Item C03 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: 10/16/2013 Division: County Administrator Bulk Item: Yes Department: AiKports .......... Staff Contact Person/Phone#: Peter Horton, 809-5200 AGENDA ITEM WORDING: Approval of Jacob Project Management Co.'s Task Order#12/14-25 for the Services Authorized-Runway 27 EMAS Design&Bidding at the Key West International Airport. ITEM BACKGROUND: This project is included in our FAA grant funding for 2013. ----------------- ............ ..................................____ ...........................................----—- PREVIOUS RELEVANT BOCC ACTION: FAA grant#3-12-0037-047-2013 approved for ratification at the 9-18-13 BOCC regular meeting. .............._­............... .............. ..............111,11111111111-­_",-----------------------­­11111111............... CONTRACT/AGREEMENT CHANGES: NA ...................................... 1111111- _­­­......... STAFF RECOMMENDATION: Approval. ..............­,­.­­. TOTAL COST: $359,500.00 INDIRECT COST: NA BUDGETED: Yes DIFFERENTIAL OF LOCAL PREFERENCE: NA COST TO COUNTY: None SOURCE OF FUNDS: FAA/FDOT/AiKport COST TO AIRPORT: $17,975.00 COST TO PFC: N/A REVENUE PRODUCING: N/A AMOUNT PER YEAR: NA APPROVED BY: County Attorney OeB/Purc Pasing Risk Managemen DOCUMENTATION: Included X Not Required ___................. DISPOSITION: AGENDA ITEM# MONROE COUNTY BOARD OF COUNTY COMMISSIONERS ........................ ............. ___.._.... . ...... ......... ......... ......... ........ �.._. CONTRACT SUMMARY Contract# Contract with: Jacobs Project Management Co. Effective Date: Execution Expiration Date: 150 Days Contract Purpose/Description: Services Authorized-Runway 27 EMAS Design & Bidding Contract Manager: Peter Horton # 5200 Airports - Stop #5 (name) (Ext.) (Department/Stop) for BOCC meeting on: 10/16/2013 Agenda Deadline: 10/01/2013 __._.... ......... ......... ......... _ ....... .... ... — _._._. ......... CONTRACT COSTS Total Dollar Value of Contract: $359,500.00 Current Year Portion: 0 Budgeted? Yes Account Codes:pending set up for grant#0037-047 Grant: Yes-FAA County Match: Operating ADDITIONAL COSTS Estimated Ongoing Costs: For: . (not included in dollar value above) (eg.maintenance, utilities,janitorial, salaries,etc.) _... __ .. ......... CONTRACT REVIEW ..._� _._.._. ... ......... .... Changes Date In Needed Reviewer Date Out Yes No ... ... 4 �f.. Airports Director ( ) ( ��� All"Ttt ff Risk Management for R'sk Mann men O.M.B./Purc asing - for O County Attorney / / �ro ( ) C n Attorney Comments: MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Upon the Date approved by the County Mayor Effective Date or his deli Task Order No. 12/14-25 Client Project No. yyv Engineer Project No. E9Y16725 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County,Florida("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated November 16, 2011 ("Agreement"), The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized-Runway 27 EMAS Design& Bidding Client authorizes Consultant to perform the Design & Bidding Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 22 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of$ 3.59,500,9.0 N/A Other(Describe) Schedule Services may commence on­-, Execution............................................ Services will cease by 365 days Other (SEAL) BOARD OF COUNTY COMMISSIONERS ATTEST: AMY BEAVILIN, CLERK OF MONROE COUNTY,FLORIDA By........ Mayor/Chairman M E Ey P3,10 I A RM File.- _P AIISTR APS—Monroe Cotinty T-r VVE Page I of 2 AS&T)RNT JNTy X1 Oqfll EN J. 6 2 013 CONSULTANT: JACOBS PROJECT MANAGEMENT CO By „s .. � ,�. ��. .w � Tit v Witness ice President Pale: MS'7R APS Monroe County Page 2 of 2 Exhibit A—(12114-25) Scope of Services Monroe County Airports Key West International Airport Runway 27 EMAS Design—PSO#25 SCOPE OF WORK Jacobs will provide project management,coordination services,design,and permitting services for the design of an Engineered Materials Arresting System(EMAS)for Runway 27 at the Key West International Airport(EYW). E%ISTING CONDITIONS EYW is a commercial service airport regularly utilized by Boeing 737-700 aircraft. The existing Runway 27 Safety Area was improved as part of the Runway Safety Area Improvements project at EYW completed in 2011. The existing safety area is approximately 600 feet long by 400 feet wide. The current FAA design standards for an Aircraft Design Group(ADG)C-III runway is a 1,000 foot long by 500 foot wide runway safety area. Providing a safety area that meets current standards at EYW is not feasible due to physical constraints,environmental factors,and cost considerations. As part of the RSA project at EYW mentioned previously,a 340 foot long by 121.5 foot wide EMAS bed was constructed for the Runway 9 Safety Area. DESCRIPTION OF WORK To continue to improve safety at EYW,Monroe County wishes to install an EMAS in the Runway 27 Safety Area. The proposed construction associated with the EMAS bed installation will consist of minor grading activities,construction of an EMAS pavement support system. The blast pad/EMAS pavement support system will consist of an asphalt surface course,limerock base,and compacted subgrade. Drainage improvements,most likely collection swales and exlfiltration trench,will be required in order to meet South Florida Water Management District permit criteria. Pavement markings will be installed on the blast pad and EMAS bed in accordance with FAA standards. Our sub-consultants,Tierra SF will provide Geotechnical services,and Avirom&Associates will provide topographic survey and mapping services. The data collection,design,bidding,and special services will provide the following: Article A—Data Collection • Perform a topographic survey • Perform a geotechnical investigation • Coordinate with design and geotechnical sub-consultants. • Coordinate with the topographic survey sub-consultant. • Review available record drawings • Obtain and review available fleet mix information to be provided to ESCO. • Perform a site investigation Services for Article A will be provided under a lump sum basis. Page 1 of 6 Article B—30%Design Based on the information collected under Article A,the design of the EMAS and pavement support system will be developed to 30%completion. Additional tasks necessary to develop 30% construction documents will be completed as outlined below: • Review the Geotechnical Investigation • Review the topographic survey and incorporate the information into the construction drawings. • Perform pavement design using current FAA guidelines. • Develop preliminary construction safety and phasing plans • Develop preliminary typical pavement section(s) • Develop preliminary pavement geometry plan(s) • Coordinate with ESCO(EMAS designer and supplier)as necessary • Develop preliminary project construction schedule • Develop preliminary project construction costs • Provide an outline of anticipated technical specifications • Prepare preliminary EMAS report for FAA review and approval. • Prepare a preliminary Engineer's Report • Conduct an in-house QA/QC review.The in-house QA/QC check will involve an experienced independent individual,depending on each discipline,to conduct a comprehensive check on all documents to be submitted(i.e.plans,specifications, estimates,etc.).Time will be required for engineers and CADD technicians to correct items listed under the in-house QA/QC review. • Meet with Airport staff to review the 30%submittal. 30%Design Deliverables FAA: 2 half size copies of 30%plans and a CD containing the drawings, Preliminary EMAS Report,outline of specifications,and engineer's estimate. County: 2 copies of plans(1 full size; 1 half size);Preliminary EMAS Report,2 copies of outline of specifications;2 copies of engineer's estimate Services for Article B will be provided under a lump sum basis. Article C—90%Design Based on the review comments and any permit requirements from Article B,the design of the EMAS and pavement support system will be developed to 90%completion. Additional tasks necessary to develop 90%construction drawings will be completed as outlined below: • Attend(1)project design progress meeting during this phase • Attend(1)project construction phasing meeting during this phase • Attend a pre-application meeting with the SFWMD to discuss the project scope and permit requirements • Update the Construction Drawings including the following: o Title Sheet(1) o General Plan(1) • Notes and Summary of Quantities(1) ® General Safety and Phasing Plan(1) o Detailed Safety and Phasing Plan(2) Page 2 of 6 o Existing conditions plan(1) o Geotechnical boring logs and location plan(1) o Pavement Geometry Plans(2) o Typical Pavement Sections(1) o Paving Details(1) o Grading Plans(2) o Pavement Marking Plans(2) o Erosions Control Plans(2) o EMAS Plans(5) • Prepare and submit the SFWMD ERP Application • Prepare the Construction Safety and Phasing Plan for review and approval by the FAA • Prepare and submit FAA Form 7460 for review and approval • Coordinate with ESCO to incorporate their 90%design into the construction drawings. • Update the project construction schedule • Update the project construction costs • Develop technical specifications to 90%completion and incorporate Monroe County Front End documents • Develop the Engineer's Report to 90%completion • Conduct an in-house QA/QC review.The in-house QA/QC check will involve an experienced independent individual,depending on each discipline,to conduct a comprehensive check on all documents to be submitted(i.e.plans,specifications., estimates,etc.).Time will be required for engineers and CADD technicians to correct items listed under the in-house QA/QC review. • Meet with Airport staff to review the 90%submittal. 90%Desian Deliverables FAA: 2 half size copies of 90% plans and a CD containing the drawings, project manual and specifications,and Engineer's Report with cost estimate. FDOT: 2 half size copies of plans; and a CD contianing the drawings,project manual and specifications,and Engineer's Report with cost estimate. County: 2 copies of plans Q full size•, 1 half size); 2 copies of project manual and specifications;2 copies of Engineer's Report with cost estimate. Services for Article C will be provided under a lump sum basis. Article D—100%Design Based on the review comments and any permit requirements from Article C,the design of the EMAS and pavement support system will be developed to 100%completion. Additional tasks necessary to develop 100%construction documents will be completed as outlined below: • Finalize the Construction Drawings including the following: a Title Sheet(1) • General Plan(1) • Notes and Summary of Quantities(1) • General Safety and Phasing Plan(1) • Detailed Safety and Phasing Plan(2) o Existing conditions plan(1) o Geotechnical boring logs and location plan(1) Page 3 of 6 o Pavement Geometry Plans(2) o Typical Pavement Sections(1) o Paving Details(1) o Grading Plans(2) o Pavement Marking Plans(2) o Erosions Control Plans(2) o EMAS Plans(5) • Coordinate with EMAS designer and supplier to incorporate their 100%design. • Finalize the project construction schedule • Finalize the project constriction costs • Respond to Request for Additional Information from the SFWMD • Finalize the technical specifications and front end documents to 100%completion • Finalize the Engineer's Report • Participate in a Safety Risk Management(SRM)meeting with the Airport regarding the project safety and phasing. • Conduct an in-house QA/QC review prior to each submission.The in-house QA/QC check will involve an experienced independent individual,depending on each discipline, to conduct a comprehensive check on all documents to be submitted(i.e.plans, specifications,estimates,etc.).Time will be required for engineers and CADD technicians to correct items listed under the in-house QA/QC review. 100%DesiM Deliverables FAA: 2 half size copies of Final Plans and a CD containing the drawings, project manual and specifications,and Final Engineer's Report with cost estimate. County. 2 copies of plans (1 full size,, 1 half size); 2 copies of project manual and specifications; 2 copies of Engineer's Report with costs estimate, CD containing Final Drawings and Project Manual forbidding purposes. Services for Article D will be provided under a lump sum basis. Article E—Bid Phase Services Upon completion of the construction documents and at the request of the Airport,Jacobs will prepare the project documents for bidding. Jacobs will perform bidding support services,the following terms will apply: A. The County appoints Jacobs as its Agent, and Jacobs accepts such appointment to perform bid/procurement services on JAA's behalf in connection with the project. B. Such services shall be performed under County's direction and in accordance to such forms, terms and conditions, or modifications or revisions to same as County may in its sole discretion at any time instruct Jacobs to use. All services shall be carried out in accordance with the procedures mutually agreed upon by County and Jacobs. C. Jacobs shall not have authority to accept or bind the County in any way to changes, modifications, revisions, alterations, amendments, or supplemental, additional, or different terms and conditions (hereinafter Page 4 of 6 referred to as "deviations') which may be submitted or requested by a vendor or contractor. Jacobs shall immediately submit any deviations from the County's standard terms and conditions to the County for review by the County's Purchasing Manager or their representative and such deviations shall not be accepted by Jacobs unless Jacobs receives express written approval thereof from the County's Project and/or Purchasing Manager or their representative. D. All documents issued by Jacobs hereunder shall be signed by Jacobs for the County if so directed. The ownership and title of all items purchased hereunder shall pass directly from the selling party to the County, and Jacobs shall at no time be a party to such transaction other than as agent of the County. The County shall have the unilateral right to have the commitment authority of Jacobs, its employee or this limited agency authorization in its entirety revoked and cancelled at any time, with or without cause. The County shall be obligated directly to the