4th Change Order 01/18/2022 CONTRACr CHANGE ORDER PROJECT TITLE: International Airport CHANGE ORDER NO:4 Hangar Rehabilitation INITIATION DATE: December 14,2021 TO CONTRACTOR: Marino Construction Group, Inc CONTRACT DATE: 02/17/2021 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price).......................................... $ 499,950..00 Net change by previously authorized Change Orders.................................................. $ 0.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$ 499,950.00 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order.......$ 0.00 The new(Contra t Sum)_(Guaranteed Maximum Price) including this Change Order is....... $ 499,950.00 The Contract Time will be(increased)(decreased) (unchanged)by............................... 0 days The date of Substantial Completion as of the date of this Change Order is....................... Detailed description of change order and justification: This change order Is for Fabrication of L Brackets In stainless steel,fabrication of stainless steel drop pins and Installation of all L Brackets with new fasteners. This change Order is 2.01J0I of the original contract price. Not v II _ _ it a102d by Owner,ALchlifidAflivable).and g9altagigr ARCHITECT: r=7 s-fr- Date CONTRACTOR: ate (RECTOR OF AIRPORTS 1.13.2022 Date ONROE COUNTY: 01.18.2022 Asst./County dministrator Date NFIOE COUNTY"ATTOnNEY AIiiV r PED b J. A 51 UNTY ATMRNEY Date Change Order Attachment per Monroe County Code Section 2-58(b) Change Order was not included in the original contract specifications. Yes(X) No( ) If Yes, explanation : Fabrication of L Brackets in stainless stell, drop pins in stainless steel and installation of as L Brackets. Costs are covered under contingencies under CUD#4. - Change Order was included in the original specifications. Yes ( ) No (X) If Yes, explanation of increase in price: - Change Order exceeds$50,000 or 5%of contract price(whichever Is greater).Yes()No(X) If Yes, explanation as to why it is not subject for a calling for bids: a Project architect approves the change order. Yes(X) No If no,explanation of why: a Change Order is correcting an error or omission in design document. Yes No (X) Should a claim under the applicable professional liability policy be made? Yes No (X) Explain: C O N S T R U C T I O N G R O U P OWNER: PROJECT: Date: 12/14/21 Monroe Board of County Comissioners Marathon International Airport 1100 Simonton Street Hangar Rehabilitation CUD Number:4-REV Key West,FL 33040 9400 Overseas Highway Marathon,FL 33050 This Contingency Use Directive is for: Fabricate 14pca 1/4"L Brackets in Stainless Steel Fabricate 6 pcs.3/4"stainless steel drop pins Remove all L brackets and reinstall with new fasteners Provide new stainless bolts,washers,8t:nylon hex nuts Provide new holes 4"into concrete at drop pin locations Is additional time needed to perform scope changes? YES X❑NO Time Extension 0 days — Changes to Contract Sum: -- —°— General Conditions: S Subtotal: __ 8,28500 General Liability: S _ 92.85 Subtotal: $ 8,367.85 GC Fee: S 1,255.18 Subtotal: �S __ 9,623.03 Contractors Bond S 14435 Total Proposed Amount: S _ 9,767.38 Reason for Changes: ®Changes in scope given by architect or owner for aesthetic and/or design reasons ❑Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions Approved b: ` Date: 1 1 / ❑ Declined by: Date: Comments: C00O21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 www.maano-construction.com - .� \ � ««<• ! l l ! Revg 2/13/21 SUBMITTED PROPOSAL Marino Construction Group ATTN- Mike Marino . . PROJECT; Marathon Airport - RFI # 3 Scope of work; • Fabricate 14 pcs. / " L - Brackets in ! • Fabricate 6 pcs. / " stainless• Remove all L brackets and re-install with new fasteners stainless;• Provide new bolts, washers & nylon hex nuts . Provide new holes into concrete at drop pin locations Total $ 89285 , ` 9 1220 SE 13"Ave. Cape Coral,Fl.33990 /r r on a cdomc