02nd Change Order 02/07/2022 MoNRoF, COUNTY/DEPARTMMT oF Ampom
PROJECT TITLE: Marathon International Airport
Terminal Reroof CHANGE ORDER NO: 2
INITIATION DATE: 01/27/22
TO CONTRACTOR: CONTRACT DATE: 3.17.2021
The Contract is changed as follows:
The original (Contract Sum)(Guaranteed Maximum Price).......................................... $1,888,375.00
Net change by previously authorized Change Orders.................................................. $ 0.00
The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$1,888,375.00
The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased)
(unchanged) by this Change Order.......$ 0.00
The new(Contract Sum)_(Guaranteed Maximum Price)including this Change Order is....... $ 1,888,375.00
The Contract Time will be(increased) (decreased)(unchanged)by............................... 0 days
The date of Substantial Completion as of the date of this Change Order is.......................
Detailed description of change order and justification:
Demo 2 existing antenna sites on roof top;Install new flex and conduit from existing location to
antenna with weather head and J box at both antenna locations.
Demo and remove existing 4 ft light.Install new 4 ft LED light in same location. Light is to be fed
with existing wiring and switching.
Remedy the non-existing box grounding at the ceiling mounted light fixtures as required by the
local inspector.
Demo existing puck light housing; Install new puck light housing.
This change Order is 0.01%of the original contract price.
Not valid until signed by Owner,Architect(if ap ).and Contractor
a 22
ARCHITECT: _ -.-
-Date
CONTRACTOR: 1,14� -
w .Date
Y2.3.2022
DIRECTOR OF AIRPORTS
s Date
MONROE COUNTY: w 02.07.2022
sst./County Administrator Date
NROE CO nNEY
A , HOVE FORM
y �
PED O J. c
hSSISTA U ATTORNEY
Date 2/3/22
Change Order Attachment per Monroe County Code Section 2-58(b)
• Change Order was not included in the original contract specifications. Yes ( x ) No( )
If Yes, explanation:
Demo 2 existing antenna sites on roof top; Install new flex and conduit from existing location to
antenna with weather head and j box at both antenna locations.
Demo and remove existing 4 ft light.Install new 4 ft LED light in same location. Light Is to be fed
with existing wiring and switching.
Remedy the non-existing box grounding at the ceiling mounted light fixtures as required by the
local inspector.
Demo existing puck light housing; Install new puck light housing.
This will be drawn against line item 70 of the budget.
• Change Order was included in the original specifications. Yes ( ) No ( x )
If Yes, explanation of increase in price:
• Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes( ) No(x)
If Yes, explanation as to why it is not subject for a calling for bids:
Project architect approves the change order. Yes(x) No ( )
If no,explanation of why:
• Change Order is correcting an error or omission in design document. Yes ( ) No ( x )
Should a claim under the applicable professional liability policy be made? Yes( ) No( x )
Explain:
C O N S T R U C T I O N G R O U P
Contingency,Use Directive(CUD)
OWNER: PROJECT: Date: 10/21/21
Monroe Board of County Comissioners Marathon International Airport
1100 Simonton Street Terminal Reroof CUD Number:3
Key West,FL 33040 9400 Overseas Highway
Marathon,FL 33050
This proposed change order is for:
Demo 2 existing antenna sites on roof top;Install new flex and conduit from existing location to antenna with weather head and j box at both antenna
locations.
Is additional time needed to perform scope changes? ®YES ®NO Time Extension 0 days
Changes to Contract Sum:
Subtotal: $ 4,127.19
General Liability: $ 41.25
Subtotal: $ 4,169.07
OC Fee: S 479.44
Subtotal: S 4,648.51
Contractor's Bond $ 69.73
Total Proposed Amount: $ 4,718.24
Reason for Changes:
Changes in scope given by architect or owner for aesthetic and/or design reasons
x❑Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions
Approved by: Date: 11 J / 1
Declined by: Date:
Comments:
CGCO21647 {305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.madno-construction.com
To-mWm Electric LLC Eartmate
1665 NARCISSUS AVE VTOMKIMS ELECTRIC
BIG PINE KEY, FL33043 US
+1 3053008451 1'1-'- C C7MC.'.,
(30S) goo -84SI
info@tomkinselectric.com
RGSMENrIAL COMMERCIAL MAMNE
www.tomkinselectric.com
ADDREM
John Foundas
Marino
E-STMAH. DAM
1191 10/18/2021
P.ROJEGTNAME
RFI #3
DATE DESCRIPTION QTY WE AMOUNT
Matefial Wire way; 1 1,487.79 1,487.79
Conduit;
Fittings;
J-Box;
Weatherhead-goose neck;
Straps;
Hardware;
Labor Demo 2 existing antenna sites 16 165.00 2,640.00
on roof top;
Install new flex and conduit
from existing location to
antenna with weather head
and j box at both antenna
locations;
If accepted please sign below TOTAL $4,127-79
Accepted By Accepted Date
Im R -1- N-0
C O N S T R U C T I O N G R O U P
CtanfinencyUse"Directive CUD
OWNER: PROJECT: Date: 10/21/21
Monroe Board of County Comissioners Marathon International Airport
1100 Simonton Street Terminal Rcroof CUD Numbcn 4
Key West,FL 33040 9400 Overseas Highway
Marathon,FL 33050
This proposed change order is for:
Demo and remove existing 4 It light.Install new 4 ft LED light in same location.Light is to be fed with exisiting wiring and switching.
Is additional time needed to perform scope changes'? YF.S X NO Time Extension 0 days_
Changes to Contract Sum:
Subtotal: S 757.93
General Liability: $ 7.55
Subtotal: $ 765.51
GC Fee: $ 88.03
Subtotal: $ 853.54
Contractor's Bond S 12.50
Total Proposed Amount: $ 866.34
Reason for Changes:
Changes in scope given by architect or owner for aesthetic and/or design reasons
X❑Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions
Approved by: �, Date:® 11 1
Declined by: Date:
Comments:
CGCO21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 I .madno-construction.com
TornUm Electric LLC -Eadmate
1665 NARCISSUS AVE )TOMMNS ELECTPIC I LC
BIG PINE KEY, FL 33043 US
+1 3053008451 (30S)300 -e4SI
info@tomkinselectric.com
R45SIOLMNTIAL COMMERMAL MARINE
www.tomkinselectric.com
ADDRESS
John Foundas
Marino
# DKEE
1192 10/16/2021
PROJEGT NAK41E
RF146
DATE DESCRIPTION QTY RATE AMOUNT
Mateidal 4-ft LED Commercial Vaportite 1 132.93 132.93
Light;
Labor Demo and remove existing 4 ft 5 125.00 625.00
light;
Install New 4 ft LED light in
same location;
(Light is to be fed with existing
wiring and switching);
If accepted please sign below TOTAL $7-57M
Accepted By Accepted Date
0
C O N S T R U C T 1 O N G R O U P
Contin enc Use D(rective CUD
OWNER: PROJECT: Date: 12/8/21
Monroe Board of County Comissioners Marathon International Airport
1100 Simonton Street Terminal Reroof CUD Number:15
Key West,FL 33040 9400 Overseas Highway
Marathon,FL 33050
This Contingency Use Directive is for:
Remedy the non-existing box grounding at the ceiling mounted light fixtures as required by the local inspector.
Is additional time needed to perform scope changes? YES X NO Time Extension 0 days
Changes to Contract Sum:
Subtotal: S 3,587.00
General Liability: $ 35.87
Subtotal: $ 3,622.87
GC Fee: $ 416.63
Subtotal: $ 4,039.50
Contractor's Bond S 60.59
Total Proposed Amount: S 4,100.09
Reason for Changes:
Changes in scope given by architect or owner for aesthetic and/or design reasons
®Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions
w
Approved by: -'`� Date:
1 / / 1
Declined by: Date:
Comments:
CGCO21647 !305-359-5269 1 PO Box 1706 Key West,FL 33041 i .madno-construction.com
WWW.TOMKINSC-LECTRICCOM
(305) 300-8451
December 3, 2021
To: Ms. Katie Beardsley
Marino Construction Group, Inc.
7025 Shrimp Road, Suite 2E
Key West, FL 33040
Re: Florida Keys Marathon International Airport
Terminal Re-Roof Rehabilitation
Dear Ms. Beardsley:
Tomkins Electric LLC is pleased to offer this proposal for the electrical work on the above referenced
project for the change order to remedy the non-existing box grounding at the ceiling mounted light
fixtures as required by the local inspector. Proposal pricing includes only electrical work as described
below. The total cost for electrical work is THREE THOUSAND,FIVE HUNDRED AND EIGHTY-SEVEN
DOLLARS($3,587.00).
WORK INCLUDED:
Drill and tap holes in each of forty-four(44)ceiling mounted light fixtures;
Furnish and install a#10 AWG grounding lug with hardware at the tapped holes in each of the forty-
four(44)ceiling mounted light fixtures;
Connect the ground lug to the circuit ground wire with a#10 AWG conductor at each of the forty-four
(44)ceiling mounted light fixtures;
STIPULATIONS:
WORK WL1., BE COMPLETED VI TOM KI S ELECTRIC LLC STANI)ARD .G
RATES;
ESCORTS, WHERE REQUIRED,TO BE FURNISHED BY MARINO CONSTRUCTION
GROUP, INC.;
Sales tax on materials is included;
Cost for bond is not included;
Encountering or handling hazardous materials is not included;
No dumpster or disposal is included;
Any work beyond this scope is not included;
All work to be completed in a competent manner according to standard practices and the local authority
having jurisdiction;
Tomkins Electric LLC would like to thank you for the opportunity to provide this proposal.Should there
be any questions or if additional information is needed, please feel free to contact me at any time,
Sincerely,
James Tomkins
Tomkins Electric LLC
(305)300-8451
C O N S T R U C T I O N G R O U P
Contingency Use Directive (CUD
OWNER: PROJECT: Date: 12/10/21
Monroe Board of County Comissioners Marathon International Airport
1100 Simonton Street Terminal Reroof CUD Number: 17
Key West,FL 33040 9400 Overseas Highway
Marathon,FL 33050
This Contingency Use Directive is for:
Demo existing puck light housing;Install new pack light housing.
Is additional time needed to perform scope changes'? rjYES ®NO Time Extension 0 days _
Changes to Contract Sum:
Subtotal: $ 3,550.00
General Liability: S 35.50
Subtotal: S 3,585.50
GC Fee: S 412.33
Subtotal: S 3,997.83
Contractor's Bond S 59.97
Total Proposed Amount: $ 4,057.80
Reason for Changes:
®Changes in scope given by architect or owner for aesthetic and/or design reasons
®Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions
1113/22
Approved by: Date:
El Declined by: Date:
Comments:
CGCO21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.morino-construction.com
Tornldns Electdc LLC EsIdmate
1665 NARCISSUS AVE VTOMKINS ELECTRIC
BIG PINE KEY, FL 33043 US
+1 3053008451 (90s) 300 -8451
info@tomkinselectric-com ReSfDENTAL COMMERCIAL MARWE
www.tomkinselectric.com
ADDRESS
John Foundas
Marino Construction Group
F-IM"MAI"E# DA',rF-
1215 12/09/2021
PROJECT NAME
Knee Wall Puck Style Light Fixt
DATE DESCRIPTION CITY RATE AMOUNT
Labor Demo existing puck light 1 3,500-00 3,500-00
housing;
Install new 14 puck light
housing for new lights
according to drawing E-1 01;
***Demo of existing lights will
be provided by Tomkins
Electric***;
'Repair of knee wall
concrete and support to mount
light can will be done by
Narino Construction Group***
Material Hardware; 1 50-00 50-00
If accepted please sign below TOTAL $3A%U0
Accepted By Accepted Date