Loading...
Item M1MEMORANDUM Office of the County Administrator TO: Board of County Commissioners FROM: Debbie Frederick Deputy County Administrator DATE: July 3, 2012 SUBJECT: County Divisions' Monthly Activity Report for June, 2012 MONTHLY ACTIVITY REPORT - JUNE, 2012 KEY WEST AIRPORT • In June, passenger figures for May were compiled. During that month, the six airlines serving Key West International Airport carried a total of 64,194 passengers. This is a 7.9% increase over May of 2011. The year to date passenger numbers for the first five months of 2012 is 9.8% higher than the same period of 2011. • It's grant season again for the airport. We have applied for and expect to receive approximately 2.3 million dollars from the FAA for capital improvement projects here at EYW. More than half of that amount will go towards paying off the bonds for the new terminal complex. The remainder will fiind drainage improvements, entrance road repaving, and commercial ramp rehabilitation. • The second passenger checkpoint lane was opened by the TSA in June. This is a tremendous improvement and doubled our passenger screening capacity. MARATHON AIRPORT • Annual FAA Airport Inspection for the Part 139 Airport Certification has been completed. Four areas required letters of correction, three of the four have been corrected. • The FDOT Friction test on the Runway has been completed, we are awaiting the letter. • The Surface Sign Enhancement Painting on the Taxiway has been completed. • The Taxiway Center Line Enhancement project has been completed. • The Taxiway Edge Markings have been painted, there will be some additional work done before they are complete. • Service Road Landscaping: Installation of 72 Sabal Palms along service road to begin in July. • FAA Airport Improvement Program & FDOT Joint Participation Agreement (JPA) Projects: • Wildlife Hazard Assessment Project: awaiting delivery of final report • Environmental Assessment Project Preliminary Draft Report associated with the runway relocation proposal: awaiting FAA review & comments 1 • Passenger Terminal Sewer Lateral Design & Constriction Project: awaiting delivery of plans and specifications for bidding. We received the initials plan and design for review. • Emergency Generator/Chiller Switch Gear Project: The building permit has been applied for, work to proceed in July. • Remove Obstruction — R/W 25 Project (Design): Task order to Jacobs Project Management Co. • Remove Obstruction — R/W 25 Project (Lease Buyout): Pre -application submitted to FAA • Purchase Essential Equipment for Airport Safety and Maintenance Project: Purchase orders have all been issued and receipt of equipment has begun. EMPLOYEE SERVICES I. Website Updates (other than normal position vacancy updates, etc.): Benefits: Monthly newsletter — Wellness & EAP Human Resources: Revised 1 job descriptions IL TURNOVER NUMBERS TO DATE: June 2012 Turnover: .39% Turnover to date: 6.74% Resignations:) Terminations:0 Retired:) Deceased:0 Layoffs:0 III. HUMAN RESOURCES IAFF Union Negotiation meeting Administrator attended FKCC Workforce Advisory Committee meeting EEOC Webinar Unemployment claims: 2 Yre 1) hearing - 1 Applications: Referral information: New applications — 54 Newspaper — 6 Re -submittals - 5 Employment Agency — 3 In -House submittals — 3 Friend — 9 Total — 62 Relative — 0 Walk-in — 2 Channel 76 — 0 Internet — 3 8 Other — 4 Total - 62 Risk Bid opening Airport Owner's and Operator's Liability Bid opening Airport Public Officials & Employment Practices Liability Benefits (Group/Workers Comp) County -wide EAP webinar/workshop held Distributed WC Excess RFP Held meeting to discuss retiree valuation report for 2012 with GBS 2 Enrollees covered by Health Insurance EMPLOYEES (Only): 912 RETIREES (Only): 276 Employee & Spouses: 111 Retiree & Spouses: 75 Employee & Children: 111 Retiree & Children: 2 Employee & Family: 82 Retiree & Family: 2 Cobra: 4 SURVIVING SPOUSE: 17 CHILDREN: 1 Safety 11 Accident/Incident reports Attended 3 hour Chemical Suicide HAZMAT training 1 site visit — Solid Waste Key Largo Conducted Murray Nelson Fire Drill Safety Training for Supervisors scheduled for July 27th BUDGET & FINANCE Budget Analysts: • FY13 Proposed Budget: • Estimated FY12 revenues and expenditures • Balanced 24 funds for the FY13 proposed budget in GovMax • Downloaded FY12 amended budgets and YTD actuals into Govmax • SHIP and mitigation FY13 budget input in GovMax. • Input Fund 306 FY13 `s budget & rev in Govmax system. • Input and made changes to MCSO's revised FY13 budget • Create Cultural & Fishing Umbrella project accts, and rebalance TDC's revised FY13 budget in Govmax. • Input GMD's revised FY13 budget, and corrected positions in GovMax. • Weatherization Grant budget and revenue reconciliation. • Compiled and processed Budget & Finance June12 BOCC agenda packet. • Processed and submitted to Finance Dept., MCSO's 911 Wireless/Wireline February 12 revenue collection • Reviewed, compiled back-up and processed May 2012 Pcard billing statement. • Processed and submitted to Finance, Comm Carruthers and Budget Director's Jun12 travel reimb. • Processed the approved June2012 resolutions and forwarded to CAY for legal stamp. • Contracts Reviewed - 34 • Prepared, Reviewed and Posted Budget transfers -135 • Prepared and Posted Resolutions — 25 • Transfers Prepared: 17 • Transfers