03rd Change Order 02/07/2022 CONMCT CHANGE ORDER PROJECT TITLE: Marathon International Airport Terminal Reroof CHANGE ORDER NO: 3 INITIATION DATE: 01/27/22 TO CONTRACTOR: CONTRACT DATE:1 3.17.2021 The Contract is changed as follows: The original (Contract Sum)(Guaranteed Maximum Price).......................................... $1,888,375.00 Net change by previously authorized Change Orders.................................................. $ 0.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$1,888,375.00 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order.......$ 0.00 The new(Contract Sum)_(Guaranteed Maximum Price)including this Change Order is....... $ 1,888,375.00 The Contract Time will be(increased) (decreased)(unchanged)by............................... 0 days The date of Substantial Completion as of the date of this Change Order is....................... Detailed description of change order and justification: Provide and weld in 2 locations 3"by at least 15'tall, capped on top pipes provided and welded by Key West Awnings.Will be welded following the plans provided by the architect. This change Order is 0.01%of the original contract price. Not valid until signed by Owner,Architect(If apj2llcablel,and Contractor ARCHITECT: r M .. Date CONTRACTOR: _. r D DIRECTOR OF AIRPORTS ' 2.3.2022 Date 02.07.2022 MONROE COUNTY: A st./County Administ or Date 11 A OVE U A FO NEY t RNM PED O J. .aR ASSISTA U ATTORNEY Date 2/3/22 SectionChange Order Attachment per Monroe County Code - • Change Order was not included in the original contract specifications. Yes( x ) No ( ) If Yes, explanation: Provide and weld in 2 locations 3"by at least 15'tall,capped on top pipes provided and welded by Key West Awnings.Will be welded following the plans provided by the architect. This will be drawn against line item 70 of the budget. • Change Order was included in the original specifications. Yes ( ) No ( x ) If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes( ) No(x) If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes(x) No ( ) If no,explanation of why: • Change Order is correcting an error or omission in design document. Yes ( ) No ( x ) Should a claim under the applicable professional liability policy be made? Yes( ) No( x ) Explain: C O N S T R U C T I O N G R O U P ConfingeIll. Use Directive CUD OWNER: PROJECT: Date:10/21/2 t Monroe Board of County Comissioners Marathon International Airport 1100 Simonton Street Terminal Reroof CUD Number:5 Key West,FL 33040 9400 Overseas Highway Marathon,FL 33050 This proposed change order is for: Provide and weld in 2 locations 3"by at least 15'tall,capped on top pipes provided and welded by Key West Awnings.Will be welded following the plans provided by the architect. Is additional time needed to perform scope changes? ❑YES ❑X NO Time Extension 0 days Changes to Contract Sum: Subtotal: S 6,342.50 General Liability: $ 63.43 Subtotal: $ 6,405.93 GC Fee: S _736.68 Subtotal: $ _—u____- TMxx7,142.61_ Contractor's Bond S 107.14 Total Proposed Amount: $ 7,249.75 Reason for Changes: ®Changes in scope given by architect or owner for aesthetic and/or design reasons ❑Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved_bx._.._ - .__._m _ ___ ...._. Date: 1 /28/21 ❑ Declined by: Date: Comments: CGCO21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com KEY WEST AWNINGS • 1075 Duval St, C-21 #222 Key West,FL 33040 Date Estimate 10/1 T2021 1367 Name/Address Marino Construction Harold Schreckengost 7025 Shrimp Rd,Suite 2E Key West,FL 33040 Project Description Qty Cost Total The 3"by 3" edge angle can be replaced in the limited length where 3 1,100.00 3.300.00T severe corrosion has occurred approximately 5'to 8'in each location.At these locations,cut the vertical leg of the angle flush with the bottom leg and weld a new plate matching the leg length and thickness of the removed angle.Stitched weld the new plate to the bottom leg of the angle with a 2-6 1/4"fillet weld along the entire length of the repaired area.Weld the interface between the existing vertical leg and the new repair length at the ends of the repair to allow for load transfer across the vertical elements. Provide and weld in 2 locations 3"by at least 15'tall,capped on top 2 1,300.00 2,600.00T pipes provided and welded by Key West awnings will be welded following the plans provided by the architect.Taking all the necessary safety measures by providing welding blankets this can be done as quickly as this coming week or weekend so roofers can be doing their job without any interruptions. 7.50% 442.50 Total $6,342.50 Customer Signature