Loading...
Item K09 K.9 County f � .�� ��� BOARD OF COUNTY COMMISSIONERS Mayor David Rice,District 4 Mayor Pro Tem Craig Cates,District 1 The Florida Keys ' Y � �F' Michelle Coldiron,District 2 Vacant,District 3 --' Holly Merrill Raschein,District 5 County Commission Meeting February 16, 2022 Agenda Item Number: K.9 Agenda Item Summary #10219 BULK ITEM: Yes DEPARTMENT: Airports TIME APPROXIMATE: STAFF CONTACT: Richard Strickland(305) 809-5200 N/A AGENDA ITEM WORDING: Report of Airport change orders reviewed by the County Administrator/Assistant County Administrator. ITEM BACKGROUND: There were four(4) change orders considered and approved by the County Administrator/Assistant County Administrator during the month of January, 2022. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 27-1998 was adopted in order to provide that the County Administrator may approve separate, non-cumulative change orders for construction projects and professional service contracts in amounts not to exceed $50,0000 (as amended by Ordinance No. 024-2015) or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: Approval. DOCUMENTATION: Airport Change Order Report FINANCIAL IMPACT: Effective Date: Expiration Date: Total Dollar Value of Contract: Total Cost to County: Packet Pg. 1949 K.9 Current Year Portion: Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: If yes, amount: Grant: County Match: Insurance Required: No Additional Details: REVIEWED BY: Beth Leto Completed 01/29/2022 1:39 PM Richard Strickland Completed 01/30/2022 10:12 PM Pedro Mercado Completed 01/31/2022 10:05 AM Purchasing Completed 01/31/2022 10:41 AM Budget and Finance Completed 01/31/2022 10:42 AM Maria Slavik Completed 01/31/2022 11:08 AM Liz Yongue Completed 02/01/2022 10:46 AM Board of County Commissioners Pending 02/16/2022 9:00 AM Packet Pg. 1950 (:podoU japi y :p a' - 6 AAAM podoU japio aBueqo4a a' :4u9ua o 44 �. R 'O tm � zg � s ro _ uo v � � c x � c o q9{ L_ V� R may. R y ro C C Tn m45 �yqq t E m = d ~u E V W, Y cY ®� ®i R ! VC mr3 O q u P R V P O O R R N N = U 8I > e E ®® e b j el R c = u C m 1.j R ; a c j « a c g 'oc a � I j � E,® b ! R C E w ow 3 m v dm;� E j � 3 m-C m m 3 g n Y e V ! 3 0 s a m 0 •0 .2 0 cc 0 ..2 M � 6 ro E IR W J C C = I C f O O ✓ V1 V w c = e = t c = ®® C V ® U ® V O U V C C? r C t7 C V° 3pI, C C7 .._,_....._. P j o c O-45 c # o c o c gto ( c0 1 R ro � m R m 8 ro I f m m re I i LL LL K.9.a MONROE CouNTY/DEPARTMENT OF AiRpom CONTRACT CHANGE ORDER PROJECT TITLE: Marathon International Airport CHANGE ORDER NO: 1 Hangar Rehabilitation INITIATION DATE: 12/8121 TO CONTRACTOR: Marino Construction Group, Inc CONTRACT DATE: 02/17/2021 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price).......................................... $499,950.00 Net change by previously authorized Change Orders.................................................. $ 0.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was............$499,950.00 0 The(Contract Sum)(Guaranteed Maximum Price)will be(Increased)(decreased) (unchanged) by this Change Order.......$ 0.00 The new(Contract Sum) _(Guaranteed Maximum Price) including this Change Order is.......$499,950.00 The Contract Time will be(increased)(decreased) (unchanged)by............................... 0 days The date of Substantial Completion as of the date of this Change Order is....................... Detailed description of change order and justification: Installation of New Composite Deck Boards at Plane Entrance. Costs are covered under contingency allowances under CUD# 1. 0 This change Order is 0 00°°of the original contract price. Not valid until signed by Owner.Architect(If applicable),and Contractor cu ARCHITECT: r 2/22 2 i Date ca CONTRACTOR: / Da e DIRECTOR OF AIRPORTS 0 mm.uw Date MONROE COUNTY: _ Via- 01.04.2022 sst./county`Adm n strator Date NROE COUNTY ATTOnNEY fiOE FORM PED 0 J. C ASSIS U A EY Date 12/23/21 Packet Pg. 1952 K.9.a Change Order Attachment r Monroe County Code Section 2-58(b) Change Order was not included in the original contract specifications. Yes(X) No( ) If Yes, explanation : Installation of New Composite Deck Boards at Plane Entrance. Costs are covered under contingency allowances under CUD#1. Change Order was included in the original specifications. Yes ( ) No (X ) 0 If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes()No()) c, 0 If Yes, explanation as to why it is not subject for a calling for bids: ft Project architect approves the change order. Yes(X) No ( ) 0 If no,explanation of why: • Change Order is correcting an error or omission in design document. Yes( ) No (X) 0 Should a claim under the applicable professional liability °'pp p ry policy be made? Yes( ) No (X) Explain: 0 Packet Pg. 1953 K.9.a --R, N'',-0- C O N S T R U C T I O N G R O U P Contin enc Use Directive ICUD OWNER: PROJECT: Date: 11122/21 Monroe Board of County Comissioners Marathon International Airport 1100 Simonton Street Hangar Rehabilitation CUD Number: 1 Key West,FL 33040 9400 Overseas Highway Marathon,FL 33050 This Contingency Use Directive is for: Install new bevel cut boards with tapcons at each location.Install new composite deck boards ry at plane entrance. 0) CJ Is additional time needed to perform scope changes? ®YES X�NO Time Extension 0 days 0 Changes to Contract Sum: General Conditions: $ 1,000.00 Subcontractor Subtotal: $ 12,600.00 �y General Liability: $ 126.00 Subtotal: $ 13,726.00 GC Fee: $ 2,058.90 Subtotal: $ 15,784.90 Contractor's Bond $ 236.77 Total Proposed Amount: $ 16,021.67 0) Reason for Changes: Xa Changes in scope given by architect or owner for aesthetic and/or design reasons t5 Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions El Approved by: Date: "�6 El Declined by: Date: Comments: CGCO21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 I .marino-construction.com Packet Pg. 1954 K.9.a F Agra 'r 11/19/21 C.1ange Order 0 0) SUBMITTED TO, Marino Construction Group PROJECT; Marathon Airport - T Hanger Buildings Change order # 1 Install new composite deck boards at plane entrance. Remove existing deck boards and install new bevel cut boards with tap-cons at each location. The total amount for this work is. Total 1 , E TARPON BAY CONSTRUCTION 1220 SE 131h Ave Cape Coral, F1. 33990 239/573-4733 FAX --239/573-8141 WEB SITE: tarponbayconstruction.com Packet Pg. 1955 K.9.a CONTRACTMONROE CouNTY/DEPARTMENT OF AIRPORTS E PROJECT TITLE: Marathon International Airport CHANGE ORDER NO: 2 Hangar Rehabilitation INITIATION DATE: 1218121 TO CONTRACTOR: Marino Construction Group, Inc CONTRACT DATE: 02/17/2021 The Contract is changed as follows: o The original (Contract Sum) (Guaranteed Maximum Price).......................................... $499,950.00 Net change by previously authorized Change Orders................................ $ 0.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was............$499,950.00 The(Contract Sum) (Guaranteed Maximum Price)will be Increased (decreased) 0) (unchanged)by this Change Order.......$ 0.00 The new(Contract Sum)_(Guaranteed Maximum Price)including this Change Order is.......$499,950.00 The Contract Time will be(increased (decreased)(unchanged) by............................... 0 days The date of Substantial Completion as of the date of this Change Order is....................... o Detailed description of change order and justification: Installation of additional wall panels beyond the original bid , amount. Includes removal of damaged panels and installation of new panels for Building 1 , 2 &3 . Costs are covered under contingency allowances under CUD #2 0 This change Order is 0.00°0 of the original contract price. of v lid 11 i n d b Ownor Architect(if a lice le) and Contra /2 ' 1 c8 ARCHITECT: --- Date CONTRACTOR: 4Dat DIRECTOR OF AIRPORTS Date 01.04.2022 MONROE COUNTY: Asst./County Administrator Date R ROVE RM U PO#�3'UEY PED t],#. .a CA ASSISTA U ATTORNEY Date 12/23/21 Packet Pg. 1956 K.9.a Change Order Attachment per Monroe County Code Section 2-58(b) • Change Order was not included in the original contract specifications. Yes(X) No( ) If Yes, explanation : Installation of additional wall panels beyond the original bid amount. Includes removal of damaged panels and installation of new panels for Building 1 , 2&3 . Costs are covered under contingency allowances under CUD #2 • Change Order was included in the original specifications. Yes ( ) No (X ) If Yes, explanation of increase in price: 0) • Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes() No(X) 0 If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes(X) No O 0 If no,explanation of why: Change Order is correcting an error or omission in design document. Yes ( ) No (X) • Should a claim under the applicable professional liability policy be made? Yes( ) No (X) W Explain: 0 Packet Pg. 1957 K.9.a __.._.___........_....... .. C O N S T R U C T 1 O N G R O U P Contin enc Use Directive CUD OWNER: PROJECT: Date 1218/21 Monroe Board of County Comissioners Marathon International Airport 1100 Simonton Street Hangar Rehabilitation CUD Number 2-REV Key West,FL 33040 9400 Overseas Highway Marathon,FL 33050 This Contingency Use Directive is for: Install additional wall panels beyond the original bid amount.Process to include removal of damaged panel and installation of new panel with new fasteners for Buildings 1,2,&3.There is a total of 21 panels needing to be replaced. 0) tJ Is additional time needed to perform scope changes? YES X�NO Time Extension 0 days 0 Changes to Contract Sum: _ General Conditions: $ 1,09090 Subtotal: $ 6,279.00 �y General Liability: $ 62.79 Subtotal: $ 7,43269 GC Fee: $ 1,114,90 Subtotal: $ 8,547,59 0 Contractor's Bond $ 128,21 Total Proposed Amount: $ 8,67580 0) Reason for Changes: ®Changes in scope given by architect or owner for aesthetic and/or design reasons 0 Changes resulting from events or circumstances:defective design,owner caused delays,:differing site conditions Araved b pp y Date s/1213 13 2 1 0) Declined by: Date: Comments: CGCO21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com Packet Pg. 1958 K.9.a s � 1,Off? f t 12/7/21 invoice 0 0) SUBMITTED TO; Marino Construction Group PROJECT; Marathon Airport - T Hanger Buildings , Change order # 2 Installation of additional wall panels. Install additional wall panels beyond the original amount bid. This process will include removal of damaged panel and installation a new panel with new fasteners. The total amount is for each additional panel required. Bldgs. 1, 2 & 3 panels21 $ , 7 TARPON BA Y CONSTRUCTION 1220 SE 131h Ave Cape Coral, Fl. 33990 239/573-4733 FAX 239/573-8141 WEB SITE: tarponbayconstruction.com Packet Pg. 1959 MONROE COUNTY/DEPMMENT OF AIMRTS CONTRACr CHANGE ORDER PROJECT TITLE: Marathon International Airport CHANGE ORDER NO:3 Hangar Rehabilitation INIT`IATION DATE:December 7,2021 0 TO CONTRACTOR: Marino Construction Group,Inc CONTRACT DATE: 02/17/2021 W The Contract Is changed as follows: 0 The original (Guaranteed Maximum Price).......................................... $ 499.9w.00 Not change by previously authorized Change Orders..................................................$ 0.00 The LQaZjqLfiKW(Guaranteed Maximum Price)prior to this Change order was.............