posted: 12 • Reviewed & Processed PAF- 12 • Incoming mail - 88 • Outgoing mail — 41 Grants: 3 • Human Service Advisory Board FY 2013 Funding: Preparation of materials for BOCC approval of $1.7M in funding to non-profit human service organizations. Compiled a comparative analysis spreadsheet with comprehensive programmatic and financial information on all non -profits funded thru County via HSAB and direct line item funding. • HSAB website information: Continuing to establish links on Grants page to this year's and previous years' applications, submissions, funding amounts, etc. and other HSAB information useful to the public. Added link to HSAB May meeting videotape. • Substance Abuse Policy Advisory Board Byrne JAG FY 2013 Funding: Submitted 5 FDLE Byrne funding applications. • 2012 RSAT County Grant: Prepared for and underwent a programmatic and financial audit and site visit by FDLE. The program's final audit report was perfect/no findings. Regular monitoring; quarterly reporting. Processed a budget change to transfer funds between line items. • Funding Line Item for SAMH: Continued to field questions/work on issue related to county portion of local match. Meeting with County Attorney and Budget Director. • BOCC line item FY 13 Funding: solicited and received annual requests from Arts Council, Fl Key Historic Foundation, Upper Keys Pool, and AARPs. • 2012-2013 Federal JAG Drug Court grant: Notified of grant award of $12,000 for Drug Court. • 2012 HSAB and BOCC line items contracts: Processing invoices, regular monitoring, collecting required documents, processing certifications; addressed compliance requirements with several entities. Addressed significant reimbursement issues with Healthy Start and Samuel's House. Prepared amendment to contract and agenda item for Healthy Start. Assisted MCEF with preparation and documentation of their reimbursement requests. Worked with Boys and Girls Club and Big Pine Athletic Association on program collaboration. • 2012 State FDLE JAG County grants: Regular monitoring; processing of invoices, quarterly reporting. • 2011 Federal JAG Drug Court grant: Regular monitoring; quarterly reporting • 2011-2012 Federal JAG Sheriffs Office grants: monitored activity; reviewed invoices; completed drawdown requests. • State DCF Criminal Justice Mental Health Substance Abuse Implementation Grant (Sheriffs Office): Continued monitoring of grant and match expenditures; review match spreadsheets from partners; reviewed/approved invoices; attended monthly council meeting. • FEMA: Worked with State PAC to close last Fay large project ($1.9M for trap debris.) • Strategic Plan: Completed Draft Plan and Plan Appendix (analysis of feedback from meetings and surveys.) Discussed with County Administrator, Deputy County Administrator, HR Director, the draft SP, Action Plan templates, and coordination with performance plans and staff evaluations. Attended training on GovMax related to Strategic Planning and inputting of SP priorities, core services, performance measures and indicators. • Misc.: Meeting with IBM team re: Smart Cities technology; telephone conference with Crystal Connor and Bill Schneider re: development; meeting with Erin Deady re: new developments in commercial PACE legislation and programming; meeting with Health Department re: planning/collaboration. Purchasing Department: • Estimated Totals for the month of June 2012 are as follows: • Total purchase orders processed 274 • Total orders placed for departments 70 • Total orders entered for departments 78 • Office Depot orders processed 61 • Staples Orders processed 4 • We opened 4 bids and processed another 3 which was average from the previous months. Addendums entered 4, contracts reviewed 40, and bills paid 10, and voided 12 purchase orders. We also processed 681 pieces of mail which was average from previous months. COMMUNITY SUPPORT SERVICES In -Home And Nutrition Services (INNS) OAA, Older Americans Act Programs: Nutrition (Information in this section is for the period 5/21/12-6/20/12): • C-1 Congregate Meals totaled 1176 units this period, right on the monthly goal of 1175. We continue to sign up new clients for this program, unusual during the slower summer months. C-2 Home Delivered Meals totaled 2924 units, a 15% increase over last month and 172 units over the monthly goal, reflecting services provided to seven new clients enrolled during the period. We continue to add new home delivered meal clients weekly so that we do not find ourselves underachieved. In -Home Services (Information in this section is for the period 4/21/12-5/20/12): • III-E In -Home Respite: 98 units this period, 588.5 units year-to-date, 45% year -to - date -achieved, 3.33% overachieved. III-E Facility Respite: 375 units this period, 1951.5 units year to date, 55% year-to-date achieved, 13.33% overachieved. No new clients are being added at this time. We expect the overachievement to moderate through attrition. Non-OAA Programs: CCDA (Community Care for Disabled Adults) for May 2012: • Case Management: 23.75 units for the month were produced; 153 units year-to- date. • Homemaking: 220 units for the month were produced; 1758.25 units year -to date. • Home -Delivered Meals: 150 meals for the month were provided; 1350 meals year-to-date. • Personal Care: 104.75 units for the monthly were produced; 732.5 units year-to- date. Overall Program Achievement was 88.24%, 3.43% underachieved year-to-date. CCE (Community Care for the Elderly) for the period 4/21/12-5/20/12 (new contract period is 3/1-6/30 2012): 5 • Case Management: 46 units for the period and 124.75 units year-to-date. 27% achieved year-to-date. There are 156 clients on the waiting list. • Intake: No units achieved and 0 units year-to-date. • Chore: No units achieved and 0 units year-to-date. • Homemaking: 419.75 units for the period and 1371.25 units year-to-date. 84% achieved year-to-date. There are 129 clients on the waiting list. • Personal Care: 313.75 units for the period and 981.25 units year-to-date. 118% achieved year-to-date. There are 58 clients on the waiting list. • Respite: 48 units for the period and 156 units year-to-date. 65% achieved year to date. There are 21 clients on the waiting list. CCE overall is at 75% achievement for the four month period, exactly on target. ADI (Alzheimer's Disease Initiative) for the period 4/21/12—5/20/12: 209.50 units were produced in the period and 2233.75 units year to date. 94.59% year-to-date achieved, 2.91 % overachieved. There are two clients on the waiting list. HCE (Home Care for the Elderly Program) for the period 5/16/12—6/15/12: 18.25 billable units this period, 178 billable units year-to-date. 101.12% year-to-date achieved, 1.12% overachieved at the end of the contract year, after adding an additional client and deobligating funds. Monroe County Transit Department Activity for June 2012: • One-way trips provided: 1991 • Unduplicated clients served ; 252 • Special Needs Clients registered: 583 Deposited Revenue: $2304.75 Expenditures: 47,417.71 Percentage Spent Fiscal YTD:78.7% Community Support Services: Incoming calls, provision of information and referrals 1120 Unduplicated Welfare client households that received service 66 New Welfare cases receiving service 26 Low Income Home Energy Assistance Grant Program cases- 41 $10,500.00 Low Income Crisis Assistance cases — 30 $ 6,767.88 Home and field visits 26 Office visits 268 Interesting Community Support Services Updates: • Social Services employees attended a 4 hour class for clients with Alzheimer's . • Tavernier office attended an Emergency Shelter Training in KW • Edith participated in the So. FL Workforce Investment Board Audit Selection Committee. • Tavernier office rec' d a donated refrigerator, 3 new computers, and a freezer for the Nutrition Center. • Beginning Basic Computer classes for Seniors at the Senior Center. • An additional $74,000.00 was given to the LIHEAP Grant for clients electric throughout the keys. Bayshore Manor (BSM): Bayshore Manor's current census is 14 residents. The current census is four private pay and 10 subsidized. BSM provided 463.75hrs of OA3E respite care and 0 hours of f Medicaid Waiver this month. Bayshore Manor has five OA3E clients and two private pay respite clients. There is one client on the waiting list. Revenue for June 2012 $34,895.66 Expenditures for the same period $55,230.59 Percentage of the budget spent year to date 67.95% T TRR A R V • Library usage figures continue to reflect the increase in Library onsite service hours and the Monday re -opening continues to be welcomed by patrons: • May circulation reached 34,696 items, 19% higher than last year's total for the same month; this is a strong indication of the result of the Libraries' restoration of Monday hours —our patrons are appreciating and making good use of the additional hours of service • 34,176 Library customers made use of our onsite services, 23% higher than a year ago —another indication of patron use of Monday service hours • 274 new Library cards were issued, 57 more than in the month last year • 7,371 public access PC sessions were provided to the public in May, which was an increase of 26% over the previous year, while the use of our wireless service continues to attract customers into our branches as well as to prime locations outside, where they can access our "hot spots", especially at times when the Libraries are closed —wireless estimates were up by over 50% from this month last year • Library staff answered 8,264 reference questions in May, up 31% from a year ago • The popularity of our digitized historic photo collection continues to spread into unexpected areas around the world: in the month of May photos from our collection were featured in Newsweek, The Guardian (UK), Focus, Paris March, and numerous other publications • As we enter the final quarter of the fiscal year, we are beginning to draw on our donations and State Aid Grant funds for our materials collections, both in print and electronic format; the results of our collection investment are easily seen in rising circulation figures EXTENSION SERVICES • Number of services provided: 409 phone calls, 37 office visits, 18 visits to clients, 16 group teachings with 445 participants, 7 media submissions, and 517 publications distributed. Total Budget for FY 11/12: $189,306.00; Year to Date Expenditures and Encumbrances: $161,976.54; Remaining Balance: $27,329.46; Percentage of budget spent and/or encumbered year-to-date: 85%. The Extension Director accomplished the following activities: • Participated in the Second NOAA SE & Caribbean Climate Change Extension and Outreach Community of Practice Workshop in Jacksonville, FL. The purpose of this workshop was to provide community planners and educators throughout the SE Atlantic and US Caribbean with information and tools for educating policy makers and the public on the potential effects of climate change and especially sea -level rise and increased storm surges associated with storms. 