selling party for all payments for materials,equipment,supplies and services procured hereunder. E. The County shall hold Jacobs and its employees harmless from any claims, suits or liabilities arising out of any breach or other failure of performance by any contractor, vendor or supplier under any contract or purchase order issued by Jacobs hereunder. The following task will be performed as part of the bid phase services: • Coordinate with the County Purchasing Department and the Airport to advertise for bids. • Coordinate with the County to provide electronic copies of the bid documents to prospective bidders • Prepare for and attend a project pre-bid conference • Prepare responses to address requests for information from prospective bidders • Prepare and coordinate the issuing one(1)addendum with the County purchasing department. • Revise bid documents as necessary for the addendum • Review bids for responsiveness • Prepare a bid tabulation • Make a recommendation for award based on review of the bid information submitted. ASSUMPTIONS 1. The design will be in accordance with the most current FAA-AIP Advisory Circular listing dated April 16,2013. 2. The current fleet mix will be provided by the Airport. 3. Based on preliminary conversations with the SFVRVID,the drainage system will be a closed system with exfiltration trench or treatment will be provided by overland flow over pervious areas. 4. DEP and ACOE permits are not required based on the current scope of the project. 5. There are no existing underground utilities in the vicinity of the project. 6. Services not included in our scope of work include,but are not limited to,the following Page 5 of 6 ■ Electrical design services. ■ Construction phase services. ■ Special services not specifically listed above ■ Other services not described in our scope of work. PROJECT'SCHEDULE: The tentative project schedule from the Notice to Proceed date will be as follows: Article A-Data Collection 30 days Article B—30%Design 30 days Article C-_,90%Design 60 days Article D—100%Design 30 days Article E—Bid Phase Services As necessary Page 6 of 6 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: Runway 27 EMAS(12114-25) FEE SUMMARY BASIC SERVICES Hours Fee DOE AMOUNT Article A:Data Collection 92 $ 14,610 Article 8:30%Design 304 $ 38,300 Article C:90%Design 592 $ 68,800 Article D:100%Design 270 $ 30,500 Article E:Bid Services 146 $ 20 400 Motel as ry s Lump Sum Fee 1,404 10 SPECIAL SERVICES Hours Fee Article A:Data Collection-Subconsultants Avirom&Associates,Inc-Survey(Lump Sum) $ 25,640 Tierra South Florida,Inc.-Geotechnlcai(Lump Sum) $ 13,850 $ 13,850 Article C:90%Design-Subconsultants Zodiac Aerospace-EMAS Design S 95,000 Article Dr Final Design-Subconsultents Zodiac Aerospace-EMAS Design $ 20„000 SFWMD Permitting 294 $ 32,400 Total Special Services Lump Sum Fee 294 1 B 890 $ 13 850 O AL LUMP SUM PROJECT-VE98 ,500 3 DBE Percentage 3.85% JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key 1AMl International Airport Projede Runway 27 EMAS(L 14-25) Article A:Data Collection 11rr. r ` a Soil I Project Management 4 S 4 16 2 Ca Lion with Survey and Geotech && 16 24 Subconaltants 3 Research rocord draw S 12 4 24 4 Attend Survey&Geotoch Field Work Kick-OIF S 5 Pedomt Site Survey See Avatars A As , 6 P.,f..GeotechnicalInvestigation See Tlimm South fbdd44 Inc,balm l 7 1�Site walk- ughs(1) S 1 1 S 1 1 4 20'I s 13 4s ViT ' a . . s.Pe1xOiL as7nA 01 _ i b te F b 4 t TOTAL,PA OLL 5 1%616 S Subconsultants Avimm&Assoc,inc $ 25,640 Subcoasultants Tierra South FloridgInc 5 13,550 5 39,490 Subconsultants 5 39,490 Expenses S 1 4 Cost Plus Fec Total ,100 4,7 Rental Car(2 visit @ S651visit) S 130 4,7 Gas for Car Rental On-Site(2 visits)- 5 60 4,7 Lunging(2 visits®522I/visit) $ 442 4,7 Akfam(2 visits @$600/vish) S 1,200... 7 Nibs $ 162 Total Expanses 1,994 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key want International Airport Projeot: Runway 27 WAS(12114.25) Article 0:30%1ks1 °"► r,►" � Pao Review Gawcohnicall Inver' tion results to 1 den gsub a tail o ies. 4 4 4 17 2 Review wristing topographicsurvey 4 B 2 16 3e 3 Develop construction safety and pltusing 2 4 B B B 16 46 4 Develop typical pavement secti (s) 2 2 8 8 12 37 S Developpavement geometry plan 2 4 8 16 161 20 66 6 Coordination with PSCO 6 6 8 8 B 36 7 Develop project construction schedule 2 4 8 8 22 It Develop project cowmacuon costa 4 8 6 4 22 9 QC Review 2 4 6 4 16 10 Review meeting with.Owner 2 8 8 4 22 AL H 10 44 62 �... . ..... .._...... 