10th Change Order 07/26/2022 MONROE CouNTY/DEPARTMENT OF AiRpom CONTRACT CHANGE ORDER PROJECT TITLE: Marathon International Airport CHANGE ORDER NO: 10 Terminal Re-Roof Project INITIATION DATE:July 6, 2022 TO CONTRACTOR: CONTRACT DATE: March 17, 2021 The Contract is changed as follows: The original JContract gMM) (Guaranteed Maximum Price)....... ....... .......... $ 1,888,375.00 Net change by previously authorized Change Orders.............. ............ .................. $ 0.00 The J22n!M2 gMj (Guaranteed Maximum Price) prior tothis Change order was......... $ 1,888,375.00 The(Contract Sum)(Guaranteed Maximum Price)will be(jncreasedl(decreased) (unchanged) by this Change Order......3 The new(Contract Sum)-(Guaranteed Maximum Price) including this Change Order is....... $ 1,888e375.00 The Contract Time will be Jincreasedl(decreased)igaghangpAl by................... ........ 0 days The date of Substantial Completion as oft date ofthis Change Order is,..... .......__A&WILt 5s® 2022 Detailed description of change order and justification: This change order Is for fabricating and Installing approximately 340 feet of custom 4"gutter and six (6)custom downspouts along the front of Roof Area#1 In the amount of$22,855.13. Both Marino Construction and the Airport have come to a mutual agreement that the work to be completed by Atlantic Roofing will be a 60140 split in regards to the total($22,855.13)with Marino Construction being responsible for 40%($9,142.06)of the cost and the Marathon Airport being responsible for 60%($13,713.08)of the cost. This change Order is 0.010/6 of the original contract price. Not valid until slaned by Owner,Architect(if anoll I cable). and Contractor ARCHITECT: Date CONTRACTOR: Marino Construction Group, Inc. ,. wM Dahl DIRECTOR OF AIRPORTS July 20,2022 .µ Date 07/26/2022 MONROE COUNTY: ;Gst/CouWnf;Tdi�inistrator Date NROE C(X, ATMnNEY PANEI FORM X 1,71 *19"AR oste_____Za1LZ_2 I Change Order Attachment per Monroe County Code Section! 2-58(b) • Change Order was not included in the original contract sbecifications. Yes ( X) No If Yes, explanation: 'his change order is for fabricating and installing approximately 340 feet of custom 4" gutter and six (6)custom downspouts along the front of Roof Area - Change Order was included in the original specifications, Yes No ( X If Yes, explanation of increase in price: - Change Orderexceeds$50,000 or 5%of contract price whichever is greater).Yes No If Yes, explanation as to why it is not subject for a calling for bids: W Project architect approves the change order. Yes(X ) No If no,explanation of why: - Change Order is correcting an error or omission in design document. Yes No X Should a claim under the applicable professional liability policy be made? Yes No ( X Explain: E IIIIIIIIIIIIIIII %//// /%///////////////; ///%/////////////liiiiiiiiiiiiiii,,Nllillillilill,O%/%//////// C O N S T R U C T I O N G R O U P Confingency Use Direcfiue(CUD) OWNER: PROJECT: Date:6/6/22 Monroe Board of County Comissioners Marathon International Airport T d`.'lw 7 , 22 1100 Simonton Street Terminal Reroof CUD Number:29 Key West,EL 33040 9400 Overseas Highway Marathon,EL 33050 This Contingency Use Directive is for: Fabricate and install approximately 340 feet of custom 4"gutter and six(6)custom downspouts along the front of Roof Area#L All gutter straps shall be fabricated in aluminum and installed every 30".The sealant to be used will be Bostik 915. Both Marino Construction and the Airport have come to a mutual agreement that the work to be completed by Atlantic Roofing will be a 60/40 split with Marino Construction being responsible for 40%of the cost and the Marathon Airport being responsible for 60%of the cost. Is additional time needed to perform scope changes? YES X�NO Time Extension 0 days Changes to Contract Sum: Subtotal: $ 19,995.00 General Liability: $ 199.95 Subtotal: $ 20,194.95 GC Fee: $ 2,322.42 Subtotal: $ 22,517.37 Contractor's Bond $ 337.76 General Conditions: $ - Total Proposed Amount: $ 22,855.13 Reason for Changes: ❑Changes in scope given by architect or owner for aesthetic and/or design reasons �X Changes resulting from events or circurnstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com CHANGE ORDER REQUEST 5/26/2022 CHANGE ORDER#3 Marino Construction 702S Shrimp Road Ste 2E Key West FL 33040 PROJECT: MARATHON AIRPORT ReRoof Project--9400 OVERSEAS HIGHWAY-MARATHON FL SCOPE OF WORK CHANGE : Fabricate and install approximately 340'of custom 4" gutter and six(6)custom downspouts along the front of Roof Area#1. All gutter straps shall be fabricated in aluminum and installed every 30". The sealant to be used will be Bostik 915. Total request for Change Order This Request $19,995.00 A P P R0VALS: CHANGE SUBMITTED BY: JONATHAN GONZALEZ APPROVED BY: 5/26/2022 SUB-CONTRACTOR: DATE: GENERAL CONTRACTOR: DATE: