Item E29BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: November 19, 2003 Division: Public Works Bulk Item: Yes X No Department: Eng./ConstructionManagement AGENDA ITEM WORDING: Approval to award bid and execute contract with A. Herrmann Associates, Inc., DBA Associates Roofing, for the Marathon Animal Shelter Re -Roofing Project. ITEM BACKGROUND: In August, 2003, a request for Marathon Animal Shelter Re -Roofing was advertised. On October 9, 2003, one (1) response was received in Purchasing from Associates Roofing for $44,395.00. After review by the Architect it was found that the contractor had included in his base bid the cost for replacing any and all rotten wood uncovered during the re -roofing. Associates Roofing agreed to correct their bid and provide unit pricing for the possible additional work. The corrected bid is $30,000.00. PREVIOUS RELEVANT BOCC ACTION: This project is included in the Capital Improvements Plan approved by the BOCC on 9/17/03. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: Approval as stated above. TOTAL COST: $30,000.00 BUDGETED: Yes X NO COST TO COUNTY: $30,000.00 SOURCE OF FUNDS: Infrastructure Sales Tax 304-24000-560620-PE0201-530340 REVENUE PRODUCING: YES_ NO X AMOUNT PER MONTH YEAR _ APPROVED OMB/Purchasing 4KoDpDpel, anagement Item Prepa StephaniVoffer. onstruction Manager DaviP.E., County Engineer DIVISION DIRECTOR APPROV Dent Pierce, Division Director DOCUMENTATION: Included X_ To follow DISPOSITION: Revised 1/03 Not required L//�_9/e� AGENDA ITEM # _y MONROE COUNTY BOARD OF COUNTY COMMISSIONERS CONTRACT SUMMARY Contract with: A. Herrimann Associates Contract # Effective Date: November 19, 2003 Expiration Date: Contract Purpose/Description: Re -Roofing Project for Marathon Animal Shelter Contract Manage .�tephiefer 4468 Construction Management (Name) (Ext.) (Department/Stop #) for BOCC meeting on 11/19/03 Agenda Deadline: 11/4/03 CONTRACT COSTS Total Dollar Value of Contract: $ 30,000.00 Current Year Portion: $ 30,000.00 Budgeted? Yes® No ❑ Account Codes: 304-24000-560620-PE0201-530340 Grant: $ - - - - County Match: $ - - - - ADDITIONAL COSTS Estimated Ongoing Costs: $_r For: (Not included in dollar value above) (eg. maintenance; etc. CONTRACT REVIEW Changes Date Out Date In Needed Rev' er Division Director II 0 3 Yes ❑ No[� / Risk Management ��ly`� 3 Yes❑ Noo' 11 116" O.M.B./Purchasing Yes[] No0 County Attorney Yes❑ NOR - 3--0y Comments: OMB Form Revised 2/27/01 MCP #2 WH JAM P. HORN ARCHITECT, P.A. m EATON STREET, KEY WEST, FLORIDA 33040 Date: 1027/03 To: Stephanie Coffer Director of Planning and Construction Re: Animal Shelter Re -roofing Bid Marathon, Florida Dear Stephanie Coffer, qp+� License No. AA 0003M PHONE 305-2964302 FAX: 305-296-1033 I have reviewed the bid from Associates Roofing dated October 8, 2003. Upon reviewing the bid and questioning the contractor, it was found that the contractor had included in his bid the cost for replacing any and all rotten wood uncovered and found during the re -roofing. Since this item, rotten wood, is an unknown factor (due to it being under the existing roof), it is typically bid out as a unit price to be billed as an extra charge. If you try to include an unknown in a fixed fee usually you will pay for a worst case scenario as was the case in this bid. I have asked the contractor to remove this item from his fixed cost and his bid went down to $30,000.00 from $44,000.00 as noted in his October 27, 2003 letter. His original bid did include unit pricing as we had requested. So, with the revised bid eliminating the wood replacement from his fixed cost I approve the bid from Associated Roofing. We have used him in the past successfully. Please review the above information and call if you have any questions or want to discuss finther options. Sincerely . HORN ARCHITECT, P.A. William P. Horn, Principal CT . 7 ASSOCIATES ROOFING A Division o/ A Hoffmann Assoc. Inc, CCC 024408 2351 Thomas St W Hollywood. Florida 33M (95e) 921-4095 October 27, 2003 V'ka facsimile to : 30S-296-1033 William P Horn 915 Eaton Street Key West, FL 33040 Attn_ William Horn Re: Monroe County Animal Shelter In regards to the proposals for the Monroe County Animal Shelter, the difference between the Budget Proposal, the proposal dated .Ian 03, 2003, and the proposal dated October 8, 2003 is the addition of wood work estimated to be involved. Associates Roofing will deduct the additional expense for wood work in Lieu of unit prices, 11is will bring the quote to S30,000.00 excluding all wood- Respectfully Submitted, 0. Art Herrmann Section 00500 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM AGREEMENT made as of the 19th day of November in the year of TWO THOUSAND THREE (in Words, indicate day, month and year.) BETWEEN the Owner: Monroe County Board of County Commissioners (Name and address) 500 Whitehead Street Key West, Florida 33040 and the Contractor: A. Herrmann Associates, Inc., DBA Associates Roofing (Name and address) 2351 Thomas Street Hollywood, FL 33020 For the following Project: Marathon Animal Shelter Re -Roofing Project (Include detailed description of project, Aviation Boulevard location, address and scope) Marathon, FL The Construction Manager is: Stephanie Coffer (Name and address) Monroe County Construction Management 1100 Simonton Street Second Floor — Room 2-216 Key West, Florida 33040 The Architect is: William P. Horn, Architect, P.A. (Name and Address) 915 Eaton Street Key West, FL 33040 The Owner and Contractor agree as set forth below. 10/30/2003 4:39 PM AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-1 ARTICLE 1 The Contract Documents The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement: these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 The Work of this Contract The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows: Scope of Work as specified in the Project Manual for this project, Section 00300. ARTICLE 3 Date of Commencement and Substantial Completion 3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the Owner, through the Construction Manager, in writing not less than five days before commencing the Work. 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than (Insert the calendar date or number of calendar days after the date of commencement. Also insert any requirements for earlier Substantial Completion of certain portions of the Work, if not stated elsewhere in the Contract Documents.) 90 calendar days from date of commencement. subject to adjustments of the Contract Time as provided by the Contract Document (Insert provisions if any for liquidated damages relating to failure to complete on time) ARTICLE 4 Contract Sum 4.1 The owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of thirty -thousand and 00/100 Dollars ($30,000.00), subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: NONE (State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement. Attach a schedule of such other alternates showing the amount for each and the date until which that amount is valid.) 10/30/2003 4:39 PM AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-2 (State the numbers or other identification of accepted alternates. if decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement. Attach a schedule of such other alternates showing the amount for each and the date until which that amount is valid.) 4.3 Unit prices, if any, are as follows: Sheathing per sq. foot $12.00 2" X 6" per lineal foot $ 8.00 2" X 4" per lineal foot $ 7.50 1" X 4" per lineal foot $ 6.00 ARTICLE 5 Progress Payments 5.1 Based upon Applications for Payment submitted by the Contractor to the Construction Manager, and upon Project Applications and Certificates for Payment issued by the Construction Manager and Architect, the Owner shall make progress payments on account of the Contract Sum to the contractor as provided below and elsewhere in the Contract Documents. 5.2 The period covered by each Application for payment shall be one calendar month ending on the last day of the month, or as follows: 5.3 Provided an Application for Payment is submitted to the Construction Manager not later than the First day of a month, the Owner shall make payment to the Contractor not later than the Twenty-first day of the Same month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than Twenty days after the Construction Manager receives the Application for Payment. 5.4 Each Application for Payment shall be based upon the Schedule of Values submitted by the Contractor in accordance with the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager or Architect may require. This schedule, unless objected to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: 5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the Schedule of Values, less retainage of Ten percent (10%). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included in applications for Payment. The amount of credit to be allowed by the Contractor to the Owner for a deletion or change which results in a net decrease in the Contract Sum shall be actual net cost as confirmed by the Construction Manager. When both additions and credits covering related Work or substitutions are involved in a change the allowance for overhead and profit shall be figured on the basis of net increase, if any, with respect to that change. 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Ten percent (10%): 10/30/2003 3:51 PM AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-3 5.6.3 Subtract the aggregate of previous payments made by the Owner; and 5.6.4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Paragraph 9.5 of the General conditions. 5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under the following circumstances: 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety percent (90%) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete Work and unsettled claims; and 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Subparagraph 9.10.3 of the General Conditions. 5.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Subparagraphs 5.6.1 and 5.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitations) ARTICLE 6 Final Payment Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment: and (2) a final Project Certificate for Payment has been issued by the Construction Manager and Architect: such final payment shall be made by the Owner not more than 20 days after the issuance of the final Project Certificate for Payment, or as follows: ARTICLE 7 Miscellaneous Provisions 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any) (Usury laws and requirements under the Federal Truth in Lending Act similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) 7.3 Temporary facilities and services: (Here insert temporary facilities and services which are different from or in addition to those included elsewhere in the Contract Documents.) 7.4 Monroe County's performance and obligation to pay under this contract is contingent upon an annual appropriation by the Board of County Commissioners. 7.5 A person or affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public 10/30/2003 3:51 PM AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-4 work, may not submit bids on leases of real property to public entity, may not be awarded or perform work as contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list. Special Conditions, if any are detailed in Section 01000 of the Project Manual for this Project ARTICLE 8 Termination or Suspension 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. 8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. Article 9 Enumeration of Contract Documents 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated and are as follows: Document Title Pages As listed in Table of Contents, Section 00001 of the Project Manual for this project. 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Section Title As listed in Table of Contents, Section 00001 of the Project Manual for this project. Pages 9.1.5 The Drawings are as follows, and are dated on each individual drawing unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Number Title Date As listed in Table of Contents, Section 00001 of the Project Manual for this project. 9.1.6 The Addenda, if any, are as follows: Number Date Pages 1 9/10/03 1 2 9/15/03 1 10/30/2003 3:51 PM AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-5 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. 9.1.7 Other documents, if any, forming part of the contract Documents are as follows: (List here any additional documents which are intended to form part of the Contract Documents. The General Conditions provide that bidding requirements such as advertisement or invitation to bid. instructions to Bidders, sample forms and the Contractor's bid are not part of the contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents., This Agreement is entered into as of the day and year first written above and is executed in at least four original copies of which one is to be delivered to the Contractor, one each to the Construction Manager and Architect for use in the administration of the Contract, and the remainder to the Owner. (SEAL) Attest: DANNY L. KOLHAGE, Clerk A Deputy Clerk Date (SEAL) Attest: A -- Title: BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA By Mayor/Chairman CONTRACTOR In Title: END OF SECTION 00500 MONROE COUNT TATTORNEY APP OVED R E WOLFE CHIEFSIS�ANF CO fY ATTORNEY J{r� Date 10/30/2003 3:51 PM AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-6 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: November 19, 2003 Division: Public Works Bulk Item: Yes X No Department: Enaineerina/ConstructionManaaement AGENDA ITEM WORDING: Approval to enter into a contract with WindTech to replace windows at the Gato Building, and approval of Resolution transferring funds. ITEM BACKGROUND: (SEE ATTACHED) PREVIOUS RELEVANT BOCC ACTION: On May 21, 2003, the BOCC granted approval to enter into a Modification to the Hazard Mitigation Grant Agreement Number 01 HM-4R-1 1-54-15-009 with the Department of Community Affairs for the Gato Building Retrofitting Project. The request was for a time extension of one year to allow the additional time necessary to resolve the issue with the non -compliant windows in the Gato Building. At the same time the BOCC granted approval of request to institute legal action, at a time to be determined by County Attorney, relative to manufacture and installation of the windows at the Gato Building. On October 15, 2003, the BOCC granted conceptual approval to waive Purchasing & Policy Procedures and enter into a contract with WindTech to replace windows at the Gato Building. CONTRACT/AGREEMENT CHANGES: NONE STAFF RECOMMENDATIONS: Approval as stated above. TOTAL COST: $762,079.00 BUDGETED: Yes X NO COST TO COUNTY: $762,079.00 SOURCE OF FUNDS: Infrastructure Sales Tax 304-24000-560620-CG9804-560620 REVENUE PRODUCING: YES_ NO X AMOUNT PER MONTH YEAR APPROVED BY: Co O B/Purchasing Ris a agement Item Prepared By: _ Stephanie Coffer, onstruction Manager Davi . Koppel, P.E., County Engineer DIVISION DIRECTOR APPROVAL: Dent Pierce, Division Director DOCUMENTATION: Included X To follow Not required DISPOSITION: AGENDA ITEM # AGENDA ITEM BACKGROUND: Monroe County was awarded two Hazard Mitigation Grants for the installation of Category 5 hurricane rated windows in the Gato Building. The grants totaled approximately $731,000.00. Following construction, impact tests were performed and the windows failed the tests and therefore did not meet the grant specifications. In short, the windows have delaminated, leaked during even moderate rain storms, and repeatedly have failed tests even after modifications. Because of their deficiencies, the existing windows must be replaced with windows that do meet the grant specifications. Staffs negotiations with the architect, contractor and vendors to modify or replace the windows have not produced a satisfactory resolution. Consequently, the County has initiated litigation against those parties but that may take months if not years to resolve. In September of 2003, FEMA indicated that the grant money may be withdrawn if the County does not immediately take steps to install windows that comply with the grant requirements. WindTech has submitted a proposal to provide and install the windows that appear to meet those requirements. Staff is working with WindTech to refine the technical issues associated with the windows and their installation. Staff is also working with the County Attorney's office and all associated agencies to obtain the necessary approvals and_ permitting of this work to include Historic Architectural Review Board, State Historic Preservation Office (SHPO), City of Key West building Department, and the Navy. The Navy has indicated that they will defer to SHPO's decision regarding the replacement windows and SHPO has determined that the proposed replacement windows may be used. The City of Key West Building Department has indicated their desire to work with the County in correcting the problem. If the County takes no action, it will be left with a building with windows that leak and are vulnerable to wind damage. Moreover, the County stands to lose $585,000.00 in grant money from FEMA and the State and may have to refund $146,000.00 to FEMA for funds already received pursuant to a previous grant. This scenario would represent a net loss to the County of $731,000.00. Initial Construction Estimated Replacement 2 Estimated Total Cost ($) Cost ($) Cost ($) Window Cost (-) 926,323.00 772,079.00 1,698,402.00 Grant Funding (+) 146,000.00' 585,000.00 731,000.00 County's Obligation (-) 780,323.00' 187,079.00 4 967,402.00 ' $926,323.00 if the County chooses not to correct window design. 2 Replacement system engineered for 150 MPH ASCE 7-98 wind loads (includes $10,000.00 disposal fees). ' If the County chooses not to proceed with the window replacement the $146,000.00 from grant funds must be returned. 4 Net outlay for window replacement. By choosing to replace -the windows, the County must spend approximately $41,079.00 over the option of leaving the current windows in place and doing nothing. DATE: 06 Nov 03 DES/DRW bbr PROJECT: Gato_windload Gato Window Cost Comparison NO. 1 mow::-r Of 1 C�UNTY . MONROE Resolution No. - 2003 A RESOLUTION CONCERNING THE TRANSFER OF FUNDS WHEREAS, it is necessary for the Board of County Commissioners of Monroe County, Florida, to make budgeted transfers in the Monroe County Budget for the Fiscal Year 2004, therefore, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA, that there shall be transfers of amounts previously set up in the Monroe County Budget for the Fiscal Year 2004 as, hereinafter set forth to and from the following accounts: Fund #304- One Cent Infrastructure Sales Tax From: 304-5900-85532-590990 Other Uses Cost Center # 85532- Reserves 304 For the Amount: $100,000.00 To: 304-5190-24000-560620-CG9804-560620 Capital Outlay- Buildings Cost Center # 24000- General Government Capital Projects Project #CG9804- Gato Building BE IT FURTHER RESOLVED BY SAID BOARD, that the Clerk of said Board, upon receipt of the above, is hereby authorized and directed to make the necessary changes of said items, as set forth above. PASSED AND ADOPTED by the Board of County Commissioners of Monroe County, Florida, at a regular meeting of said Board held on the 19th day of November AD 2003. Mayor Spehar Mayor Pro Tem Nelson Commissioner McCoy Commissioner Neugent Commissioner Rice BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA Wo Mayor/Chairman (Seal) Attest: DANNY L. KOLHAGE, Clerk Gato reso 11/7/2003 Page 1 MONROE COUNTY BOARD OF COUNTY COMMISSIONERS r i CONTRACT SUMMARY Contract with: Wind -Tech Products, Inc. Contract # Effective Date: November 19, 2003 Expiration Date: Contract Purpose/Description: Installation of new Gato Building Hurricane Windows. Contract anager: S nie Coffer 4468 Construction Management ( ame) (Ext.) (Department/Stop #) for BOC eetin on 11/19/03 Agenda Deadline: 11/7/03 CONTRACT COSTS Total Dollar Value of Contract: $ 762,079.00 Current Year Portion: $ 762,079.00 Budgeted? Yes® No ❑ Account Codes: 304-24000-560620-CG9804-530340 Grant: $ - - - - County Match: $ - - - - ADDITIONAL COSTS Estimated Ongoing Costs: $/yr For: Not included in dollar value above e . maintenance, CONTRACT REVIEW Changes Date In Needed Division Director Yes❑ No❑ Risk Management Ol03 Yes❑ No[D"_ Date Out 71c3 O.M.B./Purchasingll/07/03 Yes❑ Nog Jeniffer Hill 11/07/03 County Attorney � Yes[:] No[2r"' IQ vivits rorm tcevlsea 1/2//ul mup #2 Section 00500 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM AGREEMENT made as of the 19th day of November in the year of TWO THOUSAND THREE (In Words, indicate day, month and year.) BETWEEN the Owner: Monroe County Board of County Commissioners (Name and address) 500 Whitehead Street Key West, Florida 33040 and the Contractor: Wind -Tech Products, Inc. (Name and address) 100 E. Castle View Dr. Braselton, GA 30517 For the following Project: Installation of GATO Building Hurricane Windows (Include detailed description of project, 1100 Simonton Street location, address and scope) Key West, FL 33040 The Construction Manager is: Stephanie Coffer (Name and address) Monroe County Construction Management 1100 Simonton Street Second Floor — Room 2-216 Key West, Florida 33040 The Architect is: "Where contract documents specify Architect, the (Name and Address) Construction Manager shall be substituted for Architect" The Owner and Contractor agree as set forth below. 11M2003 AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-1 ARTICLE 1 The Contract Documents The Contract Documents consist of this Agreement, Conditions of the Con 4.3 Unit prices, if any, are a; other Conditions), Drawings, Specifications, Addenda issued prior to exeCL documents listed in this Agreement and Modifications issued after executi( Concrete/Repair, Contract, and are as fully a part of the Contract as if attached to this Agree represents the entire and integrated agreement between the parties hereto representations or agreements, either written or oral. An enumeration of tl• Modifications, appears in Article 9. ARTICLE 2 The Work of this Contract The Contractor shall execute the entire Work described in the Contract Do 5.1 Based upon Application., specifically indicated in the Contract Documents to be the responsibility of 1 Project Applications and Certific, Scope of Work as specified in the Exhibit: shall make progress payments c in the Contract Documents. 5.2 The period covered by a ARTICLE 3 of the month, or as follows: Date of Commencement and Substantia 5.3 Provided an Application 3.1 The date of commencement is the date from which the Contract Ti Of a month, the Owner shall maH shall be the date of this Agreement, as first written above, unless a differen month. If an Application for Payi made for the date to be fixed in a notice to proceed issued by the Owner. above, payment shall be made t the Application for Payment. 5.4 Each Application for Pad accordance with the Contract D( the various portions of the Work Unless the date of commencement is established by a notice to proceed is accuracy as the Construction Mc notify the Owner, through the Construction Manager, in writing not less that Construction Manager or Archite Work. Payment. 3.2 The Contractor shall achieve Substantial Completion of the entire 1 5.5 Applications for Pa pp Y men (Insert the calendar date or number of calendar days after the date of commencement. Also end of the period covered by the Completion of certain portions of the Work, if not stated elsewhere in the Contract Document 5.6 Subject to the provision: sixteen 0 6) weeks from date of commencement computed as follows: subject to adjustments of the Contract Time as provided by the Contract DI 5.6.1 Take that portion of the (Insert provisions if any for liquidated damages relating to failure to complete on time) the percentage completion of ea portion of the Work in the Schec of cost to the Owner of changes The amount of credit to be allow decrease in the Contract Sum sl additions and credits covering re ARTICLE 4 and profit shall be figured on the Contract Sum 5.6.2 Add that portion of the C stored at the site for subsequent 4.1 The owner shall pay the Contractor in current funds for the Contra( Owner, suitably stored off the sil Contract Sum of seven hundred sixty-two thousand seventy-nine and to additions and deductions as provided in the Contract Documents. 5.6.3 Subtract the aggregate 4.2 The Contract Sum is based upon the following alternates, if any, w 5.6.4 Subtract amounts, if an, Documents and are hereby accepted by the Owner: NONE Certificate for Payment as provii (State the numbers or other identification of accepted alternates. If decisions on other alterr to the execution of this Agreement. Attach a schedule of such other alternates showing the + 5.7 The progress payment; amount is valid.) under the following circumstanc 11/7/2003 AGREEMEP 11/7/2003 AGREEMENT BETWEEN OWNER AND CONTRA 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety percent (90%) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete Work and unsettled claims; and 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Subparagraph 9.10.3 of the General Conditions. 5.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Subparagraphs 5.6.1 and 5.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitations) ARTICLE 6 Final Payment Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment: and (2) a final Project Certificate for Payment has been issued by the Construction Manager and Architect: such final payment shall be made by the Owner not more than 20 days after the issuance of the final Project Certificate for Payment, or as follows: ARTICLE 7 Miscellaneous Provisions 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any) (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) 7.3 Temporary facilities and services: (Here insert temporary facilities and services which are different from or in addition to those included elsewhere in the Contract Documents.) 7.4 Monroe County's performance and obligation to pay under this contract is contingent upon an annual appropriation by the Board of County Commissioners. 7.5 A person or affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to public entity, may not be awarded or perform work as contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list. 11/7/2003 AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-4 ARTICLE 8 Termination or Suspension 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. 8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. Article 9 Enumeration of Contract Documents 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.2 The General Conditions are the General Conditions of the Contract for Construction. Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. 9.1.3 Other documents, if any, forming part of the contract Documents are as follows: (Last here any additional documents which are intended to form part of the Contract Documents. The General Conditions provide that bidding requirements such as advertisement or invitation to bid. Instructions to Bidders, sample forms and the Contractor's bid are not part of the contract Documents unless enumerated in this Agreement. They should be listed here only If intended to be part of the Contract Documents.) The information included in the following exhibits define the requirements of the work and must be read and included chronologically. Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F 11/7/2003 AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-5 This Agreement is entered into as of the day and year first written above and is executed in at least four original copies of which one is to be delivered to the Contractor, one each to the Construction Manager and Architect for use in the administration of the Contract, and the remainder to the Owner. (SEAL) Attest: DANNY L. KOLHAGE, Clerk in Deputy Clerk Date (SEAL) Attest: BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA M By: By: Title: Title: Mayor/Chairman CONTRACTOR END OF SECTION 00500 MONROE COUNTY ATTPXNEY OVED AST M: - - UZAN A. U TON ASSISTANT N A ORNEY Date _ 11/7/2003 AGREEMENT BETWEEN OWNER AND CONTRACTOR 00500-6