage ANSI Schlage ANSI Il", L 9 0 M1 k.9040 F"'22 -',,3,4 LA,",�*i,,�0 4,iD, LV90 art 4, Passage latch Exit lock Bath/bedroom privacy lock Privacy with coin Latchbolt retracted by No outside trim Latchbolt retracted by lever/ turn outside Lever/knob from either side Inside[ever always free for knob from either side unless Latchbolt retracted by[ever/ at all times immediate egress outside(ever is locked by knob from either side unless Inside lever always free for inside thumbturn outside lever is tacked by immediate egress Actuating Inside lever or inside thumbturn or outside closing door unlocks coin turn outside lever Actuating inside lever, ........... To unlock from outside closing door,or rotating remove emergency button, outside coin turn unlocks insert emergency thumbturn outside lever in access hole and rotate Inside lever always free for immediate egress .................. 'Schiage ANSI Schlage ANSI L944C; F",1 4 4 4 'L'Alg 4 4 I Privacy with deadbolt Privacy with deadbolt and •Latchbolt retracted by lever/ coin turn outside knob from either side Latchbolt retracted by lever/ Deadboit actuated by inside knob from either side thumbturn •Deadbolt actuated by inside thumbturn or outside coin turn Throwing deadbolt locks outside knob/lever •Throwing deadbolt locks Inside lever retracts both outside knob/lever deadbolt and latchbolt and Inside lever retracts both unlocks outside lever deadbolt and latchboit and To unlock from outside unlocks outside lever remove emergency button. Rotating coin turn retracts insert emergency thumbturn deadbolt and unlocks outside in access hole and rotate lever Inside lever always free for Inside lever always free for immediate egress Immediate egress II 1 II 23 Schlage L Series