Item K14
BOARD OF COUNTY COMMISSIONERS
AGENDA ITEM SUMMARY
Meeting Date: 18 September 2002
Division:
Growth Management
Bulk Item: Yes l No
Department"
Marine Resources
AGENDA ITEM WORDING:
Approval to send out a request for statements of qualification on the Keys-wide boat ramp design and
permitting project supported by the FBIP grant approved at the August Board meeting.
ITEM BACKGROUND:
The Commission approved a grant from the Florida Fish and Wildlife Conservation Commission to fund
engineering design and permitting work for six boat ramp projects from North Key Largo to Stock Island.
Since approval, staff has looked at additional sites and has added an additional boat ramp project to the list.
Staff would like to put this out for statements of qualification through the County's procurement process. The
attached Scope of Work outlines the individual boat ramp projects. Anticipated costs exceed $25,000. The
FWCC grant will provide adequate funds with a 25% match share from the Boating Improvement Fund (BIF) to
complete the project.
PREVIOUS RELEVANT BOCC ACTION:
August 2002 - Approval ofFWCC grant
CONTRACT/AGREEMENT CHANGES:
NA
STAFF RECOMMENDATIONS;
Approval
TOT AL COST:
Unknown
BUDGETED: Yes
No
COST TO COUNTY:
At least $11.250 (BIF Funds)
REVENUE PRODUCING: Yes
No --L AMOUNT Per Month
Year
APPROVED BY: County Atty NA
DIVISION DIRECTOR APPROVAL:
DOCUMENTATION: Included--L
AGENDA ITEM NO.: ,~\ l.\
DISPOSITION:
BC020930
08/27/0212:23 PM
Scope of Work
for the
Public Boat Ramp Engineering Project For The Florida Keys
Monroe County requires engineering/design work necessary for repairs and upgrades to seven
public boat ramp facilities in the Florida Keys, including (see attached site map for facility
locations):
Boat Ramp
Card Sound Boat Ramp
Sunset Point Park
MM 54 Boat Ramp
33rd St. Boat Ramp
Little Duck Key Boat Ramp
Spanish Harbor Wayside Park
Key Haven Boat Ramp
Location
Card Sound Road; Key Largo
Sunset Road; Key Largo
MM 54; Marathon
MM 48.8; Marathon
MM 40; Little Duck Key
MM 34; West Summerland Key
MM 6; Key Haven
Ownership
County
County
State (DOT)
City of Marathon
State (DOT)
State (DOT)
State (DOT)
Current Facilities Conditions:
All of the boat ramps at the above listed facilities are showing signs of age and are deteriorating.
Many of the ramps do not meet current design standards and criteria. Several of the ramp
facilities have no loading/tie off dock, and those that do are in disrepair. Bulkheads/return walls
are also in poor condition. Amenities are also lacking. Parking/paving at several of the
facilities is substandard or non-existent.
General Proiect Requirements:
The boat ramp facilities engineering project shall include all products and submittals necessary
to move forward with construction and repairs at the above listed public facilities. These
products/submittals shall include (but not necessarily be limited to): the design, engineering,
surveying, permitting, and collection of construction bids for the seven sites. All engineering
and design work shall meet all applicable local, county, state, and federal government standards
and requirements, including the criteria of the Florida Fish and Wildlife Conservation
Commission (see attached Design Handbook for Recreational Boating and Fishing Facilities).
All engineering designs and drawings shall be signed and sealed by a Professional Engineer
licensed in Florida. All surveys shall be signed and sealed by a Professional Surveyor & Mapper
licensed in Florida.
The awarded engineering firm shall consult with Marine Resources staff (Marine Resources
Planner) in regards to specific needs and facility design objectives at each site. The engineer will
meet with the Marine Resources Planner on site for the initial facility inspection and evaluation,
and to determine (and agree upon) the general facility design.
Core Proiect Improvements (as needed for each site):
Replacement of boat ramps and return walls
Bulkhead repair or replacement
Additional Site Amenities (as appropriate for each site):
New asphalt pavement and striping
Repair or installation of tie off/loading docks
Site lighting
Picnic or observation facilities
Information signs, including general boating regulations and area navigational charts
Stormwater retention
Landscaping and additional green space
......