52L4N S j5.00 140.00 S B S B6FA 7 00 ; 77111 TOTALPAYROLL f. 37.112 S S f S S Subcomuhsnns f Expenses S I l66 Cost Plm Fec Tatel 36,300 T 10 Rental Car(1 visit @ SliVvish) f 63 10 Gas for Car Round On-Sac(1 'lt�- 3 30 10 Lunging(I visit@$22Vvish) 3 221 10 (I visit @S6 visit) S 600 10 Misc S 272 Total Expenses ...,.....,.....m,,...._ JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESN TE Monrora County Airport: Key W86t IntrnmHonY Airport Prolbot: Runway V VAA8(12N445) 71 ACa:405A.IN'sl ,Ih t84 Sr-CAM o„1 4opT,-h dSp.MWJ— 20 8 44 3 4 sm idwl ® 26 3 U . a iag 0 4 24 4 b, Poe (1)pea)eat dlp pruipw Y 8 t 4 2 24 5. M mm(1)wm.1kn ph.A.8 2 6 t 4 21 24� 6 ... 4 a 2. 4 d d. a w toe 7 dw fol pl a rtd. (➢) 3 6 Pi.(fl) 3 4 t 14 N S of °dm(➢) 2 4 t 14 d otuttal pbums"ASarsy p4w(1) 2 6 6 14'... a9 t ay M.(2) 4 6 t 1. a �....�.«t . t 6Gothkal ltwmd— I (1) 4 4 b b (2) 2 2 68 L L TyplWP& (1) 2 4 !, 12. J,y4vlog ls(i) 4 q, 12 t (1) 6 16 24 46 L h p4o(2) 6 B 14 04 O H(1) 2 4 6 t s44m^n"gaovtws C000alM�k °{I) 0''�. 16 kd �4 52 q (5) 4 4 4. 20 li 8fmamv.Rqw 4 4 16 14 1 48' f P.Pa. d Sbk CSFP 4 8 16, 10 Submit FAA 7"0 I 4 4 r4l 11 � I� F.➢80%b 4 12 12 12 ,.AIQC8!13 aea g w9t6 6 t Y S 19 O S .,�. 1 MALM1O@lIR4 S 22000 f 195d.Vp5 S I40tSIM f I2lOG TOTAL PAYROLL 8 65,746 r:A Lle4tgn S 95,00D S 8 2 95,00 ElptnumS S 4 piesF TOA61 Ink jawat, 4,Sp13 'R C4e(3 viaies @ S6 ') 1 195 4,%U Ow fae CaRmial O.Sho 0 eWu)a S 120 4,5,13 1 (3'Wo@1221Mk) S 663 4,%1$ 4(3 visits teit) S 1,800 k5,13 Mitc 76 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE ne County AlrporV Key Want Intematonal Alrpod Project! Runway 27 E (12114.25) Artklc D-100%Didmas d, 1 maltzeT iul SpaYBhliom ti 0 32 matirs flout and docammta 0 6 22 3 Up wxmm aabedole and ing 41 4 l f 100%docamseMa Flasks,candmotan ymmuies a A coat alimak for 100% FUWI.the following pism L rato sht(1) b:Oe Miss(1) 1 21 I kNo1es mW S ofQuevlilim(1)... 1 2 d. lPbmmgaat Safety Plan(1) 2 2 e, t4uled P ®g Safety Plam(2) 2 2 1'Ealsliog c- &tiara(1) l 1 4Gwtwhdcd tocatiams and brae to (1) l 1 k G (2) 3 2 f' 1 Typical Details eol Satiom(1) i 1 4 Ty k.P-Iasg (2) 2 + 12 I II 1 oat (2) 2 2 tn.�pvs=mtMvking Detalls(1) 2 2 n ion 1phm 1 4 8 3 . tuts() � x ew' I a. ..EMAS Pism(5) 2 4 4 ', l 6 Fumlize Eag' e.R 2, 8 4 41 LA 7... imtionwab ESCO 'i 4'.... A... 8 Participale In Safety RkkMaoag ( meeting 0 0 e 2 _9...... A/QC 2 4 B 14 to Review mcaling with Owner B 8 2 22 ATE f 22i100 t9500 f000 123J10 90 S 0 0... 9000 SBDO �- TOTAL PAYROLL S 26,410 Zodiac A -EKW D Y 20,000 f f 20.000 Subcoandtauts f 20.WO Exp— f 2,082 cost Plm Fos"'raw Y 5DSW 8,10 Ranlal Coe 0 visit @ Whims) Y 130 8,10 Oats fm Qr ftatal On-Site(2 •• )= Y 00 8,10 Lodging(2 visits @ M Ilvaait) f 442 8,10 (2 vbib @ f600/vislQ Y 1,200 e,t0 Mlac S 230 Tote!Expenses 2,62 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key Wnt International Airport Project: Runway 27 EMAS(12114-26) *" Article S:Bid Services �,B4 IMla¢ - &•, �, Bey CAt112 AL ,. Coordinate bid inivertlsement and pasting ofbdd I g Z4 docamcaty with the Cosa g 0 2 Prepam for end attend the Pm Bid Continence 4 0 !1 4 24 3 Preimrc mstionses to [mucAddends g 16 16 4 44 4 Revisions to Bid Drawings 6 0 16 4 34 5 Review Bids for Responsiveatna 4 9 9 20 6 Preparc a Bid Tabal n 4 6 S 18 7 e RecommmendadomforAward 2 2 2 6i T $® 4 40 0 g SA 0 40 30 _. 146 ....,,,,,,. RA �...:..111..&............. ...... ..�.....,.,.._.., ,._.__..a ESTIMATE ._w 22 6 �, ���. m ....._�32D �� ®5.6DCI TOTAL PAYROLL S 14,324 $ Subconsultattim S Expenses S 1m074 Cost Plus Fee Total S 20,400 Rental Car(I visit @ 965 t) S 65 Gas for Car Rental On-Site® $ 30 Lodging(I vdsdt@$22Vvisdt) S 221 Aidism(I visits @$600hiisit) S 600 Mile S 160 Tend Expenses 1=1170ITr JACOBS ENSINEERINO MOUP JOB HOUR AND FEE ESTIMATE onros County Airport Key Wed InternaltionalAirport projedl Runway 27 E AS(12114-26) SP®vbtD Permhtln.. Pro} St P�aJ ,8s / Prod . t Review existing Permits 8 16 4 28 2 Scbedule and aneadpreapplicauoameeting 8 8 4 20 3 Prcpmestormwetercekulm0ons 8 40 8 36 4 Prepare SFWMD Permit application 16 40 20 20 96 5 QA/QC B B 16 6 Attend review meeting with 8 8 8 24 7 Prepare and submit responses 4 8 16 20 6 54 roTAt o o za 64 0 1x5 0 4a 4 4 __,...,. ... _...._ 0_...._.... ltAT4 ......,,-.- �.....• O.t#1 $ 14S.f� S 140.rNN S 124,Oti �. 94'6Ci S 8�.,fIID S 22mm 5 f 90,00 f 59,00 PAYROLL UTE S f 3 S 8 - S 11 2tl S 3 4 6 ;r »3 416 TOTAL PAYROLL S 30,416 f S f - Subconsultants $ Expenses S 1,984 Con Plus Fee Total S 32,400 ink JLHMBDL Rental Car(2 visit @ f651visit) $ 65 Gas for Car Rental Oa-Site^^ f 40 Lodging(2 visits Q S221Mah) S 442 Airfare(2 visits @S Nisit) S 1,200 Mine S 237 Tate)Expenses AVIROM & ASSOCIATES, INC. r SURVEYING & MAPPING August 13,2013 Mr.Thomas Schilling,P.E. Aviation Engineer JACOBS 245 Riverside Avenue,Suite 300 Jacksonville,FL 32202 E-mail: Thomas.Schilling@jacobs.com Re: Task Order for Key West International Airport(EYE,Key West, Florida Keys Topographic Survey of Rumvay 27 Proposed EMAS Dear Tom, The topographic survey will be performed to support the design of the Engineered Materials Arrestor System (EMAS) at the physical end of Runway 9 at the western end of Key West International Airport. Limits: 1. The limits of the survey shall be within an area defined by the edge of the threshold of Runway 9 and extending westerly for approximately 670 feet, with a bandwidth of approximately 425 feet which is currently used as the over run. Data shall be obtained on a 50 foot grid,with locations of all above ground features. 