4th Change Order 01/18/2022 CONTRACr CHANGE ORDER
PROJECT TITLE: International Airport CHANGE ORDER NO:4
Hangar Rehabilitation
INITIATION DATE: December 14,2021
TO CONTRACTOR: Marino Construction Group, Inc CONTRACT DATE: 02/17/2021
The Contract is changed as follows:
The original (Contract Sum) (Guaranteed Maximum Price).......................................... $ 499,950..00
Net change by previously authorized Change Orders.................................................. $ 0.00
The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$ 499,950.00
The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased)
(unchanged)by this Change Order.......$ 0.00
The new(Contra t Sum)_(Guaranteed Maximum Price) including this Change Order is....... $ 499,950.00
The Contract Time will be(increased)(decreased) (unchanged)by............................... 0 days
The date of Substantial Completion as of the date of this Change Order is.......................
Detailed description of change order and justification:
This change order Is for Fabrication of L Brackets In stainless steel,fabrication of stainless steel
drop pins and Installation of all L Brackets with new fasteners.
This change Order is 2.01J0I of the original contract price.
Not v II _ _ it a102d by Owner,ALchlifidAflivable).and g9altagigr
ARCHITECT: r=7 s-fr-
Date
CONTRACTOR:
ate
(RECTOR OF AIRPORTS 1.13.2022
Date
ONROE COUNTY: 01.18.2022
Asst./County dministrator Date
NFIOE COUNTY"ATTOnNEY
AIiiV
r
PED b J.
A 51 UNTY ATMRNEY
Date
Change Order Attachment per Monroe County Code Section 2-58(b)
Change Order was not included in the original contract specifications. Yes(X) No( )
If Yes, explanation : Fabrication of L Brackets in stainless stell, drop
pins in stainless steel and installation of as L Brackets. Costs
are covered under contingencies under CUD#4.
- Change Order was included in the original specifications. Yes ( ) No (X)
If Yes, explanation of increase in price:
- Change Order exceeds$50,000 or 5%of contract price(whichever Is greater).Yes()No(X)
If Yes, explanation as to why it is not subject for a calling for bids:
a Project architect approves the change order. Yes(X) No
If no,explanation of why:
a Change Order is correcting an error or omission in design document. Yes No (X)
Should a claim under the applicable professional liability policy be made? Yes No (X)
Explain:
C O N S T R U C T I O N G R O U P
OWNER: PROJECT: Date: 12/14/21
Monroe Board of County Comissioners Marathon International Airport
1100 Simonton Street Hangar Rehabilitation CUD Number:4-REV
Key West,FL 33040 9400 Overseas Highway
Marathon,FL 33050
This Contingency Use Directive is for:
Fabricate 14pca 1/4"L Brackets in Stainless Steel
Fabricate 6 pcs.3/4"stainless steel drop pins
Remove all L brackets and reinstall with new fasteners
Provide new stainless bolts,washers,8t:nylon hex nuts
Provide new holes 4"into concrete at drop pin locations
Is additional time needed to perform scope changes? YES X❑NO Time Extension 0 days
—
Changes to Contract Sum: -- —°—
General Conditions: S
Subtotal: __ 8,28500
General Liability: S _ 92.85
Subtotal: $ 8,367.85
GC Fee: S 1,255.18
Subtotal: �S __ 9,623.03
Contractors Bond S 14435
Total Proposed Amount: S _ 9,767.38
Reason for Changes:
®Changes in scope given by architect or owner for aesthetic and/or design reasons
❑Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions
Approved b: ` Date: 1 1 /
❑ Declined by: Date:
Comments:
C00O21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 www.maano-construction.com
-
.�
\
�
««<•
! l l ! Revg 2/13/21
SUBMITTED PROPOSAL Marino Construction Group
ATTN-
Mike Marino
. .
PROJECT; Marathon Airport - RFI # 3
Scope of work;
• Fabricate 14 pcs. / " L - Brackets in !
• Fabricate 6 pcs. / " stainless• Remove all L brackets and re-install with new fasteners
stainless;• Provide new bolts, washers & nylon hex nuts
. Provide new holes into concrete at drop pin locations
Total $ 89285
, ` 9
1220 SE 13"Ave.
Cape Coral,Fl.33990
/r r on a cdomc