Loading...
4. 3rd Change Order 01/14/2022 `v BOARD OF COUNTY COMMISSIONERS County of Monroes � , Mayor David Rice,District 4 FloridaThe Mayor Pro Tem Craig Cates,District 1 Michelle Coldiron,District 2 Vacant,District 3 �. Holly Merrill Raschein,District 5 Memorandum DATE: 01/13/2022 TO: BOCC FROM: Kevin G. Wilson, P.E. Kevin G.Wilson,P.E. 2022.01.13 14:20:22-05'00' SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order#3 for the Harbour Drive Bridge (#904604) and Seaview Bridge (#904606) Strengthening project. This change order increases the final contract sum by $48,900.00. The substantial completion date is increased 10 days. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority on Thursday, January 14, 2022. MONROE CouNTy/ENGiNEFRiNG/ PROJECT MANAGEMENT CONTRACT CHMGE ORDER PROJECT TITLE: Harbour Drive Bridge(#904604)and Seaview Drive Bridge(#904606) Strengthening Project CHANCE ORDER NO: NEW SUBSTANTIAL COMPLETION DATE: 2/24/22 INITIATION DATE: 1/12/2 TO CONTRACTOR: American Empire Builders, Inc. CONTRACT DATE:. 110/21 The Contract is changed as follows: The original Contract Sum .......................................... ... ...... ........... ....... ...........$1,663,376.00. Net change by previously authorized Change Order........................... .. ..................... ................$80,014.00. The Contract.Sure prior to this Change order was................. ........ ..........................................$1,743,390.00, The Contract Sum is(increased)by this Change Order#3................................. ............................$48,900.00. The Revised Contract Sum including this Change Order... ....................................................... $1,792,290.00. Pursuant to contract article 7.2.2, the cost or credit to the owner resulting from a change in the Work shall be determined in one or more of the following.. 7.2.2.1 mutual acceptance of lump sum properly itemized and supported by sufficient substantiating data to permit evaluation. 7.2.2.2 unit prices stated in the Contract Documents or subsequently agreed upon. 7.2.2.3 cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percentage fee. The contractor has proposed design and construction for strengthening the east end bent of Harbour Bridge to support the new temporary bridge deck to be installed. WSP the construction engineering and inspection (CEI) consultant observed cracking, when exposed during construction, on the end bent and recommends this Work be performed and is necessary to ensure safety to the traveling public. The lump sum cost for this change is $48,900.00 and the contract time added to complete this additional work is 10 days. Item Description Quantity UOM Unit Cost Amount End Bent Reinforcement 1 LS $48,900.00 $48,900.00 Total $48,900.00 This Change Order is 2.940 e,or' ' contr n CONTRACTOR Judith CI e,P.E. oa'ea2ozzo;13 11 3409-05`oo;P.E. Date ENGINEERING SERVICES DIRECTOR Kevin G.Wilson,P.E. Date ASSISTANT COUNTY ADMINISTRATOR `< < <<, __ 2022.01.1417:15:14-05'00' Bate Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes M No❑ If Yes, explanation: Additional bridge strengthening was added to this contract. • Change Order was included in the original specifications. Yes❑ No Z If Yes,explanation of increase in price: • Change Order exceeds$25,000 or 5%of contract price(whichever is greater). Yes❑ No Z If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes 9 No❑ • Change Order is correcting an error or omission in design document. Yes❑No M Should a claim under the appficable professional liability policy be made? Yes❑ No Z Explain: January I1, 2022 Mr. Clark Briggs Monroe County Engineering 1100 Simonton.St. 17m 216 Ivey Vilest,El. 33040 Harbour Bridge Project Subject: Harbour Bridge End Bent Repair Dear Mr. Briggs: Enclosed is the American Empire Bridge INC cost proposal for strengthening the east end bent of Harbour bridge to support the new temporary bridge deck to be installed.During construction cracks almost completely across the entire end bent through the centerline of the exiting end bent cap were observed. AEB's engineer has reviewed and recommend supporting the end bent caps with the support method utilized on the Bimini Bridge to ensure the safety of the bridge. The contractor has provided a cast estimate in the amount of$48,900.00 The contractor will remove the existing block wall between the columns and construct a steel reinforced support wall under the bent cap to the foundation. Due to the height, it will have to be constructed in two sections. AEB is requesting 10 days to complete this task. WSP has observed the cracking on the end bent and recommends that this work be performed and is necessary to ensure safety to the traveling public.WSP has performed a cost analysis compared to.Area 14 statewide averages, as well as approved pay item cost for Bimini and find the cost submittal from AEB to be acceptable. Therefore, I concur with the contractor's cost proposal of$48,900 for the end bent repair. Sincerely, WSP Keith Duke Project Administrator cc: Poinsit Chakkaphak P.E. (Enclosure) WIN ,,- Harbour-East End Bent repair CREW Hourly Rate-9.5 Hour/Day QuarrrITY Daily Rate QUANTITY Supetlntendent $ 73.00 0.5 Truck-Pickup $ 45.00 1 'Foreman $ 56.94 1 Flatbed Truck 0 Carpenter $ 36.50 2 Small_Tools+Generator $ 50.O0 1 Laborer $ 30.30 2 Crane $ 350.00 1 Operator $ 51.10 1 Mini Excavat+Basket $ 230.00 1 Barge $ 200.00 . 1 Fuel $ 50.00 1 Total Crew&.Equipment -- - $ 3,500.00 ACTIVITY DESCRIPTION DAYS nstallation of work platform 1 Demolition and removal of existing masonry between columns 2.. Reinforcing-Drilling,install rebar dowells w/epoxy,install rebar 3', Forming -2. Concrete Pour 0.5 Stripping&Curing 0.5 Removal of work platform 0.7 Contingencies 0.3 _.Total Days 10 Materials MATERIAL DESCRIPTION Concrete $ 3,000.00 Steel Reinforcing -- $ 2,652,00 Epoxy $ 150.00 Wood @ Forms $ 200.00 Miscellaneous — $ 200.00 Demolitian-Transport&Final Disposition $ 848.a0 lConcrete pump-2 pours plus minlmum travel+service $ 2,400.00 $ 9,450.00 Subtotal Labor,Equipment,Material and Transport $ 44,4Sa.0a 0u®rhead&Profit — $ 4,450.01) Trrta[.'. $ A8,900.a0'