Loading...
Item D1 E/2 BOARD OF COUNTY COMMISSIONERS C ounty of M onroe Mayor David Rice, District 4 Mayor Pro Tem Craig Cates, District 1 The Florida Keys Michelle Coldiron, District 2 Vacant, District 3 Holly Merrill Raschein, District 5 County Commission Meeting March 16, 2022 Agenda Item Number: D.1 Agenda Item Summary #10320 BULK ITEM: Yes DEPARTMENT: Project Management TIME APPROXIMATE: STAFF CONTACT: Steven Sanders (305) 295-4338 n/a AGENDA ITEM WORDING: Approval of Change Order 3 with Pedro Falcon Contractors, Inc. in the amount of $123,934.52 for the Long Key Transfer Station Building Repairs project. This change order is needed after an inspection was performed in which unforeseen additional damage to the building was found. This change order is part of the Hurricane Irma recovery effort. ITEM BACKGROUND: The Long Key Transfer Station Building was damaged during Hurricane Irma requiring repairs. A contract was awarded to Pedro Falcon Contractors, Inc. on April 21, 2021. During construction, and after removal of stored materials from the metal building, a thorough inspection was conducted. This inspection found the existing condition of the building to be much worse than originally anticipated and the minor structural repairs would not be sufficient to ensure a safe and structurally sound repair. At the recommendation of the engineer, in lieu of minor structural repairs and new siding and roof panels, the repairs require structural steel column repairs, demolition purlins, wall sheathing, roof sheathing, and new trim as well as painting of columns. Pedro Falcon Contractors has provided a request for change order for the additional repairs needed. This change order request credits the County back a portion of the original scope of work no longer needed and also includes the additional work needed to repair the building according to the PREVIOUS RELEVANT BOCC ACTION: 04/21/21 BOCC approved a contract with Pedro Falcon Contractors Inc. for the Long Key Transfer Station Building Repairs. 06/20/18 BOCC approved advertisement of any required solicitations associated with the Hurricane Irma recovery effort. CONTRACT/AGREEMENT CHANGES: Additional structural repairs and roof replacement needed due to unforseen additional damage to building Qbdlfu!Qh/!2227 E/2 STAFF RECOMMENDATION: Approval of Change Order 3 DOCUMENTATION: Change Order 03_PFC_Structural Changes_signed FINANCIAL IMPACT: Effective Date: 3/16/22 Expiration Date: 5/26/22 (new substantial completion date) Total Dollar Value of Contract: $547,661.70 Total Cost to County: $27,383.09 Current Year Portion: $547,661.70 Budgeted: Yes Source of Funds: 125-0459110 CPI: n/a Indirect Costs: n/a Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: no If yes, amount: Grant: FEMA (90%) ; State (5%) ; County (5%) County Match: FEMA (90%) ; State (5%) ; County (5%) Insurance Required: Yes already on file Additional Details: Original Contract: $394,186.00 ; Change Order #1: $22,423.85 ; Change Order #2: $7,117.33 ; Change Order #3: $123,934.52 125-0459110 03/16/22 125-0459110 · HURRICANE IRMA $123,934.52 REVIEWED BY: Cary Knight Completed 03/01/2022 11:01 AM Kevin Wilson Completed 03/01/2022 11:19 AM Joseph DiNovo Completed 03/01/2022 1:59 PM Purchasing Completed 03/01/2022 2:44 PM Budget and Finance Completed 03/01/2022 2:44 PM Maria Slavik Completed 03/01/2022 3:00 PM Liz Yongue Completed 03/01/2022 3:02 PM Board of County Commissioners Pending 03/16/2022 9:00 AM Qbdlfu!Qh/!2228 E/2/b Buubdinfou;!Dibohf!Psefs!14`QGD`Tusvduvsbm!Dibohft`tjhofe!!)Dibohf!Psefs!$4!x0!QGD!gps!Mpoh!Lfz!Usbotgfs!Tubujpo!Cvjmejoh!Sfqbjst* Qbdlfu!Qh/!2229 E/2/b After execution of the contract and following removal of stored materials from the metal building, the condition of the structure was determined to be worse than anticipated and required further structural repairs not in the original contract specifications. The contractor is already on the jobsite performing other repairs and has been in constant contact/discussions with the Design Engineer about the various additional repairs needed. Re-bidding the project would delay the repairs and most likely would not result in any savings to the County due to escalating material costs. Buubdinfou;!Dibohf!Psefs!14`QGD`Tusvduvsbm!Dibohft`tjhofe!!)Dibohf!Psefs!$4!x0!QGD!gps!Mpoh!Lfz!Usbotgfs!Tubujpo!Cvjmejoh!Sfqbjst* Qbdlfu!Qh/!222: Buubdinfou;!Dibohf!Psefs!14`QGD`Tusvduvsbm!Dibohft`tjhofe!!)Dibohf!Psefs!$4!x0!QGD!gps!Mpoh!Lfz E/2/b Qbdlfu!Qh/!2231 E/2/b Buubdinfou;!Dibohf!Psefs!14`QGD`Tusvduvsbm!Dibohft`tjhofe!!)Dibohf!Psefs!$4!x0!QGD!gps!Mpoh!Lfz!Usbotgfs!Tubujpo!Cvjmejoh!Sfqbjst* Qbdlfu!Qh/!2232 E/2/b Buubdinfou;!Dibohf!Psefs!14`QGD`Tusvduvsbm!Dibohft`tjhofe!!)Dibohf!Psefs!$4!x0!QGD!gps!Mpoh!Lfz!Usbotgfs!Tubujpo!Cvjmejoh!Sfqbjst* Qbdlfu!Qh/!2233 E/2/b Buubdinfou;!Dibohf!Psefs!14`QGD`Tusvduvsbm!Dibohft`tjhofe!!)Dibohf!Psefs!$4!x0!QGD!gps!Mpoh!Lfz!Usbotgfs!Tubujpo!Cvjmejoh!Sfqbjst* Qbdlfu!Qh/!2234 E/2/b February 14, 2022 PROPOSAL FOR: SKYLINE STEEL, INC Project Location/Ship to: 67901 Overseas Hwy Attn: Mike Davis rd Long Key, FL 33001 4987 NW 23 Ave 5 Fort Lauderdale, FL 33309 5 Email: Mike@SkylineSteel.net 1 AD-202 SOUTH-WEST ELEVATION - SHED AD-301 1 5 1/8"=1'-0" 2 12345678910111213 90-0" F.V. 2-0" F.V. 20-6" F.V.21-8" F.V.21-8" F.V. 24-6" F.V.14-10" F.V.17-8" F.V.17-8" F.V.14-8" F.V.14-8" F.V.14-8" F.V.14-10" F.V. 5 EXISTING WALL METAL PANELS BELOW TO BE REMOVED AND REPLACED 2 AD-301 T. E 1AD-202 EXISTING ROOF METAL DECKINGEXISTING ROOF METAL DECKINGEXISTING ROOF METAL DECKING TO ME REMOVEDTO ME REMOVEDTO ME REMOVED SOUTH-EAST ELEVATION - SHED / BINS 2 1/8"=1'-0" 13121110987654321 90-0" F.V. 110-0" F.V. EXISTING ROOF STRUCTURE TO BE DEMOLISHEDNEW METAL ROOF NEW 30-0 A.G. CONCRETE PANELING (NOA 20-0331.03) ELECTRICAL POLE. 2-0" F.V. 14-10" F.V.14-8" F.V.14-8" F.V.14-8" F.V.25-0" F.V.25-2" F.V.24-6" F.V.21-8" F.V.21-8" F.V.20-6" F.V. NEW METAL SIDING NEW METALT.O. RIDGE NEW METAL SIDING WITH WITH ANTI-CORROSIVE ROOF PANELING ANTI-CORROSIVE PAINT COATINGEL. 24- 3" F.V. PAINT COATING (NOA 19-0515.08) ( FL # 16083.1) (NOA 20-0331.02) T.O. ROOF-BINS EL. 19- 8" F.V. T.O. WOOD PART. EL. 16- 4" F.V. B.O. SIDING NC. WALL EL. 8- 0" F.V. 110-0" F.V. 8- 0" F.V. LEVEL 1 EL. 0- 0" EXISTING CONCRETE WALLEXISTING CONCRETE WALLS TO BE NEW CONCRETE TO BE REPAIRED TYP.PRESSURE CLEAN  SEAL TYP. BOLLARD TYP. OF 4 NORTH-WEST ELEVATION - SHED / BINS 3 1/8"=1'-0" 5 NEW 30-0 A.G. CONCRETE ELECTRICAL POLE BEYOND GFDBA EXISTING WALL METALEXISTING METAL PANELS NEW METAL ROOF PANEL BELOW TO BETO BE REMOVED AND PANELING (NOA 20-0331.03) 18-6" F.V.20-0" F.V.19-0" F.V.19-6" F.V. REMOVED AND REPLACEDREPLACED T.O. RIDGE EL. 24- 3" 5 NEW METAL SIDING. NEW METAL SIDING WITHSHADING LEGEND ANTI-CORROSIVE PAINT COATING (NOA 20-0331.02) EXISTING TO REMAIN 5 NEW METAL GIRTS. NEW CONCRETE SEE STRUCTURAL DRAWINGS BOLLARD TYP. OF 4 5 EXISTING ROOF BEAM TO BE REPLACED. SEE STRUCTURAL DRAWINGS. B.O. SIDING EL. 8- 0" F.V. GENERAL NOTES : 1.ANTI-CORROSIVE PAINT SHALL BE HEMPADUR 4588 1/ HEMPATHANE HA 55610, OR SIMILAR APPROVED SHALL BE APPLIED IN ALL METAL SIDING WALLS  ROOF OF BINS/SHED. LEVEL 1 EL. 0- 0" 2.EXTERIOR WOODEN PARTITIONS TO BE COATED WITH 2 COAT ACRYLIC SOLID NEW METAL SIDING WITH HIDE WHITE PAINT, OR SIMILAR APPROVED. STORAGE BINS IN ANTI-CORROSIVE PAINT COATING FOREGROUND (NOA 20-0331.02)3.METAL PANELS CALLED BY NOAS MAY BE SUBSTITUTED BY ALUMINUM, GALVANIZED METAL, GALVALUME ANTI-CORROSIVE PANELS, OR SIMILAR NORTH-EAST ELEVATION - SHED APPROVED. 4 1/8"=1'-0" Project: Layton Transfer Station - Long Key, FL - Renovation and Addition to Existing PEMB Building Systems of America (BSA) is pleased to quote your building needs for the referenced project. The material will be fabricated by Allied Steel Buildings to meet site visit take-off measurements for project location. Proposal details are as follows: Project Location: Layton Transfer Station, 67901 Overseas Hwy, Long Key, FL 33001 Project Description: Remove Damaged Pre-Eng Metal Building Components and Install New Components: Work to be performed on (1) existing building at the project location Specifications: Drawings by BEA Architects, Inc., dated 11/3/21 Includes but not limited to: 1. Demo of existing damaged wall panels/girts/purlins/trims 2. Installation of New wall panels/girts/purlins/trims per take-off list below 3. (61) 24 Gauge, PBR Roof Panels (w/Miami Dade Approval) (Galvalume) 4. (30) 24 ga, PBR Ridge Cap Die-Formed 1:12 pitch (Galvalume) 5. (20) low eave trim (color TBD) 6. (8) Rake Trim (color TBD) 7. (2) Peak Boxes 8. (10) Rake Angle 9. - 10. (115) 24 Gauge, PBR wall panels (w/Miami Dade Approval) (color TBD) Qbdlfu!Qh/!2235 4611 N FEDERAL HWY, SUITE 242 POMPANO BEACH, FL 33064 - 954.439.8135 E/2/b 11. (5) Outside Corner Trim (color TBD) 12. (6) Jamb Trim (color TBD) 13. s, standard punch (Galvanized) 14. , standard punch (Galvanized) 15. , standard punch (Galvanized) 16. (Galvanized) 17. (3) 14 (Galvanized) 18. 19. (4000) 12-14 x 1 1/4 w/washers. Structural Roof Screws (Galvalume) 20. (3000) 1/4- Stitch Screws (Galvalume) 21. (3000) 12-14 x 1 1/4 w/washers. Structural Wall Fasteners (color TBD) 22. (2000) 1/4- Structural Stitch screws (color TBD) 23. All material, equipment, labor, safety requirements, and insurance for a complete scope of work Exclusions: 1. Demolition of existing Rigid Frame structures (includes removal/replacement of damaged existing wall panels, wall girts, roof purlins, and trims) 2. Interior Wall Liner panels and Interior Ceiling Liner panels 3. Wall and Roof Insulation (can provide for additional cost just need to know R-Value owner wants to achieve) 4. Demo/replacement of existing wall framed openings (Windows, Doors, Louvers) 5. Roof Framed Openings- Curbs/Roof Top Equipment/Skylights 6. Field Welding (expect all members to have bolted and screwed connections) 7. Cleaning or Painting of newly installed steel members. Primer is to protect the steel during transport from factory to jobsite. Painting or cleaning steel is the responsibility of others. 8. Foundation/Footer/Slab-on-Grade Design and Install 9. Interior Architectural Build-out/ Life Safety/Landscaping/Civil/Mechanical/Electrical/Plumbing/Fire Sprinkler 10. Any work on existing wood structure (work is only on the existing PEMB) 11. Bond /Permit Fees/Impact Fees/Trash Dumpsters/Temp Toilets ________________________________________END OF SCOPE _________________________________________ Pricing: TOTAL for (1ea) of Buildings: $181,732.00 \[One Hundred Eighty-One Thousand Seven Hundred Thirty-Two Dollars\] Price above Includes sales tax on materials only This price will be honored if the Order is Entered by (Entry Date): 2/25/2022 COST BREAKDOWN: Nucor Building (1ea) = $114,732 Building Erection = $67,000 Deliverables: Lead Times (based on building order being placed by 2/25/22) a) Material Fabrication and Delivery: 3 to 6 weeks from date order is placed b) Erection: 25 working days (remove old panels/trims and replace) Alternates: None Qbdlfu!Qh/!2236 4611 N FEDERAL HWY, SUITE 242 POMPANO BEACH, FL 33064 - 954.439.8135 E/2/b Payment Breakdown: 50% Deposit for Materials (this is to schedule and fabricate) Balance on Materials due prior to shipment to jobsite (component materials must be paid prior to shipment) Erection: 20% at Mobilization, balance due at completion ____________________________________________________________________________________________________________ AGREED TO BY: GENERAL CONTRACTOR: SKYLINE STEEL NUCOR BUILDER: BUILDING SYSTEMS OF AMERICA By: ________________________________ By: _______________________________ Name/Title: _________________________ Name/Title: ___Ray Jackson / President_ Date Signed: _________________________ Date Signed: ______________________ Qbdlfu!Qh/!2237 4611 N FEDERAL HWY, SUITE 242 POMPANO BEACH, FL 33064 - 954.439.8135 E/2/b FEBRUARY 16, 2022QUOTE #022227 Page 1 of 1 PEDRO FALCON CONTRACTORS 31160 AVENUE C BIG KEY, FL 33043 PH: 305-731-6978 ATTN: KEN BYGLER KENB@PEDROFALCON.COM QUOTATION: LONG KEY TRANSFER STATION PLANS: PER EMAIL DATED 2/16/2022 We propose to furnish the following items for the above-mentioned project, F.O.B. jobsite and install items, which are noted with an asterisk (*): 1) * Revised Drawings S2.0 and S4.0 Added Repair of Columns and Base Plates LUMP SUM TOTAL FOR ITEM #1..................................................$19,250.00 NOTES: A) Galvanized Steel is to be Fabricated From Pre Galvanized Steel B)Price Includes Tax on Materials. C) Price is Subject to Review after Thirty (30) Days. D) Included Temporary Shoring of Existing Columns while Working on Repair. EXCLUSIONS: 1) Code Requirements 2) Any Item not Specifically Noted Herein 3) Signed and Sealed Engineered Drawings 4) Pulling of Permits 5) Embeds for Other Trades 6) All Stud and Gauge Metal 7) Weld Inspection by Others RESPECTFULLY SUBMITTED, MIKE DAVIS SENIOR ESTIMATOR SKYLINE STEEL, INC. rd 4987 NW 23 Avenue * Fort Lauderdale, Florida 33309 * (954) 968-1912 * Fax: (954) 968-7077 www.skylinesteel.net Qbdlfu!Qh/!2238