$ 499,950.00 The(Contract Sum)(Guaranteed Maximum Prim)will be(Ingl2l"M(decreased) (unchanged)by this Change Order.......$ 0.00 Then (Contract Sum)(Guaranteed Maximum Price) Including this Change Order is....... $ 499,950.00 The Contract Time YAII be lipgMamM(decreased)(unchanged)by............................... 0 days The date of Substantial Completion as of the date of this Change Order is....................... Detailed description d change order and justification: This change order Is for additional work for Panel Splice Replaament and additional screws beyond the 25%limit of Building 4. This change Order Is PAM of the original contmct price. 0 Notun II n t f lice ------- 1/711-912 ARCHITECT: Date CONTRACTOR: E 1.13.2022 DIRECTOR OF AIRPORTS Date 01.18.2022 MONROE COUNTY: �ICO�UWW�r�dnmlle=ktor Date NROE COUNTY AT7OnNEY A 7/ 1;10V7E FORM FD 0 A8SV3qR J. 1/14/22 Packet Pg. 1960 K.9.a Change Order Attachment per Monroe County Code Section 2-W(b) • Change Order was not included in the original contract specifications. Yes( ) No( ) If Yes, explanation : Panel Splice Replacement and additional screws beyond the 25% limit for Building 4.Costs are covered under contingencies under CUD3 . 0 • Change Orderas Included in the original specifications. Yes( ) No ( ) m If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes()No(X) 0 I fYes,explanation asto why It is not subject for a calling for bide: , • Project architect approves the change order. Yes(X) No ( If no,explanation of why: • Change Order is correcting an error or omission in design document. Yes( No (X) 0) Should a claim under the applicable professional liability policy be made? Yes( )No( ) Explain: 0 Packet Pg. 1961 K.9.a C O N S T R U C T I O N G R O U P '� 7 � >Ccntfn rah'".Use D[�ectl+fe��GUD }, '�,� � ,� ,. • �, OWNER: PROJECT: Date:1/622 Monroe Board of County COmiSaioners Marathon International Airport 1100 Simonton Street Hangar Rehabilitation CUD Number:3-REV Key West,FL 33040 9400 Overseas Highway a Marathon.FL 33050 0: This Contingency Use Directive is for: Hourly rate for additional work required at roof.Work to include:Panel splice replacement;additional screws installed beyond the 25%bid amount.This hourly rate include labor and materials. This is for work completed at Building#4 m U Is additional time needed to perform scope changes? YGS XX NO Time Extension Oda s 0 Changes to Contract Sum: General Conditions: E Subtotal: 11,250.00 General Liability: S 1_12.50 Subtotal: $ 1 I®362.50 GC Fee: $ 1,704.38 Subtotal: S 13,066.88_ 0 Contractor's Bond S 196.00 Total Proposed Amount: S m 13,262.88 W m Reason for Changes: U ®Changes in scope given by architect or owner for aesthetic and/or design reasons Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions a ❑ Approved bYE Date: , ,` m Declined by: Date: Comments: CGCO21647 1305-359-5269 1 PO Box 1706 Key West,Fl.33041 1 www.madno-construction.com - Packet Pg. 1962 K.9.a a � 4 k a t- tit q V 1 7/21 invoice 0 SUBMITTED TO: Marino Construction Group PROJECT: Marathon Airport- T Hanger Buildings Change order#3 Hourly rate for additional work required at rooL 0 This work will . Panel splice replacement Additional screws Installed beyond t / bid amount This hourly rate includes labor and materialsr tJ 0 • TARPON BA Y CONSTRUCTION 1220 SE 131h Ave Cape Coral,Fl. 33990 239/573-4733 FAX—239/573-8141 WEB SITE: tarponbayconstruction.com Packet Pg. 1963 K.9.a TITLE: CONTRACr CHANGE ORDER PROJECT International Airport CHANGE ORDER NO:4 Hangar Rehabilitation INITIATION DATE: December 14,2021 0 TO CONTRACTOR: Marino Construction Group, Inc CONTRACT DATE: 02/17/2021 m The Contract is changed as follows: 0 W The original (Contract Sum) (Guaranteed Maximum Price)... ............... $ 499,950..00 Net change by previously authorized Change Orders.... .......... $ 0.00 .................................... The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.............$ 499,950.00 The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) (unchanged)by this Change Order.......$ 0.00 The new(Contra t Sum)_(Guaranteed Maximum Price) including this Change Order is....... $ 499,950.00 The Contract Time will be(increased)(decreased) (unchanged)by............................... 0 days The date of Substantial Completion as of the date of this Change Order is....................... Detailed description of change order and justification: 0 This change order Is for Fabrication of L Brackets In stainless steel,fabrication of stainless steel drop pins and Installation of all L Brackets with new fasteners. This change Order is .01° of the original contract price. Not chl ( licable). C r rI ARCHITECT: 1 3 7 2 2 0 Date CONTRACTOR: i/1'k a ate (RECTOR OF AIRPORTS 1.13.2022 Date ONROE COUNTY: 01.18.2022 , ,� Asst./County dministrator Date NFIOE COUNTY"ATTOnNEY A r$10VE AT FC?' D O J. ASSI UUNTY ATMRNEY Date Packet Pg. 1964 K.9.a Change Order Attachment per Monroe County Code Section - ( ) Change Order was not included in the original contract specifications. Yes( ) No( ) If Yes, explanation : Fabrication of L Brackets in stainless stell, drop pins in stainless steel and installation of as L Brackets. Costs are covered under contingencies under CUD4. 0 Change Order was included in the original specifications. Yes ( No O m If Yes, explanation of increase in price: - Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes()No(X) 0 If Yes, explanation as to why it is not subject for a calling for bids: Project architect approves the change order. Yes(X) No O 0 If no,explanation of why: Change Order is correcting an error or omission in design document. Yes ( ) No (X) 0) Should a claim under the applicable professional liability policy be made? Yes ( ) No (X) Explain: 0 ___ _ Packet Pg. 1965 K.9.a C O N S T R U C T I O N G R O U P OWNER: PROJECT: Date: 12/14/21 Monroe Board of County Comissioners Marathon International Airport _ 1100 Simonton Street Hangar Rehabilitation CUD Number:4-REV Key West,FL 33040 9400 Overseas Highway Marathon,FL 33050 W This Contingency Use Directive is for: Fabricate 14pca 1/4"L Brackets in Stainless Steel Fabricate 6 pcs.3/4"stainless steel drop pins Remove all L brackets and reinstall with new fasteners Q) Provide new stainless bolts,washers,8t:nylon hex nuts Provide new holes 4"into concrete at drop pin locations m U Is additional time needed to perform scope changes? YES X❑NO Time Extension 0 days _ D — — — Changes to Contract Sum: General Conditions: S , Subtotal: __ 8,28500 General Liability: S _ 92.85 Subtotal: $ 8,367.85 GC Fee: S __ 1,255.18 Subtotal: �$ 9,623.03 D Contractors Bond S 14435 Total Proposed Amount: S 9,767.38 0) Reason for Changes: m ®Changes in scope given by architect or owner for aesthetic and/or design reasons Chan es resulting from events or circumstances:defective design, D 8 8 gn,owner caused delays,differing site conditions 0 Approved by: Date: 12/14/21 D m Declined by: Date: Comments: C00O21647 1305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.maano-construction.com Packet Pg. 1966 K.9.a t ,- �Va yYa 6� - � IY i PROPOSAL 0 0) CD SUBMITTED TO- Marino Construction Group tJ ATTN- Mike Marino Scope of work; • Fabricate 14 pcs. 1/411 - Brackets in stainless • Fabricate • /1 stainless pins • • Remove all L brackets and re-install with new fasteners 0 • Provide new stainless; bolts, washers & nylon hex nuts Provide new holes 411 into concrete at drop pin locations tJ 0 Total $ 89285 } 1220 SE 3"h Cape Coral,Fl.33990 jej)@Urponbayconstracdom _ Packet Pg. 1967