1st Change Order 05/31/2022 MONROE COUNTY/DEPARTMENT OF Mums
CONTRACT CHANGE ORDER
PROJECT TITLE: NIP Construction for CHANGE ORDER NO: 1
KWBTS Building A Phase 2
INVITATION DATE: April 29,2021
TO CONTRACTOR: DEC Contracting Group,Inc. CONTRACT DATE:September 15,2021
1660 Matthew Drive,Ste B
Fort Myers,FL 33982
The Contract is changed as follows:
The original(Contract Sum)(Guaranteed Maximum Price).......................................... $3,814,607.91
Net change by previously authorized Change Orders..................................................$ 0.00
The(Contract Sum)prior to this Change order was.................................................... $3,814,607.91
The(Contract Sum)will be decreased by this Change Order........................................$ 11,946.00
The new(Contract Sum)including this Change Order is.............................................. $3,802,661.91
The Contract Time will be increased (decreased)(unchanged)by...............................0 days
The date of Substantial Completion as of the date of this Change Order is............... 05-17-2022
Detailed description of change order and justification:
Credit for changing door opening to a window opening In Unit A202=<$1,448.00>
Credit for changing door opening to a window opening in Unit A602=<$1,448.00>
Credit for eliminating 2.6 ton condensing unit and 2 AHU's in Unit A206=<$8,950.00>
Credit for eliminating the soffits shown on plans=<$1,100.00>
Rerouting of electrical feeders needed due to conflict of water pipe and conduit in ceiling where ERV
was mounted in unit A506(Material$100.00 Labor 4 hrs x$100.00)=$600.00
Add the new junction box used In unit A505 existing junction box was buried behind the sheetrock in
the kitchen soffit and was not sized correctly by code for the number of circuits in the box.Larger box
was needed to meet code(Material$100.00 Labor 4 hrs x$100.00)=$500.00
Net Credit: $11,946.00.This Change Order is negative.003 percent of the original contract price.
a
Not valid until si ned b Owner rc111tectL Lif a licable,,and Contractor
Al CONSTRUCTION MANAGER!ARCHITECT:
Date
CONTRACTOR: 01n
Date
10
24.2022
DIRECTOR OF AIRPORTS ._
Date
-" 0 05 31.2022
MONROE COUNTY: ' '
Ass./County Administrator Date
..w.
Nate cauNrr ATrOnNEY
A ROVF T rOPAA
. .. . �
P�7 0 d-MJ:-RCAD�-..-._.,.
AS'SPErT LINTY ATTORNEY
Date 5/25/55
Change Order Attachment per Monroe County Code Section . ( )
• Change Orderwas not included in the original contract specifications. Yes(X) No()
If Yes, explanation: Owner driven change order
• Change Order was included in the original specifications. Yes( ) No (X)
If Yes, explanation of increase in price:
• Change Orderexceeds$50,000 or 5%of contract price(whichever Isgreater).Yes No(X)
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order.Yes(X) No ( )
If no,explanation of why:
• Change Order is correcting an error or omission In design document. Yes ( ) No(X)
• Should a claim under the applicable professional liability policy be made? Yes( )No(X)
Explain: