Item G06 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: September 17, 2013 Division: _Growth Management Bulk Item: Yes x No _ Department: Planning and Env. Resources Staff Contact Person/Phone #: Trish Smith 289-2547 AGENDA ITEM WORDING: Approval of a task assignment in the amount of$79,659.30 for URS Corporation Southern to conduct a Capacity Improvement Feasibility Analysis to evaluate potential improvements for Level of Service (LOS) on US 1. ITEM BACKGROUND: In December 2012, the BOCC approved the 2012 US Arterial Travel Time and Delay Study and directed staff to coordinate with FDOT to address marginal LOS in conjunction with FDOT work program projects. At the same meeting, the BOCC authorized the Mayor to send a letter to FDOT informing the agency about proposed changes to local regulations and requesting assistance to improve LOS conditions on US 1 (Attachment A) . The 2013 TTDS annual report was completed in August 2013. Excerpts from the 2012 and 2013 TTDS reports are included in this agenda item (Attachment B). This task assignment (Attachment C) will provide the county with a Feasibility Study Report that will identify specific locations on US 1 where capacity improvements could be made to sustain traffic growth over a 20 year horizon. The scope was developed in collaboration with FDOT. The report will document the feasibility of implementing improvements, the cost of improvements, and concept sketches of proposed improvements. Following completion of the study and approval by the BOCC, it will be forwarded to FDOT with a request to incorporate improvements into the FDOT work program. This task will be completed under URS's BOCC-approved Transportation Planning Services contract and is funded at 87.5% ($69,699.26) by the FDOT through JPA AQN-53. A 12.5% ($9.957.41) county match is required. PREVIOUS RELEVANT BOCC ACTION: February 2013 —Approval of a task assignment for URS Southern Corporation to complete the 2013 TTDS. December 2012—Presentation and direction from the BOCC regarding the 2012 TTDS. CONTRACT/AGREEMENT CHANGES: None STAFF RECOMMENDATIONS: Approval TOTAL COST: $79,659.30 INDIRECT COST: BUDGETED: Yes No DIFFERENTIAL OF LOCAL PREFERENCE: COST TO COUNTY: $9.957.41 SOURCE OF FUNDS: 50519 GW1201 REVENUE PRODUCING: Yes No x AMOUNT PER MONTH Year APPROVED BY: County Atty x OMB/Purchasing x Risk Management x DOCUMENTATION: Included x Not Required DISPOSITION: AGENDA ITEM# MONROE COUNTY BOARD OF COUNTY COMMISSIONERS CONTRACT SUMMARY on act7with: URS Corp Southern Contract#_ URS Continuing Contra Effective Date: 3/16/11 Expiration Date: 3/15/15 Contract Purpose/Description: Approval of a Task Order in the amount of$79,659.30-for URS C'22oration Southem �al,)_ia to co d a a a e t F asib to evaluate otenti IM row-manto 'is aist t t n uct C cit rove n i' vel f Se i e (L n US is k b com Ugh for mipleted thro a continui Le 0 c OS)o 1 t OT 11 ct Is Zn ed th rou 53 se ice Contra and d at 87.5 0 ($6 699 26 b e throu ;h JPA AQN- Contract Manager: Trish Smith 304-0412 Plann�Li�#1 1 (Name) (Ext.) (Department/Stop .................. CONTRACT COSTS To Dollar Value of Contract: $ 79,659.30 Current Year Portion: $ 79,659.30 Budgeted? Yes E No 0 Account Codes: 125-50519- 30490- Grant: $ JPA AQN-53 9WI201-L30310- County Match: $ 9,957.41 ADDITIONAL COSTS Estimated Ongoing Costs: $2/yr For: n/a. (Not included in dollar value above) salaries,etc.) fifff, CONTRACT REVIEW Changes Date Out Date In Needed Reviewer Division Director Yes[] No[:] 1: Risk Management Yes[]NoE?/ O.M.B./Purchasing a 'Lai LS Yes[] No f County Attorney YesEl NoB' 0" )"-n L, Comments: .......... OMB For Revised 2/27/01 MCP#2 Aiu4com, County of Monroe Mayor Pro Tem Heather Carruthers,District 3 Th Danny L.Kolhagr,District I e Florida Keys David Rice,District 4 Sylvia J.Murphy,Districl 5 December 12,2012 Mr.Gus Pe go,PE District Secretary FDOT District 6 1000 NW I I Vh Avenue Miarrti,FL 33172 RE: 2012 US I Arterial Travel Time and Delay Study Florida Keys Dear Mr.Pe go: Please find attached a copy of the 2012 US I Arterial Travel Time and Delay Study (TTDS). This study is performed annually by Monroe County through a Joint Participation Agreement with FDOT to monitor the Level of Service(LOS) on US 1. Over the past several months, Monroe County,FDOT, and DEO staff, as well as staff from Marathon, Islamorada. and Key West, have been evaluating the US I segments that are to LOS"C"or thoset t have dropped LOS enough to be considered a"concem". In an efibit to address LOS before it becomes a big issue for the county or its municipalities, our BOCC discussed actions that can be taken to plan for improvements to problem segments. Of course, we need to coordinate the actions between multi-agencies. The first action Monroe County will to will be to procen a Land Development Code amendment through the public hearing process. The proposed amendment's intent is to eliminate the provision in Section 114-2 of the code which states that development is not permitted on segments where travel speed would bed by more than 5% to LOS C. The 2012 study shows that are no segments in unincorpomted Monroe County faffing below LOS C. However, three (3) segments of US I (Segments 3, 19, and 20 on the following table) have only a small amount of reserve volume left, Two(2)segments in the Village of Islamorada fall below LOS C.- Se&Me 3 -Rockland Drive to Boca Chica Road(MM 9- 10.5) C 373 4-Boca Chi ca Rd to Harris Channel Bridge(MM 10.5 -16.5) B 2,881 5 -Harris Channel Bridge to Bow Channel Bridge(MM 16.5-20.5) C 1,938 10-N Pine Channel Bridge to Long Beach Dr(MM 29.5-33) C 1,182 12-7 it Bridge(MM 40-47) C 3,378 14-Coco Plum Dr.to Toms Harbor Ch Bridge MM 54.0-MM 60.5) C 2,756 15-To Harbor Ch Bridge to Long Key Bridge(MM 60.5-63) C 1,118 17-Channel 2 Bridge to Lignum.Vitae Bridge(MM 73-77.5) D 0 18-Lignurn Vite Br to Tea Table Relief Bridge(MM 77.5-MM 79.5) E 0 19-Tea Table Relief Br to Whale Harbor Bridge(MM 79.5-MM 84) C 136- 20-Whale Harbor Bridge to Snake Crzek Bridge(MM 84-MM 86) C 252 The curr-ent Land Development Regulation(LDR)(Section 114-2(b)(5)b. states"the county shall not approve applications for development in areas of the county that are served by inadequate facilities, except the county may approve development that will have no reduction in the capacity of thefacility or where the developer agrees to increase the level ofservice of the facility to the adopted level ofservive 1 standard. The county will propose amending this LDR to define what level of development may proceed without a corresponding traffic improvement on a per segment basis. The county will also be examining improvements we can make an county roads that could help improve LOS on US 1. The county requests that MT work with county staff to Rmd additional actions that can improve LOS on US 1, such as: 1. The FDOT enlumcing signal hardware, software,and timing to improve traffic flow on US 1. 2. . The FDOT addressing marginal LOS in FDOT 5-year Work Program pmjects. I. The FDOT discouraging additional sigrWized intersections along US 1. Please let our staff know when your staff can meet with us to discuss these requested actions, especially#2. We look forward to continuing our longstanding relationship with FDOT regarding transportation issues. Si dy, yY -Itge Neugl Mayor c: Christine Hurley,Growth Management Division Director(letter only) w �,o y� 2013 ulosim 1 ARTERIAL TRAVEL TIME AND DELAY STUDY August 2013 i Prepared for: MonroeI i UR$Project Number 12639726.00000 Prepared b : i CORPORATION 3343 W. Commercial I . - SuitsLauderdale, I i 1. EXIECu"riVE S111LININIAR"'I( This report contains results and findings of the 2013 Travel Time and Delay Study. The study's primary objective was to monitor the Level of Service (LOS) on U.S. I for concurrency management purposes pursuant to Chapter 163, Florida Statutes and Monroe County Land Development Regulations. The methodology adopted for this study was established by the U.S. 1 Level of Service Task Force in 1993 and amended in 1997. The methodology establishes a procedure for using travel speeds as a means of assessing the level of service and reserve capacity of U.S. 1. of Monroe County and the FDOT have adopted a LOS C Standard for U.S. 1. Further,45 mph has been adopted as the LOS C Standard for the entire length of U.S. I regardless of the posted speed limits. Under the adopted growth management process if the overall LOS for U.S. I Its below the LOS C Standard, then no additional land development will be allowed in the Florida Keys. The 2013 results are presented in the following table: Alli,IE II"UkGE 'TR,uNIii,"Iitf'.:.L SIPEEDSA11,11D III E.:."1110 S ------------------------ --------------------- Begiffnning En;ding --- ---------------- Segmerd Beginning Control Poini M LOS LOS Median Median Ending Control Polni mile Mile "a M r r Mor 2012 2013 Speed 2012 Speed 2013 arker Marker 1 Cow Key Bridge(N) Key Haven Boulevard 4.0 5.0 B 8 32.0 33.1 2 Key Haven Boulevard Rockland Drive 5.0 9.0 A A 57.0 57.1 3 Rockland Drive Boca Chica Road 9.0 10.5 C B 45-3 46.5 4 Boca Chi ce Road Herris Channel Bridge(N) 10.5 16.5 B C 52A 51.2 5 Harris Channel Bridge(N) Bow Channel Bridge(N) 16.5 20.5 C A 4o.4 47_.4 4 48 6 Bow Channel Bridge(N) Spanish Main Drive 210 a A 45. .0 7 Spanish in Drive East Shore Drive 23,0 25.0 B 8 44.7 49 8 East Shore Drive To rod Bridge(S) 25.0 21.5 B B 45.8 45.8 9 Torch-Ramod Bridge(S) N.Pine Channel Bridge(N) 27,5 29.5 A A 47.4 47.9 10 N.Pine Channel Bridge(N) Long Bead Drive 29.5 33.0 C B 39.2 40.1 40-0 _B -- �3_ 11 Long BeDrive 7-Mile Bridge(S) 33.0 B 53.s .7 12 7-Mile Bridge(S) 7- "le Bridge(N) 40,0 410 C 53.51 54.9 13' 7-Mile Bridge(N) Cocoa Plum Drive 47,0 SCO A A 36.7 35A 14 Come Plum Drive Toms Hator Ch Bridge(S) 54.0 60.5 C C 51-0 --5-1.-01 15 Tams Ha; Ch Bridge(S) ;;,,,,,,,,Legg Key PO4' 16- Long Key Bridge(S) Channel#2 Bridge(N) 63.0 73.0 B C 52.6 51.2 ,aws, ARM - aiiLgnomVi(aeBru 7,/g//:777777, /M, 'Ti bl' ......... CW,B' e, 20.. Whole Herbor Bridge(S) Snake Crook Bridge(N) 84.0 86.0 C C 41.3 41.2 21 Snake Croak Bridge(N) Ocean Boulevard 86.0 91.5 B B 41,9 41.3 ............. 22 Ocean Boulevard Atlantic Boulevard 91,5 99.5 A A 48.7 46-9 23 Atlantic Boulevard C-905 99.5 106.0 A A 46.9 43.9 24 C-905 County Line iin _106-0 112.6 A 8 52.2 52.9 Overall U 112.6 C C 47.0 45.9 City of Marathon segment@ Within area of concem Village of Islamorada 5agman NO Rssorv9 Caoicity 2013-U.S. I Arterial Travel Time and Delay Study Monroe County um Page I • The overall travel speed on U.S. I for 2013 is 46.9 mph; • Compared to 2012, the median segment speeds in thirteen (13) of the 24 segments increased ranging between 0.1 mph to 2.6 mph; • Compared to 2012, the median segment speeds in, nine (9) of the 24 segments decreased, ranging from -0.1 mph to -5.2 mph; majority of the speed reductions were in the middle and upper keys. • The largest difference in speed (-5.2 mph) was recorded on Segment# 15 (Duck— MM 60.6 to MM 63.0), which resulted in the LOS change from a V to a 1131. A temporary signal at the entrance to Hawks Kay to manage the Duck Key Bridge rehabilitation is the primary reason for this speed reduction. The rehabilitation project (and the temporary signal) is anticipated to be completed in the fall of 2013. • The second largest difference in speed (-3.0 mph)was recorded on Segment#23 (Key Largo—MM 99.6 to MM 106.0); however,the LOS remained the same at'A'. Segments with reserve speeds of less than orequal to 3 mph should be given particular attention when approving development applications. The Saddlebunch Keys (MM 10.5 to MM 16.5) in the lower keys, and a 32 mile segment of middle