Loading...
Item C04 C.4 `, County of Monroe y,4 ' �, "tr, BOARD OF COUNTY COMMISSIONERS Mayor Michelle Coldiron,District 2 �1 nff `ll Mayor Pro Tem David Rice,District 4 -Ile Florida.Keys Craig Cates,District 1 Eddie Martinez,District 3 w Mike Forster,District 5 County Commission Meeting September 15, 2021 Agenda Item Number: C.4 Agenda Item Summary #8600 BULK ITEM: Yes DEPARTMENT: Engineering/Roads TIME APPROXIMATE: STAFF CONTACT: Debra London (305) 453-8754 N/A AGENDA ITEM WORDING: Approval of Amendment Six to the contract with WSP USA, Inc. for engineering design and permitting services for the Sea Level Rise Pilot Project to extend the project limits of the Sands Subdivision (Big Pine) project to include the east end of Avenue G. The amendment adds engineering design services to elevate a portion of Avenue G and provide drainage in the maximum not to exceed amount of$77,949.58. ITEM BACKGROUND: The east end of Avenue G is approximately 8 to 10 inches lower in elevation than the surrounding roads and regularly floods during king tide events. Although it was not included in the original project boundaries staff determined that adding this work to the existing Sands Subdivision Sea Level Rise Adaptation project was the most cost effective way to address the flooding on adjacent Avenue G. The additional scope of work in this amendment includes topographic survey, engineering design and permitting of the additional roadway, utility coordination and harmonization with adjacent properties along Avenue G. PREVIOUS RELEVANT BOCC ACTION: July 21, 2021- The BOCC approved Amendment Five to the contract with WSP USA, Inc. for Engineering Design and Permitting for the Sea Level Rise Pilot Project, to provide HUD-DEO- CDBG-DR environmental review/environmental assessment and statutory checklist requirements in the maximum not to exceed amount of $15,460.37, revising the total contract amount to $1,047,451.79. March 17, 2021 — The BOCC approved Amendment 4 to the contract to evaluate and revise the roadway design criteria to higher target elevations based on more recent sea level rise projection data for both the Twin Lakes and Sands subdivisions; revised the pump station layout onto two County owned lots for the Sands design; added three phase power design for the electrical utility tie in for the pump station in Twin Lakes, and prepared a memorandum to evaluate the feasibility and cost of the use of outfalls versus injection wells. These revisions are in the maximum not to exceed amount of$467,943.61, revising the total contract amount to $1,031,991.42. Packet Pg. 177 C.4 August 19, 2020 — The BOCC approved Amendment 3 to the contract adding lightning protection design in the maximum not to exceed amount of $18,278.00, revising the total contract amount to $564,047.81. November 20, 2019 — The BOCC approved Amendment 2 to the contract for National Park Service (NPS) - (Everglades National Park) permitting requirements in the maximum not to exceed amount of$20,751.77, revising the total contract amount to $545,769.81. October 16, 2019 — The BOCC approved Amendment 1 to the contract for subconsultant Longitude Surveyors additional topographic and boundary surveying services in the amount of $7,500.00, due to utilization of the lot purchased by the County to be used for pump station infrastructure; RE Number 00302870-000000, Avenue C and Father Tony Way, Big Pine Key, revising the estimated not to exceed amount to $525,018.04. June 19, 2019 — The BOCC approved the purchase of lot RE number 00302870-000000 in the Sands subdivision on Big Pine Key for the installation of drainage system pump station equipment for the Sea Level Rise Pilot project. November 20, 2018 — The BOCC approved a contract with WSP USA, Inc. in the amount of $517,518.04 for Engineering Design and Permitting for the Sea Level Rise Pilot Project. July 18, 2018 — The BOCC approved negotiations with WSP USA, Inc., the highest ranked respondent for Engineering Design and Permitting for the Sea Level Rise Pilot Project. January 18, 2017 — The BOCC approved by resolution the final report of the Tidal Flooding