1st Change Order 09/21/2021 `v BOARD OF COUNTY COMMISSIONERS County of Monroes , Mayer Michelle Coldiron,District The OI"1 r Mayor Pro I'em David Dice,District 4 Craig Cates,District 1 f Eddie Martinez,District 3 x. Vacant,District 5 Memorandum DATE: 9/20/2021 TO: BOCC cn=Kevin G.Wilson,P.E.,o—Monroe 7 County,FL(the Florida Keys,ou, FROM: Kevin G. Wilson P.E. ''r r` em m ail—wilson-kevin@onroecounty- , ts °t _ fl.gov,c=US 2021.09.20 09:53:28-04'00' SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order #1 for the Cudjoe Gardens Drainage Rehabilitation project. This change order increases the final contract sum by $11,821.01. The substantial completion date is unchanged. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority on Tuesday, September 21, 2021. MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Cudjoe Gardens Drainage Rehabilitation Project CHANGE ORDER : 1 INITIATION DATE: 11 / 1 TO CONTRACTOR: ie Haack Excavation CONTRACT DATE: /1 / 1 The Contract is changed as follows: The original Contract Sum ......,.................................. $139,557.27 Net change by previously authorized Change Order $0 The Contract Sum prior to this Change order was.. .......... ......................,........ .....,..$139,557.27 The Contract Sum is increased by this Change Order#1 .................. $11,821.01 The Revised 1 Contract Sum including this Change Order.__............. ----------- $151,378.28 Pursuant to contract article 7.2.2, the cost or credit to the owner resulting from a change in the work shall be determined in one of more of the following: 7.2.2.1 Mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit evaluation. 7.2 2.2 Unit prices stated in the contract documents or subsequently agreed upon. 7.2.2.3 Cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percentage fee. A manatee grate was installed per project plans to one end of a pipe on Fourth Ave., creating the need for an additional grate on the opposite end of same pipe offsite at a cost of$13,329.01, In addition, a substitution of 29' of 36' RCP pipe was replaced with 18" HDPE pipe because of a utility conflict at a with an exchanged difference credit of$1508,00. Item No. Description Quantity UOM Unit Cost Amount 48" Pipe End Guard 1 Each $13 329,01 + $13,329.01 0430 175 136 36" RCP pipe 29 Ft. $515 - $14,935,00 ADS HP 18" HDPE 29 Ft. $463 +$13,427,00 +$11,821,01 The project commencement was April 8,2021. Contractor agrees to accept the increase in monetary compensation and hereby waives and releases any and all claims for any additional compensation related to these bid items. This Change Order is(8.47%)of the original contract price. Digitally signed by AnnHaackAnn Haack Date:2021.09.17 CONTRACTOR Mike Haack Excavating,Inc. 13:19:35-04'00' 9/17/2021 Date ENGINEERING SERVICES DIRECTOR cn=Kevin G.Wilson,P.E.,o=Monroe County,EL Date kth E@'da Key 'I—wilsorr {I`d onroe tyflg v,c=US ASSISTANT COUNTY ADMINISTRATOR 2021092308:2203-0400 Date MONROE COUNTY ATTORNEY Y€'I'rX. Vk.OA57OEa C9iRNTINF I.M1€ERT-ESA RROWS .ASS I SYAN7 COUNTY AT`FORNEY DArr`. 9/20/21 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes Z No ❑ If Yes, explanation: Due to field measurements and varying roadway widths, quantity of pavement treated increased_ Change Order was included in the original specifications. Yes ❑ No Z If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price(whichever is greater). Yes❑ No Z If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes ❑ No ❑ If no, explanation of why: N/A • Change Order is correcting an error or omission in design document. Yes ❑No 0 Should a claim under the applicable professional liability policy be made? Yes❑ No Explain.- E u AI 127 Industrial Road, Big Pine Key, FL 33043 (305) 872-8945 CHANGE ORDER REQUEST o: Monroe County BOCC Date: 7-15-2021 REV Location: Cudjoe Gardens Drainage Project: F 39-0-2020 Purpose of Bid set does not specify the addition of a manatee grate on existing pipe where no headwall was installed. DESCRIPTION 48"Pipe End Guard $3,500.00 End Guard Modifications(to fasten directly to existin. RCP) $1,200.00 Mobilization(Hydraulic Excavator) $ 750.00 Hydraulic Excavator w/Operator(8) Hours $1,280.00 Dump Truck(4)Hours $ 300.00 BrushNegetation Disposal $ 240.00 (2)Utility Crew Trucks(8)Hours Each $ 720.00 (1)Utility Truck with Crane&Operator $1,120.00 (4)Laborers(8)Hours Each $2,400.00 (1) Foreman(8)Hours $ 720.00 5%Overhead 536.10 5%Profit $ 562.91 Substitute 29'of 36"RCP with 29'ADS HP 18'HDPE Pipe due to existing utility conflicts ( 1,508.00) Breakdown of LineAbove:(-)$14,935 36"RCP Pipe 29LF @$515 LF +$13,427 ADS HP 18"HDPE Pipe 29LF @$463 LF This Change Order will INCREASE the subcontract in the arnount of- $11, 21.01 Original Contract Amount: 139,557.20 Net Change Previous Change Orders $ -- Current Contract Amount 139,557.20 This Change Order will INCREASE the contract in the amount of: 11,821.01 New Contract Amount including this Change Order 151,378.21 Exclusions: Engineering,Railings,Permit Fees,Bonding,Landscaping,Sod,Irrigation,Hardscape,etc.unless detailed under Description. MIKE HAACK EXCAVATING,INC.