to upper keys (7 segments) starting from Grassy Key (MM 54.0) to Windley Key (MM 86.0) are within the 'area of concern'; 4 of the 6 segments has no reserve volumes; the Duck Key segment could be discarded from this list due to the temporary traffic signal. Road widening is a typical capacity Improvement remedy exercised by most municipalities. In Monroe County, however road widening, specifically to U.S. I is restricted by the adopted comprehensive In policies to preserve and protect the fragile ecological conditions. There are other less intrusive remedies could be explored and evaluated to improve the traffic flow and the capacity of U.S. 1,they include: - Identifying strategic locations to add turn lanes. - Conducting speed studies on selected segment of U.S. I to confirm the posted speed limits are correct, if necessary. - Consolidating driveways/access points to reducelminimize friction. - Enhancing signal timing at existing signalized intersections along U.S. I to Improve the traffic flow. allowing new signalized intersections along U.S. I if there is alternative safer access exist to accommodate the turning movements. - Improving the conditions to the county maintained local streets to minimize U.S. I being used as the local street. U.S. I is a state maintained roadway. Therefore, any modifications/improvements to U.S. I have to be developed in collaboration with the Florida Department of Transportation. 2013—U.S. I Arterial Travel Time and Delay Study Monroe County ....................................................... Page 2 77, iYi i/"oi ,, i ip, i% riviaiioii ,i i /7Tr .r ri iiiiiiiiiiiiaiaiionoiiiiiimi /fr iiiii/r,,//l o i "✓oiii irk# AS— 1 i i o� 16 0 j f h I 0 wu CL ca a 1 {Q r • ■ • u K ■ ■ < r r ■ < Y O u a . o et ■ K K ■ u h r ■ u r n r�r ■ u ■ u u n r o r et u r i s u J s i y v yy yy In m �� 1 9 � 1 --------------------- r ti 1R6 gg € E € € SE € Tit, r e IEF a � � � � • a ■ � ■ � Tr a R A r r �ID 1 l�JJ,1 JJ, // / (rllllll •, !/ i ii //////� p l'. 4 't'P.Y�"54:4ddw Y•.r4dU67�:1�9\'A uaat����C EC/tir./Se UwSw I ARTERIAL TRAVEL TIME AND DELAY STUDY MONROE COUNTY FLORIDA August 2012 Prepared for: Monroe County Planning Department fl� Prepared 2012 tam URS CORPORATION 3 W.Commercial Blvd.-Sufte 100, Fort Lauderdale,Florida 33309 1. EXECUTIVE SUMMARY This report contains results and findings oft 2012 Travel Time and Delay Study. The study's primary objective was to monitor the Level of Service (LOS) on U.S. I for concurrency management purposes pursuant to Chapter 163, Florida Statutes and Section 114 of the Monroe County Land Development Regulations. The methodology adopted for this study was established by the U.S. i Level of Service Task Force In 1993 and amended In 1997. The methodology establishes a procedure for using travel speeds as a means of assessI ng the level of service and reserve capacity of U.S. 1. Both Monroe County and the FOOT have adopted a LOS C Standard for U.S.1. Further,45 mph has been adopted as the LOS C Standard for the entire length of U.S. I regardless of the posted speed limits. Under the adopted growth management process If the overall LOS for U.S. 1 falls below the LOS C Standard,then no additional land development will be aII owed In the Florida Keys. The overall travel speed on U.S. I for 2012 Is 47.0 mph. The results Indicate the median travel speeds and LOS have deteriorated In most of the segments with respect to last year. Compared to 2011, the median segment speeds Increased In six (6) of the 24 segments rangI ng between 0.3 mph to OA7 mph; whereas, eighteen (18) segments experienced a decrease In median speeds,ranging from 0.05 mph to 4.0 mph. The biggest difference In speed change was observed on Segment# 18 (Tea Table- MM 77.5- MM 79.5), which resulted In the LOS change from a " to an 'E'. This segment had been at LOS D for the past five years,and reached a critical