01st Change Order 02/07/2022 CoNTRAcr CHANGE ORDER
PROJECT TITLE:Marathon International Airport
Terminal Reroof CHANGE ORDER NO: 1
INITIATION DATE: 01/27/22
TO CONTRACTOR: CONTRACT DATE: 3.17.2021
The Contract is changed as follows:
The original (Contract Sum)(Guaranteed Maximum Price).......................................... $1,888,375.00
Net change by previously authorized Change Orders.................................................. $ 0.00
The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$1,888,375.00
The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased)
(unchanged)by this Change Order.......$ 0.00
The new(Contract Sum)_(Guaranteed Maximum Price)including this Change Order is....... $ 1,888,375.00
The Contract Time will be(Increased)(decreased)(unchanged)by............................... 0 days
The date of Substantial Completion as of the date of this Change Order is.......................
Detailed description of change order and Justification:
Provide an inspection report by using camera to inspect 27 downspouts to check for drainage
Issues.
Provide video and report for underground sections of rain downspout discharge termination.Will
provide as builts on provided plans if lines and discharge locations are not accurately indicated
on original plans.This Is Phase 2 of the Gutter Drainage Inspections.
This change Order is 0.01°/a of the original contract price.
Not valid until signed by Owner.Architect(if applicable).and Contractor
2
1 12 2
ARCHITECT:
Date
CONTRACTOR: , y
DIRECTOR OF AIRPORTS 3.2022
w._ Date .®
MONROE COUNTY: y 02.07.2022
r _...�
Asst./County Administrator Date
In
NROE COUNTY ATTOnNEY
A iOY'E FORM
PED 01 4EC
ASSIS UNTY ATTORNEY
Date 2/3/22
Change Order Attachment per Monroe County Code Section - )
• Change Order was not included in the original contract specifications. Yes( x ) No( )
If Yes, explanation:
Provide an inspection report by using camera to inspect 27 downspouts to check for drainage
Issues.
Provide video and report for underground sections of rain downspout discharge termination.Will
provide as builts on provided plans If lines and discharge locations are not accurately indicated
on original plans.This is Phase 2 of the Gutter Drainage Inspections.
This will be drawn against line item 80 of the budget.
• Change Order was included in the original specifications. Yes ( ) No ( x )
If Yes, explanation of increase in price:
• Change Order exceeds$50,000 or5%of contract price(whichever isgreater).Yes()No(x)
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes( x) No ( )
If no,explanation of why:
• Change Order is correcting an error or omission in design document. Yes ( ) No( x )
Should a claim under the applicable professional liability policy be made? Yes ( )No( x )
Explain:
C O N S T R U C T I O N G R O U P
® Contingengy Use Directive
OWNER: PROJECT: Date: 10/12/21
Monroe County Board of Commissioners Marathon International Airport
1 100 Simonton Street Terminal Reroof PCO Number:2 REV
Key West,FL 33040 9400 Overseas Highway
Marathon,FL 33050
This proposed change order is for:
Provide an inspection report by using camera to inspect 27 downspouts to check for drainage issues.
Is additional time needed to perform scope changes? ®YES XNO Time Extension
Changes to Contract Sum:
Subtotak S 6,400,00
General Conditions: S 400.00
General Liability: $ 64.00�
Subtotal-. $ 6,864.00
GC Fee: S 755.04
Subtotal: $ 7,619.04
Contractor's Bond $ 95.24
Total Proposed Amount: $ 7,714.28
Reason for Changes:
®Changes in scope given by architect or owner for aesthetic andor design reasons
®Changes resulting from events or circumstances:detective design,owner caused delays,differing site conditions
Approved bmr Date: 5/
21
El Declined by: Date:
Comments:
CGCO21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.morino-construction.com
Gary's Plumbing and Fire,Inc. Proposal
Ph. (305)296-6013
6409 2nd Terrace Suite i
Key West,FL 33040 Date
Ph.(30S)296-6oi3
garysplumbingi@aol.com 10/9/2021
Name/Address
Marino Construction
P.O.Box 17o6
Key West,FL 33041
Project
Qty Total
Ref:Marathon Airport
Provide all labor,equipment,and material necessary to camera
27 down spouts and any connecting storm system within io'of
the building and provide an inspection report.
Labor 6,400.00 6,400.00
"Three of the down spouts on the second floor may require
opening the walls to gain access.Wall opening and repair to be
done by others."
Subtotal $6,400.00
Signature/Title Sales Tax ( %) $0.00
Total $6,400.00
0,-
M, , ,=--r- R,'
C 0 N S T R U C T I 0 N G R 0 U P
Confineny Use Directive(CUDp __
OWNER: PROJECT: Date: ll/2/21
Monroe Board of County Comissioners Marathon International Airport
1100 Simonton Street Terminal Reroof CUD Number:7
Key West,FL 33040 9400 Overseas Highway
Marathon,FL 33050
This Contingency Use Directive is for:
Provide video and report for underground sections of rain downspout discharge termination.Will provide as builts on provided plans if lines and
discharge locations are not accurately indicated on original plans.This is Phase 2 of the Gutter Drainage Inspections.
Is additional time needed to perform scope changes? YES XAINO Time Extension 0 Aa s
Changes to Contract Sum:
Cubtotal: 5 3,800.00
General Liability: $ 39.00
Subtotal: $ 3,838.00
GC Fee: S 441.37
Subtotal: S 4,279.37
Contractor's Bond S 64.19
Total Proposed Amount: S 4,343.56
Reason for Changes:
Changes in scope given by architect or owner for aesthetic and/or design reasons
®Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions
L_jApproved by: Date: " 1/ '�
Declined by: Date:
Comments:
CGCO21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 I www.marino-construction.com
Gary's Plumbing and Fire,Inc. Proposal
Ph. (305)296-6013
6409 end Terrace Suite i
Key West,FL 33040 Date
Ph.(305)296-6oi3
11/2/2021
garysplumbingl @aol.com
Name/Address
Marino Construction
P.O.Box 1706
Key West,FL 33041
Project
Marathon Airport
Total
Qty
Ref: Marathon Airport
Provide video and report for underground sections of rain
downspout discharge termination. Will provide as builts on
provided plans if lines and discharge locations are not accurately
indicated on original plans.
Contract Labor 3,800.00 3,800.00
Exclusions: Removal of and possibly collapsing sections of
discharge piping.
Subtotal $3,800.00
Sales %) $0.00
Signature/Title