Roads Demonstration Project, which recommends road improvements in two communities (Twin Lakes subdivision in Key Largo and the Sands Subdivision in Big Pine Key) and to move forward with the design phase to implement the recommendations. November 22, 2016 — The BOCC approved Amendment No. 9 to the Sustainability Action Plan/Climate Change and Energy Savings Initiatives contract to finalize tasks for the Pilot Roads/Tidal Flooding Roads Demonstration Project for specified roads in the Twin Lakes subdivision in Key Largo and the Sands Subdivision in Big Pine Key. CONTRACT/AGREEMENT CHANGES: Add Avenue G design scope in the amount of$77,949.58 STAFF RECOMMENDATION: Approval of Amendment 6 to WSP USA, Inc. Engineering and Design Sea Level Rise contract. DOCUMENTATION: Amendment 6 WSP Design Services Sands Ave G (002)-signed CLB (002)_WSP Executed 08192021 (001) 5 Amendments and original WSP contract Packet Pg. 178 C.4 FINANCIAL IMPACT: Effective Date: September 15, 2021 Expiration Date: 30 days after final construction completion Total Dollar Value of Contract Amendment 6: $77,949.58. Total Cost to County: $77,949.58. Current Year Portion: $0. Budgeted: yes Source of Funds: 102— County Road and Bridge Fund 22562 CPI: N/A Indirect Costs: N/A Estimated Ongoing Costs Not Included in above dollar amounts: N/A Revenue Producing: NO If yes, amount: Grant: no County Match: N/A Insurance Required: yes - Additional Details: Amendment 6 adds $77,949.58. to WSP USA, Inc. SLR design contract for a revised total contract amount of$1,125,401.37. 09/15/21 102-22002 - COUNTY ENGINEER R & B $77,949.58 Sea Level Rise Pilot Project REVIEWED BY: Judith Clarke Completed 08/30/2021 3:13 PM Christine Limbert Completed 08/30/2021 4:44 PM Purchasing Completed 08/30/2021 4:48 PM Budget and Finance Completed 08/31/2021 10:49 AM Maria Slavik Completed 08/31/2021 10:49 AM Liz Yongue Completed 08/31/2021 11:06 AM Board of County Commissioners Pending 09/15/2021 9:00 AM Packet Pg. 179 C.4.a AMENDMENT 6 TO THE CONTRACT FOR ENGINEERING DESIGN AND PERMITTING SERVICES BETWEEN MONROE COUNTY BOCC AND WSP USA, INC. FOR THE SEA LEVEL RISE ROADWAY AND DRAINAGE PILOT PROJECT (SANDS- BIG PINE KEY) THIS AMENDMENT 6 to the CONTRACT is entered into this 15th day of September 2021, between Monroe County, whose address is 1100 Simonton Street, Room 2-216 Key West, Florida 33040, hereafter the "COUNTY" and WSP USA, Inc., a Corporation of the State of New York, whose address is 7650 Corporate Center Drive, Suite 300, Miami, FL 33126, hereafter referred to as "CONSULTANT". WHEREAS, on the 20th day of November 2018, the parties executed a contract authorizing the Consultant to '✓ perform Professional Services for the Engineering Design and Permitting Services for the Sea Level Rise Roadway and r- Drainage Pilot Project, for an estimated not to exceed amount of$517,518.04; and �-- - cv WHEREAS, on the 16th day of October 2019, the parties executed AMENDMENT 1 to the contract for subconsultant Longitude Surveyors to perform additional topographic and boundary surveying services in the amount of co $7,500.00, due to utilization of the lot purchased by the County to be used for pump station infrastructure; RE Number 00302870-000000, Avenue C and Father Tony Way, Big Pine Key; and revising the estimated not to exceed amount to $525,018.04; and WHEREAS, on the 20th day of November 2019, the parties executed AMENDMENT 2 to the contract to add National Park Service (NPS) permitting requirements in the amount of$20,751.77 due to the Key Largo project right-of CL - way encroachment on Everglades National Park lands; and revising the estimated not to exceed amount to$545,769.81; and ! WHEREAS, on the 19th day of August 2020, the parties executed AMENDMENT 3 to the contract to revise the contract to add lightning protection design for the electrical equipment associated with the proposed pump stations in �-- the amount of$18,278.00, and revising the estimated not to exceed amount to$564,047.81; and WHEREAS, on the 17th day of March 2021, the parties executed AMENDMENT 4 to the contract to revise the contract to add Task 1: Evaluate new target elevations (Twin Lakes and Sands); Task 2: Evaluate use of outfall versus injection wells for disposal method; Task 3: Revise the Sands pump station layout onto two County owned lots; Task 4: �+ Provide subsurface electrical conduit design for Phase 3 power connection required by FKEC (Twin Lakes); Task 5: cv Revise design to incorporate new target elevation(Twin Lakes)Task 6: Revise design to incorporate new target elevation (Sands) in the estimated not to exceed amount of $467,943.61, revising the total estimated not to exceed amount to $1,031,991.42; and 0) WHEREAS, on the 21st day of July 2021, the parties executed AMENDMENT 5 to the contract to revise the contract to amend Article II Scope of Basic Services to add environmental assessment for Sands subdivision and compliance support as required by U.S. Department of Housing and Urban Development's (HUD) Community Development Block Grant (CDBG) Program grant requirements in the estimated not to exceed amount of$15,460.37, 0) revising the total estimated not to exceed amount to $1,047,451.79; and NOW THEREFORE, in consideration of the mutual promises contained herein, the COUNTY and CONSULTANT agree to amend Article II, Scope of Basic Services;Article VII, Compensation, Paragraph 7.1.1 of the contract as follows: Amend Article II Scope of Basic Services per Attachment A to add Avenue G Sands subdivision Sea Level Rise CL Pilot project scope to include topographic survey, updating drainage model, design of approximately 1000 linear feet or roadway, design ditches, identify existing utilities and harmonize roadway to existing private property in the estimated not to exceed amount of$77,949.58, revising the total estimated not to exceed amount to$1,125,401.37. Amendment 6 Task WSP Avenue G Extension Design $ 68,449.58 Subconsultant Longitude Surveyors LLC Survey $ 9,500.00 E TOTAL $ 77,949.58 The costs are a maximum not to exceed amount based on WSP hourly contract rates and subconsultant lump sum amounts. 1 Packet Pg. 180 C.4.a This AMENDMENT 6 is effective September 15, 2021. In all other respects,the Contract approved November 20,2018, BOCC,as amended October 16,2019, November 20, 2019, August 19, 2020, March 17, 2021 and July 21, 2021, remains in full force and effect. In WITNESS WHEREOF, each party hereto has caused this contract to be executed by its duly authorized representative. 2 BOARD OF COUNTY COMMISSIONERS OF WSP USA, Inc. MONROE COUNTY, FLORIDA Consultant Digitally signed by Ronald M Colas,PE,SI DN:cn=Ronald M Colas,PE,SI, -US,o=WSP USA INC, P' email=RonaId.CoIas@wsp.com (V Data 2021.08.19 09:57:15-04'00' BY. BY: tV Mayor/Chairman TITLE: Vice President-Dr. Managing Director CIO x The foregoing instrument was subscribed and CL sworn to (or affirmed) before me, by means of O physical presence or LJonline (SEAL) Attest: KEVIN MADOK, Clerk this 19thday of August 2021, by Ronald M. Colas BY: Who is (x) personally known to me As Deputy Clerk or who ( ) produced a driver's license as identification. � � cv DATE: y.. NOTARY PUBLI �A E OF FLORIDA W Print, type of stamp commissioned name of notary MONROE COUNTY ATTO R NEYPPR? fn �YjhP� t(AS TO �J' tb �h"I i��(XEa pP `e cwRISTrNE LIMHEIYT E3ARItOwS ;.`*, G HElD1f+COIiDI 'VA ASSISTANT COUNTY ATTORNEY SATE 8/16/21 Notary Public- State of Florida Commission # HH 69206 My Comm. Expires Dec 3, 2024 � CL 2 Packet Pg. 181 C.4.a ATTACHMENT A 0 N CD a) T- co CL N CL Packet Pg. 182 C.4.a t TASK 1. AVENUE G EXTENSION 0 As part of the design in the Sands Community,the east end of Ave G(from 4'Street east to the 6 road terminus adjacent to the bay)will be added to the project.This avenue is not part of the 0 original SLR project area and shall include both roadway and drainage components.Avenue G 0. shall be raised to meet the target elevation of 19"above 0.0'NAVD88. The work effort due to this elevation increase will include the design of approximately 1,000 LF of roadway,design ditches CD and harmonization with properties along the road,and to design the drainage collection system along this street. CD Additional information shall be obtained for the drainage design and installation, such as a T' topographic survey,existing utilities,etc.This data is listed below,as a component of the co necessary scope to complete the task of the subject. Per your request,this proposal outlines the design effort related to the extension. W Services to be provided shall include the following activities: CL U) 1. Coordination with Monroe Co.,utility owners and WSP subconsultants,part of this amendment. N CD 2. Development of Complete Engineering Plans for the roadway and drainage improvements.Plans shall be submitted in review phases as follows: 90%and 100%for review and comments by the County. 3. Preparation of Contract and Bid Documents for the County. ,I,ssu mption C44 1. All review and approval of the design package is to be done by the County only. 0) 2. Geotechnical information used for the Sea Level Rise Pilot Project will be used for this > contract,as well. 3. Design of relocation for other utilities is not included in this proposal. ) 4. It is assumed that WSP will receive review comments from the County on all deliverables within 2 weeks following delivery.No more than one(1)review set from each party(2 in total)will be addressed per delivery. 5. Design of detailed/phased MOT plans are not included as part of this proposal.A N conceptual MOT plan shall be prepared. p CL 6. It is assumed there is no ground water or soil contamination within project areas that would require additional design and permitting. If these tasks are required by Regulatory Agencies,they will be part of a separate scope of work. 7. No wetland delineations or remediation are included in this proposal. Task I -- Project Management e( This task will consist of project control activities inclusive of contract maintenance and administration, sub-consultant coordination,and document control as follows: m E - Serve as manager of the project and main coordinator with the County and Longitude - Setup and maintain the project contract and files Packet Pg. 183 C.4.a t - Develop and submit progress reports and invoices 0 - Perform Quality Assurance/Quality Control(QA/QC)of all deliverables to the County 6 Deliverables: 2 - Progress Reports Task 1.2 _..,Data'Collection and Ana h-sls r Along Ave.G from Father Tony Way to the road terminus adjacent to the bay.: cv CD - Obtain,analyze and locate in CADD the existing utilities data.Information shall be C44 requested from Sunshine and all utility owners in this zone.Underground lines will be co compiled from collected as-builts,records provided by the utility owners and new a topographic survey information. - Obtain and analyze topographic survey Along Ave. G from Father Tony Way to the road x LLJ terminus adjacent to the bay(provided by Longitude) CL U) Deliverables: 1 N - Electronic Files of the as-built collected information I,asl 13 --- [Jfi Ales Coordination � CJ WSP shall request a design ticket from Sunshine 811 for Avenue G of this project and coordinate a with utility agency owners to obtain records of existing utilities and information related to proposed/future utility improvements within the project limits.WSP will be responsible for utility coordination,as follows: CD e - Pull the Sunshine 811 ticket and retrieve list of stakeholders within the project vicinity - Identify potential conflicts(horizontal and vertical)with existing utilities and coordinate with utility owner for the relocation - Attending one(1)meeting with utility owners with jurisdiction and or facilities on the ) project area(max 10 utility owners)and ensuring expedient follow-up on unresolved issues Deliverables: - Utility master spreadsheet N Task 1 A.._,Meetings CL Attendance and preparation of minutes for meetings during development of the design: - 90%design review and coordination meetings with Monroe Cty(2 hrs x 2 pp x 2 ea=8 r_ hrs) E - 100%design review and coordination meetings with Monroe Cty(2 hrs x 2 pp x 2 ea=8 hrs) E e( Deliverables: �. - Minutes of meeting E Packet Pg. 184 C.4.a t .1 sash 1.5,to 1A6... Design tend 11ans Dever ojwnent 90"%; and 1,00(No 0 WSP will submit the following documents at 90%and 100%stages of Complete Construction Documents: > 2 - Roadway analysis: Determine new limits of reconstruction,overbuild and milling&resurfacing for the -� current project area and the new extended project area. CD Pavement design analysis: N CD Raising the road to the target elevation requires an extensive pavement design analysis. a) T_ According to our geotechnical sub-consultant it will be hard to protect the base and CO subbase if we are adding this much asphalt on top.We may need to go with reconstruction instead of resurfacing&overbuild.Reconstruction might also be the most cost-effective solution since a lot of overbuild is costly. X W Drainage analysis: CL Raising the road to the design elevation will require redesign of the ditches.Ave.G sub- �:1 basins shall be defined and inlets shall be provided at low point in the exiting topography. CD Analysis/design of harmonization to properties shall be performed to verify the low point elevation with relation to crown of the road and property line. U - Roadway plan&profile(4 sheets): Plan view:provide limits of reconstruction,overbuild and milling&resurfacing N (including labels and patterns);update roadway geometry(different width of road c i CD depending on if it is only milling&resurfacing or also overbuild);generally update and add labels Profile view:raise profile;include labels associated with profile(including geometry labels); limits of reconstruction,overbuild and milling&resurfacing; Deliverables: - Plan set size 11"x17",2 set hard copies and 1 set in pdf format for 90%, 100%and Final design submittal - All CAD files submitted electronically at Final submittal - Specifications&OPCC in pdf format for 90%and 100%submittal Exclnsltnns CL The following items are excluded from the Scope of Work: 1. Design of relocation of utilities are not included in this proposal m 2. Applying for permit 3. Permitting due to unforeseen ground water or soil contamination within the project limits is not included and if required by regulatory agencies,will be part of a separate scope proposal 4. Landscape and irrigation design 5. Environmental Engineering Packet Pg. 185 C.4.a t 6. Subsurface Utility Engineering(SUE) 4- 0 76 Please refer to Attachment C Esti w,fte l Fee Table 2 below contains the total estimated cost for this task including a breakdown of the cost of WSP's team.Longitude's,scope and fee can be found under Attachments B. CD cv CO CD CL cv CD CJ cv CD Cu CL to Packet Pg. 186 C.4.a COVEY .________________________________________ L L 0 N G I T U D E Friday, July 16, 2021 VIA EMAIL:stacl ..sc tan �� AVENUE G Ms.Stacie Schotanus, EIT ENV SP Water Resources Department Project Engineer 76 iS P o 7650 Corporate Center Drive Suite 300 r Miami, FL 33126 305.514.3157 r cv RE:Surveying and Mapping services for Avenue G, Big Pine Key, Monroe County, FL Dear Ms.Stacie Schotanus, co Pursuant to your request regarding a fee estimate for Surveying and Mapping services for the above-referenced project, LONGITUDE SURVEYORS, LLC (LS) is pleased to submit the following Proposal for your consideration. A.Scope of Work-Topoaraphic Survey: p Longitude will recover and/or re-establish right-of-way monumentation to provide rights-of-way lines,centerlines, CL property lines,and all parcels with their number throughout limits of the project. In instances where Longitude cannot find sufficient monumentation to determine the rights-of-way; after the pavement has been located, Longitude will compute a best-fit centerline alignment showing the physical roadway location. LS will provide a graphical baseline only. �-- The Topographic Survey will consist of, but will not be limited to the following: paved roads,signs, trees, above- ground evidence of underground utilities, manholes,drainage structures, driveways, and significant above- ground improvements. Longitude Surveyors will locate existing utilities by researching into utility provider records and contacting the c utility companies to mark their facilities in the project limits.SUE (Designation with a GPR and Electro Magnetic N Locator) and Soft-Digs are not a part of this Proposal. cv LS will show utility poles and provide data sheets listing pertinent identification information for each pole. Longitude will collect elevations equivalent to a fifty (50) foot grid along the main roads and a fifty (50) foot grid at the intersections,within Survey limits. LS will only locate trees with a three (3) inch diameter trunk or larger.Vegetation lines will also be located (this will be limited to the areas where Longitude performs Topographic Survey). Longitude will collect rim, bottom and invert elevations, and attempt to provide pipe size and material of all existing sanitary and drainage structures. LS will locate and show wetlands in coordination with Environmental Sub-Consultant, if applicable.This task must be coordinated to be performed while LS is on site performing the field survey. LS will not mobilize after the field survey is completed to perform this task. Longitude Surveyors will label the ground material (asphalt, sod, concrete, etc.) on the Survey file. c Horizontal control will be referenced to the State Plane Coordinate System (Florida East Zone NAD 83/201 1). Vertical control will be referenced to NAVD88 established from the nearest governmental benchmark of record. B.Survey Limits: CL Beginning at Father Tony Way;then east along Avenue G to the road terminus adjacent to the bay, as per attached Exhibit provided by Client. C. Deliverables: Longitude Surveyors will provide WSP four (4) signed and sealed paper copies,a PDF, and CAD file of the resulting Survey. D.Time of Completion: Longitude Surveyors has estimated fifteen (15) business days from Notice to Proceed (NTP) to complete this task. Notice to Proceed (NTP) is considered effective twenty-four (24) hours after this proposal is signed and sent back to the undersigned. LONGIIUDE SLJR EYORS 7769 NW 48 Street ® SURE;375 a Doral, FL.33166 - Ph: 305.4610912 - Fax: Packet Pg. 187 C.4.a COVEY .________________________________________ L L 0 IN G I T U D E E. Fee: The total professional fee to complete the Scope of Work shall be a lump sum of 9 500.00. 76 I understand and agree by signing below"I APPROVE AND ACCEPT" this proposal as a legal binding contract. c By: Date: r (Authorized Signature) �-- cv cv Title: co (Typed or printed name) a On behalf of the firm, I thank you for the opportunity to present this Proposal. We look forward to utilizing our best professional efforts on your behalf on this very important Project. CL Respectfully Yours, 7 Eduardo M.Suarez, PSM/PId ent a cv CL LONGIIUDE SLJR EYORS 7769 NW 48 Streef ® SURE;375 a Doral, FL.33166 - Ph: 305.4610912 - Fax: Packet Pg. 188 �t t nt w � 1t � S re i}pi4a�t t � FatherTo y WaIN tk � 6rTV� t6 t } �Pt J �,,n �y '� 'g ��} �y� � � s is P 'ii ) '�4ath �'� • t t�H DATE(I ! C.4.a A�® CERTIFICATE OF LIABILITY INSURANCE 11/1/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THI: CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIE: BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZE[ REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement of this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT 4" NAME: AJG Service Team O Arthur J. Gallagher Risk Management Services, Inc. PHONE FAx 76 250 Park Avenue, 5th Floor vC No Ext: 212-981-2485 vC'Noy 212-994-7074 New York NY 10177 ADDRESS: GGB.WSPUS.CertRequests@ajg.com 0- I INSURER(S)AFFORDING COVERAGE NAIC# I. INSURERA:QBE Specialty Insurance Company 11515 <_ INSURED WSPGLOB-01 INSURER WSP USA Inc. : CD One Penn Plaza INSURER C: W New York, NY 10119 INSURER D: N INSURER E 7 CD N INSURER F: P' COVERAGES CERTIFICATE NUMBER:1481901235 REVISION NUMBER: oo THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOI INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THI: CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERM EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR INSD WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY UJ COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ CL CLAIMS-MADE OCCUR A roved Risk Management DAMAGETORENTED ppPREMISES Ea occurrence $ MED EXP(Any one person) $ I PERSONAL&ADV INJURY $ CCD V GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ POLICY ECT LOC 1-28-2021 PRODUCTS-COMP/OP AGG $ W OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ Ea accident 0) ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accidentCD $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ N WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE ❑ E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ (ry If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ A Professional Liability QPL0022630 11/1/2020 10/31/2021 Per Claim/Aggregate $1,000,000 CLAIMS-MADE 0) C DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) pug THIRTY(30)DAYS NOTICE OF CANCELLATION RE:Project#-193618; Project Description-Engineering Design and Permitting for Sea Level Rise Roadway and Drainage Pilot Project CL CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORI THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED II ACCORDANCE WITH THE POLICY PROVISIONS. Monroe County BOCC 1100 Simonton Street AUTHORIZED REPRESENTATIVE Key West FL 33040 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD packet Pg. 190 DATE(( ! C 4.a A�® CERTIFICATE OF LIABILITY INSURANCE 4/29/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THI: CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIE: BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZE[ REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement oI this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT 4" NAME: AJG Service Team O Arthur J. Gallagher Risk Management Services, Inc. PHONE FAx 76 250 Park Avenue, 5th Floor vC No Ext: 212-994-7100 vC,Noy 212-994-7047 New York NY 10177 E-MAIL ADDRESS: GGB.WSPUS.CERTREQUESTS@AJG.COM I INSURER(S)AFFORDING COVERAGE NAIC# INSURERA:Zurich American Insurance Company 16535 INSURED WSPGLOB-01 INSURER B: Liberty Insurance Corporation 42404 ^� WSP USA Inc. CD One Penn Plaza INSURER C: W New York, NY 10119 INSURER D: N INSURER E 7 CD N INSURER F: P' COVERAGES CERTIFICATE NUMBER:1432882618 REVISION NUMBER: oo THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOI INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THI: CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERM EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR INSD WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY UJ A X COMMERCIAL GENERAL LIABILITY Y GL0983581908 5/1/2021 5/1/2022 EACH OCCURRENCE $3,500,000 CL DAMAGE TO RENTED CLAIMS-MADE X OCCUR PREMISES Ea occurrence) ccurrence $300,000 X Contractual Liab MED EXP(Any one person) $7,500 I PERSONAL&ADV INJURY $3,500,000 CCD V GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $7,000,000 PRO ❑ 100 JECT LOC PRODUCTS-COMP/OP AGG $3,500,000 W POLICY❑ X OTHER: $ B AUTOMOBILE LIABILITY Y AS7-621-094060-031 5/1/2021 5/1/2022 COMBINED SINGLE LIMIT $5,000,000 Ea accident) 0) X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accidentCD $ A X UMBRELLA LIAB X OCCUR AUC0144386-05 5/1/2021 5/1/2022 EACH OCCURRENCE $1,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $1,000,000 DED RETENTION$ Follow Form $ N B WORKERS COMPENSATION WA7-62D-094060-011 5/1/2021 5/1/2022 X PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE � N/A E.L.EACH ACCIDENT $2,000,000 OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $2,000,000 (n If yes,describe under 0) DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $2,000,000 U C DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) pug THIRTY(30)DAYS NOTICE OF CANCELLATION. RE:Project#-193618; Project Description-Engineering Design and Permitting for Sea Level Rise Roadway and Drainage Pilot Project Monroe County BOC is named as Additional Insured as respects General Liability and Auto Liability policies,pursuant to and subject to the policy's terms,definitions,conditions an CL exclusions. 16K T ` 6 . 1 . 2021 oy CERTIFICATE HOLDER :ANCELLATION E ­ SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORI THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED II ACCORDANCE WITH THE POLICY PROVISIONS. Monroe County BOCC 1100 Simonton Street AUTHORIZED REPRESENTATIVE Key West FL 33040 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD packet Pg. 191