threshold this year,which may result In a localized moratorium according to county comprehensive plan. A similar trend could be observed at the adjacent Segment#17(L Matecumbe MM 73.0-MM 77.5),where the LOS remained at D for the past throe consecutive years. Segments with reserve speeds of less than or equal to 3 mph should be given particular attentIon when approving development applications. The most of lower keys - from Big Cappitt(MM 9-0)to Sugarlof(MM 20.5)and the Big in Key segment(MM 29.5-MM 33.0) Is within the 'area of concern'. Similarly, most of middle keys from Grassy (MM 54.0) to Duck (MM 63.0) Is within the 'area of concern'. Approximately 13 it segment of upper keys from L. Matecumbe(MM 73.0)to Windley(MM 84.0) continue to stay within the'area of concern'. The most critical segment of all Is the Tea Table(MM 79.5-MM 84.0) that has no reserve volumes left to allow any new development that could Impact this segment Road widening Is a typical capacity Improvement remedy exercised by most municipalities. In Monroe County, however road widening, specifically along U.S. 1 Is restricted by the adopted comprehence plan policies to preserve and protect the fragile ecological conditions. There are other less Intrusive remedies could be explored and evaluated to improve the traffic flow and the capacity of U.S.1,they Include: - Identifying strategic locations to add turn lanes. - Conducting speed studies on selected segment of U.S. I to confirm the posted speed limits,and correct, If necessary. - Consolidating driveways/access points to reduceiminimize friction. - Enhancing signal timing at existing signalized intersections along U.S. I to Improve the traffic flow. allowing now signalized intersections along U.S. I If there is alternative safer access to accommodate the turning movements exist. - Improving the conditions along the county maintained local streets to minimize U.S. I In used as the local street. U.S. 1 Is a state maintained roadway.Therefore, any modifications/Improvements to U.S.1 have to be developed Incollaboration with the Florida Department of Transportation. 2012-U.S. I Arterial Travel Thne and Delay Study Monroe County I= Page I Y I�„w ice', ( 1 1 MI LM �wmuva.. ... 91 14 1� In am- am LI r eq r 05 a ti,a m m @ t ;u wpm N!'ua hry m ! ,k 3fll • s a is ...... „d 9 w � „��,.,,,�� �a r✓.m W� ay�M $I i.6 Wd Al r � iWu 44b � ~c� �h m'.a � mt d( ,sum� ial m tl 4 w Sal 14 do br + RAY 0 A n R f i t IK!Iy N W � I h IRS AOMYOWr C SCOPE OF SERVICES FOR MONROE COUNTY- US 1 CAPACITY IMPROVEMENTS FESABILITY STUDY URS Corporation Southern proposes to provide the services identified below for the task entitled "Monroe County-US 1 Capacity Improvements Feasibility Study", pursuant to its Professional Service Agreement with Monroe County for'Transportation Planning', dated March 16, 2011. PURPO In Monroe County, the LOS on individual segments of US 1 is measured by comparing the travel speeds to the weighted average posted speeds. The difference between the LOS C speed and the travel speed is referred to as 'reserve speed'. If the reserve speed is equal to or less than 3 mph, then the area where that particular segment is located is considered 'Area of Concern'. Following the 2013 Travel Time Delay Study (TTDS), 8 of the 24 segments were categorized as within 'Areas of Concern,'-the 8 segments and the respective reserve speeds are listed below: - Saddle Bunch( M 10.5 to 16.5)-2.1 mph - L Matecurnbe(MM 73.0 to 77.5)-(-) 0.6 mph - Grassy(MM 54.0 to MM 60.5)-2.5 mph -Tea Table(MM 77.5 to MM 79.5)- (-) 3.5 mph - Duck(MM 60.5 to MM 63.0- (-) 2.7 mph - U.Matecurnbe(MM 79.5 to MM 84.0)-(-) 1.7 mph - Long Key Br. (MM 6 .0 to MM 7 .0-2.3 mph - Windley(MM 84.0 to MM 86.0)-0.7 mph Of the 8 segments categorized as ''Area of Concern' 3 segments are located within unincorporated Monroe County, 4 segments are within the Village of Islamorada, and 