Loading...
Item L06 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: Feb. 19,2003 Division: Growth Management Bulk Item: Yes X No Department: Building Department AGENDA ITEM WORDING: Approval of a resolution amending Resolution Number 214-2002 to increase the Building Department's permitting and application fees and repealing Resolution Number 165-2002 [Engineered Inspections]. ITEM BACKGROUND: While expenses have risen over the past 12 years, permitting fees have remained the same since the adoption of the present fee schedule in 1990. The permitting software system has been converted and is still being upgraded and will be soon connect to the Internet for greater customer satisfaction. Resolution 165-2000 is no longer needed as state statutes (553.791)have addressed that procedure. PREVIOUS REVELANT BOCC ACTION: Resolution 214-2002 To establish an inspection fee concerning participation by Monroe County and the Federal Emergency Management Agency in an inspection procedure. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: Approval. TOTAL COST: N/A BUDGETED: Yes No X COST TO COUNTY: SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes X No AMOUNT PER MONTH $25,000 Year $300,000 DOCUMENTATION: Included X To Follo Not Required APPROVED BY: County Arty ~ DIVISION DIRECTOR APPROVAL: AGENDA ITEM #4 DISPOSITION: Revised 1/03 County of Monroe Growth Mana$:ernent Division 2798 Overseas Highway Suite 410 Marathon, TIorida 33050 Voice: 305.289. 2500 FAX: 305.289. 2536 Board of County Commissioners Mayor Dixie Spehar, District 1 Mayor Pro Tern Murray Nelson, District 5 Comm. Charles "Sonny" McCoy, District 3 Comm. George Neugent, District 2 Comm. David Rice, District 4 TO: Board of County Commissioners FROM: Timothy 1. McGarry, AICP Director of Growth ManagefJJ:1t DATE: January 22,2003 SUBJECT: Background on Permit and Application Fee Increases Proposal The Growth Management Division is proposing to increase building permit fees across-the-board from 20 to 50 percent with the minimum permit fee increasing from $35 to $50 and the establishment of plan review fees for compliance with the County's Land Development Regulations. The proposed fee schedule is presented in the attached draft resolution for consideration by the Board of County Commissioners. Permitting Fee Philosophy The Growth Management Division's philosophy toward the setting of permit fees is that users (i.e., permit applicants) should pay a majority share of the costs for processing and administering the permit as they directly benefit from receiving such permits. It is not the philosophy of the Division that these users should bear the full share of the cost of services, as under "cost recovery" fee systems. The rationale being that State and local codes require permits for building improvements and the public and other property owners do accrue direct and indirect benefits from a building permitting system. Basis for the Proposed Fee Increases The current permit fee schedule was approved by resolution of the Board of County Commissioners in 1990. The fee schedule was based on the estimated costs to administer, process, review, approve, and conduct inspections for the average permit in each building permit category. Since the initial fee schedule was approved, the Consumer Price Index has increased by over 40 percent and the "loaded" average hourly rate of the permitting staff has increased by 65 percent. In addition, the initial fee schedule failed to account for reviews conducted by planners, biologists, flood plain administrators and county engineers to ensure compliance with Land Development Regulations (LDR) or review by fire marshal to ensure compliance with life and safety codes. Although the costs for such LDR compliance review is typically covered by the application fees for conditional use approvals, it is not adequately covered by the fees for "as of right" permits. Significant New Elements of Proposed Permit Fee Schedule Significant new elements of the proposed fee schedule are the inclusion of new permit and permit application fees for the following: o LDR and Non-building code site and plans review fees: These eight new complianQe review fees are itemized in paragraph (I) of the proposed resolution. o ROGO/NROGO and privatized plans compliance review application fees: An up- front application fees as itemized in paragraph (J) will be assessed for any ROGOINROGO projects, except those authorized under a conditional use approval or plans submitted under Chapter 553, F.S. (privatized plan review), will be required to file an application for compliance review with non-building technical codes and LDRs prior to processing of the building permit application. If the application is approved, this fee will be deducted from other permit fees that may be due. o Renewal of expired permits: An renewal fee will be assessed for reinstating an expired permit for a new dwelling as provided for in sub-paragraph (K.8). The Building Code (Chapter 6.0) still needs to be revised to set policy standards for renewal of such permits. Comparison with Other Jurisdictions For comparison purposes, the proposed permit fee schedule is shown in the attached exhibit with those for the City of Marathon and Village of Islamorada. As can be seen, the County's proposed fee schedule 'compares favorably with these two communities. Coordination with Contractors and Development Community The Growth Management Division presented the proposed fee schedule at a specially scheduled public workshop on November 12, 2002. In addition, Growth Management Division staff presented the proposed fee schedule at the December 2002 and January 2003 monthly meetings of the Florida Keys Contractors Association. In general, participants at these meetings were very supportive of these fee changes recognizing that the County has held permitting fees constant for over a decade. Furthermore, many contractors in attendance voiced the opinion that the proposed fees were very reasonable compared to fees charged by other communities. Recommendation The Growth Management Division recommends approval of the resolution which revises the County's permitting fee schedule. Attachments RESOLUTION NO. -2002 A RESOLUTION AMENDING RESOLUTION NO. 214-2002 PERTAINING TO THE BUILDING DEPARTMENT FEE SCHEDULE TO MORE EFFECTIVELY IMPLEMENT THE TRUE COSTS OF PROVIDING THE SERVICES ASSOCIATED WITH THE BUILDING PERMITTING AND INSPECTION SYSTEM AND TO REPEAL RESOLUTION NO. 165- 2000 [ENGINEER CONDUCTED INSPECTIONS] WHEREAS, the Monroe County Board of County Commissioners wish to provide the citizens of the County with the best possible service in the most cost effective and reasonable manner; and WHEREAS, we find that it would be in the best interests ofthe general public to charge the true cost for such services, thereby placing the burden of such costs directly upon those persons deriving the benefit; and WHEREAS, the Director of Growth Management has demonstrated that the existing fee schedule does not reflect the true cost of providing the services to the persons requesting the Building Department services; and WHEREAS, after hearing testimony and evidence presented as to the appropriate fee schedule; and WHEREAS, the provisions of the engineer conducted inspection program are no longer applicable; and WHEREAS, we concur with the conclusions and findings of the Growth Management Director and adopt them as our own; NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA, THAT: Section 1. Resolution No: 214-2002 is hereby amended to read as follows: Pursuant to Monroe County Code, the following building permit fees are hereby established: (A) Building Application Fees: 1. New commercial buildings 2. New duplex or multi-family buildings 3. New conventional single family home 4. New modular single family home 5. New replacement mobile home 6. All over the counter permits and signs 7. Residential repairs/remodel (less than $10,000) 8. Residential repairs/remodel ($100,000 or more) 9. Commercial repairs/remodel (less than $10,000) 10. Commercial repairs/remodel ($10,000 or more) Maximum 1500.00 1500.00 750.00 500.00 52.00 52.00 52.00 100.00 52.00 200.00 II. Construction of seawall, riprap, dredge and dill, dock, or any combination thereof 80.00 12. After the fact permits 352.00 [If the application is approved, the fee shall be deducted from any other amount which may be due and owing under the other terms of this subsection.] (B) Building Permit Fees: 1. Minimum Fee 50.00 2. Buildings (including balconies, additions, garages, enclosures and accessory buildings): For each 100 square feet of enclosed area or fractional part thereof 25.00 i 3. Structures other than Buildings & misc. construction (Unless specified herein): For each $1000.00 of cost or fractional parts thereof 30.00 Seal coating/painting For each $1000.00 of cost or fraction part thereof 20.00 Cabinets & Vanities (All) 50.00 4. State Approved Modular Homes: Basic Building Foundation (up to and including Tie-beams) 350.00 For all "add-ons" as well as electrical, plumbing and mechanical permit fees, refer to [Applicable sections herein. Minimum fees shall apply to electrical and plumbing permits. Mechanical fees shall relate to AlC.] 5. Sewer Treatment Plants: Physical Plant (with lift station)_ prices per par. (B) 3. above [For collection system and disposal well permit fees; refer to "Plumbing" Section herein. For electrical permit fees refer to "Electrical" Section herein.] 6. All flat work and decks on grade (Concrete, Asphalt, Wood, etc.), as well as all floor coverings (tile, carpet etc.) For each 1000 square feet or fractional part thereof 25.00 7. Fences and retaining walls (all types): For each 100 lineal feet or fractional part thereof 25.00 8. Roofing (including repairs and new roofs): For each 100 square feet or fractional part thereof Waterproofing 5.00 50.00 9. Swimming pools: Residential Commercial Spaslhot tub (up to 12' diameter) [For all "ad ons" as well as electrical and plumbing permit fees refer to applicable sections herein.] 150.00 250.00 75.00 2 [NOTE: "wading" pools (kiddy pools) i.e.: vinyl liner, no plumbing, no electric and a maximum water depth of 18" no permit required if placed on grade and fair market value is less than $500.] 10. Cisterns: Residential Commercial (non-potable water only): For each 1000-gallon capacity or fractional part thereof Minimum Fee 100.00 10.00 150.00 11. Mobile Home Installation: Tie downs, blocking, sewer connection, water connection, and electrical Connection Tie downs, in~pection for insurance purposes only [For all " add ons" refer to applicable sections herein.] 150.00 75.00 12. Temporary Trailer (Construction and/or Sales): Pulnual Fee (each) [NOTE: Removal required prior to issuance of project C.O.] 200.00 13. Tents: (Temporary only-30 days) 50.00 14. Tanks (all types): For each 1000-gallon capacity or fractional part thereof 7.00 Minimum Fee (each tank) 75.00 [For plumbing and electrical permit Fees, refer to applicable sections herein.] 15. Moving building 200.00 16. Demolition: F or each 1000 square feet or fractional part thereof 50.00 17. Seawalls and riprap: For each 50 lineal feet or fractional part thereof Inspection 25.00 80.00 18. Docks: For each 100 square feet of flat area or fractional part thereof Inspection With piling ( each pile) With boat davit (each davit) With retaining wall 25.00 80.00 15.00 20.00 priced as fence 19. Excavation: a. Borrow pits, canals, etc: Pulnual Fee: Inspection Boat slips, ramps, miscellaneous minor excavations: For first 100 cubic yards or fractional part thereof For each additional 100 cubic yards or fractional part thereof 3 500.00 80.00 50.00 15.00 . Inspection 20. Filling (On land and/or water): For each 100 cubic yards or fractional part thereof Inspection Fee [Note: If an application is made for a seawall, dock, excavation or filling as per paragraphs B (18) - B (21) or any combination of this work where all the work is to be done on one (1) lot, a single inspection fee of $80.00 will be charged.] 80.00 15.00 80.00 21. Land Clearing: a.) Removal or trimming of invasive exotics: Melaleuca (Melaleuca quinquinerva), Australian pine (spp. Casuarina), Brazilian Pepper (Schinus terebinthifolius), Leatherleaf (Colubrinaasiatica), and Sapodilla (Manikara zapota) = North of the Seven Mile Bridge No Fee b.) Major pruning or removal of non-invasive exotics and natives: Inspection fee, when necessary First acre or fractional part thereof For each additional acre 22. Awnings and removable canopies: For each 100 square feet or fractional part thereof 23. Hurricane Shutters: Retrofit or New Construction 24. Wood lattice and screening: For each 100 square feet or fractional part thereof 25. Commercial kitchen vent hoods: For each $1000 of cost or fractional part thereof [For plumbing, electrical and mechanical permit Fees refer to applicable sections herein.] 26. Signage: Signs (New): For each 50 square feet of sign face or fractional part thereof Annual Re-inspection Fee (when applicable) Signs (Modify, Repair, Repaint): For each 50 square feet of sign face or fractional part thereof Highway Billboards (Repair/Maintenance Only): For each 50 square feet of sign face or fractional part thereof Annual Re-inspection Fee (when applicable) [For electrical permit Fee refer to par. (C) 11.] (C) Electrical Permit Fees: 1. Minimum Fee 4 35.00 35.00 6.00 25.00 No Fee 15.00 30.00 30.00 25.00 20.00 40.00 35.00 35.00 50.00 2. Site work: (Commercial) For each $1000 of cost or fractional part thereof 30.00 3. Outlets: General (receptacles, switches, lights, telephones, TV, etc.): For each 100 square feet of enclosed area or fractional part thereof_ 10.00 Appliance outlets, each (including ceiling fans) 10.00 Exterior Area Lighting, each 10.00 4. Services: Temporary: 50.00 Single Phase o to 300 amp 50.00 Over 300 amp to 400 amp 75.00 Over 400 amp to 600 amp 100.00 Over 600 amp 125.00 Three Phase o to 300 amp 75.00 Over 300 to 400 amp 100.00 Over 400 to 600 amp 125.00 Over 600 amp 200.00 [Sub Feeds to be charged by amps at the same rate as Service] 5. Motors: o to 10 HP 50.00 Over 10 HP to 25 HP 100.00 Over 25 HP 125.00 6. Generators, Transformers, and Transfer Switches (each): o to 25 KW 50.00 Over 25 KW to 50 KW 100.00 Over 50 KW 125.00 7. X-ray Machines (each): 150.00 8. Welding Machines (each): o to 25 amps (primary) Over 25 amps to 50 amps Over 50 amps 50.00 65.00 75.00 9. AlC (each): Window or wall (If New Service Required) Central System: Up to 20 tons Over 20 tons 20.00 50.00 3.00/ton 5 Refrigeration: Up to 20 tons Over 20 tons Heat Pump (per unit) 50.00 3. DO/ton 50.00 10. Elevators, Commercial (each) Elevators, Residential (each) Dumbwaiters, wheelchair lifts or stair lifts (each) 200.00 75.00 75.00 11. Signage: 1 st sign connection Each additional sign connection 50.00 15.00 12. Plug Mold and Track Lighting: For each 100 lineal feet or fractional part thereof 50.00 13. Alarm Systems: Low Voltage Systems Residential (each) Commercial For each $1000 of cost or fractional part thereof 50.00 20.00 14. Commercial kitchen vent hood motors price per par. (C) 5 15. Repairs/ Remodeling: Same as New Work Minimum Fee 50.00 16. Swimming Pools & Hot Tubs: [NOTE: Shall be priced according to motor size(s) and dedicated feeder circuit (s). See paragraphs (C) 4 & (C) 5 respectively.] 17. Home Automation System: For each $1000 of cost or fractional part thereof 20.00 18. Fiber Optic System: For each $1000 of cost or fractional part thereof 20.00 19. Carnivals, Circuses, Road Shows and similar temporary installations: Generators: Price per (C) 6 Minimum Fee 200.00 Also refer to Chapter 12.1-24, Monroe County Code, regarding occupational Licenses and Resolution 076-1986 regarding bonding requirements. 20. Miscellaneous: (Any electrical work not included herein): F or each $1000.00 of cost or fractional part thereof 20.00 6 (D) Plumbing Permit Fees: 1. Minimum Fee 50.00 2. Fixtures (each): Roughed in and set 15.00 3. Sewer: Building interior lines and connection 50.00 Outside sanitary and storm lines (site work): For each $1000 of cost or fractional part thereof 50.00 4. Manholes (each): 50.00 5. i Sewage Treatment Plant: For each $1000 of cost or fractional part thereof for: Collection System and Disposal Well 65.00 6. Water Piping: a. Connection to supply system (each) 20.00 b. Connection (each) to any appliance or fixture not covered by fixture fees item no. 2 above 15.00 c. Irrigation system: For each $1000 of cost or fractional part thereof 12.00 d. Fire protection system: For each $1000 of cost or fractional part thereof 12.00 7. Water Mains and Distribution Lines: For each $1000 of cost or fractional parts thereof 50.00 8. Swimming Pool No Fee [NOTE: No Fee, unless additional site plumbing and/or potable water hook-up is required.] If required, then price as follows: Hook-up and site work (Residential) 50.00 Commercial 100.00 9. Wells (where applicable) each 25.00 10. Repairs/Remodeling: Same as New Work...Minimum Fee 50.00 11. Commercial kitchen vent hood (if plumbing required) 50.00 12. Miscellaneous: (Any plumbing work not included herein): For each $1000.00 of cost or fractional part thereof 25.00 (E) Mechanical Permit Fees: 1. Minimum Fee 50.00 7 2. AlC Systems (excluding windows units) and refrigeration: o to 2 Ton Over 2 Ton to 5 Ton Over 5 Ton to 10 Ton Over 10 Ton to 25 Ton Over 25 Ton to 50 Ton Over 50 Ton to 100 Ton Over 100 Ton 3. Duct Work: Per each drop (opening) 4. Co~rcial Kitchen Vent Hood 5. Heat Pump (per unit) 6. Miscellaneous (any mechanical work not included herein): For each $1000.00 of cost or fractional part thereof (F) Fuel Gas Fees: Service fee: Fixtures, i.e.; range, dryer, water heater etc. (each) (G) Building Plans Review Fees: Building plans review fees must be charged for all significant new work and/or each significant revision, as follows: 1. New, single family residential 2. Remodeling plans review single family residential 3. Repeat plans review for total footprint change of new, single family residence already reviewed 4. New, commercial and/or remodeling plans review 5. Revisions (Plans review) Plus appropriate fees first subsequent_ (H) Re-inspection Fees: When extra inspection trips are necessary due to anyone of the following reasons, a charge of twenty-five ($25.00) dollars shall be made for first and fifty ($50.00) for each subsequent reinspection: (1) Wrong address; (2) Work not in accordance with plans and specifications; (3) Rejected work resulting from faulty construction; (4) Repairs or corrections not made when inspection is called; (5) Work not ready for inspection when called; 8 50.00 65.00 85.00 115.00 155.00 250.00 300.00 10.00 50.00 50.00 20.00 50.00 15.00 100.00 50.00 200.00 150.00 50.00 100.00 (6) Permit not posted. The payment of re-inspection fees shall be made before any further inspections will be made for the person/entity owing it. (I) LDR and Non-building code site and plans review fees: 1. H.E.I. evaluation review and site visit 2. Compliance review for new development without conditional use approval: Single family and mobile homes Duplex, multi- family and commercial [Any H.E.I. evaluation or site visit is not included.] 125.00 75.00 150.00 3. Compliance review for expansion of the footprint of existing structures, expansion of impervious areas, and clearance of and/or reduction of habitat without conditional use approval: Single family and mobile home Duplex, multi-family and commercial [Any H.E.I. evaluation or site visit is not included.] 40.00 80.00 4. Floodplain regulations compliance 40.00 5. County Engineer stormwater management site plan review [Not required for permits to be issued under conditional use approval.] 50.00 6. Fire Marshal site plan review [Not required for permits to be issued under conditional use approval.] 50.00 7. Fire Marshal building plans review 50.00 8. Site visits not part of building inspection process (per visit) [Not included as part ofH.E.I. evaluation on (I) above.] 50.00 (1) ROGOINROGO and privatized plans compliance review application fees: Any plans to be submitted for ROGOINROGO projects (except for those adhered under conditional use approval) and plans submitted under Chapter 553, Florida Statutes (Privatized Plans Review) will be required to file an application for compliance review with non-building technical codes and LDRs prior to processing of the building permit application. This up-front compliance review is not required for permits to be issued under a conditional use approval. Single family residential, mobile home Attached residential and commercial [Upon issuance of the permit, this fee will be deducted from any other amount which may be due and owing under the other terms of thus section.] 200.00 400.00 (K) Miscellaneous Fees: 1. Transfer of a building permit upon change of ownership 9 200.00 2. Extension of permit fee (One per permit) 250.00 3. Education Fee $2.00 per permit issued 4. Flood Insurance Inspection and Compliance: Program inspection fee 50.00 5. Blasting Fees: Payment of a fee in an amount not to exceed fifty dollars ($50.00) per month or six hundred dollars ($600.00) per year for a user permit and one hundred dollars ($100.00) per year for a blaster permit. 6. Building permit records research request fees (per request) 25.00 Charge for copies priced per Section 119.07(1)(a), F.S. 7. Replacement permit card 25.00 8. Renewal of an expired RaGa permit or a permit for a major structure shall be based on the percentage of completion and be subject to prorated fees with a minimum fee of $500.00 Section 2. Resolution no. 165-2000 is hereby repealed. Section 3. The Clerk of the Board is hereby directed to forward one (1) certified copy of this Resolution to the Division of Growth Management. PASSED and ADOPTED at a regular meeting of the Board of County Commissioners of Monroe County, Florida, held on the day of ,2003. Mayor Dixie M. Spehar Mayor ProTem Murray E. Nelson Commissioner Charles "Sonny" McCoy Commissioner George Neugent Commissioner David Rice (SEAL) Attest: Danny L. Kolhage Board of County Commissioners Of Monroe County, Florida By Deputy Clerk By Mayor/Chairman IO COMPARISON OF LOCAL PERMITTING FEES BUILDING PERMITS CURRENT FEE PROPOSED FEE MARATHON ISLAMORADA MINIMUM FEE $ 35.00 $ 50.00 $ 65.00 $ 50.00 BUILDINGS 1 PER 100 S.F. $ 20.00 $ 25.00 $ 25.00 Res. $ 24.00 Comm. $ 30.00 STRUCTURES OTHER THAN $ 25.00 $ 30.00 $ 25.00 Res. $ 32.00 BUilDINGS 1 $1000.00 Comm. $ 35.00 STATE APPROVED ~ 275.00 $ 350.00 $ 500.00 Residential $ 550.00 MODULAR I Commercial $ 1,000.00 FENCES 1 PER 100 l.F. $ 20.00 $ 25.00 $ 25.00 Res. $ 30.00 Comm. $ 40.00 FLAT WORK 1 SLABS ON GR. $ 20.00 $ 25.00 $ 25.00 Res. $ 30.00 PER. 1000 S.F. Comm. $ 40.00 ROOFING 1100 S.F. $ 3.00 $ 5.00 $ 4.00 Res. $ 4.00 Comm. $ 5.00 WATERPROOFING $ 35.00 $ 50.00 $ 50.00 N/A SWIMMING POOLS: RESIDENTIAL $ 100.00 $ 150.00 $ 250.00 $ 200.00 COMMERCIAL $ 100.00 $ 250.00 $ 500.00 $ 500.00 CISTERNS: RESIDENTIAL $ 75.00 $ 100.00 $ 100.00 $ 150.00 COMMERCIAL $ 75.00 MIN. $ 150.00 MIN $ 75.00 MIN. $ 150.00 PER 1000 GAL 1 $ 7.50 $ 10.00 $ 10.00 MOBilE HOME INSTALLATION $ 100.00 $ 150.00 $ 100.00 Res. $ 200.00 Comm. $ 300.00 TIEDOWNS ONLY $ 50.00 $ 75.00 $ 50.00 Res. $ 50.00 Comm. $ 50.00 MOVING BUilDING $ 100.00 $ 150.00 $ 250.00 Res. $ 250.00 Comm. $ 500.00 DEMO 11000 S.F. $ 35.00 $ 50.00 $ 50.00 Res. $ 50.00 Comm. $ 75.00 SEAWALLS 1 50 l.F. $ 20.00 $ 25.00 $ 25.00 Res. $ 25.00 Comm. $ 30.00 DOCKS: PER 100 S.F. FLAT AREA $ 20.00 $ 25.00 $ 25.00 Res. $ 25.00 Comm. $ 30.00 INSPECTION $ 80.00 N/A N/A $ 80.00 PILINGS (EA) $ 10.00 $ 15.00 $ 10.00 Res. $ 15.00 Comm. $ 20.00 BOAT DAVITS (EA) $ 15.00 $ 20.00 $ 25.00 Res. $ 25.00 Comm. $ 30.00 HURRICANE SHUTTERS NO FEE NO FEE $ 65.00 N/A WOOD LATTICE AND SCREEN $ 10.00 $ 15.00 $ 65.00 Res. $ 15.00 PER 100 S.F. Comm. $ 15.00 COMPARISON OF LOCAL PERMITTING FEES BUILDING PERMITS CURRENT FEE PROPOS EO FEE MARATHON ISLAMORADA ELECTRICAL: MINIMUM $ 35.00 $ 50.00 $ 65.00 $ 50.00 SITE WORK I $1000. $ 25.00 $ 30.00 $ 25.00 $ 30.00 OUTLETS: GENERAL I PER 100 S.F. $ 7.00 $ 10.00 $ 7.00 $ 9.00 APPLIANCES $ 7.00 $ 10.00 $ 7.00 $ 9.00 SERVICES: TEMPORARY $ 35.00 $ 50.00 $ 65.00 Res. $ 50.00 Comm. $ 100.00 SINGLE PHASE o TO 300 AMP $ 35.00 $ 50.00 $ 65.00 Res. $ 50.00 Comm. $ 70.00 OVER 300 AMP TO 400 AMP $ 50.00 $ 75.00 $ 85.00 Res. $ 75.00 Comm. $ 90.00 OVER 400 AMP TO 600 AMP $ 75.00 $ 100.00 $ 100.00 Res. $ 100.00 Comm. $ 115.00 OVER 600 AMP $ 100.00 $ 125.00 $ 110.00 Res. $ 200.00 Comm. $ 225.00 THREE PHASE o TO 300 AMP $ 50.00 $ 75.00 $ 65.00 Res. $ 75.00 Comm. $ 90.00 OVER 300 AMP TO 400 AMP $ 75.00 $ 100.00 $ 85.00 Res. $ 100.00 Comm. $ 115.00 OVER 400 AMP TO 600 AMP $ 100.00 $ 150.00 $ 100.00 Res. $ 150.00 Comm. $ 175.00 OVER 600 AMP $ 125.00 $ 200.00 $ 25.00 Res. $ 200.00 Comm. $ 225.00 MOTORS EACH: OTO 10 HP $ 35.00 $ 50.00 $ 65.00 Res. $ 50.00 Comm. $ 55.00 10 HP TO 25 HP $ 80.00 $ 100.00 $ 75.00 Res. $ 105.00 Comm. $ 115.00 OVER 25 HP $ 110.00 $ 125.00 $ 110.00 Res. $ 145.00 $ 160.00 ALARM SYSTEMS: LOW VOLTAGE RESIDENTIAL $ 35.00 $ 50.00 $ 65.00 $ 50.00 COMMERCIAL 1$1000. $ 15.00 $ 20.00 $ 20.00 $ 25.00 MISCELLANEOUS: PER $1000. OF COST $ 15.00 $ 20.00 $ 25.00 Res. $ 20.00 Comm. $ 25.00 PLUMBING: MINIMUM $ 35.00 $ 50.00 $ 65.00 $ 50.00 FIXTURES (EACH) $ 10.00 $ 15.00 $ 12.00 Res. $ 15.00 Comm. $ 20.00 SEWER $ 35.00 $ 50.00 $ 35.00 Res. $ 50.00 Comm. $ 60.00 COMPARISON OF LOCAL PERMITTING FEES BUILDING PERMITS CURRENT FEE PROPOSED FEE MARATHON ISLAMORADA WATER PIPING: CONNECTION TO SUPPLY $ 15.00 $ 20.00 $ 25.00 Res. $ 25.00 Comm. $ 35.00 IRRIGATION SYSTEMS I $1000. $ 9.00 $ 12.00 $ 20.00 Res. $ 15.00 Comm. $ 20.00 FIRE PROTECTION SYSTEMS PER $1000. $ 9.00 $ 12.00 $ 20.00 Res. $ 15.00 Comm. $ 20.00 MISCELLANEOUS I $1000. i$ 15.00 $ 20.00 $ 20.00 Res. $ 20.00 Comm. $ 25.00 MECHANICAL MINIMUM $ 35.00 $ 50.00 N/A $ 50.00 AlC SYSTEMS o TO 2 TON $ 35.00 $ 50.00 N/A $ 45.00 2 TON TO 5 TON $ 50.00 $ 65.00 N/A $ 60.00 5 TON TO 10 TON $ 65.00 $ 85.00 N/A $ 75.00 10 TON TO 25 TON $ 80.00 $ 110.00 N/A $ 90.00 25 TON TO 50 TON $ 110.00 $ 155.00 N/A $ 120.00 50 TON TO 100 TON $ 155.00 $ 250.00 N/A $ 200.00 OVER 100 TON $ 250.00 $ 300.00 N/A $ 300.00 MISCELLANEOUS I $1000 $ 15.00 $ 20.00 $ 20.00 Res. $ 25.00 Comm. $ 30.00 FUEL GAS: SERVICE FEE N1A $ 50.00 N/A N/A FIXTURES N/A $ 15.00 N/A N/A TRANSFER OF OWNERSHIP $ 200.00 $ 200.00 $ 350.00 N/A EXTENTION OF PERMIT $ 100.00 $ 250.00 $ 150.00 N/A