Loading...
4th Change Order 02/04/2022 `v BOARD OF COUNTY COMMISSIONERS County of Monroes � , Mayor David Rice,District 4 FloridaThe Mayor Pro Tem Craig Cates,District 1 Michelle Coldiron,District 2 Vacant,District 3 �. Holly Merrill Raschein,District 5 Memorandum DATE: 02/03/2022 TO: BOCC Kevin G.Wilson,P.E. FROM: Kevin G. Wilson, P.E. 2022.02.03 13:20:25 06'00' SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order#4 for the Rockland Key Temporary Monroe County Fleet Garage Build Out project. This change order increases the final contract sum by $3,163.86. The substantial completion date is unchanged. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority on Friday, February 4, 2022. MONROE CouNTYIENGINEIBRINGI PROJECT MANAGEMENT CONTRACTE PROJECT TITLE: Rockland Key Temporary Monroe County Fleet Garage Build Out CHANGE ORDER NO: 04 INITIATION DATE: 02/02/2022 CONTRACT DATE: 12/08/2021 TO CONTRACTOR: Pedro Falcon Contractors, Inc. 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: The original (Contract Sum)(Guaranteed Maximum Price) $452,600.00 Net change by previously authorized Change Orders........................ $21,938.47 The (Contract Sum)(Guaranteed Maximum Price) prior to this Change order was... $474,538.47 The (Contract Sum)(Guaranteed Maximum Price)will be(increased) (decreased) s (unchanged) by this Change Order................... $3,163.86 The new(Contract Sum)(Guaranteed Maximum Price) including this Change Order is. $477,702.33 The Contract Time will be increased decreased unchanged b 0 days ( ) ( )( ) Y ........ .... .. . The date of Substantial Completion as of the date of this Change Order is ................ 02/23/2 p g 022 Detailed description of change order and justification: During construction additional work was identified that was not included in the gri_ final ,wca e. Additional spailing damage was found overhead at the northeast bay door which needs to be removed ar)d re aired.. Change order is 0,7%of original contract price. zE=�` Not valid until signed by Owner.Architect if _ licable , and Cori�ractor ARCHITECT: 1Nillim Horn d rltct P.A. ate CONTRACTOR: Pe ro con Contractors, Inc. atd Cary Knight Digitally signed by Cary Knight DEPARTMENT DIRECTOR: Date:2022.02.0314:05:13-05'00' Cary Knight Date t�4 t Kevin G.Wilson,P.E. COUNTY/ASSISTANT ADMINISTRATOR: 2022.02.04 16:41:09 06'00' Roman Gastesi Date Kevin Wilson Change Order Attachment per Ordinance No. 024-2015 • Change Order was not included in the original contract specifications. Yes E No El If Yes, explanation: During construction, additional spalling damage was identified that was not included in the original scope. • Change Order was included in the original specifications. Yes El No E If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes [-] No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes No E] If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes No E Should a claim under the applicable professional liability policy be made? Yes 0 No Explain: 31160 Avem,.�e C" Big Pine Key, FL 33043-4516 PEDRO FALCON (305)8_72-2200 Fax: (305)8-72-2219 13 CONTRACTORS INC. EC 13003416 "" CGC 150-761-7 Request for Change Order Date Submitted: 02/01/2022 Project: Rockland Key Temporary Monroe County Fleet Garage Build Out PCO Number: 06 DesSri in: On 01/26/2022 we received an email from Mr. Michael DeAngelis requesting a proposal to repair some additional concrete spalling over the bay doors for he above referenced project. Therefore, this PCO includes the following concrete spalling repairs: • Remove spall ed and damaged concrete including any severely corroded rebar above the bay doors that were observed needing repairs. • Cut existing concrete as required. • Treat existing rebar for rust and corrosion as required and install and additional rebar as required. • Place concrete over areas where concrete has been removed to restore structure to original condition. • This proposal is based on 7.0 cubic feet o repair mortar. This number is subject to final field measure. Cost will be adjusted at unit cost of$425 per cubic feet if a significant difference occurs in quantities occur. We will notify Monroe County if it appears the quantities • Excludes stucco and painting. All back-up documents are at the end of this PCO. .............................................................................................................................. Bella Construction of Spalling Repairs............................ ................................................................$ 2,976.00 Subtotal Including Mark-up...............................................................................$2,976.00 Management Fee @ 5%..................................................................................$148.80 P & P and 1.25% of Total Cost............ .............................................................$ 39.06 Total...........................................................................................................$3,163.86 ............................................................................................................................... Total Reguest for Change Order Amount ...... 1ndu,s'triW,-Um-tn-terciW,- InstitutionM, - Rer,iderai.M,- IAPHity Estral'.flished 1984 o additional time requested. Please contact me if you have any questions. Thanks. Respectfully Submitted, Christian Rrisson Project Manager lndu Sri 3a✓4m-twterciW, Instttirt0.r x ij$on M, u ers'iderfti.5 IAPHity #..s f 315,-5'S'R d 984 Bella Construction of Key West, Inc. CGC 1518284 35 Diamond dr., Key West,FL 33040 Office(305)292.9888 tim concretebella.com Change Order Proposal Date: January 31,2022 COP 3 Concrete repairs To Pedro Falcon Contractors, Inc. From: Tim Neely Attn: Christian Brisson Project: Rockland Key Public Works email: E,bj r�ed r 0 fa 10 0�no 0 m Christian Per your email of 1.28.22, We sent our expert over to look at the repairs in the photo and also did a bit of exploratory work arriving at the quantity of repair required below. Please review and let me know if you have any questions: Description Costf Total Overhead repairs 7.0 cf 425.00 $2,976 Description: 1 Remove spalled and damaged concrete including any severely corroded rebar. 2 Cut existing concrete as required 3 Treat existing rebar for rust and corrosion as required and install any additional rebar as required. 4 Place concrete over areas where concrete has been removed to restore structure to original condition. 7 Includes all labor,material and equipment required to complete this scope of work 8 Estimate is based on quantities above,this number is subject to final field measure and cost will be adjusted at unit costs above if a significant difference occurs. General Exclusions: 1 Permits or permit fees(reimbursable expense) 2 Work not outlined above 3 Stucco(if required) 4 Painting Contractor: Owner/Contractor: Page 1 of 1