1 segment is within the city limits of Marathon.All 3 segments in the unincorporated areas of the Monroe County have had a historical trend of being categorized as 'Area of Concern' (see Figure 1).The 3 segments identified in the 2013 TTDS and 2 other segments (Big Coppitt and Big Pine Key) that had historically shown a trend of being within the area of concern are included in this study (a total length of 17.5 miles). The CONSULTANT will perform planning and engineering services required to identify appropriate improvements to address the capacity deficiencies and evaluate the feasibility, including the environmental impacts associated with the potential improvements for these 5 segments. These segment limits may be extended to develop segments with rational limits for analysis purposes. The final product of this task will be a Feasibility Sfey earl. The report will identify specific locations of US 1 (within the 5 segments) in unincorporated Monroe County requiring capacity improvements to sustain anticipated future growth (20 year horizon) in traffic. The report will also document the feasibility of implementing the potential improvements, including the environmental impacts and the cost. The potentialI improvements will be presented on concept sketches. It will be the CONSULTANT'S responsibility to utilize the standard engineering judgment, practices and principles possible during the prosecution of the work commissioned under this task. The Congress Centre 7609 Congress Avenue,Sulte 296 Boca Raton,F 133487-1350 rek 661,994.6666 Fm 561.994.6524 °1 UR1,1, EXHIBIT A Scope of Services:US I I Overseas Highway Capacity Improvements Feasibility Study August 14,2013 Page 2 of 5 The CONSULTANT will demonstrate good project management practices while working on this task.These include communication with the COUNTY and others as necessary; management of time and resources, and documentation. The CONSULTANT should make every effort to make use of all past studies and information gathered, and not repeat tasks that have been completed through other studies. The County will provide contract administration, management services,and technical reviews of all work associated with the development of this Feasibility Study and the concept plans.The County will provide job specific information and/or functions as outlined in this agreement. 1. BACKGROUND RESEARCH The CONSULTANT will investigate and compile existing relevant data, studies and roadway plans, including as-built plans related to the 5 study segments. The existing studies include planning,engineering,and environmental resource permits and any ancillary documentation which is readily attainable. 2 _COLLECT NEW DATA Two types of new data will be collected to perform this study: i. Field Data - Field observations and roadway geometric data to perform the engineering analysis, and a cursory desktop review of the potential environmental constraints; such as protected species and regulated habitats within each of the 5 segments. ii. Traffic Data - Directional vehicle speed and volume data will be collected, as a minimum for a period of 24 hrs.for all 5 segments.Additional data will be collected if there are speed limit changes and potential volume changes are anticipated within each segment. 3. PERFORM TRAFFIC OPERATIONAL ANALYSIS The CONSULTANT will develop a methodology to project future LOS anticipated along the 5 study segments. The beginning year for the analysis will be 2013 and the horizon year will be 2023. Because a nontraditional methodology is used to measure the LOS along US 1, the proposed LOS projection methodology will be a collaborative effort between the CONSULTANT, COUNTY, FDOT, and other agencies the COUNTY deem necessary to be part of the process. The Synchro/SimTraffic traffic operational analysis tool will be utilized to perform the analysis. The field observations, geometric data, and traffic data collected in tasks 1 and 2 will be utilized to simulate the existing speeds and to develop speed projections to determine the future LOS. 4. PERFORM TRAFFIC SAFETY ANALYSIS The CONSULTANT will gather most recent 3 years of crash data from FDOT for the 5 study segments of US 1. The crash data will be used to prepare collision diagrams and perform the safety analysis to identify and support potential roadway improvements. 