2021-04 Customs Terminal Annex Repairs 1. Kevin Madok, CPA
' Clerk of the Circuit Court& Comptroller— Monroe County, Florida
DATE: June 23, 2021
TO: Beth Leto, Business Manager
Airports
FROM: Sally NI. Abrams, D.C.
SUBJECT: June 16th BOCC Meeting
Attached, for your is item I6, McFarland Johnson Task Order No. 2021-04 in the
amount of$117,118.00 for design services phase 3B for the Customs Facility - Terminal Annex
Repairs,Renovation& Equipment project at the Key West International Airport; to be paid 50%
from FDOT Grant AQH10 and 50% Airport Operating Fund 404.
Should you have any questions, please feel free to contact me at ext. 3550. Thank you.
cc: County Attorney
Finance
File
KEY WEST MARATHON PLANTATION KEY PK/ROTH BUILDING
500 Whitehead Street 3117 Overseas Highway 88820 Overseas Highway 50 High Point Road
Key West,Florida 33040 Marathon,Florida 33050 Plantation Key,Florida 33070 Plantation Key,Florida 33070
305-294-4641 305-289-6027 305-852-7145 305-852-7145
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
TASK ORDER FORM
Effective Date Upon Execution Task Order No. 2021-04
404-630169-530490-
Client Project No. GADKI29-5 3 04 1 0 Engineer Project No. 18221.18
This Task Order is entered into on the effective date noted above pursuant to the"Master Agreement for
Professional Services" between Monroe County, Florida ( Client") and McFarland Johnson Inc.
("Consultant"),dated February 15,2017("Agreement"). The Agreement is incorporated herein and forms
an integral part of this Task Order.
Services Authorized: Design Phase Services Phase 3B for Customs Facility — Terminal Annex
Repairs,Renovation& Equipment at Key West International Airport
Client authorizes Consultant to perform the Eneineerine.Services described in Exhibit A attached hereto
and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of
six(6)page(s).
Pricing
N/A Time and Expense per Agreement and Appendix B to the Agreement.
X Firm Fixed Price ofS117,118
N/A Other(Describe): -'
Schedule
N
Services may commence on Execution N -
- i�
Services will cease by 45 days -
Other r
,a
r } ,_
(SEAL) BOARD OF COUNTY COMMISSIONERS
ATTEST ICE IN MADOK,CLERK OF MONROE COUNTY,FLORIDA
.I SDI
� ,
,e.aan -As De aft Clerk By
�b r NRDE ATTORNEY �6Lddd
FOIM Cr Chairman
drkk AMIRNEY
CONSULTANT:
pate 5/28/21 MCFARI.ANDJOBNNONINc.
By 7k.�
Witness ((}4.AKD.J I✓1. b' IVr'u.Ysh,j James M.Festn, P.E.,C.E.O.
Title ri iii , jt ',tzy f
File.
Page I of I
/) McFarland Johnson
EXHIBIT A
PROPOSED SCOPE OF SERVICES
PHASE 3B
DESIGN PHASE SERVICES
KEY WEST INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION FACILITIES
May 2021
PROJECT BACKGROUND
As Phase 3A of the Key West International Airport nears completion, Phase 3B become the focus
as the airport continues its expansion of the terminal and FIS. Phase 3A has temporarily relocated
Primary and Secondary screening to the west side of the annex terminal. Figure 3A represents
Phase 3A scope from column line"A"to"D". It is anticipated that these spaces will be completed
in August 2021 and will include 60% new roof, HVAC replacement roof top units, new electrical
(power, data, lighting), plumbing (restrooms, sinks, drinking fountains), interior walls, doors,
windows, ceilings, finishes, millwork, x-ray screening equipment, furniture, fixtures, equipment
(FFE), security, IT, and access control systems built to CBP Airport Technical Design Standards.
Wth a budget of$1.5 million; EYW would like to continue with Phase 3B,which would incorporate
the new primary and secondary processing. A basic floor plan representing the preliminary design
is shown in Figure 36.
Figure 1: Phase 3A CBP Layout
i
o
�— T .4 .,,<�,i�
Uzi m
° El SiltialCIEI
,YIB H7� "ns ��.,.- u:� �,�.csS°saN‘ r�
n4111111r
Page 1 of 4
Figure 2: Preliminary Phase 38 CBP Layout
1 I 1 -
ei
& t z i '.m. r ',�
•� � • fir. i.
t fa!
7■I�t•1 i o
1 •
•
: � ... F 1 r { k; ♦ wt
■ �' `•a
a
The Phase 3B scope will include finalizing design for the eastern portion of the building from
column D to column G. A new VAV rooftop unit will be incorporated into the design and ceiling
mounted mini-split units to serve the baggage pick-up area. The remaining roof area will be
replaced as part of Phase 3B.
McFarland Johnson, Inc, (MJ) will use the current CBP Airport Technical Design Standards and
will coordinate the Phase 3B design with CBP to ensure a harmonized approach. The power
distribution design shall include circuiting for new equipment, lighting, and receptacles. Most of
the major electrical distribution design was completed in Phase 3A. Lighting system design shall
include photometric calculations, new fixtures selected to match Phase 3A design, and integrating
controls with the existing lighting control system.
As part of the Phase 3C scope, the primary processing area constructed in Phase 3A will be
demolished to convert this space to the new public restrooms, and the temporary public restrooms
located in secondary will become secure hold-rooms with institutional grade equipment. Phase
3C will also include the new baggage handling system and the northern"bump-out"of the building.
This design/configuration of Phase 3C will be completed under a separate scope of work later
this year and will need to be coordinated with the Terminal Expansion project.
MJ's design services will include architecture: interior design: and mechanical, electrical,
plumbing, and fire protection engineering and cost estimating for the design and bidding for the
implementation of the CBP facilities. This proposal assumes that furniture and equipment will be
included in this project.
The phasing and subsequent duration of each construction period as well as an operational plan
Page 2 of 4
will be addressed during each phase of the project. This scope of work does not currently include
bidding, permitting, or construction phase services. These will be addressed in a separate scope
of services.
Description of Base Design Services:
Base design services for the project include:
• As Built Conditions Verification of Phase 3A (detailed verification of structural,
mechanical, electrical, fire protection, and plumbing facilities)
o Review Site Conditions
o Team Coordination
o Revision of Layout as Required by CBP
o Development of Phasing and Operational Plan
o Revision/development of Base Drawings per the Field Survey
• Design Development(60%)
o Airport Review Coordination Meeting
o Design Development Drawing Preparation
o Phasing and Operational Plan Review
o Specification Preparation
o Print and Issue Redline Review Sets
o Quality Control
• Construction Documents (95%)
o Airport Review Coordination Meeting
o Preparation of Construction Document Package
o Phasing and Operational Plan Review
o Preparation of Final Specifications
o Printing and Issuing of Redline Review Sets
o Quality Control
o CBP/Airport Review Meeting
• Construction Documents(100%)
o Consultant Coordination
o Preparation of Construction Document Package
o Preparation of Final Specifications
o Printing and Distribution of Documents
Deliverables
Progress set deliverables will be printed and distributed for review at the end of:
• Construction Documents Phase 38 (95%)
• adding Documents Phase 3B (100%)
Meetings
One (1) on-site meeting is included in this proposal:
1. 95% milestone review meeting with Airport and CBP
Page 3 of 4
SCHEDULE
Milestone Duration Ending
Issue Notice to Proceed for Design 17 May 2021
Existing Conditions Documentation 7 Days 24 May 2021
Re-validation of CBP Layout 2 Days 26 May 2021
Design Development Phase 60% 14 Days 9 June 2021
Construction Documentation Phase 95% 14 Days 23 June 2021
Bid Documents (100%) 7 Days 30 June 2021
Page 4 of 4
Key West International Airport-CBP Phase 3B Design Phase Services
Monroe County
May 2021
FEE SUMMARY �I McFarland Johnson
DESIGN/PLANNING
SERVICES
DIRECT TECHNICAL LABOR 5117,118.24
TOTAL FEE ESTIMATE $117,118.24
TOTAL LUMP SUM FEE FOR ALL SERVICES I S117,118 I
i8.1 MCFAJOH-01 KLISHM
A O, DATE IMWOMYYY)
IR CERTIFICATE OF LIABILITY INSURANCE 12/23/2020
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER,THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder In lieu of such endorsement(s).
PRODUCER 'UPIC'CT Michael Burns
insurance Office of America PHONE WC.sues*(607)754-0329 45230 I PWMa.NH:(607)754-9797
S Lewis Street pg`MIchael Burns ioausa.eom
Binghamton,NY 13901 .er_ _LAFFORPaDCOVRPADE I SAKI/
INSURER National Fire Insurance Co of Hartford 20478
INSURED ..INSURERS Continental Insurance Company 135289 -
McFarland Johnson,Inc. Raman Valley Forge Insurance Company_ 20508
49 Court Street Suite240 INSURER O: - --
- --- — _ ---
Binghamton,NY13901 INSURERE
I INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
INa0. POLICY EFT POUCY FA
Lm TYPE OF INSURANCE ROD aNUBYU POLICY NUMBER IMMNDMYYI IMWOMTYYI LIMITS 1,000,BDD
A X COMMERCIAL OENEML NABNTY EACH OCCURRENCE
oANADETOREmEo 100,000
CLAMS-MADE I XIOCCUR X X 0056803227 111R021 1/1/2022 PREMISESIERonalnGa) 15,000
MED EaP(Any ono pawn)
Approved Risk Managem rat 1,000,000
;PERSONAL&ADV INJURY ,
44s2 L. 2,000,000
pEMLA06NEWTELWnP I XEI PERLot GENERALAGROMP/OP
POLICY X X PRODUCTS•COMP/OP AGO 2,000,000
• �� Lot 1-zazozl
..�... COMBINED
OMBI MmosINGLE LIMIT 1,000,000
B AIn°MOWLELuam'a
I X ANY AUTO X i X 8055803213 1/1/2021 1/1/2022 BOOBY Kanoinwpwsnl. .
I OWNEDI AUTOS ONLY I ANEEWPLE° BODILY INJURY.(per w
tlMM
X P0. ONLY X I A8
T0ONV l PQ1p10M1°E
10,000,000
B X UMBRELLA LIAR ' X OCCUR EACH OCCURRENCE
EXCESS LIAR CLAW-MADE X X '8056803244 1Mt2021 11112022 AGGREGATE 10.000.000
DEO I^ I RETENTIONS 10,000
X 1 PER OTN
C ANDWORKERSIWIOYEPENMMIN STATUTE ER 1,000,000
AND EMPLDrEp•LIA9am YIN X WC858003230 1/1/2021 111I2022 EL.EACH ACCIDENT
ANT PRORETOBPFRINEETXECUTAT I N 1 NJA 1,000,000
CFFICERMEMBHI EXCLUDED? El.O5FP5E-BA EMELovEE
X yywExs4PNMutn NN.Jesuit*underEI.INSFA$E-9otl:v LIMIT 1,000,000
DESCRI Of OPERATIONS Gabes
A Val Pprs B Records •I3056803227 1/1/2021 inno22 Blanket Limit 1,000,000
II
Pro°jxrtIM Of Otl IATIoIIS LOCKIIONS/t Key VEHICLES
(ACORD
Neperb. nl Romes Schedule.mare.aINa+d N more span Is required)
l
rk
Monroe County BOCCand all other parties as required by written contract ere additional insured on a primary and noncontributory basis including completed
operations in regard to general liability per endorsement numbers CNA/4858NY,CNA75079XX,CNA749E7XX,In regard to auto per endorsement number
and all
r
liability per endorsement nu711327.A Waiver of mbation berGRAMMI58NYes In,Inor of the certificate holder,regard to auto per endorsement,number Ae04441013,nies es guired regardo wowrirkers compensatn contract hi�ionrd le n per general
endorsement WC 00 0313.The umbrella policy is following form of the underlyIng policies per endorsement MCNA76804XX.
ERTIF CATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES SE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF. NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
Monroe County BOCC AUTHORIZED REPRESENTATIVE
InsPO Box 100085e 0 -FXca / n ( c lak Likal
&KAI—