1st Change Order 01/04/2022 MONROE CouNTY/DEPARTMENT OF AiRpom CONTRACT CHANGE ORDER PROJECT TITLE: Marathon International Airport CHANGE ORDER NO: 1 Hangar Rehabilitation INITIATION DATE: 12/8121 TO CONTRACTOR: Marino Construction Group, Inc CONTRACT DATE: 02/17/2021 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price).......................................... $499,950.00 Net change by previously authorized Change Orders.................................................. $ 0.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was............$499,950.00 The(Contract Sum)(Guaranteed Maximum Price)will be(Increased)(decreased) (unchanged) by this Change Order.......$ 0.00 The new(Contract Sum)_(Guaranteed Maximum Price) including this Change Order is.......$499,950.00 The Contract Time will be(increased)(decreased) (unchanged)by............................... 0 days The date of Substantial Completion as of the date of this Change Order is....................... Detailed description of change order and justification: Installation of New Composite Deck Boards at Plane Entrance. Costs are covered under contingency allowances under CUD# 1. This change Order is 0 00°°of the original contract price. Not valid until signed by Owner.Architect(If applicable),and Contractor ARCHITECT: 2/22/2111 Date CONTRACTOR: Da e DIRECTOR OF AIRPORTS mm.uw Date MONROE COUNTY: -- 01.04.2022 sst./county`Adm n strator Date NROE COUNTY ATTOnNEY A f iOE FORM PED J. C ASSIS 'UNTY ATTORNEY Date 12/23/21 Change Order Attachment r Monroe County Code Section 2-58(b) • Change Order was not included in the original contract specifications. Yes(X) No( ) If Yes, explanation : Installation of New Composite Deck Boards at Plane Entrance. Costs are covered under contingency allowances under CUD#1. • Change Order was included in the original specifications. Yes ( ) No (X ) If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes()No()) If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes(X) No ( ) If no,explanation of why: • Change Order is correcting an error or omission in design document. Yes( ) No (X) Should a claim under the applicable professional liability policy be made? Yes( ) No (X) Explain: --R, N'',-0- C O N S T R U C T I O N G R O U P Contin enc Use Directive ICUD OWNER: PROJECT: Date: 11122/21 Monroe Board of County Comissioners Marathon International Airport 1100 Simonton Street Hangar Rehabilitation CUD Number: 1 Key West,FL 33040 9400 Overseas Highway Marathon,FL 33050 This Contingency Use Directive is for: Install new bevel cut boards with tapcons at each location.Install new composite deck boards at plane entrance. Is additional time needed to perform scope changes? ®YES XNO Time Extension 0 days Changes to Contract Sum: General Conditions: $ 1,000.00 Subcontractor Subtotal: $ 12,600.00 General Liability: $ 126.00 Subtotal: $ 13,726.00 GC Fee: $ 2,058.90 Subtotal: $ 15,784.90 Contractor's Bond $ 236.77 Total Proposed Amount: $ 16,021.67 Reason for Changes: Xa Changes in scope given by architect or owner for aesthetic and/or design reasons Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions Approved by: Date: "�6 2 El Declined by: Date: Comments: CGCO21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 I .marino-construction.com F Agra 'r 11/19/21 Change Order SUBMITTED TO, Marino Construction Group PROJECT; Marathon Airport - T Hanger Buildings Change order # 1 Install new composite deck boards at plane entrance. Remove existing deck boards and install new bevel cut boards with tap-cons at each location. The total amount for this work is. Total 1 , TARPON BAY CONSTRUCTION 1220 SE 131h Ave Cape Coral, F1. 33990 239/573-4733 FAX --239/573-8141 WEB SITE: tarponbayconstruction.com