7 • Attended a Sea -Level Rise Summit sponsored by Florida Atlantic University, Florida Sea Grant and others in Boca Raton, along with Rhonda Haag, Sustainability Coordinator (speaker). Most of the speakers from outside the region focused on 100 year projections and possible impacts. The SE Florida Climate Compact's activities was highlighted by four different speakers and the Compact's efforts were lauded for their leadership role. • Attended the NOAA Coral Endangered Species Workshop in Ft. Lauderdale to review the science of corals and the threats that may cause them to become extinct within the next 100 years if no action to protect them is taken. The Environmental Horticulture Agent accomplished the following activities: • Attended the 125th Annual Meeting of the Florida State Horticulture Society in Delray Beach, FL where the Agent displayed a 20-slide PowerPoint presentation, "The Rugose Spiraling Whitefly: A Sticky Situation in the Florida Keys." Thirty- five people were in attendance. • Held three plant clinics with seven Master Gardeners assisting seven clientele. • Made four site visits in Key West to establish monthly Rugose Spiraling Whitefly monitoring locations. The Family & Community Development Agent accomplished the following activities: • Met with contractor Cameron -Cole to finalize the Community Greenhouse Gas Emissions Inventory and Report. The report will look at emissions for the entire county over five years and will guide recommendations for emissions reductions. • Collaborated with Rhonda Haag, Sustainability Coordinator, to provide input for the Southeast Florida Climate Compact Regional Climate Action Plan workshop held in Key Largo. • Worked with Monroe County high school students and the University of Florida/Center for Precollegiate Education and Training to find summer opportunities (camps and for -credit internships) for juniors and seniors. EMERGENCY SERVICES Fire Rescue/EMS • Stock Island Fire Station moving forward; road abandonment announced at June BOCC, and architectural plans almost complete for RFP completion and submission to building department for permits. • Conch Key Fire Station moving forward; constriction started back up after change order approval. • Report given to BOCC on Sugarloaf Fire Station referencing response concerns. Emergency Management • Requested, and attended, visits with Florida City Schools Administration and the City of Homestead government to discuss mutual aid in the search of additional mainland shelter locations for Monroe County residents. • Conducted Shelter Management training to county employees. • Completed the new Emergency Services Administrator Website 4-day training course, as well as alert/messaging training. • Participated in the Florida Department of Economic Opportunity Hurricane Evacuation Workshop. Trauma Star 9 • Upgraded new equipment and completed hands on training: - New suction units on rescues to Laerdal's for use - New intubation kits on prime rescues - New EKG simulators and completed hands on training for use - Added pediatric intubation rolls to Braslow bags • Completed 2 Advanced 12 lead classes. • Conducted county wide Helispot training. KWIA • Sprinkler system repaired and tested; assuring accurate operation. • FAA Inspection completed. Fire Marshal • Conducted Fire Safety presentation at Sea Camp tieing in the importance of prevention in relation to our delicate marine environment. • Completed review of major project at Mariners Hospital for certificate of occupancy. Fire Academy • Florida State Fire College administered the Firefighter II test for certification; 92% pass rate. • Conducted a State Certified 40 hr Fire Administration Class. • Conducted a State Certified 40 hr Public Information Officer Class. • Conducted a 40hr 1st Responder Class. • Conducted an Orientation Aeadelny for new hire firefighters. PUBLIC WORKS • Pollution Control removed approx. 31 tons of debris illegally dumped in County rights of way and 12.93 tons for other departments (12,400 lbs. from the Key West Garage; 4,660 lbs. for Marathon Public Works; 880 lbs. of tires from the Plantation Key Garage; 7,400 lbs. for Facilities Maintenance; and 520 lbs. from miscellaneous clean ups) • Household Hazardous Waste program collected 575 batteries: 14 car batteries, 128 S-S LA, seven power tool batteries, 248 Alkaline, 41 Lithium -ion, 110 button, and 27 Nickel -Cadmium • Paint collection/recycling program recycled 10 gallons of paint for the transfer stations • Received two additional Hybrid vehicles purchased with the Energy grant • Marathon Mechanics rebuilt a right of way tree/limb cutter for the Road Department utilizing super stricture from a surplus unit which is now being stripped for parts to rebuild a second unit • Ordered two new grass cutting mowers for the Road Department • PK Mechanics finalized pre -hurricane season inspection and repair of trailer used for transporting special needs cots to/from hurricane shelters • Under contract with -1 Generation Plumbing, the KL Animal Shelter was connected to the KLWTD sewer utility • Two events at the Nelson GC required a total of seven hours of employee overtime • Installed flat screen TV at Nelson GC reception area • HVAC contractor replaced a/c fan motor at PK Court House B • Replaced fan belt on air handler at Spottswood Building • Completed roof work and removed storage loft and stairs at PK Garage • HVAC contractor replaced a/c unit at SR 905 tower at Transfer Station • Exercise track at KL Park was replaced with asphalt and re -sodded where necessary • Replaced damaged parts at Friendship Park playground • Completed safety repairs and Land Steward requests at all Upper Keys parks • Closed end of Bayview Drive r-o-w with fence per BOCC direction • Completed signage request for Harry Harris Park • Completed elevation adjustment at Big Pine Road, Key Largo; ready for asphalt resurfacing by contractor (all asphalt removed from site was crushed and recycled for use on shoulder work) • Juvenile Cell renovation continues; windows were cut out and shower unit was moved in place • Stock Island Detention Center Dorm G & F shower walls and floor were sealed by All Keys Constriction Company to stop water leakage from seeping down building columns • Grey water pump station emergency repairs for reuse water system; flushing of all toilets was restored same day • Out of 110 requested work requests, 86.4 % were completed within three days • Completed acquisition and delivery of MC Schools 4R Earth Day received competition awards from 25 organizations and businesses • Designated 35 top entries and 20+ raffle winners; completed distribution of 700 reusable bags and pledge cards • Completed draft and final copy of SW/Recycling ad for Key Largo Visitors Digest • Completed draft and final Monroe County property tax insert • MC Renews Recycling Newsletter and composting presentation links • Participated in State electronics challenge webinar • Prepared materials for Big Pine citizen group proposing "bag ban;" attend first meeting and provide follow-up assistance • Participated in Live Pirate Radio interview • Monroe County Environmental Education Advisory Council networking meeting • Prepared and distributed laminated signage for MC recycling bins • Prepared tentative FY13 Residential and Commercial Solid Waste rate resolutions • On -going community email and phone requests/communications. ENGINEERING • Tom's Harbor Channel —Revised MOT plans received; Contractor applied for FDOT permit. On site meeting on June 26th° discussing contractors concerns and working without a lane closure permit. 10 • No Name Key Bridge Repair Design —Conference call with consultant; Based on estimate request for increased funding sent to FDOT • Old SR 940 Leg A (Watson Boulevard Bridge) — 60% drawings, calculations, schedule submitted; design exception request sent to County and FDOT. • Pigeon Key Ferry Service - Amendment approve; Service extended until June 30, 2013 • Doctor's Arm Culverts- Project qualified for a permit exemption from SFWMD. Confirmed with FDEP that no NPDES permit was required. Waiting for response from US army corps. • US 1 Bayside Shared Use Path —horizontal alignment revised based on comments received; walk through anticipated week of July 2nd to confirm proposed alignment does not impact trees and other items on right of way. • CR 905 Bike Lane Project - Four miles of topography survey completed; Geotechnical borings progressing. • Duck Key Security Cameras —Permit application re -submitted to Monroe County Building Dept.; permit anticipated on July 3rd; Installation work will commence as soon as possible after receipt of permit. PROJECT MANAGEMENT • Conch Key Fire Station — Second floor slab, beams and cells poured; block walls up. • Marathon Courthouse — Project stopped until change orders approved. • ADA Segment 3 - Proposal opening date on July 10, 2012 TDC PROJECTS • E. Martello Brick and Mortar Restoration —Continuing restoration. Architect and Contractor's amendment to the BOCC for approval in July • W. Martello Brick and Mortar Restoration —Continuing restoration. Architect and Contractor's amendment to the BOCC for approval in July. • Murray Nelson Theater Dressing Rooms— Interior dry wall installed and working on tiling bathroom TECHNICAL SERVICES We completed 206 work orders, researched last missing items for Clerk's office on inventory of computers and phones, received latest round of new computers, updated library computers, received upgraded box for Barracuda, ordered upgrade of bandwidth for Marathon Govt Center, ordered new video encoder systems for MCTV, continued preparations for MP2 upgrade, fixed issue with E-Gov, ISA and Kaspersky, and pushed out Microsoft updates. VETERANS AFFAIRS Clients assisted: VA phone calls: 1241 Office visits: 316 New clients: 62 Field visits: 12 11 Benefits Delivery at Discharge: 5 Transportation program: Transportation calls: 424 Veterans transported: 137 Financial data: The financial data for the month of June totals $309,357.00 and indicates the amount of new revenue brought into Monroe County derived from claims filed by the entire department. The financial data captured monthly will variable time frame in adjudicating awards. GROWTH MANAGEMENT vary due to the Veterans Administration's 12 2009, 2010, 2011 & 2012 GROWTH MANAGEMENT REVENUE vs. EXPENSE REVENUE ENDING MAY Total Revenue FY'09 Total Revenue FY'10 Total Revenue FY`II Total BUDGETED Revenue FY'12 Total Revenue YTD as of May, 2011 Total Revenue YTD as of May, 2012 Administrative Engineering $44,814 $2,052 $19,866 $0 $15,699 $5,063 Boat Improvement Fund $683,175 $668,103 $699,750 $600,000 $371,820 $373,450 BuildingBook/Copy/etc. $10,050 $8,867 $10,836 $10,000 $6,688 $5,380 Building -Income fromPermits/Applications $2,537,198 $2,134,998 $2,180,439 $2,000,000 $1,310,767 $1,232,422 Certificate of Competency/Contractor Exam $29,782 $160,815 $18,817 $155,000 $15,508 $149,013 Code Compliance $344,640 $348,442 $532,445 $395,000 $374,626 $333,947 Education Fees - Building $30,228 $32,420 $24,677 $0 $16,060 $15,565 Education Fees - Environmental $0 $2,120 $14,254 $0 $9,462 $9,752 Environmental Mitigation $100,231 $133,368 $155,042 $100,000 $84,188 $155,835 Fire Marshal $80,804 $45,571 $15,240 $18,000 $10,144 $9,953 Flood Review (sub -account of Building Income) - - - - $47,140 $43,340 Flood Variance $0 $50 $0 $0 $0 $0 Historic Preservation $400 $0 $0 $0 $0 $0 Impact Fees $329,596 $176,996 $163,363 $127,510 $104,211 $115,615 Conservation Land Purchase (ROGO Buy) $0 $0 $0 - $0 $7,088 Marine Resources $0 - $3,079 $3,000 $2,354 $1,300 Planning Admin/Research/Copy/etc. $4,078 $1,629 $295 $1,500 $1,760 $765 Radon/DCA $2,923 $2,459 $26,526 $24,500 $16,716 $15,550 Recovery/DBPR $2,894 $2,459 $26,551 $24,500 $16,718 $15,550 Wastewater $0 $0 $0 $0 $0 $23,009 Zoning/ROGO/Environmental $521,583 $443,2781 $471,401 $400,000 $295,851 $266,915 Total $4,722,396 $4,163,627 $4,362,581 S3,859,010 S2,699,711 S2,779,511 EXPENSES ENDING MAY Total Actual Expense FY'09 Total Actual Expense FY'10 Total Actual Expense FY`II Total BUDGETED Expense FY'12 Total Expense YTD as of May, 2011 Total Expense YTD as of May, 2012 Boating Improvement- County $ $7,651 $13,784 $106,379 $502,881 $52,732 $73,649 Boating Improvement- State $ $313,085 $292,524 $364,167 $250,000 $155,064 $193,476 Building Dept $2,236,331 $2,144,364 $2,351,380 $2,340,029 $1,544,269 $1,461,774 Code Compliance $1,049,348 $1,157,050 $995,330 $1,292,751 $687,132 $651,641 Comprehensive Plan $46,045 $380,765 $240,249 $252,000 $110,186 $63,035 Environmental Resources $269,072 $280,108 $295,142 $368,729 $192,232 $215,241 Environmental Restoration $128,739 $153,611 $158,229 $171,162 $95,403 $70,419 Geographic Info. (GIS) $232,759 $209,676 $168,827 $196,657 $114,305 $104,718 Growth Mgmt. Admin. $458,496 $464,890 $909,891 $762,593 $476,625 $246,515 Planning $899,234 $990,168 $1,052,377 $1,189,798 $659,564 $744,383 Planning Commission $84,698 $80,563 $81,844 $84,191 $51,881 $49,813 Total $5,725,458 $6,167,503 $6,723,815 $7,410,791 $4,139,393 $3,874,664 Difference (Revenue vs. Expense) -S1,003,062 -S2,003,876 -S2,361,234 -S3,551,781 -S1,439,68L51 -S1,095,153.34 NOTE: FY '09, ' 10, ' 11 Revenue, Total Budgeted Revenue FYI & Expenses (all) from Finance *FY'09, ' 10, & ' 11 Building Expenses updated 2/7/12 per reports with ML; All expense totals confirmed by ML 03/15/12-1 Revenue YTD FY' 11, & YTD FY'12 from CommPlus. AccountNo. & Fee ID for Flood Review. 4/18/12 Land Acquisition name and account number updated -now Conservation Land Purchase- 158-341905-SG. Formatting decimal place "0". 13 14 3,000,000.00 500,000.00 iii iii ii 1,500,000.00 1,000,000.00 500,000.00 N ii -tin kno ItEn ItEn It& k1a �f s} * Does not include "Boat Improvement Fund" income - receipts only MONROE COUlN GROWTH MANAGEMENT REVENUE MAY, 2012 Upper Keys 10 Middle Keys Lower Keys TOTAL 15 MONROE COUNTY JROWTH MANAGEMENT ZEVENUE v1AY, 2012 1111 Upper Keys Middle Keys 1-1 Lower Keys * Does not include "Boat Improvement Fund" income -receipts only Revenue 2012 vs. 2011 Office March,'11 March '12 April,'11 April,'12 May, '11 May,'12 FYI 1-May,'11 FY12-May,'12 Upper Keys 133,261.24 137,764.42 83,131.32 121,631.47 $167,817.50 $117,917.84 $986,044.64 $1,005,285.07 Middle Keys 154,789.03 120,031.02 130,212.78 140,466.58 $128,649.71 $194,494.34 $1,151,120.51 $1,114,743.37 Lower Keys 27,464.62 17,035.861 26,910.22 33,780.23 $24,200.08 $33,774.37 $190,726.34 $286,032.22 TOTAL 315,514.89 274,831.301 240,254.32 295,878.28 $320,667.29 $346,186.55 $2,327,891.49 $2,406,060.66 * Does not include "Boat Improvement Fund" income - revenue from receipts only. GIS OFFICE GIS Projects - Data/Map Requests/Technical/Programming - City of Key West — Redistricting —Additional Alternative — Don Craig - Industrial Zoning Analysis — Big Coppitt, Rockland Keys — Planning - Managed Anchoring Zones Mapping— Marine Resources - FEMA — Flood Zone Parcel Analysis — Planning - Community Center Mapping Project - Planning - Marsh Rabbit— Parcel Analysis - Environmental - SQL Server Database Maintenance - Flex Viewer (GIS) development GIS Addressing - 22 Address Assignments CODE COMPLIANCE 16 50 0 JQQ �Q� 5FS p`'�5 o,°4, y�5 �P Upper Keys — New Cases 25, IUSDectlons Comuleted 206, Special Magistrate 6 700 600 500 400 300 200 100 0 o A A Alz LOWER KEYS — New Cases 78, Inspections Completed 629, Special Magistrate 7 1r1 600 500 400 300 200 100 cnNcn0ZKYO0}}OciZK W }WQ O U Z CO COO Z F Q FQOpWp cn Np ZWNorY O < MC}.) QorQLL MU orJW W Jp cG ,QUUQQUm F F VW a Zv? <LUFFLU d Dz�o—j— j �ii ��Q� 2izQ Z }� or MMp Z z uL-u pZY QwwVQ nOOpFmm-J F O N cn F U Z U U W 0 Q n00O LU 0 v w O n n F-j F Z Z 1 F 0 U O 0 LU LU F F W N L Q Z O O a w W a N w a F F 0 a N w O LU J LL w w U a z z U v p U w U CO U Z a a z 0 0 z 0 p z QZZZOuOw LU — O F N N m QV)< Z w Z z O v a 00 O O x 0 F or a nUFQ w wcn nzw ,,x z a< z N N N Z Z N - - Q U Middle Keys — New Cases 68, Inspections Completed 557, Special Magistrate 30, CEB 3 MARINE RESOURCES OFFICE 18 June 2011 $15,121.70 July $0.00 August $4,978.00 September $15,082.00 October $0.00 November $0.00 December $0.00 January 2012 $5,000.00 February $11,574.00 March $1,325.00 April $2,675.00 May $11,43 8.00 Total $67,193.70 19 20 6 2 8 4 0 Derelict Vessels Removed June July Augg Sept Oct Nov Dec Jan Feb March April May 2011 2012 June 2011 $500.00 July $45,728.00 August $19,422.22 September $10,945.00 October $300.00 November $12,700.00 December $6,550.00 January 2012 $32,850.00 February $7,902.00 March $13,242.00 April $13,170.00 May $3,500.00 Total $166,809.22 20 Number of Pumpouts 160 140 120 100 t �� so 60� 40� 20 � - it Q June July Augg Sept Oct Nov Dec Jan Feb March April May 2011 2012 Sewage Removed (gal.) 6000 , t SQQQ 4000 - t Y- / ft _ - r i r i 3000 -_ f { f 2000 ; - 1000 _. Q June July Augg Sept Oct Nov Dec Jan Feb March April May 2Q11 2012 June 2011 $400 Jul $225 Aug $75 $3,459 Sept $0 Oct $0 Nov $0 $1,267 Dec $0 Jan 2012 $115 Feb $625 March $560 April $0 May $0 21 I Total: 1 $2,000 1 $4,726 BUILDING DEPARTMENT PERMITS INSPECTIONS PLAN REVIEW Upper Keys 222 1,148 1,608 Middle Kevs 225 135 1,340 Lower Kevs 87 681 343 TOTAL 534 1,964 3,291 NOTE: Inspection by region data derived from "Inspector Activity" -Building inspectors only. 22 Inspections, FY 2012 vs. 2011 Marck'11 Marck'12 April,'11 April,'12 May,'11 May,'12 YTD -FY'll YTD -FY'12 Building 1,110 1,195 1,201 931 1,009 1,023 8,203 8,475 PlwnblMech 1,038 751 956 638 853 561 7,638 5,704 Electrical 4141 3681 4331 265 3171 2771 2,8031 2,973 Total 2,5621 2,3141 2,5901 1,834 2,1791 1,8611 18,6441 17,152 March ' 11 March, ' 12 April, 'I I April, ' 12 May, 'I I May, ' 12 YTD - FY' l 1 YTD - FY' 12 2,433 2,250 2A4 2,787 2,250 3,291 17,109 1809 23 PLANNING & ENVIRONMENTAL RESOURCES DEPARTMENT CURRENT PLANNING CATEGORY Appeal to Planning Commission, Completed.......................................................................... 1 Appeal to Planning Commission, In Progress......................................................................... 1 Appealto DOAH, In Progress................................................................................................. 1 Alcoholic Beverage Permit, Applied....................................................................................... 1 Alcoholic Beverage Permit, In Progress.................................................................................. 1 Conditional Use, Major, Permit, Issued................................................................................... 2 Conditional Use, Minor, Permit, Applied................................................................................ 3 Conditional Use, Minor, Permit, In Progress........................................................................... 3 Conditional Use Minor Deviation Applied.............................................................................. 1 Conditional Use, Time Extension, Applied............................................................................. 1 HB 7207 Time Extension, In Progress.................................................................................... 2 Public Assembly Permits, Applied.......................................................................................... 2 Public Assembly Permits, Issued............................................................................................. 1 RoadAbandonment, Completed............................................................................................. 1 Road Abandonment, In Progress............................................................................................. 3 Setback Waiver, Administrative, Applied............................................................................... 1 Variance, Administrative, Applied.......................................................................................... 2 Variance, Administrative, Completed...................................................................................... 2 Variance, Administrative, In Progress..................................................................................... 1 Variance, Planning Commission, Completed.......................................................................... 1 Variance, Planning Commission, In Progress.......................................................................... 1 PermitReviews....................................................................................................................... 145 VacationRental, in progress.................................................................................................... 1 Vacation Rental Renewal, Complete....................................................................................... 1 24 LUD Map Amendment, In progress........................................................................................ 2 MCC Text Amendment, In progress........................................................................................ 13 Research Request, Completed................................................................................................ 2 ROGOExemptions, Applied................................................................................................... 3 ROGO Exemptions/Denials, Issued......................................................................................... 1 LDRD's in progress................................................................................................................. 3 Letters of Understanding, Applied......................................................................................... 2 Letters of Understanding in progress....................................................................................... 1 Historic Preservation Committee Applications, In Progress ................................................... 2 Historic Preservation Committee Applications....................................................................... 4 Administrative Meetings Development Review Committee — 1 meeting, 3 items Planning Commission Meeting — 1 meeting, 5 items COMPREHENSIVE PLANNING CATEGORY Kathy Grasser, Comprehensive Planner May Proiects 2012 COMPREHENSIVE PLAN AMENDMENTS Proj ects: KeyLargo LCP Update.........................................................................................................1 COMPREHENSIVE PLAN UPDATE Meeting Attendance: BOCCAdoption hearing........................................................................................................1 In-house Staff Only................................................................................................................1 In-house / Keith and Schnars Staff........................................................................................1 Reviewed / Updated current calendar/schedule.....................................................................3 COMPREHENSIVE PLANNING - MITCH HARVEY May 2012 Development Review Committee meeting............................................................................1 Planning Commission Regular Meeting................................................................................1 Reviewof Lower Keys LCP..................................................................................................1 Meeting with Staff to review the Lower Keys LCP..............................................................4 Keith & Schnars Teleconference...........................................................................................1 BOCC Special Meeting to adopt the EAR.............................................................................1 ReviewedDraft EAR.............................................................................................................1 Prepared Draft Disaster Housing Strategy.............................................................................1 Meeting with staff to review Draft Disaster Housing Strategy..............................................1 Responded to E-mails and phone calls.................................................................................10 ENVIRONMENTAL RESOURCES PERFORMANCE REVIEW CATEGORY: Site Visits Permit Inspections/Final Bio Inspections..............................................................................75 WetlandDelineation..............................................................................................................1 25 OTHER: Misc Bio Site Visits [Miscellaneous]...................................................................................................5 WRITTEN CORRESPONDENCE/ BIOLOGICAL ASSESSMENTS: Code Enforcement Assessment Memo..................................................................................4 GISMap Assorted.................................................................................................................24 GOECARecording................................................................................................................2 Interagency Coordination ACOE/DEP/FWS/FEMA............................................................4 Long Dock Variance Memo/Approval..................................................................................1 OTHER: Permit Application Review/Assessment-Plan Reviews Completed by Bio ..........................204 MEETINGS: Comp Plan/EAR Review meetings........................................................................................1 FWS/FEMA BO Coord..........................................................................................................4 Climate Compact Leadership Summit...................................................................................2 MOCO Climate Change Advisory Comm.............................................................................1 DRC.......................................................................................................................................1 PlanningCommission.......................................................................................................................1 BOCC.....................................................................................................................................2 Pre -Application — Assorted....................................................................................................1 OTHER: PhoneCalls [Estimated].........................................................................................................900 26