Loading...
2022-02 Design Phase for New Trash Dumpster 03.17.2022 February 22, 2022 McFarland Johnson 1111 Park Centre Blvd, Suite 202 Miami, FL 33169 Attn: Mr. Robert Overby, Aviation Design Manager email: roverby@mjinc.com Re: Proposal for Geotechnical Services Key West International TSF Proposal No.: 2202-121 Dear Robert: As requested, Tierra South Florida, Inc. (TSF) is pleased to submit this proposal for the above- referenced project. Based on information provided by McFarland-Johnson, proposed construction will consist of dumpster pad, with block walls with foundations into the limestone to prevent overturning. PROPOSED SCOPE OF WORK Our scope of work will consist of: Two (2) Standard Penetration Test (SPT) borings to a depth of 25 feet. Laboratory Testing of soil samples recovered from SPTs. A report will be issued that contains the exploration data, geotechnical recommendations for foundation design, and a discussion of some construction considerations. Prior to drilling at the project site, TSF will notify the local utility companies and request that underground utilities be marked. Our experience, however, is that the utility companies will not mark privately owned utilities. Locating utilities on the air si responsibility. Our proposal assumes that utility lines on the air side will need be located in the field by others prior to mobilization of the drill rig. TSF will recommend a utility line locating service upon request. We believe that significant coordination will likely be required to perform the field operations. This proposal is based on the assumption that 1) all boring locations are open and accessible to a truck mounted drill rig. McFarland-Johnson, Inc. TSF Proposal: 2202-121 Page 2 ESTIMATED FEES It is proposed that the fee for the performance of the services outlined above is determined on a unit price basis in accordance with the attached Fee Schedule and that the work be performed enclosed herewith and incorporated into this proposal. On the basis of the proposed quantities, it is estimated that the total fee will be approximately $9,557.50. Our estimate covers the work needed to present the results. Not included are post design services such as reviews of drawings, preparation of construction specifications, special conferences, and SCHEDULE AND AUTHORIZATION TSF will proceed with the work after receipt of a signed copy of this proposal. With our present schedule, we can commence work within several days of project approval (weather permitting) and fieldwork is expected take about 8 to 9 days to complete. The report can be submitted in about four weeks after completion of the field work. We at TSF appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you should have any questions concerning our proposal, please contact our office. Respectfully submitted, TIERRA SOUTH FLORIDA, INC. Harmon C. Bennett, P.E. Ramakumar Vedula, P.E. Principal Engineer Principal Engineer Attachments: 1. TSF General Conditions 2. Fee Estimate 3. Boring Location Plan McFarland-Johnson, Inc. TSF Proposal: 2202-121 Page 3 McFarland-Johnson, Inc. TSF Proposal: 2202-121 Page 4 Unit# of UnitsUnit PriceTotal I.FIELD INVESTIGATION Mobilization of Men and Equipment Truck-Mounted EquipmentLS1$350.00$350.00 Specialized ATV/MudbugLS0$720.00$0.00 Support VehicleDAY2$150.00$300.00 Standard Penetration Test Borings (By Truck-Mounted Equipment) Land: 0 - 50 ft depthL.F.50$18.00$900.00 50 - 100 ft depthL.F.0$20.00$0.00 Grout-Seal Boreholes (By Truck-Mounted Equipment) Land: 0 - 50 ft depthL.F.50$6.75$337.50 50 - 100 ft depthL.F.0$8.00$0.00 Casing (By Truck-Mounted Equipment) Land: 0 - 50 ft depthL.F.50$9.00$450.00 50 - 100 ft depthL.F.0$10.00$0.00 Auger BoringsL.F.0$12.00$0.00 Double Ring Infiltration TestTest0$500.00$0.00 Field Permeability Tests Test0$850.00$0.00 Pavement Cores, AsphaltEach0$225.00$0.00 Pavement Core Equipmentday0$400.00$0.00 DCPEach0$700.00$0.00 II.LABORATORY TESTING Visual Examination/StratifyPer Hour2$100.00$200.00 Natural Moisture Content TestsTest2$10.00$20.00 Grain-Size Analysis - Full GradationTest2$65.00$130.00 Grain-Size Analysis - Single SieveTest0$35.00$0.00 Organic Content TestsTest1$35.00$35.00 Atterberg Limit TestsTest0$75.00$0.00 Liquid Limit Tests (Only)Test0$52.00$0.00 Plastic Limit Tests (Only)Test0$33.50$0.00 Laboratory CBR + SamplingTest0$700.00$0.00 Grain-Size with HydrometerTest0$115.00$0.00 Proctor Test a) ModifiedTest0$108.00$0.00 b) StandardTest0$102.00$0.00 Bitumen Extraction Test0$150.00$0.00 Bitumen GradationTest0$150.00$0.00 IIIENGINEERING/COORDINATION/MANAGEMENT Project ManagerHour1$185.00$185.00 Principal EngineerHour2$165.00$330.00 Senior EngineerHour4$130.00$520.00 Project EngineerHour8$100.00$800.00 Senior TechnicianHour20$85.00$1,700.00 CADDHour4$75.00$300.00 Badging/trainingHour0$65.00$0.00 LS1$3000.00$3,000.00 IV.Travel, Hotel, per-diem $9,557.50 McFarland-Johnson, Inc. TSF Proposal: 2202-121 Page 5 ¸ ¸ ¸ ¸ ¸ ¸ ¸