Agenda Item Number: C.20
Agenda Item Summary #3334
BULK ITEM: Yes DEPARTMENT: Project Management
TIME APPROXIMATE: STAFF CONTACT: Matthew Howard (305) 292-4337
N/A
AGENDA ITEM WORDING: Approval of a First Amendment to the Task Order with T.Y. Lin
International (TY Lin) for Professional Design and Permitting Services for the Stock Island
Detention Center Main Electrical Upgrades Project This Amendment removes the 104-day time
constraint because the work extended beyond the original end date. There are no additional tasks or
costs added.
ITEM BACKGROUND: The electrical system at the Monroe County Detention Center is nearly 30
years old. Due to multiple electrical outages, an emergency study was performed by Schneider
Electric to evaluate the conditions of the building. A report was completed in January 2019 and
provided to the County which outlined corrective actions needed in order to ensure the safety of
inmates, employees and visitors. Due to unforeseen issues including the Covid-19 pandemic and the
emergency electrical fire at the jail, Monroe County and TY Lin were not able to meet the expected
milestones outlined in the Task Order. This Amendment to the Task Order will remove the 104-day
time constraint.
PREVIOUS RELEVANT BOCC ACTION:
1/17/18 —BOCC approved an Agreement for On Call Professional Engineering Services with TY
Lin.
8/21/19—BOCC approved a Task Order for Monroe County Detention Center Upgrades
CONTRACT/AGREEMENT CHANGES:
Removing time constraint from original Task Order
STAFF RECOMMENDATION: Approval of Amendment
DOCUMENTATION:
TY Lin TO Amendment 41 JXD TYLI
Task Order TY Lin EXEC 8.21.19
Packet Pg.695
C.20
FINANCIAL IMPACT:
Effective Date: 8/21/19
Expiration Date: TBD
Total Dollar Value of Contract: $90,500.00
Total Cost to County: $90,500.00
Current Year Portion: $7,850.00
Budgeted: yes
Source of Funds: 20505
CPI: no
Indirect Costs: n/a
Estimated Ongoing Costs Not Included in above dollar amounts: n/a
Revenue Producing: no If yes, amount:
Grant: no
County Match:
Insurance Required: yes
Additional Details:
08/21/19 101-20505 - CORRECTION FACILITIES $90,500.00
REVIEWED BY:
Dan Bensley Completed 05/28/2021 4:43 PM
Cary Knight Completed 06/01/2021 12:32 PM
Kevin Wilson Completed 06/01/2021 12:33 PM
Joseph DiNovo Completed 06/01/2021 2:46 PM
Purchasing Completed 06/01/2021 2:49 PM
Budget and Finance Completed 06/01/2021 4:57 PM
Maria Slavik Completed 06/01/2021 5:20 PM
Liz Yongue Completed 06/01/2021 5:27 PM
Board of County Commissioners Pending 06/16/2021 9:00 AM
Packet Pg.696
C.20.a
FIRST AMENDMENT TO TASK ORDER
FOR DESIGN AND PERMITTING SERVICES
BETWEEN MONROE COUNTY AND TY LIN INTERNATIONAL
FOR STOCK ISLAND DETENTION CENTER MAIN ELECTRICAL UPGRADES
In accordance with the Consultant Agreement for On Call Professional Engineering Services,
made and entered into on January 17, 2018 between MONROE COUNTY, ("County") and TY
LIN INTERNATIONAL, ("Consultant"),where professional services are allowed if construction
costs do not exceed$4,000,000.00, or for study activity if the fee for professional services for each .2
individual study under the contract does not exceed $500,000.00 ("Agreement"), as provided in
Subsection 287.055(2)(g), Florida Statutes, as amended by Section 2, Chapter 2020-127, Laws of
Florida, pursuant to which Paragraph 2 of the Recitals of the Agreement is hereby modified, the
parties enter into this First Amendment to the Task Order with an effective date of August 21,
2019 ("Task Order"). 0
All terms and conditions of the Agreement apply to this First Amendment, unless this First
Amendment amends, adds, or modifies a provision or an Article of the Agreement of which will
be specifically referenced in this First Amendment and the amendment, addition, or modification
shall be precisely described.
This First Amendment to the Task Order is effective on the 16th day of June 2021. °®
0
WHEREAS, the parties entered into a Task Order on August 21, 2019 whereby the Consultant a
would provide Design Services/Studies and Post Design Services for the Stock Island Detention
Center Main Electrical Upgrades project as specified in Attachment A of the original Task Order; 0
and et
WHEREAS, the original Task Order stated that services were to be completed 104 days after
issuance of the Notice to Proceed; and
WHEREAS, due to unforeseen circumstances, the services to be provided will extend beyond the
initial time estimate.
m
NOW, THEREFORE, in consideration of the mutual promises and covenants set forth below, the
parties agree as follows:
E
1. Task Order for the Stock Island Detention Center Main Electrical Upgrades shall be
amended to remove the 104-day time constraint.
All other Terms and Conditions of the Task Order and Agreement remain unchanged and in full
force and effect.
0
[Remainder of page intentionally blank]
Page 1 of 2
Packet Pg.697
C.20.a
IN WITNESS WHEREOF, each parry caused this First Amendment to the Task Order to be
executed by its duly authorized representative.
(SEAL) BOARD OF COUNTY COMMISSIONERS
Attest: KEVIN MADOK, Clerk OF MONROE COUNTY, FLORIDA
By: By:
As Deputy Clerk Mayor/Chairman
MONROE COUNTY ATTORNEYS[ FbCC
Date: APPROVED AS TO FORM �
STANT QOUIIV 1Y ATTORNEY
DATE: 5_?I_?m i
WITNESS TO CONSULTANT: CONSULTANT: �-
(Seal) TY LIN INTERNATIONAL 0
Attest:
Ahmad Digitally signed byAhmad
Digitally signed by David H Russell Hammoud
DN:CN=David H Russell, Date:2021.05.27 16:25:54
OU=A01410C0000017509E3FCA600002F3E,O=TY LININTE H a m m o u d
By: Date R2021..05.27L162241-04'00' By. 0400
C�
Title: Project Manager Title: Vice President W
05/27/202 05/27/202
Date: Date:
x
Page 2 of 2
Packet Pg.698
TASK ORDER FOR PROFESSIONAL DESIGN AND PERMITTING SERVICES
BETWEEN MONROE COUNTY AND TY LIN INTERNATIONAL
FOR STOCK ISLAND DETENTION CENTER MAIN ELECTRICAL UPGRADES
: y
In accordance with the Agreement for On Call Professional Engineering Services made and
entered on the 17th day of January 2018 between Monroe County hereinafter referred to as the
"County" and TY Lin International hereinafter referred to as "Consultant", where professional
services are allowed if construction costs do not exceed Two Million and 00/100 Dollars 2
($2,000,000.00), or for study activity if the fee for professional services for each individual study
under the contract does not exceed Two Hundred Thousand and 00/100 Dollars ($200,000.00),
hereinafter referred to as "Agreement".
L)
All terms and conditions of the Agreement apply to this Task Order, unless this Task Order
amends, adds, or modifies a provision or an Article of the Agreement of which will be specifically
referenced in this Task Order and the amendment, addition, or modification shall be precisely 0)
described. These additions apply only to the project referenced in this Task Order.
le
This Task Order is effective on August 21, 2019. Design of the work is anticipated to be
completed within 104 days of issuance of the Notice to Proceed.
NOW, THEREFORE, in consideration of the mutual promises and covenants set forth below, the
parties agree as follows: c
In accordance with Article II Scope of Basic Services, Paragraph 2.1,the Scope of this Task
Order is as follows:
The scope of services will include Design Services/Additional Services and Post Design Services
for the Stock Island Detention Center Main Electrical Upgrades project, which are specified in the
Consultant's proposal dated June 19, 2019 that is made a part of this Task Order and attached
hereto as Attachment A.
T_
In accordance with Article VII, Paragraph 7.1 Payment Sum, the Payment Sum of this Taskco
n!
Order is as follows:
c,
LU
The Consultant shall be paid monthly for work performed and deliverables as follows:
i
Design Services/Additional Studies $78,500.00
Post Design Services $12,000.00
Total (Lump Sum) $90,500.00
Article IX Miscellaneous, Paragraph 9.29 Federal Contract Requirements do not apply to
this project.
All other Terms and Conditions of the Task Order shall remain in accordance with the Agreement
and as amended.
Page 1 of 5
Packet Pg.699
IN WITNESS WHEREOF,each party caused the Task Order to be executed by its duly authorized
representative.
CONSULTANT .
Consultant Witness: TY LIN INTERN I AL
{ Signature: Sign ure: -
{
Name: ;�i�VO A sAR �/L Name. V : �
Title: SINiO/L /166�N(t Title: \-hC '11 j
�- E
Date: D 7-Z 10 A e/_9 Date:
s
L) BOARD OF COUNTY COMMISSIONERS
+� t: Kevin Madok, Clerk OF MONROE COUNTY, FLORIDA
e�h N
~oH Cou�
By:. By: a44-4,"._5 E
Deputy Clerk ayor/Chairm
Date: tip, 1 Date: 21, Z.19
MONROE COUNTY co
ry
APPR VED ,
As ro RM� � "
ASS►ST'A T CS9U l3F p�'
Dot®: .
AT-r 0RNEy
� v/ /�� i
- o �
o
r�- x�• r n
�•rn � e®
M-V .. ..
i
di
do U
C.->
`rl
Page 2 of 5
Packet Pg.700
ATTACHMENT A ' y
2
c)
0
co
cv
u
UJ
i
i
Page 3 of 5
Packet Pg.701
TYLININTERNATIONAL
engineers I planners I scientists
Monroe County June 19, 2019
5501 College Road
Key West, FL 33407
Attention: Mr. Dan Bensley
Subject:Stock Island Main Detention Center - Main Electrical Panel Upgrades .2
Dear Mr. Bensley:
Thank you for providing TYLIN International (TYLI) an additional opportunity to be of service to Monroe
County at the Stock Island Main Detention Center for the main electrical service panel upgrades. After c)
reviewing the provided electrical study by Schneider Electric and our initial investigation, TYLI is pleased
to submit a lump sum proposal for the Design Services of$78,500 with an additional $12,000 for Post-
Design Services, as outlined to address the issues listed in the Schneider Electric study.
• Design Services/Additional Studies($78,500): y
r o Arc Flash - Panel housing modifications for future infrared studies
j o Short Circuit — Replacement of obsolete and damaged circuit breakers in main electrical
switchboard
o Circuit Breaker Settings—Provide new settings based on Schneider Electric's study
i o Inrush Issues—Provide upgrades to resolve issues
o Emergency System — Provide upgrades to enhance system coordination with between non-
emergency and emergency modes
o Emergency Generation- Provide quick connect branch and connection methods
o Damaged Surge Suppression Devices — Provide replacement details, review/design surge
suppression system,as needed.
o NEC Issues/Damaged Equipment—Update riser diagrams based on the in-house modifications W
to the panel(s).
o Additional Studies
• Ground Fault Protection of Equipment (GFPE) — Determine recommendations for future Co
design modifications with budget cost estimate
■ Generator Paralleling Gear- Evaluation of new generator paralleling gear with budget cost
estimate
• Post Design Services ($12,000)
o Respond to RFIs �I
o Review submittals and shop drawings
Deliverables
• 60% design submittal — Two hard copy sets of full size plans and corresponding preliminary
specifications,along with preliminary additional study reports,and corresponding electronic PDF files.
• 100%design submittal—Two hard copy sets of full size plans, corresponding specifications,applicable
calculations and additional study reports, and corresponding electronic PDF files.
• Final document acceptance - Two hard copy signed/sealed sets of full size plans, corresponding
specifications, applicable calculations, additional study reports and electronic files, in AutoCAD and
PDF formats.
Schedule:
The design work for these services is anticipated to be 60 calendar days from the issuance of the Notice
to Proceed, with an additional 30 calendar days after receipt of the 60% review comments for the 100%
201 Alhambra Circle,Suite 900 1 Coral Gables,Florida 33134 1 T 305.567.1888 1 F 305.567.1771 1 www.tylin.com Page 4 of 5
Packet Pg.702
C.20.b
Page 2
June 19,2019
Stock Island Main Detention Center - Main Electrical Panel Upgrades
submittal, and 14 calendar days after receipt of the 100% review comments for the final document
i
submittal.
Proposed Payment Schedule:
• 60%-at submission of 60%documents.
• 30%-at submission and acceptance of final documents
• 10% -at acceptance of final documents
Exclusions:
CJ
1) Pre-construction activities, such as procurement assistance and re-designs due to bidder RFI's.
2) Post design services during construction are limited to one on-site meeting, responses to RFIs,
review of submittals and review of shop drawings. Other items, such as pre bid meetings, field
supervision and inspection of the installations for compliance,are not included the basic scope of
work and will be considered additional services.
3) Only those designs and description of services noted in the previous sections are included and no
other work is intended or inferred.
4) Any additional services required from TYLI will be on a negotiated basis, at the time of service °®
request, and a supplemental work task order will be issued to authorize the work and payment.
General Requirements/Assumptions:
0
1) Allowance for two on -site meetings during the design phase and one one-site meeting during the
post design phase,with additional meetings as additional services, as needed.
2) Any modifications to the general scope described in this proposal will be considered additional
services.
Thank you once again for the opportunity to serve. If you have any questions, please feel free to contact
me at 305-714-4040 or David Russell at 305 341-7200.
W
Sincerely, T:
Co
cv
Ui
i
Ah 'ad Hammoud, PE,4YA P
Vice President i
m
Cc: David Russell
201 Alhambra Circle,Suite 900 ) Coral Gables,Florida 33134 I T 305,567.1888 I F 305.567.1771 I www.tylin.com Page 5 of 5
Packet Pg.703