Item K14 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: 18 September 2002 Division: Growth Management Bulk Item: Yes l No Department" Marine Resources AGENDA ITEM WORDING: Approval to send out a request for statements of qualification on the Keys-wide boat ramp design and permitting project supported by the FBIP grant approved at the August Board meeting. ITEM BACKGROUND: The Commission approved a grant from the Florida Fish and Wildlife Conservation Commission to fund engineering design and permitting work for six boat ramp projects from North Key Largo to Stock Island. Since approval, staff has looked at additional sites and has added an additional boat ramp project to the list. Staff would like to put this out for statements of qualification through the County's procurement process. The attached Scope of Work outlines the individual boat ramp projects. Anticipated costs exceed $25,000. The FWCC grant will provide adequate funds with a 25% match share from the Boating Improvement Fund (BIF) to complete the project. PREVIOUS RELEVANT BOCC ACTION: August 2002 - Approval ofFWCC grant CONTRACT/AGREEMENT CHANGES: NA STAFF RECOMMENDATIONS; Approval TOT AL COST: Unknown BUDGETED: Yes No COST TO COUNTY: At least $11.250 (BIF Funds) REVENUE PRODUCING: Yes No --L AMOUNT Per Month Year APPROVED BY: County Atty NA DIVISION DIRECTOR APPROVAL: DOCUMENTATION: Included--L AGENDA ITEM NO.: ,~\ l.\ DISPOSITION: BC020930 08/27/0212:23 PM Scope of Work for the Public Boat Ramp Engineering Project For The Florida Keys Monroe County requires engineering/design work necessary for repairs and upgrades to seven public boat ramp facilities in the Florida Keys, including (see attached site map for facility locations): Boat Ramp Card Sound Boat Ramp Sunset Point Park MM 54 Boat Ramp 33rd St. Boat Ramp Little Duck Key Boat Ramp Spanish Harbor Wayside Park Key Haven Boat Ramp Location Card Sound Road; Key Largo Sunset Road; Key Largo MM 54; Marathon MM 48.8; Marathon MM 40; Little Duck Key MM 34; West Summerland Key MM 6; Key Haven Ownership County County State (DOT) City of Marathon State (DOT) State (DOT) State (DOT) Current Facilities Conditions: All of the boat ramps at the above listed facilities are showing signs of age and are deteriorating. Many of the ramps do not meet current design standards and criteria. Several of the ramp facilities have no loading/tie off dock, and those that do are in disrepair. Bulkheads/return walls are also in poor condition. Amenities are also lacking. Parking/paving at several of the facilities is substandard or non-existent. General Proiect Requirements: The boat ramp facilities engineering project shall include all products and submittals necessary to move forward with construction and repairs at the above listed public facilities. These products/submittals shall include (but not necessarily be limited to): the design, engineering, surveying, permitting, and collection of construction bids for the seven sites. All engineering and design work shall meet all applicable local, county, state, and federal government standards and requirements, including the criteria of the Florida Fish and Wildlife Conservation Commission (see attached Design Handbook for Recreational Boating and Fishing Facilities). All engineering designs and drawings shall be signed and sealed by a Professional Engineer licensed in Florida. All surveys shall be signed and sealed by a Professional Surveyor & Mapper licensed in Florida. The awarded engineering firm shall consult with Marine Resources staff (Marine Resources Planner) in regards to specific needs and facility design objectives at each site. The engineer will meet with the Marine Resources Planner on site for the initial facility inspection and evaluation, and to determine (and agree upon) the general facility design. Core Proiect Improvements (as needed for each site): Replacement of boat ramps and return walls Bulkhead repair or replacement Additional Site Amenities (as appropriate for each site): New asphalt pavement and striping Repair or installation of tie off/loading docks Site lighting Picnic or observation facilities Information signs, including general boating regulations and area navigational charts Stormwater retention Landscaping and additional green space ...... ca o al ~~ ~ ca . ~ 0::...... ca. o al >. ~ ~a. () E :::l ca 00:: 0)...... -ca Eo ....Jal .. ... , \ " ,. .:'~. ., 41 ' \./ . . .' ...... '. . - "'. I .~ ,.J. ~ : .' . .~.' .' " ~