2. The limits of the survey shall be within an area defined by the edge of the threshold and northerly paved edge of Runway 9 and extending easterly for approximately 170 feet,with a bandwidth of approximately 112 feet. The limits shall also include an area defined by the northerly paved edge of Runway 9 and extending southerly for approximately 305 feet,with a bandwidth of approximately 80 feet from the western edge of the threshold. The preceding two areas forming an inverted L with data obtained on a 25 foot grid, including markings, lights,signs and any other above ground features. 3. Obtain a centerline profile every 25 feet from Station 7+00 to Station 11+00. Scope: The survey minimum requirements for the project are as follows: 1. Recover National Geodetic Survey benchmarks on site to perform the topographic survey. Additional benchmarks shall be established by a closed-loop three wire differential leveling from the recovered National Geodetic Survey benchmark. 2. Elevations shall be based on the National Geodetic Vertical Datum of 1929 (NGVD 29) as referenced to the above benchmark by the National Geodetic Survey (NGS). The elevations shall also be horizontally referenced to the 1990 adjustment of the North American Datum of 1983 (NAD 83-90). 3. Locate all above ground improvements including pavement, pavement markings, taxiway edge lights,duct bank markings and above ground evidence of utility. We will obtain rim 402 APPELROUTH LANE, MUITE 2E KEY WEST, FLORIDA 33045 305-294-7770 WWW.AVIROM8uRVEY.COM Mr.Thomas Schilling,P.E. Runway 27 EMAS August 12,2013 Page 2 elevations of sewer and drainage structures. Utility locations will include fire hydrants, water valves, meter boxes,vaults and electrical outlets. We will locate main irrigation valves,but will not locate individual sprinkler heads. 4. Recover the survey reference markers set by Fredrick H. Hillderbrant on May 29, 2002 to establish the Baseline which will be utilized on this survey. We will check the Baseline to verify the measurements and will report any significant discrepancies,if any. Deliverables: 1. Two signed and sealed hard copies of the survey shall be furnished to the client, together with an AutoCAD (2010 or lower)digital drawing file created in Carlson 2013, including a PDF file of the hard copy. 2. The drawing scale shall be at 1"=30'. Timeframe: We can mobilize to the site within 48 hours from a notice to proceed and have the project completed within three weeks after mobilization. Cost: The cost to perform the above services shall be a lump sum amount of$25,640.00 which includes mobilization and demobilization with reasonable security and safety delays factored in. It is understood that the field work will be conducted during the night to facilitate uninterrupted airport operations. Surveyor will notify client of extensive delays, if encountered, which may incur additional costs. GENERAL CONDITIONS: All work shall be completed under the direction of a Professional Land Surveyor registered in the state of Florida.All work shall be conducted using equipment,personnel,and procedures that will insure compliance with the accuracy standards as defined by State of Florida Minimum Technical Standards in Chapter 5J-17.05, FAC. All documents submitted shall bear the Surveyor's seal, signature, and a certificate that all work was done under the Surveyor's supervision and that all information contained in the document is true and is accurately shown. The Surveyor is responsible for quality assurance for the survey work performed on this project. All survey information shall be recorded in hard bound field books or in electronic data collector files.A map shall be provided by the Surveyor in AutoCAD,Version 2010(or earlier version). Thank you for the opportunity to submit this proposal. Should you have any questions, please contact me accordingly. Respectfully, Keith M. Chee-A-Tow,P.L.S. Project Manager Mr.Thomas Schilling,P.E. Runway 27 EMAS August 12,2013 Page 3 THESE CONDITIONS ARE ACCEPTABLE,AND I HEREBY AUTHORIZE YOU TO PROCEED. Mr.Thomas Schilling,P.E. Date Aviation Engineer JACOBS \KeitWs Doc tsTroposal\KeysVacobs\Key West Airport\FYW Rmwq 27 EMAS.doex ENGINEERED ARRESTING ZODIAC SYSTEMS CORPORATION AEROSPACE 13 AEROSAFETY&TECHNOLOGY Emergency Arresting Systems August 12, 2013 Christopher W, Bowker,Jr., P.E. Jacobs, Manager Aviation 245 Riverside Ave., Suite 300 Jacksonville, FL 32202 Subject: Runway Safety Area Improvements@ Key West International Airport Reference: Price Proposal for EMAS Design Services for RW 27 Departure End Dear Chris: Engineered Arresting Systems Corporation (ESCO) is pleased to provide the following proposal for design of an Engineered Material Arresting System(EMAS) for RW 27 Departure End at Key West International Airport. Our total fee for design and support of EMAS is$115,000.00. Attached please find Exhibit A,which details the EMAS product design services to be provided to JACOBS, and our proposal terms, and Exhibit B,which contains the breakdown on our design fee. As detailed in Exhibit B, a Performance Modeling fee is separated from the Design Support fee for the project. The Performance Modeling Fee covers the development, maintenance, and continued R&D associated with ESCO's proprietary, FAA-validated computer model (including costs associated with obtaining and using manufacturer's proprietary aircraft data), which allows us to predict aircraft performances under varying scenarios. We look forward to working with you on the proposed effort. If you have any questions, or need any additional information, please do not hesitate to contact me. Respectfully yours, David Heald, C.M. Regional Director- EMAS Tel: 1.856.241.8620, Extension 451 Email david heald odiacaerosacecom c.c John Bosco,Melissa Flatley,Susan Lopez ENGINEERED ARRESTING SYSTEMS CORPORATION 2239 High Hill Road,Logan Township,NI 08085—USA,Tel. +856 2418620—Fax +856 241 8621—wwwaodiaceemspace com ENGINEERED ARRESTING ZODIAC SYSTEMS CORPORATION AEROSPACE 13 AEROSAFETY&TECHNOLOGY _....,__ Emergency Arresting Systems EXHIBIT A Project Description: Design of Engineered Material Arresting System(s)for Key West International Airport Runway Safety Area(s)—Runway 27 Departure End Desion Services: The following work tasks will be accomplished by ESCO ENGINEERING &SERVICES, PC (the CONSULTANT)in support of the EMAS installation design described in the project description. All work of the CONSULTANT will be done as a subordinate of JACOBS (the ENGINEER),who will be responsible for overall project design and for supervision of the CONSULTANT.All work of the CONSULTANT will be performed by regular,full-time employees of ESCO, who perform services solely for ESCO or its affiliates. The CONSULTANT will provide Professional Engineering Signature/Certification of all pertinent EMAS documents and drawings generated by the CONSULTANT, including design reports, project drawings, statements of work, and/or specifications as applicable. Professional Engineering Certification will be for the State of Pennsylvania. I-B Arrestor Bed Design The CONSULTANT will: 1.1 Attend meetings and conferences as may be necessary to obtain and supply information and coordination and/or resolve any design matters or questions. 1.2 Work with the ENGINEER and the Airport Authority to define the critical aircraft for the EMAS based on data provided by Airport Authority and/or developed from other sources. 1.3 Conduct performance modeling to evaluate the arrestor bed configuration for the Project.This will be accomplished through use of ESCO's proprietary computer model. Design will be in accordance with FAA Advisory Circular AC 150/5220-22a, Engineered Materials Arresting System(EMAS). 1.4 Provide detailed product installation requirements and guidance to support the ENGINEER in preparation of detailed construction drawings(drawings to be prepared by the ENGINEER). Information will include longitudinal and side slope requirements for EMAS support pavement, and details of debris deflector, concrete foundation for debris deflector, requirements for pavement ramping, arrestor bed siting, block layout, and block profile. 1.5 Review detailed construction drawings and provides comments and recommendations to ensure EMAS product requirements have been met. ENGINEERED ARRESTING ZODIAC SYSTEMS CORPORATION AEROSPACE 13 AEROSAFETY&TECHNOLOGY ..... ....... .... .. ... .. ....... _. _. E LOGY Emergency Arresting Systems 1.6 Provide results of computer modeling. Aircraft runway exit speed performance of selected aircraft will be provided by CONSULTANT to the ENGINEER without restriction and included in an EMAS Design Report. Due to the proprietary nature of ESCO's computer model and related product design methods, production process and product testing method, proprietary design information and computer model calculations will remain the exclusive proprietary property of ESCO and be retained by ESCO and not disclosed to the ENGINEER. 1.7 Provide a preliminary performance modeling design report as set forth in Item 1.2. Report will be finalized when all preliminary engineering drawings are made available to CONSULTANT. TERMS AND CONDITIONS: 1. Payment Terms are: Net 30 Days 2. Services performed by the Parties will be conducted in a manner consistent with that level of care and skill ordinarily exercised by other members of the engineering profession currently practicing under similar conditions subject to the time limits and financial and physical constraints applicable to the services. 3. No Warranty, expressed or implied, is made. ENGINEERED ARRESTING ZODIAC SYSTEMS CORPORATION AEROSPACE AEROSA TECHNOLOGY FETY 8 Emergency Arreshng Systems EXHIBIT B - COMPENSATION 1-C Initial and Preliminary EMAS Arrestor Bed Design Performance Modeling Lump Sum Fee $ 65,000 Preliminary Design Support Lump Sum Fee 30,000 Subtotal Initial and Preliminary Design $ 95,000 Submittal of Preliminary Design Report will complete this Phase 2-C Final EMAS Arrestor Bed Design Lump Sum Fee $$ 201000 Submittal of Preliminary Design Report will complete this Phase TOTAL FOR ESCO SERVICES $ 115,000 Fees stated are exclusive of sales, use or any similar or equivalent local taxes. This proposal is Firm-Fixed Price and valid for 90 days from the date of the offer. ff: it e rra SOUTH rr ter., August 9,2013 Jacobs 3300 PGA Boulevard, Suite 9780 Palm Beach Gardens,Florida 33410 Attention: Mr, Ryan A.Forney,P.E. Senior Project Manager Re: Proposal for Geotechnical Services Key West International Airport—Runway 27 EMAS Monroe County,Florida TSF Proposal No.: 1308-330 Dear Ryan: As requested, Tierra South Florida, Inc. (TSF) is pleased to submit this revised proposal for the above-referenced project. The proposal is based on information provided by Jacobs. PROPOSED SCOPE OF WORK As requested, we will perform a total of six(6)BHP tests in two test holes per FDOT method as described in FDOT "Drainage Handbook Exfiltration Systems", three (3) Standard Penetration Test (SPT) borings to a depth of 10 feet, two (2) pavement cores, and two (2) laboratory CBR tests (ASTM D1883). BHP tests will be performed at depths of 10 feet, 15 feet, and 20 feet in each test hole(i.e. three BHP tests in each test hole). All boring and test locations will be located in the field by Jacobs. Prior to drilling at the project site, TSF will notify the local utility companies and request that underground utilities be marked. Our experience,however, is that the utility companies will not mark privately owned utilities. We have included Ground Penetrating Radar (GPR) in our estimate to clear utilities at the boring locations. It is important to note that while the use of GPR will minimize the potential of striking utilities, it is not a 100% accurate. Therefore, private utilities will be the owner's/Airport's responsibility.We believe that significant coordination will likely be required to perform the field operations. As we understand, the all work will be conducted at night time. It is our understanding that Jacobs or the Department of Aviation will provide an escort to the test locations. Upon completion of the field exploration, laboratory testing will be performed on selected samples. A report will be issued that contains the exploration and laboratory data. 2765 VISTA PARKWAY.sm rL 10 • WUSI°PALM BEACH,rLoRti)A 33411 (561)687-8539. FAX f560 687.8S70 State of Florida Professional Engineers I tense#28073 Jacobs TSF Proposal: 1308-330 Page 2 ESTIMATED FEES It is proposed that the fee for the performance of the services outlined above is determined on a unit price basis in accordance with the attached Fee Schedule and that the work be performed pursuant to TSF's General Conditions enclosed herewith and incorporated into this proposal. On the basis of the proposed quantities, it is estimated that the total fee will be approximately $13,847.50. Our estimate covers the work needed to present the results. Not included are reviews of drawings, preparation of construction specifications, special conferences and any other work requested after submittal of our report. SCHEDULE AND AUTHORIZATION TSF will proceed with the work after receipt of a signed copy of this proposal. With our present schedule, we can commence work within several days of project approval (weather permitting) and fieldwork is expected take about 3 to 4 days to complete. The results can be submitted in about two weeks after completion of the field work. We at TSF appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you should have any questions concerning our proposal, please contact our office. Respectfully submitted, TI7sident SO` H FLORIDA,INC Ranasamy,P.E. Pr Attachments: 1. TSF General Conditions 2. Fee Estimate AUTHORIZED BY: INVOICE TO: Name: Firm: Title: Name: Date: Address: