10th Change Order 07/26/2022 MONROE CouNTY/DEPARTMENT OF AiRpom
CONTRACT CHANGE ORDER
PROJECT TITLE: Marathon International Airport CHANGE ORDER NO: 10
Terminal Re-Roof Project
INITIATION DATE:July 6, 2022
TO CONTRACTOR: CONTRACT DATE: March 17, 2021
The Contract is changed as follows:
The original JContract gMM) (Guaranteed Maximum Price)....... ....... .......... $ 1,888,375.00
Net change by previously authorized Change Orders.............. ............ .................. $ 0.00
The J22n!M2 gMj (Guaranteed Maximum Price) prior tothis Change order was......... $ 1,888,375.00
The(Contract Sum)(Guaranteed Maximum Price)will be(jncreasedl(decreased)
(unchanged) by this Change Order......3
The new(Contract Sum)-(Guaranteed Maximum Price) including this Change Order is....... $ 1,888e375.00
The Contract Time will be Jincreasedl(decreased)igaghangpAl by................... ........ 0 days
The date of Substantial Completion as oft date ofthis Change Order is,..... .......__A&WILt 5s® 2022
Detailed description of change order and justification:
This change order Is for fabricating and Installing approximately 340 feet of custom 4"gutter and
six (6)custom downspouts along the front of Roof Area#1 In the amount of$22,855.13.
Both Marino Construction and the Airport have come to a mutual agreement that the work to be
completed by Atlantic Roofing will be a 60140 split in regards to the total($22,855.13)with Marino
Construction being responsible for 40%($9,142.06)of the cost and the Marathon Airport being
responsible for 60%($13,713.08)of the cost.
This change Order is 0.010/6 of the original contract price.
Not valid until slaned by Owner,Architect(if anoll I cable). and Contractor
ARCHITECT:
Date
CONTRACTOR: Marino Construction Group, Inc. ,. wM
Dahl
DIRECTOR OF AIRPORTS July 20,2022
.µ
Date
07/26/2022
MONROE COUNTY:
;Gst/CouWnf;Tdi�inistrator Date
NROE C(X, ATMnNEY
PANEI FORM
X 1,71
*19"AR
oste_____Za1LZ_2
I
Change Order Attachment per Monroe County Code Section! 2-58(b)
• Change Order was not included in the original contract sbecifications. Yes ( X) No
If Yes, explanation:
'his change order is for fabricating and installing approximately 340 feet of custom 4" gutter and
six (6)custom downspouts along the front of Roof Area
- Change Order was included in the original specifications, Yes No ( X
If Yes, explanation of increase in price:
- Change Orderexceeds$50,000 or 5%of contract price whichever is greater).Yes No
If Yes, explanation as to why it is not subject for a calling for bids:
W Project architect approves the change order. Yes(X ) No
If no,explanation of why:
- Change Order is correcting an error or omission in design document. Yes No X
Should a claim under the applicable professional liability policy be made? Yes No ( X
Explain:
E
IIIIIIIIIIIIIIII %//// /%///////////////; ///%/////////////liiiiiiiiiiiiiii,,Nllillillilill,O%/%////////
C O N S T R U C T I O N G R O U P
Confingency Use Direcfiue(CUD)
OWNER: PROJECT: Date:6/6/22
Monroe Board of County Comissioners Marathon International Airport T d`.'lw 7 , 22
1100 Simonton Street Terminal Reroof CUD Number:29
Key West,EL 33040 9400 Overseas Highway
Marathon,EL 33050
This Contingency Use Directive is for:
Fabricate and install approximately 340 feet of custom 4"gutter and six(6)custom downspouts along the front of Roof Area#L All gutter straps
shall be fabricated in aluminum and installed every 30".The sealant to be used will be Bostik 915.
Both Marino Construction and the Airport have come to a mutual agreement that the work to be completed by Atlantic Roofing will be a 60/40 split
with Marino Construction being responsible for 40%of the cost and the Marathon Airport being responsible for 60%of the cost.
Is additional time needed to perform scope changes? YES X�NO Time Extension 0 days
Changes to Contract Sum:
Subtotal: $ 19,995.00
General Liability: $ 199.95
Subtotal: $ 20,194.95
GC Fee: $ 2,322.42
Subtotal: $ 22,517.37
Contractor's Bond $ 337.76
General Conditions: $ -
Total Proposed Amount: $ 22,855.13
Reason for Changes:
❑Changes in scope given by architect or owner for aesthetic and/or design reasons
�X Changes resulting from events or circurnstances:defective design,owner caused delays,differing site conditions
❑ Approved by: Date:
❑ Declined by: Date:
Comments:
CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com
CHANGE ORDER REQUEST
5/26/2022 CHANGE ORDER#3
Marino Construction
702S Shrimp Road Ste 2E
Key West FL 33040
PROJECT: MARATHON AIRPORT ReRoof Project--9400 OVERSEAS HIGHWAY-MARATHON FL
SCOPE OF WORK CHANGE :
Fabricate and install approximately 340'of custom 4" gutter and six(6)custom downspouts along the front of Roof Area#1. All gutter
straps shall be fabricated in aluminum and installed every 30". The sealant to be used will be Bostik 915.
Total request for Change Order This Request $19,995.00
A P P R0VALS:
CHANGE SUBMITTED BY: JONATHAN GONZALEZ
APPROVED BY:
5/26/2022
SUB-CONTRACTOR: DATE:
GENERAL CONTRACTOR: DATE: