Item C19 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: July 17, 2013 Division: Engineering&Public Works Bulk Item: Yes X No _ Department: Wastewater Staff Contact Person/Phone#:Wilson(453-8797) AGENDA ITEM WORDING: Approval for expansion of the Upper Sugarloaf Central Sewer collection system to include an additional six (6)parcels at a cost of$122,010($20,335/EDU) less the assessment revenue of$27,000. ITEM BACKGROUND: FKAA requested price quotations for expanding the central collection system on Upper Sugarloaf after inspection of the proximity of these six parcels to the existing collection system. The quoted price for the six parcels meets the criterion established by the BOCC in 2009 and in January 2013. Including the properties, each of which is a single family residence, will enable a higher level of treatment than the on-site BAT systems that would otherwise be installed at a similar cost. The properties will be assessed $4,500/EDU and they will be added to the assessment rolls upon approval. PREVIOUS RELEVANT BOCC ACTION: In January 2013, the BOCC approved expansion of the Inner & Outer Islands collection systems to include an additional 131 EDUs. In 2009 the Commission established a breakpoint of$22,000/EDU for adding properties to the central sewer system CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: Recommend Approval TOTAL COST: $95,010 INDIRECT COST: Staff Time BUDGETED: Yes No X DIFFERENTIAL OF LOCAL PREFERENCE: N/A COST TO COUNTY: N/A SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes No AMOUNT PER MONTH Year APPROVED BY: County Atty V OMB/Purchasing Risk Management DOCUMENTATION: Included X Not Required, DISPOSITION: AGENDA ITEM# Revised 7109 Wilson-Kevin Subject: FW:Additional Service Area-Inner Islands#4052— 12 Attachments: CO3S.XLS; Change Order 3S.DOCX; RFQ 012 - Crane Blvd Upper Sugarloaf Response.doc From: Donald Hubbs [mailto:dhubbs@fkaa.com] Sent: Thursday, June 20, 2013 3:34 PM To: Wilson-Kevin Cc: Tom Walker; Clarke-Judith Subject: Additional Service Area-Inner Islands #4052— 12 Hey Kevin-- Attached is the agenda item backup material set for this month's meeting. Notably the Upper Sugarloaf additional area will need to be added to the assessment roll for next year-- six properties in total. Please let us know if you have any questions. Thanks again Managing Director-Engineering 1100 Kemiedv Drive Kev West, FL 33040 (305) 295-2142 (305) 295-2223 -fax i REQUEST FOR QUOTATION QUOTATION NO: RFQ 012 TO: Giannetti Contracting Corp. DATE: April 26, 2013 FROM: Florida Keys Aqueduct Authority PROJECT: Cudjoe Regional Wastewater Program— Inner Islands KEYWORD DESCRIPTION: Additional Sewer Service DATE QUOTATION REQUIRED: May 10, 2013 The following modification to the contract has been identified. Pursuant to the General Conditions,please provide a quotation for the alteration as described in Item 1.The quotation should include an itemized breakdown of contractor and subcontractor costs, including labor, materials, rentals,approved services,overhead,and profit.This request shall not be considered authorization to proceed with the work herein described. 1. Scope of Work: (include list of attachments): Verify proposed costs for additional sewer service, based on contract unit prices, to extend LIPS service to six (6) additional homes located on Upper Sugarloaf, accessed via Crane Blvd. Refer to attached cost spreadsheet and figure. 2. Reason(s)for Modification: ® Owner ❑ Unforeseen Conditions(site,weather,etc ❑ Other 3.Approval of Request: Owner: Do.r aW Mub& Date: 5/1/13 Engineer: Waft ScPum= Date: 5/1/13 4. Total cost of modification (attach detailed breakdown) $ 122,010.00 5. Will a modification to the contract time be required? ❑ Yes ❑No If so, trade(s) No. of personnel Duration (calendar days) 6. Attachment identification: (list) 7. Quotation is in effect until: (date) Duration of the Project 8. Approval of Quotation Contractor Ilia Lyssenko, Giannetti Contracting Date May 15, 2013 ITEM QUANTITY UNITS UNIT PRICE TOTAL PRICE 2" FM w/fittings 4980 LF $13.00 $64,740.00 2" Valve 3 EA $350.00 $1,050.00 Flushing Connection 3 EA $740.00 $2,220.00 Assembly Simplex Station 6 EA $9,000.00 $54,000.00 TOTAL $122,010.00 TOTAL/EDU $20,335.00 CK Lcc��r�u: PROPOSED rOracE MaNra PROPOSED SERVVCECONNECriON VV)LPS PUMP STAWTUQN STUDY AREA me �x ! V i .a i i \� I w � y tl Diu r , r. ky � " July 2013 Expansion—Upper Sugarloaf RE# 00117490.002000 (PC=01) 00117490.001801 (PC=o1) 00117490.001800 (PC=o1) 00117490.001700 (PC=01) 00117490.000700 (PC=01) 00117490.000301 (PC=01) Il O N — I O w H 1 8 0 a a j 0o o p j m Z w m 0w F C7 J 0. CDa o 0 w �j Y Z O_ Q O O Of J �0- QO oa ) �ryq' �a — / �% r CCD Q Icu r r i j 4 _ LL. Q "kk _e Grp J�e / 1//lWI r✓ / J %1 '� S / I �v- Vdr r / ANC �V �ln'1�%9' ✓'� / O o 0 0 � N m 0 c '0 0 0 o O w n c m o n. w 3 a O rn a� s � w O (h Q N 0 �Ue bmpgoo„obis—z b�j/looi.oa�s.aaa�/'o�,ro Id 11111,3 is3a —zo:6t 60oz\syaro,d/s:awoN/vr�d Id::!—A,azn a a,oali.qor moaor ,oio+a�ai4r�id waa,ro �oaae—eooa,�oc'gar:a��.rVama (war swU saua:�os�an v w