5. IDENTIFY AND DEVELOP POTENTIAL GEOM RIC IMPROVEMENTS The CONSULTANT will identify and evaluate potential geometric improvements to mitigate the operational deficiencies. Potential improvements may include change in speed limits,access management/shared access,roadway widening, including bridge widening,addition of turn lanes, intersection improvements, etc. A meeting will be held with the County staff to review the potential improvements and solicit feed-back necessary to move forward with the selected improvements for the 5 segments. m io° ��iiiil�III EJ VH BIT A Scope of Services:US 1 I Overseas Highway Capacity Improvements Feasibility Study u IViiIIIIIIIUW August 14,2013 Page 3 of 5 6.DEMOP CONCEPT SKETCHES The CONSULTANT will develop concept sketches for the proposed roadway improvements consistent with FDOT Plans Preparation Manual (PPM).The sketches will be at a 1"=100' scale and is not intended to be design plans. When necessary,blow-up of specific improvements will be provided at 1"=20' scale to present' the details. The concept sketches will include approximate right of way and above ground utility information.The below ground utilities will have to be addressed during the design phase. 7. PERFORM ENVIRONMENTAL ANALYSIS OF PRPOSED IMPROVEMENTS The CONSULTANT is very familiar with the habitats, resources and environmental constraints within Monroe County and The Florida Keys through our 12 years of work as the Florida Department of Transportation, District VI Districtwide Environmental Permits Consultant. The CONSULTANT will conduct a cursory desktop analysis to identify potential impacts to regulated resources and habitats within the study areas.The CONSULTANT will document the findings and prepare an impact matrix for submittal to the COUNTY as part of the reporting documentation. In addition, the CONSULTANT will prepare a preliminary list of the anticipated environmental resource permits that will likely be required for the proposed improvements. 8. ATTENQ AND PRESENT THE PLANJ The COUNTY will schedule,invite the appropriate agencies, and conduct a meeting to review the proposed conceptual improvements.The CONSULTANT will provide large scale sketches of the proposed improvements and present the findings at the meeting. 9. DOCUMENTATION The CONSULTANT will document the findings in a report. The report will be submitted to the COUNTY, initially in a DRAFT format to solicit input prior to submitting the FINAL report. The report will also include a probable cost estimation of proposed improvements. The report will identify potential constraints-engineering,environmental,and policy,and potential mitigation measures. Deliverables: Three (3) deliverables are anticipated to accomplish this project. They are: 1. Preliminary identification of potential improvements by location. 2. DRAFT Report. 3. FINAL Report. Each submittal to the COUNTYwill include ten (10) sets of 11"x17" plans and/or8'/z"xl l"written documents for review and circulation. The final submittal will include six signed and sealed reports, along with six copies of calculations report, if any, signed and sealed. Project Schedule: Within seven (7) days after the Notice-To-Proceed, the CONSULTANT will provide a schedule of calendar deadlines.The schedule will be prepared in a format prescribed by the COUNTY.See attached for a tentative project schedule. EXHIBIT A Scope of Services:US 11 Ovqrseas Highway Capacity improvements Fessiblocy Study August14,2013 Page 4 of 5 Meetings and Presentaflons: Three (3) meetings are anticipated during the course of this study: L A meeting to review preliminary improvements and locations identified by the CONSULTANT. 4. A meeting to present and solicit input to the proposed conceptual improvements; and lil. An additional meeting as necessary. Quality Control: The CONSULTANT will be responsible for the professional quality, technical accuracy and coordination of all submittals and other services furnish ed by the CONSULTANT under this task in accordance with the standard of care in the industry and based on the circumstances of the work. The CONSULTANT may rely upon and use in the performance of its services information supplied to it by the County or its consultants or agents without independent verification and CONSULTANT will not be responsible for defects in its services attributable to its reliance upon or use of such information. Any cost opinions or estimates provided by CONSULTANT will be on a basis of experience and judgment, but since CONSULTANT has no control over market conditions or bidding procedures,CONSULTANT cannot and does not warrant that bids,ultimate construction cost,or project economics will not vary from such opinions or estimates. Neither the Agreement nor the services provided hereunder will constitute or provide for, and CONSULTANT shall not be considered to have rendered,any legal or financial opinion(sJ regarding the feasibility of this project or any other project matter. Compensation for Services The Consultant shall be paid a lump-sum amount of$79,659.30for satisfactory performance of work as stated in this scope of services. The staff-hour estimates and the fee are attached. Invoices will be submitted monthly,reflecting the compensation for proportional completion of the task, Acceptance and approval of this Work Order by both parties by signatories below constitute authorization for the Consultant to proceed. ACCEPTED AND APPROVED ACCEPTED AND PROVED Monroe County UR orpo 1 3 them (Signature) (Sig afur ) (Name&Title) (Name L Title) -rTORNE)UNTy A (Date) AS -ro Fonm� _pp F D {Date) U N M. GRIMSL 4SSIS4tAg-t COUNTY ATTORNEY ui EXHIBIT A Scope of Services:US 1/Overseas Highway Capacity Improvements Feasibility Study M August 14,2013 VUrI Page 5 of 6 Pre gry Project ed Notice to Proceed: 27 September 2013 Kick-Off Meeting: 30 September 2013 Preliminary Review Meeting: Week of December 2, 2013 Pre-DRAFT submittal Meeting: Week of January 6, 2014 DRAFT Report Submittal: 10 February 2014 FINAL.Submittal: 10 March 2014 s Monroe County CaPwft IM MM Sr i rrty Study T N.I :: 'I k 1, of c# re 2bUBTUFAL g 422 42' 2a------------- 1. Ike for a 201y, Collect Traffic 5 2 5 40 40 14.243.60 C Environmental Data Reel 2 4 12 12 13,aa2.�r L 62 72 107 412,2aII.E7 TASK-3:P FGRTRAFFIC OPERATIONALANALYSIS jz� Ic .�.. $ 8 87T7- 407a.24 gc Create . i the r"e ' c t _.-.s qt.4 to r�T so 1ye. 00 Calft Is 6 10 Al .rr: 4. Porform n conditions 2 4. 1 txa3, a 3. futuree a 2 a 16 �s2203,20 1z a 10® $21,315.64 2213.20 T ®4:P Pa�FE Y 8 2. I S 223 4.. ._ ..... ....... Li=t== I� aL:;=1=4 W726.35 T —6.IDENTIFY ENTS&PERFORM TRAFFIC OPERATIONAL ANALYSIS 1. Identify Potential Irn f h m reent 3 2 10 4 1 �2r .gg4 2 exa n 1 13 aIn a 4 40 1 11;7Pp.1a f rg c 3 e 1 is 6 4 10 1 1'ao7a . 2 1 0 4 �a.'a .44 TASK®3:DEVELOPCG T SKETCHES 1. ne and Deslori I h 5 5 .u4ae.rsa 2 a 0 1 .10.01 IC®7:PERFORM ENVIRONMENTAL YS 1. Perkmnn Environmental'Analysis oF selected Affem6 10 2C c 1a a a .fa .1a4 T — .�UMENTA-nofti 1. T R® 4 t0 42 8 840 HAWN 2Develop FINAL Re 4 8a 4 3 30 13,7I0. SUBTOTAL 0 24 IO 12 1ai MEETINGS73 'IO,00a„ia 1. /a 12 S 33 1wu 23 SUBTOTAL 0 15 0 12 0 33 �4., �•f TOTAL STAFF HOURS _.......................... °I 33 102 Contract 1 2 1 Hourly I B $1--- -- S1112.63 .59 .34 TOTAL BUDGET7 �® ffi19 �1, ®. d010 dr