1st Change Order 07/21/2021 ..... Kevin Madok, CPA r Clerk of the Circuit Court& Comptroller— Monroe County, Florida DATE: July 26, 2021 TO: Breanne Erickson Project Management FROM: Sally M. Abrams, D.C. SUBJECT: July 21' BOCC Meeting Attached, for your handling, is an electronic copy of item Dl, Change Order#1 to the Agreement with Sea Tech of the Florida Keys, Inc. for the Key Largo Community Park Repair project. Additional damages caused by Hurricane Irma were discovered upon commencement of construction. Also attached, for your handling, is an electronic copy of item D2, Change Order#1 to the Agreement with Sea Tech of the Florida Keys, Inc. for the replacement of the Big Pine Community Park Sheriffs House in the amount of$9,405.45. The Sheriffs residence was damaged during Hurricane Irma. BOCC approval is required since the extension of the completion date is longer than 6 months. Should you have any questions, please feel free to contact me at extension 3550. cc: County Attorney Finance File KEY WEST MARATHON PLANTATION KEY PK/ROTH BUILDING 500 Whitehead Street 3117 Overseas Highway 88820 Overseas Highway 50 High Point Road Key West,Florida 33040 Marathon,Florida 33050 Plantation Key,Florida 33070 Plantation Key,Rattle 33071 305-294-4641 305-289-6027 305-852-7145 305-852-7145 MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: BIG PINE SHERIFF'S HOUSE REPLACEMENT CHANGE ORDER NO: 01 BOCC APPROVAL DATE: 07/21/2021 CONTRACT DATE:10/21/2020 TO CONTRACTOR: SeaTech of the Florida Keys,Inc. The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) $747,125.00 Net change by previously authorized Change Orders... . $0.00 The (Contract Sum (Guaranteed Maximum Price) prior to this Change order was $747,125.00 The(Contract Sum)(Guaranteed Maximum Price)will be (increased) (decreased) (unchanged) by this Change Order . $9 405.45 The new(Contract Sum)_(Guaranteed Maximum Price)including this Change Order is. $756,530.45 The Contract Time will be(increased) (decreased) (unchanged) by 270 days The date of Substantial Completion as of the date of this Change Order is ...... ..... 04/14/2022 Detailed description of change order and justification: _ This change order is required due to FEMA Building Code requirements. FEMA required an increase to the structure elevation to 1.5 feet above base flood elevation. FEMA also required a specific review and approval process during the repair or rebuild analysis and the design process. The contractor is requesting a 270 day increase to the project schedule due to delays in the permitting process and additional reviews by FEMA. Change order is 1.25%of original contract price. • Not valid until signed by Owner Architert(if aoolicablr6 and Contractor m z CONTRACTOR: <.3/20211` G SeaTe, - of the Florida Keys, IncriDate — z' r 4 ,_-. BOARD OF COUNTY COMMISSIONERS (SEAL) OF MONROE COUNTY •: •: ATTEST: KEVIN MADOK, CLERK p By: �111 By: � /� l� ./�'4�^Y2�w15 c7. Z.1. 2L'Z1 Mayor/Chairperson (1.' (As Deputy Clerk MONROE COUNTY ATTORNEYS OFFICE ‘., 1 . `' APPROVED AS TO FORA AMR COUNTY ATTORNEY DATE: 6-23-2021 �/r Change Order Attachment per Ordinance No. 024-2015 • Change Order was not included in the original contract specifications. Yes ❑ No ❑ If Yes, explanation: After the RFP proposals were received by Monroe County, FEMA conducted a repair vs replace analysis. During the design process, FEMA required several plans reviews and approvals, and added additional design requirements. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No 19 If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ❑ No If no, explanation of why: Project was bid as a design/build contract therefore Architect is not under contract with Monroe County. • Change Order is correcting an error or omission in design document. Yes ❑No LJ Should a claim under the applicable professional liability policy be made? Yes ❑ No❑ Explain: 1,eckTao'ch i0%o iIIII . OF THE FLORIDA KEYS DESIGN BUILD CONTRACTORS November 10, 2020 Monroe County Public Works & Engineering Project Management Department Office: (305)295-4338 Cell: (305)395-8283 Attn: Tom Henry, Contract Manager Re: Big Pine Sheriff House Subject: Change Order 901 -Raise FFE 1.5 feet We hereby propose to furnish materials, equipment and perform the labor necessary to increase the structure elevation by 1.5 feet above the original required elevation for RFP: Big Pine Sheriff House Repairs, Monroe County, FL, submitted by SeaTech on May 12, 2020. These costs are in addition to the $747,125.00 for the original RFP Alternative 91 Option. CONTRACTOR EXPENSES/DIRECT COSTS UNIT 5% ITEM DESCRIPTION UOM CITY PRICE SUBTOTAL(S) 5%O/H 5%P MGMT TOTALS Sea Tech Superintendent HR 32 $62.00 $1,984.00 $99.20 $99.20 $2,182.40 Sea Tech Stucco columns add 1.5' ea 23 $50.00 $1,150.00 $57.50 $57.50 $1,265.00 $0.00 $0.00 Subtotal $3,134.00 $156.70 $156.70 $3,447.40 SUBCONTRACTOR WORK UNIT 5% ITEM DESCRIPTION UOM CITY PRICE SUBTOTAL(S) 5%O/H 5%P MGMT TOTALS JTCC Add 1.5'to all columns ea 23 $215.00 $4,945.00 $247.25 $5,192.25 Blue water Additional Piping LS 1 $150.00 $150.00 $7.50 $157.50 TEM Additional Materials LS 1 $100.00 $100.00 $5.00 $105.00 Woods Additional Electrical Materials LS 1 $258.00 $258.00 $12.90 $270.90 $0.00 $0.00 Subtotal $5,453.00 $272.65 $5,725.65 P/P BOND ITEM DESCRIPTION TOTALS P&P Bond @ 2.5% $159.61 Subtotal $159.61 Overhead at 5% $156.70 Profit at 5% $156.70 Management at 5% $272.65 Taxes $72.79 CHANGE ORDER GRAND TOTAL $9,405.45 Page 1 of 2 All material is guaranteed to be as specified and the above work to be performed in accordance with the manufacturer's specifications and completed in a substantial workmanlike manner for the sum of Nine Thousand, Four Hundred Five and 45/100 Dollars... .......................$9,405.45 Payment in full upon completion. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate.All agreements contingent upon strikes, accidents,or delays beyond our control. Owner to carry fire,tornado and other necessary insurance upon above work.Workers Compensation and General Liability insurance on above work will be taken out by SEA TECH, INC. Note - This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work specified.Payment will be made as outlined above. Signature Date Page 2 of 2 JTCC, Inc. Additional Work Proposal 127 Industrial Dr, Ste C Big Pine Key, FL 33043 Date Proposal# 6/29/2021 920097 Name/Address Ryon LaChapelle 830 Crane Blvd. Terms Project Summerland,FL 33042 062321 Big Pine Park Sheriffs Residence Description Cost Qty Total TTCC,Inc proposes to provide the materials,labor and equipment to raise the columns by LS to meet FEE. Add LS to all full height columns 215.00 23 4,945.00 0.00% 0.00 Phone# Fax# E-mail 305-741-7893 305-741-7893 admin@jtccina.com Total $4,945.00 UPON SIGNING BELOW,YOU HEREBY ACKNOWLEDGE AND ACCEPT THE PRICES,SPECIFICATIONS,TERMS AND CONDITIONS FOUND ON THIS PROPOSAL AND AUTHORIZE THE COMPANY TO BEGIN WORK IN ACCORCANCE WITH THIS AGREEMENT. Signature Print Name Date IP.1111 " „ „ 'IMWIN Professional Attitude, Quality- Work &Local ili SeaTech BPK Sheriff House 31009 Atlantis Attn: Ryon Lachapelle ]Re: Change Order 01 To Whom it May Concern: It is our pleasure to provide you with our proposal to perform the work of extending our piping, etc 1.5' in height. Our Cost to provide the labor and material to perform this work is----------------------$ 100.00 One Hundred Dollars Zero Cents Our Proposal Includes the following Scope: ➢ Additional materials/labor to extend 1.5' ➢ Daily clean up We thank you for the opportunity to provide you this proposal. If you have any questions please do not hesitate to contact us. We look forward to working with you in the future. TEM Environmental & Mechanical Services, Corp Tom McKechnie Vice President ell l0 Fl�igl€ar° Av€nuo Koy Wort, A9tlL PIPIT l0 Tol: 805 d l d 8290 www.j,f°ni( nvIi onif9t°tl„t°onl ...................................................................................................................................................................................... t,em('nvlronm(X nl,ril((,)y,ii.ioo.('om Blue e P L tj MH I N G Blue Water Plumbing Solutions Inc_ PO Box 430032 Big Pine Key, FL 33043 305-872-1876 July 6, 2021 SeaTech of the Florida Keys, Inc 131 Palomino Horse Trl Big Pine Key, FL 33043 Attn: Ryon LaChapelle Re: Change order—BPK Sheriff House—31009 Atlantis Dr Extend water lines and sewer lines additional 1.5................................................ $150.00 Total Bid Price: $150.00 Thank you, Britni Preston Blue Water Plumbing (305) 872-1876 Woods Electric ILILC 1565 BUttonvuood Dr Big Vine Key FL 33043 Florida #EC 3008447 305-305-1071 (cell) Proposal submitted to: Work to be performed at: Big Pine Park Sheriffs Residence Ryon LaChapelle 31009 Atlantis Dr. SeaTech, Inc Big Pine Key FL 33043 Phone: 305-304-8406 PROPOSAL FOR Wiring Complete New Home We hereby propose to furnish the materials and perform the labor to complete the following for TWO HUNDRED AND FIFTY-EIGHT DOLLARS($258.00) 1) Furnish and install the following a. Install additional 1.5' of conduit and wire to raise electrical above the flood plain. 2) Owner information shall be provided to Electrical Contractor with signing of proposal for acceptance. Any alternations or deviations from above specifications Involving extra costs will be executed only upon written Order and will become an extra charge over and above the estimate.All agreements contingent upon strike,accidents, or delays beyond our control. Respectfully submitted, Woods Electric LLC By Joshua Woods Date: Note:This proposal may be withdrawn by us if not accepted within thirty(30) days. Payment terms: Payments are due on or before the 301"day from the date of invoice; Payment schedule is 1/3rd at start of project, 1/3rd at rough in inspection and final 3rd at final electric inspection. Should it become necessary to place this account for collection,suit or other legal proceedings,(1)(We)the undersigned,agree to pay all costs and expenses of collection,suit or other legal action, including a reasonable attorney fees and,if necessary, appellate fee. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified. Payments will be made as outlined above. (Company Name) Date: Signature Title PROPOSAL Page 2 of 2 31009 Atlantis DR Big Pine Key FL fe." h ON% inc, June 18, 2021 Attn: Tom Henry Monroe County PWD 1100 Simonton St Key West, FL 33040 Re: Big Pine Sheriff House Replacement Subject: Time Extension Dear Mr. Henry, Sea Tech is requesting a two hundred seventy (270) day no cost time extension to our contract. We have had delays due to FEMA reviews and approvals during the design process. Sea Tech has every intention of accelerating the work progress to reduce the time indicated on the project schedule.Please advise if you need additional information.I may be reached at(305) 872-0888. Sincerely, /2yor2 LaChapeZ4e, Ryon LaChapelle Project Manager