Loading...
Release of Contingency Funds #35 ' `v BOARD OF COUNTY COMMISSIONERS County of Monroes � , Mayor David Dice,District 4 Mayor Pro Tern Craig Cates,District 1 FloridaThe s Mrchelle Coldiron,District 2 Vacant,District 3 Holly Merrill Raschein,District 5 Memorandum DATE: 2/01/2022 TO: BOCC FROM: Kevin G. Wilson, P.E. r Kevin G.Wilson,P.E. 2022.02.01 09:57:13-05'00' SUBJECT: Release of Contingency funds Attached is proposed Release of Contingency Funds #35 for the Plantation Key Courthouse & Detention Center project. This does not affect the contract price but releases contingency funds already included in the Guaranteed Maximum Price for work that was either not foreseen or for which a price could not be determined at the time of contract execution. The amount requested is $6,930.00. The attached Release of Owner Contingency Request provides the details. This is being provided to ensure the BOCC is aware of this change. Please contact me with any questions. If there are none with the normal 24-hour window, I will approve the request. 1k BOARD OF COUNTY�C'[7�MMISSIONEF S County of Monroe `ra r i ti Mayor David Rice District4 t Mayor Pro Tern C raig Cates,s,District i The IoI'1 S � � ��a Michelle C`oldiron,District 2 J Vacant,Distract 3 ' Holly Murrill FZrrSchein,District 5 DATE. sP MEMORANDUM 31-Jan-2022 Administrator irector, Project Management Matthew Howard Release of Owner Contingency for: Plantation Key Courthouse & Detention Center Action Requested- Approval for release of project contingency funds in the amount of , 30.00 as outlined below, Basisi 1. The requested release does not increase the total cost of the project as approved by the CC. . The scope for which the release is requested is within the intended project scope. . The release is not based upon an error or omission by the designer or the general contractor. Background: This PCA recomends the addition of: Epoxy Curbs to be placed at shower areas in the proximity of showers in the detention center. The curbs are being requested by facilities to help with building maintenance. ($ , 50) - Inclusion of 12 toilet paper holder shelves in the detention center. In some detention centers toilet paper is provided to the prisoners in an alloted amount to prevent waste. On 1/25/22 the IVICSO requested holders to be installed in the community commodes. ($1, 30) Digitally signed by Cary Kevin G.Wilson, P.E. Car Kn I ht Knight -.'�� _ 2022.02.02 12:08:56 Y g Date:2022.01.3118:08:46 � - -05'00' 06'00' Cary Knight,Director of Project Management Kevin Wilson,Assistant County Administrator ■ Provide funding for limited site work from Project Contingency until which time an Amendment is reissued by Owner to fund this work. Amendment 4 originally issued for this work was canceled June 19, 2019. Limited site work Includes the following: Clearing and Grubbing Drainage Water Provide addition survey work to identify if curbs, sidewalks or building corners conflict with existing tree locations. 08/05/19 Provide all labor, materials and equipment to modify/raise Catch Basins and Manhole Structures as a result original survey discrepancies. Refer to revised drawings C400.1A, C400.1 B and attached proposal from ToppIno & Sons for additional information. 01/06/20 --------- - - ImIgIffli MEN! IlIgIIIIII IIIII III;111 1 '1 miIII Thickened Slab Details 01/27/20 -------------- ........ ........................................... ............................................................................................................................................ --Site Utility Relocation Project 04/03/20 VA ....................... Refund of unspent T&M allocation 06/11/20 R141I A WAFI RIA40 SM M ■ � . ExistingConsolidation of CM contingency funds 12/02/20 Courthouse Renovations # # AT&T • 01122121 ! :* Negative Air Pressure Room 02/10/21 Power& Data adds 04/12/21 Plinths, Sump Alarm Wi-Fi 05/19/21 Flooring Upgrade in Courthouse 06/17/21 Contingency Consolidation 3 08/16/21 Mailbox and Courier Box-", 11/01/21 , s Builder's Risk Extension and Data Drops 11/28/21 Toilet Paper Holders/Shower Curbs 01/31/22_ � E .BILTMORE � CONSTRUCTION CO., [ N C. ! Date- January 27, 2O22 Monroe County Mr. Matthew Howard, Project Manager 1100 Simonton Street, Room 3-2I6, Key West, FL33U40 fL Re: PC4#TBD AS| O17 Additional curbing at shower locations Dear Matthew: The following was requested via AS] and is being submitted to be incorporated via Contingency Adjustment: rDivision Summary of Costs Value by Division 09 3/4"high x 4"sloped epoxy curbing at shower locatoins D121-127 and D132 4,950.00 *See attached backup $ "This scope of work requires full access to the facility during business hours the week of February 21,2022,for the epoxy flooring crew. 'This scope of work will increase the project schedule by 30 days *See attached bockup Subcont actor Direct Cost(SDC)SUBTOTAL $ 4,95,0.00 General Conditions NIA on contingency adjustments Construction Cost Budget(CCB) 4,950,00 CM Contingency 1%SDC N/A General Liability Insurance.92%SDC N/A Pending your review and approval,vVe will add this scope of work per your direction via signed Contingency Adjustment. Sincerely, Project Manager Enclosures: As noted above. F1.0. Box 2046 00- 310 Scarlet Blvd, r Rt1 €tour' Florida 46 7- 018 CBC 058989 www.hair'izoiis t,1acesyst n,is,c.rstTi Change Order Request #5 T Lenard Anderson Company: Biltmore Construction FROM: Dan Carnegie Phone: 727-585-2084 Date: 1/26/2022 Email: landersori= bilttTtor constr cti . �1i Project: Plantation Key CourthouseSection: 9740 Project ite: 88820 Overseas HwyDescription: Concrete Coatings Tavernier, FL 88070 Please accept our bid to perform the following scope of work: Scope: Add 3/4" x 4" curb at showers D121-127 and 132.................. ......... ................................... 4,950 ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS Proiect: Plantation Key Judicial A51_d#: 017 Courthouse/Detention Facility Owner: Monroe County Issue Date: 01/21/22 CURRIE To: Biltmore Construction Co,. Inc, Architect Proiect No.:. 140404 S WARDS AGUILA Contract: GMP ri r c h i t ta=c t Contract Date: 12/13/2017 Owner Architect Consultant Contractor X Field Other The work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in the Contract Sum or Contract Time.Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum or contract Time Description: This ASI is to acid 3/4" high x 4"with sloped edges 'epoxy shower curbs' in cells#D121rD127 and D132 CURRENT _ -- -� 'EPDXY CURB' t. — EXTEND ct" 'EPDXY CURB'pLumBwG CHASE CORR �1=I 1 ui=T j DOUBLE fr ��'i[! DOUBLET )� :�€'DOUBLE ELL CELL CELL C® DOUBLE CELL CELL CELL j T_3p ADDED ADDED ADDED 'CP7XV CVRCb}y 'CDOXYCURW .�. 6 Epoxy cuffly Issued By: Keith, Beal Principal 185 NE 4th Avenue,Suite 101, Delray Beach, FL 33483 -Tel:561-27'6-4951. • O, NST U1 T' N CO., INC.. Date: January27, 2022 Monroe County Mr. Matthew Howard, Project Manager 1100 Simonton Street, Room 2-21 , Key West, FL 33040 jigw i ;;.I c.attli.q .�. an.c .;.q.in..t:-. .. y. e; PCA Tl3CD Toilet Paper Holders for Detention Dear Matthew: The followingwas requested via email and is beingsubmitted to be incorporated via Contingency Adjustment; Division SummaLiL of Costs _Y&H2,kLalsion'II 10 12 each toilet paper shelves from Viking Goods,per Owner request. $ 1,980.00 ........................ ........................................................................................................................................................................... ................................. Installation is not included in this PCA request $ ........................ ........................................................................................................................................................................... ..................................................... e have quoted 12 units to allow for attic stock as needed $ - ........................ ........................................................................................................................................................................... ..................................................... ........................ ........................................................................................................................................................................... ..................................................... *See attached backup $ - ........................ ........................................................................................................................................................................... ..................................................... **The current lead time for this product is 4-5 weeks for fabrication $ - ........................ ........................................................................................................................................................................... ..................................................... ***This scope of work will increase the project schedule by 10 days $ - ........................ ........................................................................................................................................................................... ..................................................... ........................ ........................................................................................................................................................................... ..................................................... ........................ ........................................................................................................................................................................... ..................................................... ........................ ........................................................................................................................................................................... ..................................................... ........................ ........................................................................................................................................................................... ..................................................... Subcontractor Direct Cost;(SDC)SUBTOTAL 1,980.00 General Conditions $ - ..................................................................................................................................................................................................... ..................................................... NIA on contingency adjustments Construction Cost Budget(CCB) 1,9 0.00 CM Contingency 1%SbC /A ..................................................................................................................................................................................................... ..................................................... General Liability Insurance.92%SbC N/A ..................................................................................................................................................................................................... ..................................................... Bonding.9°I CCB N/A ..................................................................................................................................................................................................... .................................................... CM Fee 6°,CCB N/A Total Construction Cost(T B) $ 1,980.00 Pending you r review and approval,we WIII add this scrape of work per your direction via signed Contingency Adjustment. Sincerely, Lzo,P,44d APdftim, Project Manager Enclosures:As noted above. phone: 714.881.3680 fax: 714.881.3679 email: frontdesk@vikingfab.com 4 web: www.vikingfab.com 2238 N. Glassell, Suite E, Orange, Ca 92865 Quotation Customer: iltmore Construction Pric ing Ea 'i d Till'- 3/28/2022 PreparedBy DP*F.0.B. Origin Terms Prepaid Job Name: Plantation Key Detention Center, FL Warranty-1 year from DS C L r. ...Quoted Per: Drawings **Fab Lead Time 4-5 weeks Eng Lead Time Scope: Base Quantity Part Description Finish Selling price Extension 12 Toilet Paper Shelf SS $165.00 $1,980.00 MOCKUPS/SAMPLES EXCLUDED 1 Frei ht and handli NOTES: Tax excluded Total $1,980.00 B y accepting the above Dricing you agree to the following terms, conditions, and warranty General Terms & Conditions ® General a. All products supplied by Viking Products are subject to our Standard Product Warranty. Revisions to this warranty must be confirmed in writing and approved by Viking Products. b. All quotes shall be valid for thirty (30) days from the date of quotation. c. Orders accepted after 30 days are subject to price increase due to current material and labor costs at the time order is placed. d. Project schedules that extend longer than 6 months (from date order is placed) are subject to price increases due to commodities prices. e. Viking Products reserves the right to revise pricing should there be any change in design, quantity, size, finish or method of shipment differing from the original quotation. f. Typographical and other errors in stated quotations are subject to correction. g. All Credit card orders are subject to a 4% credit card transaction fee. 2. Shipping a. Freight is an estimation based on the information provided at the time of original quotation. b. Any shipments not clearly stated in the quotation need to be addressed immediately and may require a change order. c. Delivery will be F.O.B. point of origin. d. Viking shall have no further responsibility for the products, and all risk of damage to or loss or delay of the products shall pass to the customer, upon their delivery to the F.O.B. point. e. Viking shall not be liable for damages caused by delays in shipping or delivery for any reason whatsoever. f. Customer is liable for all freight charges when refusing delivery or receipt of materials shipped under the terms of the negotiated and acknowledged shipping schedule. g. Partial shipments upon the request of the customer are subject to additional freight charges, unless negotiated during the bid period. ® Storage a. Storage fees will apply to any products stored after the original requested 'on site'date. These fees will be applied monthly and invoiced accordingly. 4. Cancellations a. Orders cancelled prior to starting fabrication will be subject to a 5% charge. b. Orders cancelled after starting fabrication will be subject to charges equaling the amount of work done up to the cancellation date including engineering, material purchase, fabrication, finishing, and shipping. 5. Fabrication Lead Times a. Leads times will be clearly stated on the quotation. Modifications to these lead times must be confirmed in writing. b. Viking Products reserves the right to a price increase due to expedited lead times. c. Fabrication lead time begins when all required information has been received. d. Common required documents include but are not limited to executed purchase order, approved submittal drawings, finish color requirements, field dimensions, &scheduling coordination documents. 6. Job Delays a. Viking Products reserves the right to stop all work and shipments if your account becomes past due. ® Damages a. To receive claims consideration for damaged freight , the customer must inspect the freight for damage and record the specifics on the Bill of Lading. b. You must notify the carrier of any damage as their insurance will cover the cost of the damage. c. It is the responsibility of the receiver to inspect products for concealed damage within 7 days of receipt of the shipment and to report to Viking any discrepancies. d. Viking will not be liable for damaged or missing product if not reported within the first 7 days after delivery. e. Viking will not be responsible for any back charges or claims unless we are informed of the problem and consent, in writing, to the proposed action. f. Viking will be given an opportunity to correct any product deficiencies. g. Customer is responsible for inspecting product before installation. h. Once installed, Viking is no longer liable for any back charges or corrections to the product. 8. Testing a. Any testing or calculations not specifically noted in quote are not included. 9. Submittals a. Due to manufacturing requirements, submittals may be inconsistent with plans and specifications. In the event of such inconsistency, Viking approved shop drawings will control. Exclusions - Unless specifically noted above exclusions include (but are not limited to). a. Touch up Paint b. Mockups/Samples c. Hardware d. Embeds e. Installation f. Tools for Installation g. USMS formed bench insulation h. Liquidated damages I. Duties, tarrifs, and taxes of any kind j. Engineering calculations, certifications, and testing k. Free storage past the original requried date I. additional quantity of any products (attic stock, maintinance, etc.) m. Field measurinc. Installing contractor to provide all required dimensions for fabrication. 1 €xY � I v :ems � a 9 — C. ..............................______...................... . ,fry