Loading...
2. 1st Change Order 09/16/2021 `v BOARD OF COUNTY COMMISSIONERS County of Monroes , Mayer Michelle Coldiron,District The OI"1 r Mayor Pro I'em David Mice,District 4 Craig Cates,District 1 f Eddie Martinez,District 3 x. Vacant,District 5 Memorandum DATE: 9/15/2021 TO: BOCC ;.k cn=Kevin G.Wilson,P.E.,o=Monroe County, �".,(..' ,' a ,j FL(the Florida Keys,ou,email—wilson- FROM: Kevin G. Wilson, P.E. .t., .' kevin@monroecounty-Fl.gov,c=US 2021.09.15 16:41:23-04'00' SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order#1 for the Harbour Drive Bridge (#904604) and Seaview Bridge (#904606) Strengthening project. This change order increases the final contract sum by $80,014.00. The substantial completion date is unchanged. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority on Thursday, September 16, 2021. MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CHANGECONTRACT OMER PROJECT TITLE: Harbour Drive Bridge (#904604)and Seaview Drive Bridge (#904606) Strengthening Project CHANGE ORDER NO: 1 INITIATION DATE: 9/14121 TO CONTRACTOR:American Empire Builders, Inc. CONTRACT DATE: 3/10121 The Contract is changed as follows: The original Contract Sum ...................................................................................................$1,663,376.00. Net change by previously authorized Change Order.................................................................................$0. The Contract Sum prior to this Change order was......................................a..............................$1,663,376.00. The Contract Sum is(increased)by this Change Order#2........................................................... —$80,014.00. The Revised 1 Contract Sum including this Change Order......................................................... $1,743,390.00. Pursuant to contract article 7.2.2, the cost or credit to the owner resulting from a change in the Work shall be determined in one or more of the following: 7.2.2.1 mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit evaluation. 7.2.2.2 unit prices stated in the Contract Documents or subsequently agreed upon. 7.2.2.3 cast to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percentage fee. The contractor has proposed design and construction of a bridge abutment at each end of the Harbour and Seaview bridges to maintain the safety and integrity of the existing bridge approaches and structures. This change order is the result of unforeseen conditions discovered by the contractor during the demolishing phase of this project. This change order has been approved by the Construction Engineering and Inspection(CEI)consultant. The lump sum cost for this change is$522,248.00 and the estimated time to complete this work is 3 months. Item Description Quantity UOM Unit Cast Amount Abutment—Gravity Wall 1 L $80,014.00 $80,014.00 Total $80,014.00 This Change Order is 4.81°a of the on el co tit price. CONTRA C70 - - i ENGINEERING SERVICES DIRECTOR Judith Clarke,P.E. Date co—Kevin G.Wilson P E o Monroe County Date ASSISTANT COUNTY ADMINISTRATOR heFlordaKeys ou emal w,lson ` {- FL I�heRonrncrn ntK,fJ,Bnvr iI5 2021091710-03-08 0400 Date MAYOR Date MONROECOVNTY ATTORNEY t,�TNj, 1PPR?All AS TO 0 C RISTME LIMB�aERT-BARROWS AS5ISTANTC 14)21'�rORNEY BATE. T3- poi - I I. AEB American Empire Builders,Inc. 13775 SW 145T"CT., SUITE B., MIA Imo, 33186 [OFFICE: 305-261-9276/ FAX: 305-261-9210 August 17, 2021 County: MONROE COUNTY, FLORIDA Project Name: Harbour Bridge i#904604 and Seaview Bridge#904606 Strengthening Project Subject: Change Order Ike uest due to unforeseen conditions at existing bridges Abutments Please see below American Empire Builders, Inc. Price proposal for construction of 112 LP of Gravity Walls in Harbour and 'Seaview Bridges. Ite�t l Des reptlon Vnit QU0ht ty Unit Price Amount Abutment-Gravity Wall LS 1 80,014.00 $ 80,014.00 Total 80,014.00 Sincerely, Antonio M. onzale n ident American Empire Builders, Inc. t ff a s September 14, 2021 r. Clark riggs Monroe County Engineering I100 Simonton St. Rm 216 Key West, Fl. 33040 Seaview and Harbor Bridge projects Subject: Change Order#1 Addition of Abutment— Gravity Walls at Approaches Dear Mr. riggs: American Empire Bnidge has submitted and demonstrated the necessity to design and construct a gravity wall behind the end cap on both sides of the Seaview and Harbour bridges. This wall is necessary as observed after demolition began and discovered that there is no back-wall construction on the existing bridges. These walls are necessary to secure the new beam placement as well as allow reconstruction of the roadway up to the new temporary bridge deck. I have reviewed the pay application and I concur with the contractor's pay request in the amount of$80,014.00 for the design and construction of 4 Abutment—Gravity Walls. Sincerely, PARSONS BRINC O ,,,," Keith Duke Project Administrator cc: Pornsit Chakkaphak P.E. (Enclosure) Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes E No El If Yes, explanation: Additional bridge strengthening was added to this contract. • Change Order was included in the original specifications. Yes El No E If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes El No E If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes E No El • Change Order is correcting an error or omission in design document. Yes No E Should a claim under the applicable professional liability policy be made? Yes 0 No Explain: